Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L2₹16.8 CrAccepted-AOC | ₹16.8 Cr Quoted ₹160.0 Cr | L2 | Accepted-AOC Accepted being first lowest not submitted necessary performance security. |
| 2 | L1₹15.0 CrRejected-AOC | ₹15.0 Cr | L1 | Rejected-AOC Rejected due to not submitted necessary performance security. |
| 3 | L3₹16.1 CrRejected-Finance HARDAHA BALUWA VARANASI CHANDAULE | ₹16.1 Cr | L3 | Rejected-Finance Rejected being higher. |
| 4 | L4₹16.2 CrRejected-Finance | ₹16.2 Cr | L4 | Rejected-Finance Rejected being higher. |
| 5 | L5₹17.0 CrRejected-Finance | ₹17.0 Cr | L5 | Rejected-Finance Rejected being higher. |
Tender Value
Refer Docs
EMD Value
₹30 L
Closing Date
28 Dec 2020, 12:00 pmClosed
S.E. BAREILLY CIRCLE PWD BAREILLY
OFFICE OF THE S.E.BAREILLY CIRCLE, PWD BAREILLY
Widening and Strengthening of Baheri Ruderpur (O.D.R.) , Length 16.400 Km.
2020_CEBLY_539533_1
9110/413C /E- Tender -4/3/20 Date 17/11/20
Open Tender
Civil Works
365 days
BAREILLY
PLEASE REFER TENDER DOCUMENT
3 documents required · 3 mandatory
₹2,725
₹30 L
OFFICE OF THE S.E.BAREILLY CIRCLE, PWD BAREILLY
6 Apr 2021
19 Dec 2020
29 Dec 2020
20 Dec 2020
28 Dec 2020
20 Dec 2020
24 Dec 2020
Amount
Excavation for road work in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000 m.
Earth work in cutting or in embankment in ordinary soil, excavation to be in the regular pits not exceeding 0.5m in depth and earthwork in embankment to be in 20cm. layers, including ramming and dessing the surface to required levels & slopes & also including 1.5 lift & 30m. lead. The earth from cutting to be used in making embankment or to be deposited as spoil banks within 30m. Distance as directed by the enginee incharge including watering, dressing & compacting the soil to achieve 95% proctor density. (Compection only)
Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2.(EARTH FROM RIGHT OF WAY) (Data Book Sr. no. - 3.16)
Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2. lead upto 2 kms.
Providing and laying of Granular Sub-Base with coarse Graded material (Table 401-B) in granular sub-base by providing coarse graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC and compacting with vibratory roller to achieve the desired density, complete as per clause 401.
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specifications including premixing the material with water at OMC in mechanical mix plant, carriage of mixed material by tipper to site laying in uniform layers in sub-base/base course on a well prepared under base and compacting with power vibratory-roller to achieve the desired density including lighting, guarding, barricading and maintenance of diversion etc.
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam with 1% OPC cement and 3.50 % emulsion specifications including premixing the material with water at OMC in mechanical mix plant, carriage of mixed material by tipper to site laying in uniform layers in sub-base/base course on a well prepared under base and compacting with power vibratory-roller to achieve the desired density including lighting, guarding, barricading and maintenance of diversion etc.
Providing and laying tack coat with bitumen VG-10 using bitumen pressure distributor at the rate of 0.30 Kg. Per sqm on the prepared bitumenous surface cleaned with mechanical broom.
Providing and laying bituminous concrete with 60-90 TPH batch type hot mix plant producing an average output of 75 tonne per hour using crushed aggregates of specified grading, premixed with bituminous binder VG-30 @ 5.4 percent of mix and filler, transorting the hot mix to work site, laying with a hydristatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH&H Specifications clause 509 complete in all respects.
Construction of subgrade and earthen shoulder with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2. (Lead 1 km.) (E/w in Patri) (Data Book Sr. no. - 3.18)
Dismantling brick work or stone work in lime or cement mortar and including stacking of materials as directed by the Engineer-in-charge within a distance of 60 m (200ft.)
Dismantling reinforced cement concrete or reinforced brick work, including stacking of dismantled materials as directed by the Engineer-in-charge within a distance of 60 m.
Earth work in excavation for foundation of structure as per drawing and technical specification , including removal of stumps dressing of sides ,bottom and backfilling with approved materials.(Depth up to 3.00 Mtr)
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. As per MoRT&H specification Cl. 304
Pointing with cement mortar (1:3) on brick work in substructure as per MoRT&H Technical Specifications Cl. 1300 & 2200
Dewatering of the construction site
Supply and fixing of 10cm internal dia A.C down pipe in Raft and Abutments
12 mm thick plaster with cement and approved coarse sand in 1:3 over brick work minimum thickness not to be less than 10 mm i/c supply of all materials, labour and T&P etc. required for proper completion of the work.
Sand Fillling in foundation trenches as per drawing and technical specification Clause 305.3.9 For Box Culvert
Back filling behind abutment, wing wall and returned wall complete as per drawing and specification. For Culvert.
Sand Filling in Foundation Trenches as per Drawing & As per MoRT&H specification Cl. 304 For Minor Bridge
Supply of Laying and fixing of NP-3 class hume pipe in proper position in 350 culvert.
Supply of Laying and fixing of NP-3 class hume pipe in proper position in 600 culvert.
Supply of Laying and fixing of NP-3 class hume pipe in proper position in 1000 mm dia culvert.
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 (M-15)
Plain cement concrete 1:3:6 mix with crushed stone aggregate 40 mm nominal size mechanically mixed , placed in foundation and compacted , curing etc.
Supply, fixing and placing HYSD Steel bar or TMT bar reinforcement for RCC works complete as per drawing & technical specifications clauses 1002,1005,1010 and 1202
Brick Masonry Work in Cement Mortar 1:3 in Foundation complete excluding Pointing and Plastering, as per Drawing and Technical Specifications. As per MoRT&H specification Cl. 1300
Cement concrete with 2 cm. stone grit, approved coarse sand and cement in the proportion of 4:2:1 including supply of all materials, labour and T&P etc. required for proper completion of the work.- Copping for return, bed block, dirt wall, RCC Kerb, RCC Pillar at four corners at the end of returns. S.I. 279
Providing and laying reinforced cement concrete in superstructure work-M20 (1:1.5:3) for RCC Slab as per drawing and technical specifications Clauses 1500, 1600 & 1700
Furnishing and Placing Reinforced cement concrete in super-structure as per drawing and Technical Specification RCC Grade M 25
Plain / reinforced Cement concrete in open foundation complete as per drawing and technical specification. M-20
National Highway Const. Co
M/S SHIV CONSTRUCTION
M/S SOBTI INFRATECH LIMITED
SHARMA CONSTRUCTION
RAM SANEHI AND SONS
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid