Tender Value
₹7.9 L
EMD Value
₹15,840
Closing Date
21 Sept 2026, 6:00 pm
Executive Engineer
Office Of The Executive Engineer REW Samba
Refer as per BOQ
2026_RDPR_324260_1
116 REW Samba of 2026-27, Date 10.09.2026
Open Tender
Civil Works
Percentage
45 days
Banglad
Please refer Tender documents.
3 documents required · 3 mandatory
₹600
Executive Engineer REW samba
₹15,840
11 Sept 2026
11 Sept 2026
22 Sept 2026
11 Sept 2026
21 Sept 2026
11 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as
directed for All kind of soil. | 22 | cum | 479.3 | ₹10,544.6 |
| 2 | Providing and laying in position cement concrete of specified grade including curing butexcluding the cost of centring and shuttering. All work upto plinth level with: 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) | 9.78 | cum | 4,826.5 | ₹47,203.17 |
| 3 | Providing and laying in position specified grade of reinforced cement concrete M20 Grade including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level. | 5.16 | cum | 7,788.4 | ₹40,188.14 |
| 4 | Reinforcement for RCC work incl. straightening, cutting, bending, placing in position and binding all complete indluding all leads, lifts and carriages complete | 465 | KG | 123.2 | ₹57,288 |
| 5 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 16.38 | cum | 5,733.6 | ₹93,916.37 |
| 6 | Centring and shuttering including strutting, propping etc. and removal of form work for:-
a) Foundation, footings, bases of columns. | 70 | sqm | 286.35 | ₹20,044.5 |
| 7 | Providing and fixing mild steel round holding down bolts with nuts and washer plates complete. | 65.47 | kg | 96 | ₹6,285.12 |
| 8 | Structural steel work in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete 10.2.2 Welded | 58.25 | kg | 138.2 | ₹8,050.15 |
| 9 | Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting , hoisting , fixing in position and applying a priming coat of approved steel primer, including welding and
bolted with special shaped washers etc. complete. Hot finished welded type tubes | 1,899.1 | kg | 156.95 | ₹2,98,063.74 |
| 10 | Painting with synthetic enamel paint of approved brand and manufacture to give an even shade. Two or more coats on new work. | 76.85 | sqm | 131.85 | ₹10,132.67 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.94 MB
BOQ_1093558.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .