Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹34.4 LAdmitted-Finance | ₹34.4 L | L1 | Admitted-Finance |
| 2 | L2₹37.0 L+₹2.7 L (7.71%)Admitted-Finance DA PARBATIA TEZPUR DISTT SONITPUR ASSAM 784 001 | TEZPUR | SONITPUR | ASSAM | 784001 | ₹37.0 L+₹2.7 L (7.71%) | L2 | Admitted-Finance |
| 3 | L3₹37.8 L+₹3.4 L (9.86%)Admitted-Finance BAMPARBOTIA WARD P O P S TEZPUR DIST SONITPUR PIN 784001 | SONITPUR | ASSAM | 784001 | ₹37.8 L+₹3.4 L (9.86%) | L3 | Admitted-Finance |
| 4 | L4₹38.0 L+₹3.6 L (10.4%)Admitted-Finance NEW HARIGAON BEHIND BASE HOSP PO NIKAMUL TEZPUR ASSAM 784001 | SONITPUR | ASSAM | 784001 | ₹38.0 L+₹3.6 L (10.4%) | L4 | Admitted-Finance |
| 5 | L5₹38.9 L+₹4.5 L (13.0%)Admitted-Finance VILLAGE GOROIMARI PO SHALONIBAIR DIST SONITPUR ASSAM PIN 784104 | SONITPUR | ASSAM | 784104 | ₹38.9 L+₹4.5 L (13.0%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | MAHENDRA BARUAH L5 | M/S ROHAN BARUA L1 | Chinmay Traders L7 | tun baruah L6 | NMS ENTERPRISES L2 | M/S SAIKIA ENTERPRISE L3 | M/S SINGH FURNITURE MART L4 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Dismantling Floor, Hearth or Wall Tiling including Cement Mortar Bedding (but not backing), and removing rubbish off the Premises, complete all as specified and as directed. | 675 | Sqm | 50 ₹33,750 Lowest | 90 ₹60,750 | 60 ₹40,500 | 55 ₹37,125 | 91.5 ₹61,762.5 | 93 ₹62,775 | 93.6 ₹63,180 |
| 2.00 | M&L for Ceramic Paved tiles of size 400 x 400 x 10 to 12 mm thick with grey cement and pigment, set and jointed and pointed in neat cement slurry in floors laid over & including 15 mm thick screed bed in cement mortar 1:6 complete all as specified and as directed. | 675 | Sqm | 1,376 ₹9,28,800 | 1,300 ₹8,77,500 Lowest | 1,400 ₹9,45,000 | 1,380 ₹9,31,500 | 1,420 ₹9,58,500 | 1,450 ₹9,78,750 | 1,450 ₹9,78,750 |
| 3.00 | Demolition of cement concrete in ground floor and pavings n exc. 15 cm thickness (below or above the ground level) (Un-reinforced) and removing to a distance not exc 50 meter complete all as specified and as directed by Engr-in-Charge. | 67.5 | Cum | 1,430 ₹96,525 | 1,380 ₹93,150 | 500 ₹33,750 Lowest | 1,440 ₹97,200 | 1,399 ₹94,432.5 | 1,400 ₹94,500 | 1,425 ₹96,187.5 |
| 4.00 | M&L Cement Concrete 1:3:6 (40mm graded crushed stone aggregate) 75mm thick as in Plinth Protection, etc. laid in alternate Bays, finished Concrete Surfaces Even and Smooth without using Extra Cement, making impression or expanded metal,whilst the concrete is green,complete all as specified and as directed. | 850 | Sqm | 500 ₹4,25,000 | 475 ₹4,03,750 | 471 ₹4,00,350 Lowest | 520 ₹4,42,000 | 490 ₹4,16,500 | 490 ₹4,16,500 | 496 ₹4,21,600 |
| 5.00 | M&L Machine pressed precast concrete interlocking paver block with grey cement and pigment any shape and size confirming to IS 15658-2006 of 60 mm thickness M-35 Grade over 100 mm sand cushion over rammed earth complete all as specified and as directed. | 950 | Sqm | 672 ₹6,38,400 | 600 ₹5,70,000 Lowest | 1,053 ₹10,00,350 | 680 ₹6,46,000 | 630 ₹5,98,500 | 635 ₹6,03,250 | 670 ₹6,36,500 |
| 6.00 | M&L Sand filling under floors or in founda-tions including watering and consolidation, complete all as specified and as directed. | 63.75 | Cum | 2,289 ₹1,45,923.75 | 2,000 ₹1,27,500 | 1,200 ₹76,500 Lowest | 2,290 ₹1,45,987.5 | 2,150 ₹1,37,062.5 | 2,200 ₹1,40,250 | 1,800 ₹1,14,750 |
| 7.00 | Dismantling of fencing posts or struts (wood, steel or R.C.C.) any section, including taking out embedded portion and making good disturbed ground complete all as specified and as directed. | 493 | RM | 65 ₹32,045 | 43 ₹21,199 | 21 ₹10,353 Lowest | 65 ₹32,045 | 49 ₹24,157 | 53 ₹26,129 | 57 ₹28,101 |
| 8.00 | Dismantling chain link fencing, any thickness or mesh, fixed with steel fillet and nut bolt. N.exc 4KG per Sqm complete all as specified and as directed. | 765 | Sqm | 31 ₹23,715 | 19 ₹14,535 | 14 ₹10,710 Lowest | 33 ₹25,245 | 23 ₹17,595 | 25 ₹19,125 | 29 ₹22,185 |
| 9.00 | Excavating in post holes (or similar holes) each n exc 0.5 cum, getting out, returning, filling in and ramming earth or broken rubble mixed with earth round, in layers not exceeding 25 cm in soft/loose soil watering, and removing surplus soil to a distance n exc 50 m and making good surface complete all as specified and as directed. | 136 | Each | 340 ₹46,240 | 267 ₹36,312 Lowest | 442 ₹60,112 | 355 ₹48,280 | 300 ₹40,800 | 330 ₹44,880 | 335 ₹45,560 |
| 10.00 | M&L Plain Cement Concrete type C2 (1:3:6) using 40 mm graded aggregate) in Foundation, Filling and Mass Concrete, complete all as specified and as directed. | 17.41 | Cum | 7,000 ₹1,21,870 | 6,580 ₹1,14,557.8 | 6,000 ₹1,04,460 Lowest | 7,100 ₹1,23,611 | 6,890 ₹1,19,954.9 | 6,900 ₹1,20,129 | 6,999 ₹1,21,852.59 |
Tender Value
₹35.0 L
EMD Value
₹70,000
Closing Date
8 Aug 2026, 6:00 pmClosed
GE South Tezpur
GE South Tezpur Mission Chariali
REPAIR TO PATH, HARDSTANDING, AREA DRAINAGE, FENCING INCLS MISC B/R WORK AT ZONE-1B, ZONE-1C AND ZONE-5 UNDER GE (S) TEZPUR
2026_MES_777839_1
9174
Open Tender
Civil Works
Item Rate
210 days
GE South Tezpur
as per NIT
4 documents required · 4 mandatory
₹500
GE South Tezpur
₹70,000
Yes
29 Aug 2026
10 Jul 2026
10 Aug 2026
10 Jul 2026
8 Aug 2026
25 Jul 2026
10 Jul 2026 - 18 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling Floor, Hearth or Wall Tiling including Cement Mortar Bedding (but not backing), and removing rubbish off the Premises, complete all as specified and as directed. | 675 | Sqm | - | - |
| 2 | M&L for Ceramic Paved tiles of size 400 x 400 x 10 to 12 mm thick with grey cement and pigment, set and jointed and pointed in neat cement slurry in floors laid over & including 15 mm thick screed bed in cement mortar 1:6 complete all as specified and as directed. | 675 | Sqm | - | - |
| 3 | Demolition of cement concrete in ground floor and pavings n exc. 15 cm thickness (below or above the ground level) (Un-reinforced) and removing to a distance not exc 50 meter complete all as specified and as directed by Engr-in-Charge. | 67.5 | Cum | - | - |
| 4 | M&L Cement Concrete 1:3:6 (40mm graded crushed stone aggregate) 75mm thick as in Plinth Protection, etc. laid in alternate Bays, finished Concrete Surfaces Even and Smooth without using Extra Cement, making impression or expanded metal,whilst the concrete is green,complete all as specified and as directed. | 850 | Sqm | - | - |
| 5 | M&L Machine pressed precast concrete interlocking paver block with grey cement and pigment any shape and size confirming to IS 15658-2006 of 60 mm thickness M-35 Grade over 100 mm sand cushion over rammed earth complete all as specified and as directed. | 950 | Sqm | - | - |
| 6 | M&L Sand filling under floors or in founda-tions including watering and consolidation, complete all as specified and as directed. | 63.75 | Cum | - | - |
| 7 | Dismantling of fencing posts or struts (wood, steel or R.C.C.) any section, including taking out embedded portion and making good disturbed ground complete all as specified and as directed. | 493 | RM | - | - |
| 8 | Dismantling chain link fencing, any thickness or mesh, fixed with steel fillet and nut bolt. N.exc 4KG per Sqm complete all as specified and as directed. | 765 | Sqm | - | - |
| 9 | Excavating in post holes (or similar holes) each n exc 0.5 cum, getting out, returning, filling in and ramming earth or broken rubble mixed with earth round, in layers not exceeding 25 cm in soft/loose soil watering, and removing surplus soil to a distance n exc 50 m and making good surface complete all as specified and as directed. | 136 | Each | - | - |
| 10 | M&L Plain Cement Concrete type C2 (1:3:6) using 40 mm graded aggregate) in Foundation, Filling and Mass Concrete, complete all as specified and as directed. | 17.41 | Cum | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.44 MB
Tenderdocus.pdf
Tender Documents • 1.42 MB
Addldocus.pdf
Additional Documents • 0.16 MB
BOQ_871153.xls
BOQ • 0.51 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .