Loading…
Loading…
Tender Value
₹30.3 L
EMD Value
₹30,260
Closing Date
29 Apr 2026, 6:00 pmClosed
Similar tender results from the same govt authority in the past 3 years.
Dy. Municipal Commissioner ( East Zone) Ahmedabad Municipal Corporation
Construction of New R.C.C road and New interlocking paver block work MP/MLA AND COUN.BUDGET at different society and chali area in Viratnagar ward in East Zone (ARC)
296629
EZ 33/1628
Open
Miscellaneous Works
Ahmedabad
3 documents required · 3 mandatory
₹1,500
Municipal Commissioner, Ahmedabad
₹30,260
14 Apr 2026
14 Apr 2026
14 Apr 2026
29 Apr 2026
14 Apr 2026
2 TOTAL ESTIMATED COST ₹
3 EARNEST MONEY ₹
In DEMAND DRAFT / PAY ORDER FROM
BANK ACCEPTABLE TO THE AMC
4 VALIDITY PERIOD 120 DAYS FROM THE DATE OF
OPENING OF THE TENDER.
5 SECURITY DEPOSIT 5% OF SANCTIONED TENDER AMOUNT
IN FORM OF CASH / DEMAND DRAFT /
BANK GUARANTEE.
6 RETENTION MONEY 2% FROM EACH RUNNING BILL WILL BE
RETAINED AND WILL BE RELEASED
AT THE TIME OF FINAL BILL
7 TIME ALLOWED FOR
COMPLETION OF THE WORK 12 Months
FROM THE DATE OF WRITTEN
ORDER TO COMMENCE WORK
8 TENDER FEE Rs. -- ₹ 1500 TENDER CLASS -- E1
In DEMAND DRAFT / PAY ORDER FROM
BANK ACCEPTABLE TO THE AMC
Contractor's Name :-
Contractor's Address :-
Contractor's Register Number / Renewal Year / class :-
Contractor's Bank, Branch Name :-
Bank Account Number :- Banks MICR Number-
8 DOWN LOAD DATES FOR
TENDER FROM WEB SITE ------ TO --------
9 DATE ON OR BEFORE WHICH
THE TENDER MUST REACH
THE OFFICE 29-Apr-26 6.00 PM
10 OPENING DATE OF THE
TENDER BY THE OFFICE 30-Apr-26 5.00 PM
11 LOCAL COMPETITIVE BIDDING
-- TENDER CLASS -- E1
12 MODE OF SENDING THE IN SEALED COVER BY REGISTERED
TENDER POST OR IN PERSON.
TENDER SENT BY ORDINARY POST
WILL BE REJECTED OUTRIGHT.
CONDITIONAL TENDER WILL BE
REJECTED OUTRIGHT.
13 DESCRIPTION ESSENTIAL TO NAME OF THE WORK.
BE MADE ON SEALED COVER TENDER No.--
DATE OF RECEIVING TENDER BY
14 MODE OF QUOTING RATES IN PERCENTAGE RATE IN FIGURES AS
SCHEDULES OF RATES. WELL AS IN WORDS.
TENDER SHALL BE SUBMITTED IN
DUPLICATE.(EXCEPT E-TEDER)
NAME OF WORK --
Construction of New R.C.C road and New interlocking paver block work
MP/MLA AND COUN.BUDGET at different society and chali area in
Viratnagar ward in East Zone (ARC)
E TENDER NOTICE No. -- 33 TENDER No. --
LOCAL COMPETITIVE BIDDING -- TENDER CLASS -- E1
Time Limit (Months)
Issue Date ------ Last Date of 29-Apr-26 Opening 30-Apr-26
ofT ender --- -------- Receiving of 6.00 PM Date of 5.00 PM
From - To Tender --- Tender-
The Municipal Commissioner of Ahmedabad Municipal Corporation, invites Percentage
rate tender for the above works from the contractors registered with Municipal
Corporation of Ahmedabad in Class E1 or registered with Government of Gujarat
in Class E1 or from contractors registered in similar class with any other
State Government of India who have the financial capability and technical ability to
carry out the work. Also Private pre qualified reputed experience builders can also
apply. Experience in carrying out works of comparable nature is essential.
Filled up tender shall be received by Asst. Manager, East Zone Zonal Office,
Ahmedabad Municipal Corporation, Harubhai Maheta Bhavan, Viratnagar Char Rasta,
Nikol, Ahmedabad - 382415 on or before last date of receiving tender with Tender Fee
and E.M.D.as per information in memorandum above.
AHMEDABAD MUNICIPAL CORPORATION
ENGINEERING DEPARTMENT
SPECIAL GENERAL INSTRUCTIONS TO TENDERERS
NAME OF WORK --
Construction of New R.C.C road and New interlocking paver block work
MP/MLA AND COUN.BUDGET at different society and chali area in
Viratnagar ward in East Zone (ARC)
1 The work is to be completed in all respects within 12 months reckoned
from the date of written order to commence the work.
2 The tender shall be valid for acceptance for a period of 120 days from the date of
opening of tenders.
3 Each tender must be accompanied by a receipt for a deposit as Earnest Money
of ₹ 30260.00 in Pay order, Demand Draft, Bank Guarantee or Cheque from
bank acceptable to the AMC.
4 Tender deposit is accepted as detailed out in Ahmedabad Municipal Corporation,
Section B-1, Engineering Department, percentage Rate Tender and General condition's of
Contract for Works here in afterwards referred as Form- B-1.
5 An overall schedule of the "Work Plan "of the project based "Network Technique Method"
Programmer Evaluated and Review Technique (PERT) / Critical Path Method (CPM) for
appreciating his method of planning, scheduling and control of project execution
should be submitted by the contractor.
