Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹75,401Accepted-AOC | ₹75,401 | 1 | Accepted-AOC low |
| Sl No | Description | Qty | Unit | T SURESH BABU L1 |
|---|---|---|---|---|
| 1.00Construction Of Foot Path. | ||||
| 1.01 | Cutting or breaking hard rock manually (where blasting is prohibited ) measured in solid, including conveying with an initial lead up to 50 m and lift up to 1.50m & Stacking for at site for measurement. | 1.85 | m3 | 1,828 ₹3,381.80 |
| 1.02 | DR with Departmental. Stone - DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course using departmental rubble including packing to compactness to lines and levels, labour charges etc. complete as per direction of Departmental officers at site | 1.85 | m3 | 748 ₹1,383.80 |
| 1.03 | DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site | 11.6 | m3 | 2,516.8 ₹29,194.88 |
| 1.04 | Centering and shuttering including strutting, etc. and removal of form for: Foundations, footings, bases of columns, etc for mass concrete | 37.26 | m2 | 186.5 ₹6,948.99 |
| 1.05 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level: ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 6.84 | m3 | 5,738.7 ₹39,252.71 |
Tender Value
₹75,401
EMD Value
₹1,885
Closing Date
10 Oct 2025, 3:00 pmClosed
SECRETARY
KALPETTA MUNICIPALITY
Construction of Foot Path (Step) Near Sarjini House RE TENDER
2025_UAD_804202_3
657320-2024
Open Tender
Civil Works - Roads
KALPETTA
Please refer Tender documents.
7 documents required · 7 mandatory
₹555
Yes
₹1,885
Yes
18 Dec 2025
3 Oct 2025
13 Oct 2025
3 Oct 2025
10 Oct 2025
3 Oct 2025
Amount
Construction Of Foot Path.
Cutting or breaking hard rock manually (where blasting is prohibited ) measured in solid, including conveying with an initial lead up to 50 m and lift up to 1.50m & Stacking for at site for measurement.
DR with Departmental. Stone - DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course using departmental rubble including packing to compactness to lines and levels, labour charges etc. complete as per direction of Departmental officers at site
DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site
Centering and shuttering including strutting, etc. and removal of form for: Foundations, footings, bases of columns, etc for mass concrete
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level: ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1337383.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid