| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.6 CrAccepted-AOC | ₹11.6 Cr | L1 | Accepted-AOC Responsive |
| 2 | L2₹11.7 CrRejected-AOC | ₹11.7 Cr | L2 | Rejected-AOC Responsive |
| 3 | Rejected-Technical | - | - | Rejected-Technical Non-Responsive |
| 4 | Rejected-Technical | - | - | Rejected-Technical Non-Responsive |
Tender Value
₹11.7 Cr
EMD Value
₹23.3 L
Closing Date
12 Feb 2025, 3:00 pmClosed
SE Rampur Circle PWD Rampur
Office of SE Rampur Circle PWD Rampur
Widening and Strengthening of Badhapur to Kiratpur Nagina Harewli Sherkot road km 28 via Chhayli Kashiwala Naiwala Kayamnagar Dodhrajpur Dharmuwala Road ODR Ch. 4.000 to 11.700 and Ch. 21.100 to 23.100 Including 05 year mai
2025_CEMBD_1002726_2
686/E-Tender-R.Circle/24-25 Dt. 30.01.2025
Open Tender
Civil Works - Roads
365 days
Office of SE Rampur Circle PWD Rampur
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,354
₹23.3 L
Office of SE Rampur Circle PWD Rampur
15 Mar 2025
6 Feb 2025
12 Feb 2025
6 Feb 2025
12 Feb 2025
6 Feb 2025
7 Feb 2025
Amount
Excavation for roadwork in soil with hydraulic excavator including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m. Including cost of all material, labour, T&P, labour cess, all taxes but excluding cost of GST.
Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2. Including cost of all material, labour, T&P, labour cess, all taxes but excluding cost of GST.
Construction of embankment with approved material , spreading, grading to required slope and compacting to meet requirement of table 300-2. Including cost of all material, labour, T&P,labour cess, all taxes but excluding cost of GST.
Construction of sub-grade and earthen shoulders with approved material , spreading, grading to required slope and compacted to meet requirement of table No. 300-2. Including cost of all material, labour, T&P, labour cess, all taxes but excluding cost of GST.
Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401. Including cost of all material, labour, T&P, Royality, labour cess, all taxes but excluding cost of GST.
Providing, laying, spreading and compacting graded stone aggregate (WMM) after mixing with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying with 1% OPC Cement and 3.5% Emulsion (SS Grade) in uniform single layer on sub- base/sub-grade and compacting with Road roller to achieve the desired density. Including cost of all material, labour, T&P, Royality, labour cess, all taxes but excluding cost of GST.
Providing and applying tack coat with bitumen VG-10 using Bitumen pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous surface cleaned with mechanical broom. Including cost of all material, labour, T&P, labour cess, all taxes but excluding cost of GST.
Providing and laying bituminous concrete with higher capacity batch type hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects. Including cost of all material, labour, T&P, Royality, labour cess, all taxes but excluding cost of GST.
Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days. Including cost of all material, labour, T&P, Royality, labour cess, all taxes but excluding cost of GST.
Brick Masonry Work in Cement Mortar 1:3 in Foundation complete excluding Pointing and Plastering, as per Drawing and Technical Specifications. Including cost of all material, labour, T&P, Royality, labour cess, all taxes but excluding cost of GST.
Pointing with cement mortar (1:3 ) on brick work in substructure as per Technical Specifications . Including cost of all material, labour, T&P, Royality, labour cess, all taxes but excluding cost of GST.
Plastering with cement mortar (1:3 ) on brick work in sub-structure as per Technical Specifications . Including cost of all material, labour, T&P, Royality, labour cess, all taxes but excluding cost of GST.
Laying Reinforced cement concrete pipe NP3/prestressed concrete pipe for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets. (1000 mm Dia)
Laying Reinforced cement concrete pipe NP3/prestressed concrete pipe for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets (900 mm Dia) but excluding cost of GST.
Laying Reinforced cement concrete pipe NP3/prestressed concrete pipe for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets (600 mm Dia)
Dismantling Brick / Tile work/ rubble masonary/ pitching/ etc by mechanical means but excluding cost of GST.
Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. (RCC Grade M15). Including cost of all material, labour, T&P, Royality, labour cess, all taxes but excluding cost of GST.
Furnishing and Placing RCC M25 Reinforced/ Prestressed cement concrete in super-structure as per drawing and Technical Specification. Including cost of all material, labour, T&P, Royality, labour cess, all taxes but excluding cost of GST.
Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing force. Complete as per drawing and Technical Specifications but excluding cost of GST.
Supplying, fitting and placing HYSD bar reinforcement in sub-structure complete as per drawing and Technical Specifications
Providing and laying Cement concrete wearing coat M-30 grade excluding reinforcement complete as per drawing and Technical Specifications but excluding cost of GST.
Drainage Spouts complete as per drawing and Technical specification Clause 2705 (15.17) but excluding cost of GST.
Providing and laying boulders apron on river bed for protection against scour with stone boulders weighing not less than 40 kg each complete as per drawing and Technical specification. Including cost of all material, labour, T&P, Royality, labour cess, all taxes but excluding cost of GST.
Providing and laying of boulder apron laid in wire crates made with 4mm dia GI wire conforming to IS: 280 & IS:4826 in 100mm x 100mm mesh (weaved diagonally) including 10 per cent extra for laps and joints laid with stone boulders weighing not less than 40 kg each. Including cost of all material, labour, T&P, Royality, labour cess, all taxes but excluding cost of GST.
Providing and laying Filter material underneath pitching in slopes complete as per drawing and Technical specification. Including cost of all material, labour, T&P, Royality, labour cess, all taxes but excluding cost of GST.
Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specifications. Including cost of all material, labour, T&P, Royality, labour cess, all taxes but excluding cost of GST.
Routine Maintenance of road after completion work (A) Carriageway/Pavement: (a) Potholes,cracks,other surface defects (SWMM & BC), (b) Repair of Edges, Rutting (BC). (B) Road, Embankment, Cuttings, Shoulders, Trees & Plantation: (a) Roads Maintained free of edge drop, inadequate cross fall, undulations, settlement, Ponding (E/W), (b) Deficient slopes, rain cuts in embankments (E/W), (c) Vegetation growth, Loping of tree branches. (C) Bridges and Culverts: (a) De-silting, (b) Clearing vegetation growth (Jungle Clearance), (c) Damaged/disturbed boulder pitching, breast /toe wall retaining wall, apron flooring , guide bunds (Boulder Apron), (d) Parapet, any damage to foundations, (e) Any defects in sub-structures, (f) Any defects in superstructures, raillings, parapets., (g) wearing coat, (h) Approach slab, (i) Painting & lettering of No. plates, repairs. (D) Repair of Roadside Drains: (a) Brick Work in 1:4, (b) Plaster, (c) CC-1:2:4. (E) Road Furniture: (a) Cleaning, Painting & lettering of stones & sign boards, Replacement of damaged/ missing stones & sign boards., (b) 200 m stones, (c) Km stones, (d) 5th km stones,. Maintenance requirement as per above and Mentioned in Special Conditions of Contract for Maintenance. Payment of Maintenance work as Percentage of final Civil Construction Cost.
For Ist Year @ 0.00 %
For IInd Year @ 0.25 %
For IIIrd Year @ 0.50 %
For IVth Year @ 0.75 %
For Vth Year @ 1.00 %
Jeet Construction (BID ID -4947156)
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf