Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹5.8 L
EMD Value
₹5,848
Closing Date
25 Nov 2026, 4:00 pm2d left
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Executive Officer, Gopalpur NAC, Gopalpur
Executive Officer, Gopalpur NAC, Gopalpur
Construction of Both Side Drain with Cover Slab and C C Road at Guna Sahi Back Side in Ward No 5 under Gopalpur NAC
2026_ORULB_145058_4
GPN-NAC-04/2026-27
Open Tender
Civil Works - Others
Percentage
Gopalpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹4,720
₹5,848
Yes
16 Nov 2026
16 Nov 2026
26 Nov 2026
16 Nov 2026
25 Nov 2026
16 Nov 2026
60 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in F & P in Ordinary soil within initial lead of 50 m and initial lift of 1.5 m including rough dressing and breaking the clods, etc., all complete as per direction of Engineer-in-Charge. | 61 | Cum | 210.52 | ₹12,841.72 |
| 2 | Dismantling & removing cement concrete including the useful materials for reuse & removing the debris with in 50 mt lead. | 11.75 | Cum | 877.16 | ₹10,306.63 |
| 3 | Conveying the excavated earth by mechnical carriage from the site where it has been deposited after excavation & disposal of the same within 5 km. distance at suitable locations as per direction of Engineer-in-Charge etc. complete. | 72.94 | Cum | 276.01 | ₹20,132.17 |
| 4 | Supply and filling the F & P with filling sand of approved quality with well watered & rammed including cost, conveyance, royalty & all taxes, etc., complete. | 16.46 | Cum | 899.1 | ₹14,799.19 |
| 5 | CC(1:4:8) with 4cm size HG Hand Broken metal including hoisting , laying, curing and including all cost, conveyance, royalty & taxes, etc., complete. | 7.65 | Cum | 5,328.75 | ₹40,764.94 |
| 6 | M20 with 10mm to 20 mm size HG Crusher Broken chips for RCC works including hoisting and laying, compacting with suitable vibrator, curing and filling the construction joints with bitumen ,including all cost, conveyance, royalty & taxes, etc., complete. | 45.05 | Cum | 5,995.62 | ₹2,70,102.68 |
| 7 | Rigid & smooth centering & shuttering for R.C.C. and C.C. works including false works, dismantling and removing them from the site after casting, curing including cost of materials etc., complete. | 306 | Sqm | 249.83 | ₹76,447.98 |
| 8 | Supplying, fitting & placing uncoated HYSD reinforcement including cutting, bending,binding & placing the steel rods as per drawing & technical specifications with cost of binding wire 18 to 20 gauges, etc., complete. work.) | 12.33 | Qtl | 9,217.03 | ₹1,13,645.98 |
| 9 | 6mm thick cement plester (1:4) to RCC surface finish smooth including closed deep chiping & slury treatment including all cost conveyance royalty and taxes etc. comp. | 119 | Sqm | 216.87 | ₹25,807.53 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.91 MB
BOQ_621170.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .