Making a drain with cover slab for outlet of dirty water of Qtrs. No. AR-317 near Durga Mandir Bhowra Bazar Under E.J Area
2026_BCCL_363711_1
BCCL/EJA/CIVIL/2026-27/eNIT/26
Open Tender
Civil Works - Buildings
Percentage
21 days
Bhowra
Please refer Tender documents.
3 documents required · 3 mandatory
13 Aug 2026
13 Aug 2026
25 Aug 2026
13 Aug 2026
24 Aug 2026
13 Aug 2026
13 Aug 2026 - 20 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 2 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil. | 3.96 | M3 | 214.15 | ₹848.03 |
| 3 | Providing Fly Ash Brick flat Soling do-do complete job. | - | M2 | 327.6 | - |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources). | 0.83 | M3 | 5,120.95 | ₹4,250.39 |
| 5 | Brick work with clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in: Cement mortar 1:4 (1 cement : 4 coarse sand) | - | M3 | 5,203.35 | - |
| 6 | Brick work with clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in: Cement mortar 1:6 (1 cement : 6 coarse sand) | - | M3 | 5,002.05 | - |
| 7 | Brick work with clay F.P.S. (non modular) bricks of class designation 7.5 in super structure in: Cement mortar 1:6 (1 cement : 6 coarse sand) | 1.25 | M3 | 5,483.5 | ₹6,854.38 |
| 8 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, ifnishing and reinforcement- All work up to plinth level :1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources: 4 graded stone aggregate 20 mm nominal size derived from natural sources). | 0.7 | M3 | 6,520.45 | ₹4,564.32 |
| 9 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.Thermo-Mechanically Treated bars of grade Fe-500D or more. | 49 | Kg | 75.65 | ₹3,706.85 |
| 10 | Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete | 3.37 | M2 | 247.95 | ₹835.59 |
| 11 | 12 mm cement plaster of mix : 1:6 (1 cement: 6 fine sand) | 13.09 | M2 | 222 | ₹2,905.98 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 2.03 MB
BOQ_376622.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].