6 After the demand of R.A. Bills by contractors, work shall be verified by the Engineer in
charge of AMC or the Architect / Consultant will give his certificate, whether the work has
been executed according to the standard norms and approved designs and the
workmanship is of acceptable quality. Also the progress of work shall be according to
the construction programme approved by AMC or the Architect /Consultant. On
recommandations of Engineer in charge of AMC or Architect / consultant , R.A. Bills will
processed for the payment.
7 2% FROM EACH RUNNING BILL WILL BE RETAINED AND SHALL BE RELEASED
AT TIME OF FINAL BILL
8 In the circumstances of dispute, the decision of Add. City Engineer ( Zones) shall
be final & bound for the contractor. In case, in the detailed specifications of materials
and code of practice specifications of Index Nos. are found missing thus they must be
referred to the of specification of materials and code of practice.
PAYMENT CONDITIONS TO CONTRACTOR
9 Without proper Refilling, compaction and watering no payment shall be given to
contractor for excavation, refilling and or earth filling items.
10 Contractor shall have to submit a demand letter for running bill as well as final bill..
11 If progress of work is not in proportion to the time limit, otherwise penalty will be imposed.
MATERIAL PROCUREMENT
12 All material like Cement, M. S. Bars / Tor steel reinforcement and structural steel,
Bitumen etc. required for this work shall be procured by the contractor from the open
13 No difference in rates of cement and steel prevailing in the market in Ahmedabad at a
later date shall be paid /Recovered by A.M.C.(as the case may be) to / from contractor for
the procurement of Cement and Steel from open market in Ahmedabad. Contractor will
not be paid for any transport, handling & storage expenses separately and he
should quote for the works accordingly.
14 Test certificate for all materials like Cement , Steel, Bitumen and other important
materials shall be obtained and submitted by contractor. Contractor shall have to
produce test certificates for all procurement of Cement , Steel, Bitumen and other
important materials
INSTRUCTION TO THE TENDERER
15 ALL INSTRUCTIONS TO TENDERERS, SPECIAL INSTRUCTIONS FOR
CONTRACTORS, DOCUMENTS, RULES FOR GRANT OF ADVANCES, CLAUSE
FOR ARBITRATION, GENERAL SPECIFICATIONS, PROJECT INFORMATION
GENERAL,PAYMENT CONDITION TO THE CONTRACTOR, DEFINITION OF TERMS
EARNEST MONEY, SUBMISSION OF TENDERS, GENERAL RULES AND
DIRECTIONS FOR THE GUIDANCE OF CONTRACTORS TERMS AND
CONDITIONS OF CONTRACT AS PER FORM B-1. ETC. SHALL BE AS PER
STANDARD PERFORMA OF AHMEDABAD MUNICIPAL CORPORATION OF
ENGINEERING DEPARTMENT AND SHALL BE APPLIED TO THIS TENDER
CONTRACTOR MUST HAVE THIS DOCUMENT AND SHALL BOUND FOR THE
I HAVE READ AND VERIFIED ABOVE DOCUMENT AS WELL AS P.W.D.
GENERALTECHNICAL SPECIFICATIONS , CONDITIONS, CLAUSES,
INSTRUCTIONS ETC. AND AGREE TO ABIDE BY THEM.
I HAVE ALSO GONE THROUGH CONDITIONS AND CLAUSES OF FORM B -1
AND AGREE TO ABIDE BY THEM.
I HAVE ALSO GONE THROUGH TECHNICAL SPECIFICATIONS FOR THE
ITEMS AND AGREE TO ABIDE BY THEM.
IN THIS TENDER THERE ARE MANY POSSIBILITIES OF ADDITIONAL AND
ALTERATION ITEMS HENCE MANY ITEMS ARE LIKELY TO BE DROPPED OR
THERE QUANTITIES ARE LIKELY TO BE VARY UP TO ANY EXTENT AND
HENCE FOR THIS CONTRACTOR WILL NOT CLIAM FOR ANY EXTRA
AMOUNT OR COMPENSATION FOR THE SAME I AGREE TO ABIDE BY THEM.
GENERAL RULES & DIRECTIONS FOR THE GUIDANCE OF CONTRACTORS
TERMS AND CONDITIONS OF CONTRACT AS PER FORM B-1. ETC. SHALL BE AS
PER STANDARD PROFORMA FOR TENDER OF AHMEDABAD MUNICIPAL
CORPORATION OF ENGINEERING DEPARTMENT AND SHALL BE APPLIED TO
THIS TENDER . CONTRACTOR MUST HAVE THIS DOCUMENT.
Dated Signature Of Contractor ADD. CITY ENGINEER
With Seal EAST ZONE
AHMEDABAD MUNICIPAL CORPORATION
ENGINEERING DEPPARTMENT
16 DECLARATION FORM :- TENDER No
Name of the work for which the Tender is under consideration-
Construction of New R.C.C road and New interlocking paver block work
MP/MLA AND COUN.BUDGET at different society and chali area in
Viratnagar ward in East Zone (ARC)
1 I / We hereby declare that I / We have visited the above site & fully acquainted my self /
our selves with the local situation regarding materials, labour and other factors pertaining
to the work before submitting this tender.
2 I / We hereby declare that I / We have carefully studied the conditions of contract,
sections and other tender documents of this work and agree to execute the same
3 I / We hereby declare that I / We shall not charge any costs towards the visit of site for
preparing the tender for submission accordingly.
4 I / We hereby declare that My / Our near relatives are not working in A.M.C. as City
Engineer, Add. City Engineer, Dy. City Engineer, Asst. City Engineer, Assistant
Engineer, Add. Assistant Engineer, Technical Supervisor, Assistant Manager,
Accountant, Store Keeper or any such category. If yes, then, the names should be
Dated Signature Of Contractor
AHMEDABAD MUNICIPAL CORPORATION
ENGINEERING DEPPARTMENT
GENERAL SPECIFICATION
1 The work shall be completed with in 12 months time limit.
2 The details of reinforcement of R.C.C. work shall be as per design and instruction of
Add. City Engineer or his representative and his order will be considered final. The
contractor shall have to maintain account of steel, cement and other materials, that may
be brought by him on site. This account shall be regularly maintained and kept open for
inspection by municipal staff. Watering of all the items shall be done as per
instructions. Mixing of concrete shall be done by concrete mixer machine.
3 Arrangements of bringing vibrator for R.C.C. works if required shall have to be made by
the contractor othervise concrete work shall not be allowed.
4 The contractor shall remain responsible for workman's compensation of any accident that
may occur. The contractor shall arrange for lights at night and fencing and security
guard and shall be responsible for any damage of life and property if any happen, during
the execution of work in case of dispute for unseen or over looked items, the decision of
the Add. City Engineer or his representative shall be final. The contractor shall have to
clean all rubbish on completion of work and hand over the building with final finishing
as directed. All the rejected materials shall be removed from site with in 24 hours by
contractor at his risk and cost.
5 For mixing mortar either for masonry or for plaster; or for any other purpose contractor
shall have to prepare trough of bigger size and mix the mortar in the required
proportion in case he shall be allowed to mix the mortar either on solid floor or any
finish surfaces.
6 The contractor shall have to make his own arrangement for water required for the work
7 If any extra item crops up during the progress of work, the same shall be carried out by
the contractor and he shall be paid at the rate fixed by Add. City Engineer or his
representative as per the rate analysis based on current market rates and as per
prevailing circular of AMC..
8 If in the interest of the Corporation it is necessary to change either any site or the design
of the proposed work, the contractor shall carry out the same at his quoted rates without
charging any extra and the contractor will have to carry out the works and he will be paid
at the rates quoted by him in the tender and no claim for extra charges entertained.
9 The cubical contents of the cement bag shall be taken as 1.25 cft. or 0.035 cmt. / bag
and the contractor shall have to prepare the measure box according to this measures.
10 Retention money at the rate of 2% shall be deducted from every running bill of the
contractor and which will be paid at the time of final bill.
11 Contractor will be fully responsible for compliance of the various provision under
contract Act. 1970 and rules framed there under.
12 The tender for the work shall remain valid for a period of 120 days from the date of
opening of the tenders for this work and that the Tenderer shall not be allowed to
withdraw or modify the offer on his own during this period. If any Tenderer withdraws or
makes any, modifications or additions in the terms and conditions of tender. His tender
will not be acceptable to the Municipal Corporation. The Municipal Corporation
,without prejudice to any right or remedy be at liberty to forfeit the Earnest Money
13 No Materials shall be supplied by A.M.C. The contractor have to make their own
arrangement for procurement of materials from open market. But the contractor
shall have to give necessary test certificates for different materials as per relevant
I.S. code before using the same in the work at his cost in presence of AMC Engineers..
14 As per circular No MGR 2176(96),2418 (ii)GHH dated 31-3-77 issued by Government of
Gujarat contractors are requested to procure their quarry materials required for
construction work through legal sources i.e. Only from the quarry lease. holders permit
holder or middleman who satisfies the contractor as the legality of the source of
purchase by him on these materials.
15 If the work is not carried out within the specified time limit
12 months from the date
order to start the work. Penalty shall be recovered at the rate of 10% on the amount
of the non completion of the remaining work for delay in allotted,/ extended time limit
and shall be recovered from the immediate bills payable to the Contractor.
16 The contractor shall have to take labour License of the work as per Labour act.
The contractor shall have to follow Child Labour act. The Tenders are to be
submitted in duplicate except E-Tender without which the tenders are liable to be
rejected. Conditional tender will not be accepted.
Dated Signature Of Contractor ADD. CITY ENGINEER
With Seal EAST ZONE
TECHNICAL SPECIFICATIONS FOR MATERIALS AND ITEMS
NAME OF WORK -- Tender No.
Construction of New R.C.C road and New interlocking paver block work
MP/MLA AND COUN.BUDGET at different society and chali area in
Viratnagar ward in East Zone (ARC)
GENERAL AND STANDARD TECHNICAL SPECIFICATIONS FOR WORK.
1 In the specifications “as directed” / “ approved shall be taken to means "'directed” /
“approved” by the Engineer-in-charge.
2 Wherever a reference to any Indian Standard appears in the specifications, it shall be
taken to mean as a reference to the latest edition of the same inforce on the date of
3 In“Mode of Measurement”in the specification wherever a dispute arises in the absence of
specific mention of a particular point or aspect, the provisions on these particular
points or aspects in the relevant Indian Standards shall be referred to.
4 All measurements and computations, unless otherwise specified, shall be carried out
nearest to the following limits:
(i) Length, width and depth (height) 0.01 meter.
(ii) Areas 0.01 Sq. Mt.
(iii) Cubic Contents 0.01 Cu. Mt.
In recording dimensions of work, the sequence of length, width, and height (depth) or
thickness shall be followed.
5 The distance which constitutes lead shall be determined along the shortest practical
route and note necessarily the route actually taken. The decision of the
Engineer-in-charge in this regard shall be taken as final.
6 Where no lead is specific, it shall mean “all leads".
7 Lift shall be measured from plinth level.
8 Up to “floor two level” means actual height of floor (Maxi. 4 M) up to 3 Mt. Above plinth
9 Definite particulars covered in the items of work, though not mentioned or included in it
specifications shall be deemed to be included therein.
10 Reference to specifications of Materials as made in the detailed specification of the
items of works is in the form of a designation containing them number of the
specification of the Materials and prefix „M‟ e.g. "M-5"
11 Approval to the samples of various Materials given by the Engineer in charge shall not
absolve the contractor from the responsibility of replacing defective Materials brought on
site or Materials used in the work found defective at later date. The contractor shall
have no claim to any payment or compensation whatsoever on accounts any such
Materials being rejected by the Engineer-in-charge.
12 The contract rate of the item of work shall be for the work completed in all aspects.
13 No collection of Materials shall be made on site before it is got approved from
the Engineer-in-charge.
14 Collection of approved Materials shall be done at site of work in a systematic manner.
Materials shall be stored in such manner as to prevent damage ,deterioration of
intrusion of foreign matter and to ensure the preservation of their quality and fitness for
15 Materials , if
and when rejected by the Engineer - in - charge, shall be immediately
removed from the site of work.
16 No Materials shall be stored prior to, during and after execution of a structure in such a
way as to cause or lead to damage or overloading of the various components of the
17 All works shall be carried out in a workman like manner as per the best techniques for
the particular item.
18 All tools, templates, machinery and equipment for correct execution of the work as well
as for checking lines, levels, alignment of the work during execution shall kept in
sufficient numbers and in good working condition on the site of the work.
19 The mode, procedure and manner of execution shall be such that it does not cause
damage or overloading of the various components of the structure during execution or
after completion of the structure.
20 Special modes of construction not adopted in general Engineering practice, if
proposed to be adopted by the Contractor, shall be considered only if the contractor
provides satisfactory evidence that such special mode of construction is safe, sound
and helps in speedy construction and completion of work to the required strength and
quality. Acceptance of the same by the Engineer- in- charge shall not, however, absolve
the contractor of the responsibility of any adverse effects and consequence of adopting
here in the course of execution or completion of the work.
21 All installations pertaining to water supply and fixtures thereof as
well as drainage lines
and sanitary fittings shall be deemed to be completed only after giving satisfactory tests
by the contractor.
22 The contractor shallbe responsible for observing the rules and regulations imposed
under the “ Minor Minerals Act ”, and such other laws and rules prescribed by
Government from time to time.
23 All necessary safety measures and precautions (including those laid down in the
various relevant Indian Standards) shall be taken to ensure the safety of men, Materials
and machinery on the works as also of the work itself.
24 The testing charges of all Materials shall be borne by the Contractor.
25 Approval to any of the executed items for the work does not in any way relieve the
contractor of his responsibility for the correctness, soundness and strength of the
structure as per the drawings and specifications.
26 I HAVE ALSOGONE THROUGH TECHNICAL SPECIFICATION FOR THE ITEMS AS
PER STANDARD P.W.D. TECHNICAL SPECIFICATION FOR THE ITEMS AND
AGREE TO ABIDE BY THEM. (ALSO AVAILABLE ON AMC WEB SITE)
27 IN CASE OF WHERE THERE IS NO TECHNICAL SPECIFICATION FOR THE ANY
ITEMS AVAILABLE, SPECIFICATION GIVEN BY THE ENGINEER IN CHARGE
SHALL BE FOLLOWED. AND FOR THE SAME I AGREE TO ABIDE BY THEM.
Dated Signature Of Contractor ADD. CITY ENGINEER
With Seal EAST ZONE
AHMEDABAD MUNICIPAL CORPORATION
ENGINEERING DEPPARTMENT
SUMMARY OF COST AND
SCHEDULE OF QUANTITIES AND RATES
_ SUMMARY OF COST AND RECAPITULATION SHEET
_ SCHEDULE OF QUANTITIES & RATES
PAGE -- 1 of 2 SHEDULE
AHMEDABAD MUNICIPAL CORPORATION
ENGINEERING DEPPARTMENT
1 The schedule of quantities and rates are to be read for the purpose of pricing in
conjunction with instructions to tenderers, technical specifications, drawings and
general conditions of contract for civil works.
2 The Price quoted in the summary of costs; sheet of schedule of quantities and rates
shall be in all inclusive value for the work described including all costs and expenses
which may be required in and for the execution of the work described together with all
general risks, liabilities and obligations set forth or implied in the document on which
the tender is based.
3 The quantities furnished are approximate. In the event of actual quantities varying from
those furnished herein below or items deleted or added, the Rates quoted for the entire
work shall remain firm and no extra claims in this respect will be entertained. The
payment shall be made based on the actual quantities in the completed work.
4 All works shall be carried out strictly as per detailed specifications whether actually
specified or not. If not specified, as per directions of Engineer in charge
5 Rates quoted by Tenderer shall be firm even if the contract is split. If tenderer does not
agree to keep his quoted Rates valid under such a condition he shall clearly state so in his
6 Rates and the total amount entered in the summary of cost sheet of schedule of
6 Rates and the total amount entered in the summary of cost sheet of schedule of
quantities and rates shall be written in ink and shall be entered both in figures and
7 If Tenderer need any clarifications, they should obtain the same in writing from
owner/ Engineer. No notice will be taken of any verbal discussion in such matter.
1 Rate and amount shall be written both in figures and words.
2 Refer Schedule of quantities for items of Works & Estimated Quantities.
3 Plans are available with Asst. City Engineer. Tenderers are instructed to see
them during office hours in his office before quoting tender.
PAGE -- 2 of 2 SHEDULE
AHMEDABAD MUNICIPAL CORPORATION
ENGINEERING DEPPARTMENT
GENERAL TENDER CONDITIONS
1 After sanctioning of tender, a work order will be issued to the contractor. In response
contractor shall have to arrange for Security Deposit within 10 days for works up to
lacks of tender amount and 15 days for works above 10 lacks of tender amount. The time
limit shall be counted after 10 days for works up to 10 lacks of tender amount and 15 days
for works above 10 lacks of tender amount after issuance of work order. The contractor
shall be fined 4% of interest per year for delay in submission of S.D. and shall be
deducted from contractor‟s bill. Security Deposit of 5% of sanctioned tender amount shall
be deposited by pay order / demand draft / cheque or Bank Guarntee of nationalized
bank/scheduled bank only. Contractor shall have to sign contract paper with AMC.
2 In case of earnest money cheque bounce back, contractor‟s tender shall treated as
cancelled and the contractor shall not be given any tender, offer, quotation work in AMC
3 Muni. Commissioner shall have right to accept, reject the tender as well as the rate at
which tender to be accepted and awarded.
4 Specification of tender items shall be as per PWD manual in general / AMC‟s norms and
B-1 form conditions shall be applicable. In case of controversy, Addl.C.E.‟s decision shall
5 If watering is not done as per norms/specifications or if debris is not removed within
hours, then without notice, AMC shall have a right to execute that work at contractor‟s risk
and the amount shall be recovered from the bill.
6 Contractor shall have to work in such a system that there shall be no damage to any
service line of electric, telephone, gas, any type of service cable, drainage or water lines
etc. In case of damage to service line, the contractor will be responsible for damage and
shall have to repair/reinstate the damaged existing services. The contractor shall have to
safe guard the labours against any accident or damage of lives or public property if any..
In case of police complain, Contractor shall be held responsible for negligence. In case of
soil/land collapse, contractor shall be held responsible for not supporting the soil with
shoring, strutting and shuttering. Contractor shall safeguard the labour before allowing
labour to enter in excavated pit or other hazardous site. In case of accident to labours,
contractor shall be held responsible for police complain against him. AMC‟s staff will not
be responsible for any accident at the site of the work.
7 Contractor shall take insurance of his all labour and supervisory staff.
8 Only registered contractor shall quote the tender, if the contractor is registered with
government then they shall have to apply for registration in AMC within 180 days from the
date of work order.
9 AMC‟s general condition and Form-B-1 shall be binding to the contractor B-1 Form is put
up on AMC‟s web site.
10 Payment of running bill, final bill shall be as per policy of AMC in force at time of payment.
11 Any time of litigation shall be in court of Ahmedabad city jurisdiction only.
12 As per site conditions/requirement of site, there shall be increase or decrease in tender
item quantities. In such case contractor shall not have right to any price rise. In case of
decrease in any tender item quantity, contractor shall not ask for compensation.
13 If any construction material brought to site by contractor is not as per specification, or any
inferior quality material brought to site, then such rejected material shall be removed from
the site within 24 hours, otherwise AMC can throw away such material at any place and
recover the amount for such removal work from contractor bill. In this case contractor shall
not be entitled for compensation.
14 Cost of testing of material shall be borne by the contractor. He shall provide vehicle for
taking material / staff from site to testing laboratory / manufacturing site and contractor
shall be bear the cost of transportation of staff and material.
15 Contractor shall work as per labour Act. Contractor shall not be given any payment if
labour act rules are not followed or insurance of labour is not taken for work.
16 Contractor shall deposit the material on site in such a way that it should not become
obstruction to any one in any way.
17 All type of taxes(e.g. sales tax, surcharge, vat etc) to be borne by the contractor.
18 If asked by AMC Engineering staff, contractor shall take photograph of site of work /
before start of work, during work and after the completion of work, with digital camera and
deposit to AMC office or transfer photograph from camera to AMC computer. No
additional cost shall be paid.
19 In case of cancellation / rejection of tender, contractor shall not be entitled for any
compensation or right.
20 In case of extra item, AMC circular no. 9 Dt.08.05.12 shall be follwed in general If item is
not available in SOR, then market rate shall be derived by the Eng. dept by rate analysis.
Contractor shall not ask for the rates as per his rate analysis. This should be clearly
understood and taken in to consideration while quoting the tender by the contractor.
21 During execution of work, contractor shall take safely measures like protection by ropes,
drums, danger sign boards, plastic strips, bamboos, wooden poles etc as per requirement
& instruction of Egg.- in –charge. In case of accident due to lack of protection, contractor
shall responsible for police complains, compensation etc AMC staff shall not be held
responsible for contractor‟s negligence.
22 If instructed by AMC officials, contractor shall have to keep daily progress register and
get it signed by Ass. City Engineer. Contractor shall maintain record of daily No.of labours
employed, work done. If rectification work is not done by contractor within 24 days, the
contractor shall be finned Rs.250/- per day for delay & shall be recovered from the
contractors bill.
23 Contractor shall not be entitled for any type of compensation or right for the cancellation
of tender or tender items by any means.
24 Deduction from bills shall be done as per rules prevailing or the rules which shall come in
to force, by State or Central Govt.
25 1% amount shall be deducted for labour welfare fund as per state Govt. order.
26 All the above conditions shall over rule the conditions given in Form B-1.
27 Specifications are placed on AMC website www.egovamc.com for tender items, PWD
manuals should be followed in general.
28 Contractor shall have to register the work as per labour act & as per building safely act,
1906 with, Dy.Director building safety act., Shram Bhavan, 5th floor labour commissioner
office, Khanpur, Ahmedabad.
29 In case, at the time of submitting tender copy in duplicate, if single copy of tender bid is
quoted by contractor then it shall be treated as cancelled at the time of opening ( except
30 At the time quoting tender, if tender fee or EMD is not deposited then tender shall be
treated as cancelled at the time of opening of tender.
31 In case of the bank detail are not given then EMD return procedure shall be delayed.
32 In case of water pipe line work, If materials are not available from AMC central stores,
then the time limit delay of providing materials by central stored shall be given to the
33 In case of road grouting work tender, if at the time of resurfacing paver work, If paver gets
stucked in grouting work then contractor shall have to rectify the poor grouting work
without any cost.
34 Before quoting the tender contractor should know that, he has seen the site understood
the item of works, site conditions. He should be in a positions to provide labours at the
time of festivals like Holi, Diwali, Navratri, Marriage season, rainy season or any other
time of the year Contractor cannot say that he has no labours due to festivals.
35 Running bill amount should be restricted to 90% sanctioned tender amount and remaining
10% amount shall be paid in final bill after completion of work..
I have read all above conditions carefully and ready to work as per above conditions.
Contractor’s Name and seal Add. City Engineer
Mobile No. EAST ZONE
Address Ahmedabad Municipal Corporation
AHMEDABAD MUNICIPAL CORPORATION
ENGINEERING DEPPARTMENT
Construction of New R.C.C road and New interlocking paver block work MP/MLA AND
COUN.BUDGET at different society and chali area in Viratnagar ward in East Zone
vwJoÍtullt rJhtxldh Jtuzobtk yub.ve./ yub.yuj.yu./ <&t ftWLmejh©elt Vt¤Juj csux btk&e sw>e sw>e atjeytu <&t
mtumtgxeytubt yth.me.me htuz <ubs vuJh çjtuf jdtzJtlltk ftb ctc<. (Jtr»tof xuLzh)
RECAPITULATION SHEET Months
Sr.No DESCRIPTION AMOUNT
MAIN ESTIMATED TENDER COST
C.F. THIS TOTAL FROM TENDER#########
AMOUNT ( A )#########
(1) WRITE HOW MUCH PERCENTAGE HIGHER
OR LOWER IN FIGURES _______________ % LOWER / HIGHER
(Strikeout which ever is not applicable)
(2) WRITE HOW MUCH PERCENTAGE HIGHER or LOWER IN WORDS -
PERCENT LOWER/HIGHER
(Strikeout which ever is not applicable)
(3) AMOUNT ( B ) IN ₹.
IF PERCENTAGES QUOTED IS HIGHER THAN ADD AND SUM IT. ( i.e. C=A+B)
OR IF PERCENTAGES QUOTED IS LOWER THAN DEDUCT AND SUBSTRATE IT.
(4) WRITE TOTAL TENDER AMOUNT IN WORDS - ₹
Dated Signature Of Contractor ADD. CITY ENGINEER
With Seal EAST ZONE
AHMEDABAD MUNICIPAL CORPORATION
ENGINEERING DEPPARTMENT
Name of Construction of New R.C.C road and New interlocking paver block work MP/MLA AND
Work :- COUN.BUDGET at different society and chali area in Viratnagar ward in East Zone (ARC)
vwJoÍtullt rJhtxldh Jtuzobtk yub.ve./ yub.yuj.yu./ <&t ftWLmejh©elt Vt¤Juj csux btk&e sw>e sw>e atjeytu <&t
mtumtgxeytubt yth.me.me htuz <ubs vuJh çjtuf jdtzJtlltk ftb ctc<. (Jtr»tof xuLzh)
Sr.No. DESCRIPTION QTY. RATE PER AMOUNT
Box cutting the road surface to proper slope and
camber for making a base for road work including
removing the excavated stuff and depositing on the
road side slope as directed upto 200 Mt.lead
Conveyance charge of earth, lime, murrum, building
rubbish, manual garbage, sludge, excavated rock , fly
2 ash, aggregate of any kind etc complete up to 10.0 KM 0.00
a) Lead up to 1 Km. 0.00 23.388 Cu.M
b) Lead From 1Km to 2 Km. 0.00 30.94 Cu.M
c) Lead From 2 Km to 3 Km. 0.00 38.37 Cu.M
d) Lead From 3 Km to 4 Km. 0.00 45.52 Cu.M
e) Lead From 4 Km to 5 Km. 0.00 52.42 Cu.M
f) Lead From 5 Km to 10 Km. 540.00 78.54 Cu.M
g) Lead From 10 Km to 15 Km. 0.00 104.65 Cu.M
Providing and laying Cement Concrete 1:3:6 (1-
3 Cement : 3-Coarse sand : 6-Hand broken stone 105.00 2339.59 Cu.M
aggregates 40mm nominal size) and curing complete
Providing and laying in position Ready Mixed M-200
grade concrete for reinforced cement conctere work,
using cement content as per approved Design Mix
manufactured in fully automatic batching plant and
transported to site of work in transit mixer for a lead up
to 10 kms having continuous agitated mixer,
manufactured as per mix design of specified grade for
reinforced cement concrete work including pumping of
R.M.C. from transit mixer to site of laying, excluding
the cost of centering shuttering finishing and 225.00 3980.17 Cu.M
reinforcement including cost of admixtures in
recommended proportions as per IS: 9103 to
accelerate/retard setting of concrete, improve
workability without impairing strength and durability as
per direction of the Engineer - in - charge. Without Fly
Ash (Min cement level as per latest IS 456 shall be
maintained) (Item Code : 5055, SOR 2021-22, R & B
Sr.No. DESCRIPTION QTY. RATE PER AMOUNT
Providing Formwork of ordinary timber planking so as
to give a rough finish including centering shuttering
strutting and propping etc. Height of propping and
centering below supporting floor to ceiling not
5 exceeding 4 M. and removal of the same for in situ 165.00 99.79 smt
reinforced concrete and plain concrete work in.
(A)Foundations Footings Bases of Columns etc. and
Mass concrete. (Item Code : 09001AA, SOR 2021-22,
R & B Ahmedabad City
Providing TMT Bar FE500D reinforcement for
R.C.C. Work including bending,binding and placing in
6 position complete upto floor two level. (As Per Road 5100.00 63.1 kg
P/A Tremix with dewartering machine and floater
machine on constructed CC work for finishing the
surface as per requirement. The rate including all
7 machinaries, labor, loading, unloading, transportaion 1200.00 54 smt
etc complete as per direction given by engineer in
Making 15 mm. Groove in RCC work on road & filling it
8 with polysulfied selant & finished ot good incl. all labour 165.00 30 Rmt
charges etc. comp.as directed.
Repairing damaged M.H. and rasing M.H. up to road
level incl. removing damaged brick work and repairing
by brick masonry in C.M. 1:5 and plaster in C.M. 1:3
9 and fixing C.I. steps and existing MH sheet cover, 0.00
removing the debris from MH and carting the same as
(A) up to 0.15 mt. (@ Two Coarse) 15.00 728.82 No
(B) up to 0.35mt. (@ Four Coarse) 15.00 1155.44 No
(C) up to 0.65 mt. (@ Seven Coarse) 15.00 1786.49 No
Providing F.R.C. MH seat cover incl. carting to the
work site etc. comp.Directed.
F.R.C. Extra Heavy Duty (EHD-35) Manhole Covers &
Frames Cover : 728mm ø & 100 mm thick circular
cover, 35.00 MT load design, 100x2mm MS flat
allround, 16mm ø plain round bar for lifting the cover &
should be fitted with plastic cups. Frame : 560 mm ø
a clear opening, outer size- 888x888x175 mm. On the 3.00 3354.74 SET
upper periphery of frame 25 x 3 mm wide MS flat
should be well embed in concrete to protect the edges
of frame. FRC E.H.D.-35 manhole cover & frame
F.R.C. Heavy Duty [HD-20] Machinehole Covers -
mm ø clear opening, The dimension of frame and
b cover as per mentioned in Amend No.1 to IS 12592 : 15.00 1720.44 SET
F.R.C. Medium Duty [MD-10] Machinehole Covers -
560mm ø clear opening, The dimension of frame and
c cover as per mentioned in Amend No.1 to IS 12592 : 0.00 1255.52 SET
Sr.No. DESCRIPTION QTY. RATE PER AMOUNT
F.R.C. Medium Duty [MD-10] Chamber Covers &
Frame- 600 x 450 mm clear opening, The dimension
d of frame and cover as per mentioned in 3.00 2254.98 SET
Amend No.1 to IS 12592 : 2002 table
F.R.C. Light Duty [LD-2.5] Machinehole Covers &
Frames-560mm ø clear opening, The dimension of
e frame and cover as per mentioned in Amend 3.00 1915.14 SET
No.1 to IS 12592 : 2002 table
CatchPit Jali (Heavy duty) Fixing P/F FRC catch pit jali
with frame 600mm x 600mm clear opening etc. comp..
As directed by engineer in charge.
Providing and fixing S.W. Gully Trap with C.I. Grating
brick masonry chamber and water tightC.I. cover with
frame of 300mm x 300mm size(inside) with standard
12 weight.(i) Square mouth traps. (A) 100mm x 100mm 15.00 1127.81 No
size P type. (SOR 2021-22 Item no-24.19 page no-
Leveling or orientation of existing Gully Trap chamber
incl.nece. masonry in CM (1:6) and plaster in CM (1:3)
13 etc. using old GT stone and cover etc.comp 15.00 71.43 No
Extra rate over item of excavation of earth for
excavation of asphalt pavement / RCC of thickness up
to 0.20 meter including demolishing the asphalt carpet,
14 metal,s oiling/cutting Reinforcement etc.comp. with 0.00
stacking the material as directed. (Based on Previously
approved rate by C E sir )
0.20 meter thickness 15.00 71.1 smt
Providing & Supplying JCB Machine on rental basis in
case of emergency situation and break down type
work & also during unavoidable condition as per
instruction of engg. in charge, rate includes all nece.
shifting, fuel and operating charges and stacking of
useful & non-useful materials separately up to store.
(No payment should be allowed for non working
condition of machinery and for pipe line excavation
and laying work)
Estimate- B ( Paver Block)
Box cutting the road surface to proper slope and
camber for making a base for road work including
removing the excavated stuff and depositing on the
road side slope as directed upto 200 Mt.lead
Conveyance charge of earth, lime, murrum, building
rubbish, manual garbage, sludge, excavated rock , fly
2 ash, aggregate of any kind etc complete up to 10.0 KM 0.00
a) Lead up to 1 Km. 0.00 23.388 Cu.M
b) Lead From 1Km to 2 Km. 0.00 30.94 Cu.M
Sr.No. DESCRIPTION QTY. RATE PER AMOUNT
c) Lead From 2 Km to 3 Km. 0.00 38.37 Cu.M
d) Lead From 3 Km to 4 Km. 0.00 45.52 Cu.M
e) Lead From 4 Km to 5 Km. 0.00 52.42 Cu.M
f) Lead From 5 Km to 10 Km. 0.00 78.54 Cu.M
g) Lead From 10 Km to 15 Km. 450.00 104.65 Cu.M
Providing and laying Cement Concrete 1:5:10 (1-
Cement : 5-Fine Sand : 10-Graded Brick Bat
3 Aggregates 40 mm Nominal Size) and curing 144.00 1901.59 Cu.M
Providing and Laying of Rubber Moulded Paver Block
Grey/Coloured 60 mm thick, M-35 Grade of any
size;shape (Usually Uni-Paver Blocks) using black trap
good quality aggragate of 20 mm nominal size for
footpath, parking areas, service lanes and other areas
as mentioned in the drawing/instruction of engineer in
charge. Cost includes formworks using rubber mould,
Rate providing and laying paver blocks as per required
grading and specification. The paver block shall be
mechanically compacted. The work of paving blocks
shall be executed in line and level by skill mason of 1425.00 501.6 smt
flooring work only. It should be laid in such a way that
the no cutting of the paver block to be necessary. if
cutting of paver block necessary then it should be cut
by machine only and carting. The finished surface of
the paver block shall have resonably good, plain
finished. Paver blocks shall be compacted and shall be
relaid if necessary. Gravel or such type of materials
shall not be allowed for production. Laying on 5cms
thick sand beddding
Providing, supplying and fixing pre cast C.C. blocks (M-
20) edge kerb having size of 75 x 300 x 300 mm depth
and as per design conveying it to the site, jointing into
C:M 1:3 and racking out the joints incl. necessary 150.00 195.54 Rmt
asphalt, soil etc. completed. ( App Rate )
Extra rate over item of excavation of earth for
excavation of asphalt pavement / RCC of thickness up
to 0.20 meter including demolishing the asphalt carpet,
6 metal,s oiling/cutting Reinforcement etc.comp. with 0.00
stacking the material as directed. (Based on Previously
approved rate by C E sir )
a 0.20 meter thickness 30.00 71.1 smt
Repairing damaged M.H. and rasing M.H. up to road
level incl. removing damaged brick work and repairing
by brick masonry in C.M. 1:5 and
7 plaster in C.M. 1:3 and fixing C.I. steps and existing 0.00
MH sheet cover, removing the debris from MH and
carting the same as directed.
(A) up to 0.15 mt. (@ Two Coarse) 6.00 728.82 No
(B) up to 0.35mt. (@ Four Coarse) 6.00 1155.44 No.
(C) up to 0.65 mt. (@ Seven Coarse) 6.00 1786.49 No
Providing F.R.C. MH seat cover incl. carting to the
work site etc. comp.Directed.
Sr.No. DESCRIPTION QTY. RATE PER AMOUNT
F.R.C. Extra Heavy Duty (EHD-35) Manhole Covers &
Frames Cover : 728mm ø & 100 mm thick circular
cover, 35.00 MT load design, 100x2mm MS flat
allround, 16mm ø plain round bar for lifting the cover &
should be fitted with plastic cups. Frame : 560 mm ø
a clear opening, outer size- 888x888x175 mm. On the 3.00 3354.74 SET
upper periphery of frame 25 x 3 mm wide MS flat
should be well embed in concrete to protect theedges
of frame. FRC E.H.D.-35 manhole cover & frame
F.R.C. Heavy Duty [HD-20] Machinehole Covers -
mm ø clear opening, The dimension of frame and
b cover as per mentioned in Amend No.1 to IS 12592 : 15.00 1720.44 SET
F.R.C. Medium Duty [MD-10] Machinehole Covers -
560mm ø clear opening, The dimension of frame and
c cover as per mentioned in Amend No.1 to IS 12592 : 3.00 1255.52 SET
F.R.C. Medium Duty [MD-10] Chamber Covers &
Frame- 600 x 450 mm clear opening, The dimension
d of frame and cover as per mentioned in Amend No.1 3.00 2254.98 SET
to IS 12592 : 2002 table
F.R.C. Light Duty [LD-2.5] Machinehole Covers &
Frames-560mm ø clear opening, The dimension of
frame and cover as per mentioned in Amend
No.1 to IS 12592 : 2002 table
CatchPit Jali (Heavy duty) Fixing P/F FRC catch pit jali
with frame 600mm x 600mm clear opening etc. comp..
As directed by engineer in charge.
Providing and fixing S.W. Gully Trap with C.I. Grating
brick masonry chamber and water tightC.I. cover with
frame of 300mm x 300mm size(inside) with standard
10 weight.(i) Square mouth traps. (A) 100mm x 100mm 3.00 1127.81 No
size P type. (SOR 2021-22 Item no-24.19 page no-
Leveling or orientation of existing Gully Trap chamber
11 incl.nece. masonry in CM (1:6) and plaster in CM (1:3) 3.00 71.43 No
etc. using old GT stone and cover etc.comp
Sr.No. DESCRIPTION QTY. RATE PER AMOUNT
Supplying and fixing of 300 mm-L x 150 mm-B x
mm-H Kerb Block for Footpath in M-20 grade using
mm nominal size black trap aggregate of
Sevaliya/Timba or equivalent quality for pre-cast
blocks, reasonably exposed finish/ formwork , mould
with well equipped with vibratory system for kerb
stones of approved design including curing,
etc. complete, including the cost of formwork etc.
complete. The rate shall also include necessary cutting
of asphalt, fixing the Kerb stones in line and level on
12 cm thick sand bedding with necessary equipments and 45.00 350.89 Rmt
materials. The rate shall also include the flush pointing
in CM (1:3) for all joints of the kerbstones. Filling of
zari alone the sides of the kerb stone fixed with
Bituminous concrete mixed in proper position as
directed by Engineer in change to form a portable
mixture. In any case Gravel or such type of materials
shall not be allowed for production.
a)Laying on 5 cm thick Sand Bedding.
Filling available excavated earth (excluding
rock) in trenches, plinth, sides of foundations etc.
13 in layers not exceeding 20 cm. in depth 45.00 90.85 Cmt
consolidation each deposited layer by ramming and
Supplying and fixing Nimbhada ladi 37 to 50 mm thick for
walk-way, covering the activity of excavation, ramming,
Laying on sand bedding as per requirement to fix the
14 Nibhada Stone in Line & Level with cement pointing in 100.00 236.61 Smt
cement mortar 1:2 etc complete as directed. (AMC
approved SOR Rate Jan-2016)
P/L brickbats sand concrete (1:2) of one part of sand and
two part of old brickbats including spreading, laying,
15 ramming, watering and consolidation etc complete as 10.00 312.50 Cmt
(AMC approved SOR Rate Jan-2016)
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
E-Tender- 1628.pdf
Download all tender documents and submit your bid