Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.9 LAccepted-AOC | L1 | Accepted-AOC lowest | |
| 2 | L2₹8.0 L+₹7,262.10 (0.92%)Rejected-AOC | L2 | Rejected-AOC second lowest |
| Sl No | Description | Qty | Unit | V JAYAKUMAR L2 | MAHESH B R L1 |
|---|---|---|---|---|---|
| 1.00Appendix 1 | |||||
| 1.00 | OD340155/2025-2026:Cutting and removing Arayal growth (baniyan tree) over the parapet wall, roof slabs, sunshade, expansion joints etc in various floors. After dismantling the existing cement plaster, brick work, cement concrete work etc wherever if necessary for removing stem and root with out any damages of remaining structure and cutting and removing its stem and roots and chemically burying the remaining roots where ever if necessary and rectifying the dismantled portion etc complete in cleaning all cost and conveyance of rectifying materials, burying chemicals (acid, kerosene etc) including disposal of waste materials with in a distance of 150m away from the site. | 20 | each | 485 ₹9,700 | 481 ₹9,620 Lowest |
| 1.00 | 14.72:Providing and fixing double scaffolding system (cup lock type) on the exterior side, upto seven story hight made with 40 mm dia. M.S. tube 1.5 m centre to centre, horizontal & vertical tubes joining with cup & lock system with M.S. tubes, M.S. tube challies, M.S. clamps and M.S. staricase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for the required duration as approved and removing it there after. The scaffolding system shall be stiffened with bracings, runners, connection with the building etc wherever required for inspection of work at required location with essential safety features for the workmen etc. complete as per directions and approval of Engineer- in Charge. The elevational area of the scaffolding shall be measured for payment purpose. The payment will be made once irrespective of duration of scaffolding. Note:- This item to be used for maintenance work judicially, necessary deduction for scaffolding in the existing item to be done . | 60 | sqm | 401 ₹24,060 | 398 ₹23,880 Lowest |
| 1.00 | OD340161/2025-2026:Cleaning of terrace/loft water storage tank (inside surface area) up to 5000 litre capacity at all heights with coconut brushes, duster etc, removal of silt, rubbish from the tank and cleaning the tank with fresh water disinfecting with bleaching powder @ 0.5gm per litre capacity of tank including marking the date of cleaning on the side of tank body with the help of stencil and paint and disposing of malba all complete as per direction of Engineer-in-Charge. (The old date already written on tank should be removed with paint remover or black paint and if date is not written with the stencil or old date is not removed deduction will be made @ Rs. 0.10 per litre) (if during cleaning any GI fittings or ball cock is damaged that is to be repaired by contractor at his own cost and nothing extra will be paid on this account) | 2,09,000 | Litre | 0.45 ₹94,050 Lowest | 0.45 ₹94,050 Lowest |
| 1.00 | 14.76:Cleaning and desilting of gully trap chamber, including removal of rubbish mixed with earth etc. and disposal of same, all as per the direction of Engineer-in-charge. | 10 | no | 126 ₹1,260 | 125 ₹1,250 Lowest |
| 1.00 | OD340158/2025-2026:Cleaning the blocked up and not working sewer manhole of size 0.60x0.60x0.8m including disposal of black earth etc. | 10 | each | 973 ₹9,730 | 964 ₹9,640 Lowest |
| 1.01 | OD340159/2025-2026:Cleaning the blocked up and not working sewer manhole of size 0.80x0.80x1.20m including disposal of black earth etc. | 22 | each | 2,190 ₹48,180 | 2,170 ₹47,740 Lowest |
| 1.01 | OD340157/2025-2026:Cleaning the blocked up and not working sewer manhole of size 0.80x1.2x1.20m including disposal of black earth etc. | 10 | each | 3,261 ₹32,610 | 3,231 ₹32,310 Lowest |
| 1.01 | OD340160/2025-2026:Cleaning the blocked up sewage line using sewage clearing rod and put up the same in
working order etc. | 100 | metre | 123 ₹12,300 | 122 ₹12,200 Lowest |
| 1.01 | OD340162/2025-2026:Labour engaged for removing waste materials, cleaning, etc | 16 | each | 1,216 ₹19,456 | 1,205 ₹19,280 Lowest |
Tender Value
₹7.2 L
EMD Value
₹18,116
Closing Date
3 Jun 2026, 3:00 pmClosed
AEE
O/o the AEE,KLC TVPM
Govt Secretariat -Anticipated plumbing and sanitarywork. Water Tank cleaning and all other allied works for clearing blockages in bathrooms ,toilet and premises of secretariat campus for the period from April 2026 to June 2026
2026_PWD_853078_1
PWD/BLDG/TR/3706/2026_5_1_1/1
Open Tender
Civil Works - Buildings
Item Rate
90 days
Govt. Secretariat, TVPM
Please refer Tender documents.
10 documents required · 10 mandatory
₹1,600
Yes
₹18,116
Yes
27 Jul 2026
26 May 2026
5 Jun 2026
26 May 2026
3 Jun 2026
26 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Appendix 1 | |||||
| 1.001 | OD340155/2025-2026:Cutting and removing Arayal growth (baniyan tree) over the parapet wall, roof slabs, sunshade, expansion joints etc in various floors. After dismantling the existing cement plaster, brick work, cement concrete work etc wherever if necessary for removing stem and root with out any damages of remaining structure and cutting and removing its stem and roots and chemically burying the remaining roots where ever if necessary and rectifying the dismantled portion etc complete in cleaning all cost and conveyance of rectifying materials, burying chemicals (acid, kerosene etc) including disposal of waste materials with in a distance of 150m away from the site. | - | each | - | - |
| 1.002 | 14.72:Providing and fixing double scaffolding system (cup lock type) on the exterior side, upto seven story hight made with 40 mm dia. M.S. tube 1.5 m centre to centre, horizontal & vertical tubes joining with cup & lock system with M.S. tubes, M.S. tube challies, M.S. clamps and M.S. staricase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for the required duration as approved and removing it there after. The scaffolding system shall be stiffened with bracings, runners, connection with the building etc wherever required for inspection of work at required location with essential safety features for the workmen etc. complete as per directions and approval of Engineer- in Charge. The elevational area of the scaffolding shall be measured for payment purpose. The payment will be made once irrespective of duration of scaffolding. Note:- This item to be used for maintenance work judicially, necessary deduction for scaffolding in the existing item to be done . | - | sqm | - | - |
| 1.003 | OD340161/2025-2026:Cleaning of terrace/loft water storage tank (inside surface area) up to 5000 litre capacity at all heights with coconut brushes, duster etc, removal of silt, rubbish from the tank and cleaning the tank with fresh water disinfecting with bleaching powder @ 0.5gm per litre capacity of tank including marking the date of cleaning on the side of tank body with the help of stencil and paint and disposing of malba all complete as per direction of Engineer-in-Charge. (The old date already written on tank should be removed with paint remover or black paint and if date is not written with the stencil or old date is not removed deduction will be made @ Rs. 0.10 per litre) (if during cleaning any GI fittings or ball cock is damaged that is to be repaired by contractor at his own cost and nothing extra will be paid on this account) | 0.29 | Litre | - | - |
| 1.004 | 14.76:Cleaning and desilting of gully trap chamber, including removal of rubbish mixed with earth etc. and disposal of same, all as per the direction of Engineer-in-charge. | - | no | - | - |
| 1.005 | OD340158/2025-2026:Cleaning the blocked up and not working sewer manhole of size 0.60x0.60x0.8m including disposal of black earth etc. | - | each | - | - |
| 1.006 | OD340159/2025-2026:Cleaning the blocked up and not working sewer manhole of size 0.80x0.80x1.20m including disposal of black earth etc. | - | each | - | - |
| 1.007 | OD340157/2025-2026:Cleaning the blocked up and not working sewer manhole of size 0.80x1.2x1.20m including disposal of black earth etc. | - | each | - | - |
| 1.008 | OD340160/2025-2026:Cleaning the blocked up sewage line using sewage clearing rod and put up the same in
working order etc. | - | metre | - | - |
| 1.009 | OD340162/2025-2026:Labour engaged for removing waste materials, cleaning, etc | - | each | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1441603.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.05 MB
Requisitionforepayment.pdf
Tender Documents • 0.15 MB
license.pdf
Tender Documents • 0.18 MB
preagreement.pdf
Tender Documents • 0.09 MB
Bidsubmissionletter.pdf
Tender Documents • 0.15 MB
integritypactcertificate.pdf
Tender Documents • 0.15 MB
GST.pdf
Tender Documents • 0.14 MB
sbd.pdf
Tender Documents • 1.64 MB
nit.pdf
Tender Documents • 0.03 MB
BOQ_1441603.xls
BOQ • 0.35 MB
Affidavit.pdf
Tender Documents • 0.19 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .