| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.6 LAccepted-Finance | ₹2.6 L | L1 | Accepted-Finance Lowest |
| 2 | L2₹2.7 LRejected-Finance | ₹2.7 L | L2 | Rejected-Finance Other than Lowest |
| 3 | L3₹2.7 LRejected-Finance VILLAGE DHAR P O DASHERA TEH BALH REWALSAR DISTT MANDI HP 175036 | REWALSAR | MANDI | HIMACHAL PRADESH | 175036 | ₹2.7 L | L3 | Rejected-Finance Other than lowest |
| Sl No | Description | Qty | Unit | Zakir Hussain L1 | NOOR HUSSAIN L2 | Chuni lal L3 |
|---|---|---|---|---|---|---|
| 1.00 | Excavation in foundation, trenches (for pipes & pits) up to all depths in all classification of earth work such as pick work, jumper work, saturated soil including blasting soft/hard rock or chiseling soft/hard rock where blasting is prohibited in all lifts including trimming & dressing of sides, levelling of beds to correct grade i/c shoring/ strutting, planking, timbering wherever required, stacking the useable or unuseable material/ soil separately & after excavated soil clear from the edge of excavation returning the excavated soil after laying jointing testing of pipes in trenches in 15 Cm layers including consolidating of each deposited layer by ramming, watering & then disposing of all surplus excavated soil/unusable material as directed with in all leads & lifts including restoration of unmetalled surfaces to its original condition & including cost of diversion for traffic, night signals, fixing caution boards, crossing over trenches for access to houses, fencing etc. complete in all respect with in all leads & lifts as per the entire satisfaction & directions of Engineer-in-Charge. | 271.69 | Cum | 370 ₹1.0 L | 380 ₹1.0 L | 375 ₹1.0 L |
| 2.00 | Laying, jointing ( by way of circumfrential butt welded joints by electrical arc welding ) and testing of Galvanised mild steel tubes (GI Pipes) of following dia meters confirming to BIS 1239-2001 (latest with upto date amendments) having wall thickness as per code with bevelled / plain ends in a random length of 4 to 7 meters, including manufacturing reducers/ tapers , all short pieces, bends etc. as per site requirement made from parent tubes . The laying of pipe will include all operation such as cutting, welding, jointing, fabrication of bends, tees etc. including lowering and laying in excavated trenches to ensure required level including flushing, cleaning and hydraulic testing complete in all respects to the satisfaction of the Engineer in charge. The fabricated bends shall have three or four cuts having its radius not less than five times the dia of pipe. The damaged portion of the pipes and specials made form the parent tube during welding or otherwise shall be provided anticorrosive treatment by applying two coats of anticorrosive bituminous paint over a priming coat as per AWWA specifications C-203-1978. The welding electrodes shall be as per IS 814 of Advani Oerlikon/ L&T or ISI marked make. The rates also includes entire carriage of material, flushing, cleaning & hydraulic testing complete to the best satisfaction & direction of Engineer in charge with in all leads and lifts. (Earth work in trenches will be measured and paid for separately). | 1,350 | Rmt. | 115 ₹1.6 L | 120 ₹1.6 L | 125 ₹1.7 L |
Tender Value
₹2.8 L
EMD Value
₹5,650
Closing Date
18 Apr 2026, 5:00 pmClosed
Executive Engineer
EE JSV Mandi
Laying jointing and testing of GI pipe Butt welding 65 mm dia dia at various RD,s ( Under PDNA )
2026_HPIPH_134074_1
1022-1121
Open Tender
Civil Works
90 days
Mandi
Please refer Tender documents.
6 documents required · 6 mandatory
₹350
₹5,650
8 May 2026
11 Apr 2026
20 Apr 2026
11 Apr 2026
18 Apr 2026
11 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
Excavation in foundation, trenches (for pipes & pits) up to all depths in all classification of earth work such as pick work, jumper work, saturated soil including blasting soft/hard rock or chiseling soft/hard rock where blasting is prohibited in all lifts including trimming & dressing of sides, levelling of beds to correct grade i/c shoring/ strutting, planking, timbering wherever required, stacking the useable or unuseable material/ soil separately & after excavated soil clear from the edge of excavation returning the excavated soil after laying jointing testing of pipes in trenches in 15 Cm layers including consolidating of each deposited layer by ramming, watering & then disposing of all surplus excavated soil/unusable material as directed with in all leads & lifts including restoration of unmetalled surfaces to its original condition & including cost of diversion for traffic, night signals, fixing caution boards, crossing over trenches for access to houses, fencing etc. complete in all respect with in all leads & lifts as per the entire satisfaction & directions of Engineer-in-Charge. | - | Cum | - | - | |
Laying, jointing ( by way of circumfrential butt welded joints by electrical arc welding ) and testing of Galvanised mild steel tubes (GI Pipes) of following dia meters confirming to BIS 1239-2001 (latest with upto date amendments) having wall thickness as per code with bevelled / plain ends in a random length of 4 to 7 meters, including manufacturing reducers/ tapers , all short pieces, bends etc. as per site requirement made from parent tubes . The laying of pipe will include all operation such as cutting, welding, jointing, fabrication of bends, tees etc. including lowering and laying in excavated trenches to ensure required level including flushing, cleaning and hydraulic testing complete in all respects to the satisfaction of the Engineer in charge. The fabricated bends shall have three or four cuts having its radius not less than five times the dia of pipe. The damaged portion of the pipes and specials made form the parent tube during welding or otherwise shall be provided anticorrosive treatment by applying two coats of anticorrosive bituminous paint over a priming coat as per AWWA specifications C-203-1978. The welding electrodes shall be as per IS 814 of Advani Oerlikon/ L&T or ISI marked make. The rates also includes entire carriage of material, flushing, cleaning & hydraulic testing complete to the best satisfaction & direction of Engineer in charge with in all leads and lifts. (Earth work in trenches will be measured and paid for separately). | - | Rmt. | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.58 MB
Form6.pdf
Tender Documents • 0.67 MB
Form8.pdf
Tender Documents • 1.13 MB
BOQ_198270.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid