Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.6 CrAccepted-AOC BHUCHO | JAJAPUR | ODISHA | 755007 | ₹1.6 Cr | L1 | Accepted-AOC TENDER RATE APPROVED |
| 2 | L2₹1.7 CrRejected-Finance N A | NA | NA | 121004 | ₹1.7 Cr | L2 | Rejected-Finance L2 |
Tender Value
₹1.4 Cr
EMD Value
₹2.8 L
Closing Date
2 Dec 2022, 4:00 pmClosed
EXECUTIVE ENGINEER
Ropar Head Works Division Roopnagar
concrete lining of Nurpur minor RD 0-16912 (Ludhiana)
2022_WR_92516_1
21/22A/2022-23
Open Tender
Civil Works
90 days
Ludhiana
Please refer Tender documents.
3 documents required · 3 mandatory
₹5,000
₹2.8 L
Ropar
27 Apr 2023
17 Nov 2022
2 Dec 2022
17 Nov 2022
2 Dec 2022
17 Nov 2022
24 Nov 2022
Amount
Ordinary Jungle Clearance of both banks of running Disty., Minors and Drains including Boundary road with discharge exceeding 1.5 cum/ but upto 1.5 cum/s
Earth work in excavation in foundations trenches etc. in all kinds of soil where Pick-Jumper work is not involved and not exceeding 2.0 metres depth including dressing of bottom and sides of trenches, stacking the excavated soil clear from the edge of excavation and subsequent filling around masonry in 15 cm, layers with compaction including disposal of all surplus soil as directed within lead of 30 metres
Excavation in Soil (any type) using Hydraulic Excavator CK 90 Excavation with hydraulic excavator of 0.9 cum bucket capacity including cutting trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, including all lift and combined lead up to 60 mtr.
Excavation in Soil (any type) using Hydraulic JCB and hydraulic tracter trolly with disposal upto 4.50 km including cutting and loading in trolly trimming bottom and side slopes in accordance with requirement of grades and cross section and transporting to emabankments location with all leads.
Extra for laying earth as per specifications for compaction in 20 Cm. layers and dressing including the cost of rolling and watering as per P.W.D Specifications.
Earth work for lip cutting for lining of irrigation channels inclusive of all allowance leads and dressing (as per earth work statement), 0-1.5 mt. depth
Dressing of Earth Work (NEW)
Dressing and preparation of sub grade for side slopes
Providing and laying cement concrete M-15 SLEEPER in bed and side slopes below the joints of concrete lining mixed in automatic computerized batching and mixing plant and transported to the site in transit mixers including supply carriage ,loading & unloading of material complete in all respect in PWD specifications in SLeepers
Laying cement water slurry 1:3, with cement @ 2.25 kg/sqms as on prepared bed & side slopes before laying concrete.
Cement Conrete Lining 75 mm thick or less laid manually for irrigation channels, using cement conrete M-15 with cement content 325 kg/cum mixed in automatic computerised batching and mixing plant and transported to the site in transit mixers with an average lead of 1 Km (For Trapezoidal Section and Cup Section of all Radii)
Providing and laying cement concrete M-15 for COPING mixed in automatic computerised batching and mixing plant and transported to the site in transit mixers including supply carriage loading and unloading of material complete in all respect in PWD specifications
Filling of Construction/Contraction joints with sealing compound 12.5 mm
Filling expansion joints with special impervious hot pour 12.5mm wide including supply,carriage of material complete in all respect as per design/drawing and P.W.D Specification ,for 60 mm thick slab of lining.
Providing & laying LDPE 150 micron over sleepers on constructions joints and expansion joints complete in all respect as per design/drawing and P.W.D Specification
Shuttering for faces of concrete lining on side slopes and bed complete in all respect as per design/drawing and P.W.D Specification
Applying Bitumen Primer coat on side of lining and top of sleeper for construction joint, Expansion Joint & Contraction Joint. Complete in all respect.
Dag belling single kassi stroke minimum 7.5 cm depth complete in all respect as per design/drawing and P.W.D Specification
P & F Distance Marks after every 1000 feet interval as per Estimate
P & F Boundary Pillars as per Estimate
Construction of Outlets , Tail Cluster
Construction of Outlets NON-PATROL BANK
ANY OTHER ITEM
BALRAJ SINGH CONTRACTOR
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid