Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
₹3.0 Cr
EMD Value
₹3.0 L
Closing Date
21 Nov 2026, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer, Surat Canal Division, Surat
Constructing CR CUM V.R.B @ CH. 100.04 RD KLBMC and HR cum VRB @ CH. 0.00 RD of ubrat branch canal Ex. Ch 100.04 RD of KLBMC.
363685
NIT-05 of 2026-27
Open
Civil - All
Works
Surat
13 documents required · 11 mandatory · 2 optional
₹3,600
Executive Engineer, Surat Canal Division, Surat
₹3.0 L
7 Nov 2026
7 Nov 2026
7 Nov 2026
21 Nov 2026
7 Nov 2026
120 days
BILL OF QUANTITIES
BILL OF QUANTITIES
1. The bill of Quantities shall be read in conjunction with the Instructions to Bidder,
Conditions of Contract, Technical Specifications and Drawings.
2. The quantities given in the Bill of Quantities are estimated and provisional, and are given
to provide a common basis for bidding. The basis of payment will be the actual quantities
of work ordered and carried out, as measured by the Contractor and verified by the
Engineer and valued at the rates and prices tendered in the priced Bill of Quantities, where
applicable, and otherwise at such rates and prices as the Engineer may fix within the terms
of the Contract.
3. The rates and prices tendered in the priced Bill of Quantities shall, except in so far as it
is otherwise provided under the Contract, include all constructional plant, layout,
supervision, materials, erection, maintenance, insurance, profit, taxes and duties,
together with all general risks, liabilities and obligations set out or implied in the Contract.
4. The rates and prices shall be quoted entirely in Indian Currency.
5. A rate or prices shall be entered against each item in the Bill Quantities, whether quantities
are stated or not. The cost of Items against which Contractor has failed to enter a rate or
price shall be deemed to be covered by other rates and prices entered in the Bill of
Quantities (in case of Item rate contract).
6. The whole cost of complying with the provisions of the Contract shall be included in the
items provided in the priced Bill of Quantities, and where no Items are provided the cost
shall be deemed to be distributed among the rates and prices entered for the related items
7. General direction and descriptions of work and materials are not necessarily repeated
or summarized in the Bill of Quantities. References to the relevant sections of the contract
documentation shall be made before entering rates or prices against each item in the Bill
8. The method of completed work of payment shall be in accordance with the specification for
Road and Bridge works. For building works specifications for building are to be followed.
9. Errors will be corrected by the Employer for any arithmetic errors pursuant to
Clause 29 of the Instructions to Bidder.
10. Rock is defined as all materials which, in the opinion of the Engineer, required blasting,
or the use of metal wedges and sledgehammers, or the use of compressed air drilling
for its removal, and which cannot be extracted by ripping with a tractor of at least 150 kw
with a single rear mounted heavy duty ripper.
BILL OF QUANTITIES
Name of Work : Constructing CR CUM V.R.B @ CH. 100.04 RD KLBMC and HR cum VRB @ CH. 0.00 RD of
ubrat branch canal Ex. Ch 100.04 RD of KLBMC.
Percentage Rate Tender (Up to INR 50 Cr. )
Sr Description of Item (with brief Quantity Unit Rate in Amount
No specification and reference to book of Figure
specifications) s
Dismentalling the existing brick masonry including
sorting out and stacking the useful materials and
removing the debries and making good the
damage etc. complete as directed. (b) In cement
Dismentalling the existing foundation concrete
including disposing the dismentalled stuff including
sorting out and stacking the useful materials and 99.07 CM 1310.80
removing the debries and making good the
damage etc. complete as directed.(c) R.C.C for
super structure
Excavation for foundation in all sorts of soil
including yellow, sandy, gravelly soil, soft & hard
murrum, etc. dry condition including depositing the 1807.53 CM 81.50
excavated stuff in uniform layers in banks or as
directed etc. complete for lead uo to 1.0 Km and all
lifts. (By machinery) (a) Above water table.
Providing and laying plain/ reinforced Design Mix
cement concrete of various grade with cement,
sand and coarse aggregates including centering,
shuttering, batching, mixing, transporting, placing,
vibrating, smooth finishing, curing etc. complete for
all lead and lift.(Baching Plant Based, Including
(A) Foundation (i) M-10 grade 131.41 CM 3836.00
(B) Piers, abutment, wing walls, headwall, return
wall etc (ii) M-15 grade
(C) Raft, Bottom slab of barel, footing of columns,
piers, abutment and bottom slab of sump etc. (iii) CM 4796.10
Concrete grade M-20 and MSA-20 mm
(D)For Column / Beam / Solid Slab of Road Bridge
/ Barrel / Cutoff wall/ Approach Slab etc. CM 4844.70
(iv)Concrete grade M-25 and MSA-20 mm
E) Roadway slab, approch salb, chute floor slab,
kerb, pier cap, abutment cap, hoisting platform, top CM 5206.30
slab of barrel etc.
Providing and placing in position reinforcement
bars including cutting, bending welding, joints Qtl. 7194.00
where necessary, hooking etc. complete as per
drawing for all lead and lifts. (A) TMT.
Providing and fixing in position pre moulded
asphalt or bitumen cork board of approved quality SM 1007.40
and specification as per design and drawing as
directed. (D) 12mm thickness
Providing and fixing in position PVC heavy duty
water stops in barrels, trough, and wing wall with
25 mm wide expension joint as shown in drawing
including filling the joints with asphalt pad or
bitumins or cork board of approved quality. (A)
225mm wide PVC water stop.
Providing and filling the polysulphide joint selent of
the approved make in the expansion and RM 533.00
contraction joints in the c.c. lining including clearing
the joints with air water jet.
Providing and fixing in position 110 mm dia PVC
pipe weep holes in abutment, wing wall, and laying
training etc. complete
Back fiing the foundation trenches around the
structures etc. with selected excavated stuff CM 19.50
including watering, ramming, compacting etc.
complete.(By machinery)
Providing & fixing in position sign board of standard
size of 1.20mx0.90m with M.S angle 40mm x
40mm x 6mm with 3mm thick iron plate including 1.00 Nos 3011.30
fixing in 1:5:10 prop. Concrete block size
40cmx40cmx75 cm including painting existing data
on the board etc. complete as directed.
Providing and applying anti carbonation, anti
fading, mold resistant, heat insulating, and 100%
acrylic breathable decorative external waterproof
coating of approved shade having Viscosity @
Room Temperature by Ford cup No. B-4 (dilute
parts of product with I part of water) 18 to 30 sec. 134.00 SM 120.51
pH of 7.00 to 10.00 and Sp. Gravity @ Room
Temperature 1.30+0.1, tested forcarbon dioxide
diffusion resistance properties for coating materials
and coating systems for exterior masonry and
concrete as per DIN EN 1062-6 (2002-2010) by a
NBAGrade "A" accredited institution.
Constructing of granular sub-base Gr-II by
providing course graded B.T. machine crushed
material satisfying MOST specification of grading II
including spreading in uniform layer with motor CM 1145.00
grader on prepared surface, mixing by mix in place
method with rotavator at OMC and compacting with
vibratory roller to achieve the desired density etc.
Providing and laying spreading and compacting
graded stone aggregate to Wet Mix Macadam
(WMM) in two layer as per specification and
drawing including premixing the Material with water
at OMC in mechanical mix plant carriage by tipper
to site, laying in uniform layer in sub-base/base
course on well prepare surface and compacting
with vibrator rollar to achive the desired density as
per MORTH fifth revision clause-406
Providing gauge plate of following size of material
fibre glass reinforced plastic with engraved bands
width and figures with necessary clits and fasteners
and fixing the same at the site of work etc complete
as directed.For 0.60 mt. x 1.0 mt. gauge pat
Type - A, "W" : Metal Beam Crash Barrier
(Providing and erecting a "W" metal beam crash
barrier comprising of 3 mm thick corrugated sheet
metal beam rail, 70 cm above road/ground level,
fixed on ISMC series channel vertical post, 150 x
75 x 5 mm spaced 2 m centre to centre, 1.8 m high, RM 3462.00
1.1 m below ground/road level, all steel parts and
fitments to be galvanised by hot dip process, all
fittings to conform to IS:1367 and IS:1364, metal
beam rail to be fixed on the vertical post with a
spacer of channel section 150 x 75 x 5 mm,
mm long complete as per clause 811)
Care and diversion of Canal including required
dewatering during construction of CD works and 2.00
allied works as prescribed and directed etc.
complete. (Including credit of usable NP pipe after
completing of work)
Fabrication, Supply, Erection, Testing and
commissioning of Vertical Gate including Hoisting
Mechanism, Gate Leaf, Embeded parts with
second stage concret of CR cum VRB at
CH.100.04 RD of KLBMC & HR cum VRB at
CH.0.00 RD of UBHARAT Branch canal with all Nos 452637.0
accessories, including cost of all materials,
machinery, labour, cutting, bending, aligning,
welding, finishing,cleaning, painting, seal fixing
etc., complete as per specifications and approved
drawings with all leads and lifts. Gate Size 2.50 mt.
X 2.75 mtr- (8 Nos )
Providing videogrphy on the occasion of function or
for ongoing construction work including dubbing, 1230.51
titling etc. complete including cost of cassate
/CD.(b) Up to 4.0 hours
Rupees Two Crore Ninety-Seven Lakh Thirty-One Thousand Eight Hundred Forty-Four Rupees and Eighty-
I/We am/are willing to carry out the work at… ...................... % above/below percent (Should
be written in figures and words) of the estimated rate mentioned above. Amount of my /our
tender works out as under.
Estimated amount put to tender Estimated amount put to tender
Deduct………% below Add………% Above
In words In words
Note:-GST as per prevailing rate shall be paid Extra.
(A) For Item Rate Tender (For above INR 50 Cr.):
Item Description of Item Quantity Unit Rate Amount
No (with brief specification
and reference to book of In In
specifications) figures Words
(A) Total Tendered Amount
(B) Rebate on above tendered amount (if any) % (in figure) ………………………………
(C)Net Tendered Amount (A-B) (in figure) ………………………………
1 The Contractor shall exhibit a board with detailed specification and details of work as
directed by the Engineer-In-Charge for which no extra payment shall be made.
2 The labour cess will be deducted as per prevailing rules i.e. 1% of the work done.
3 GST and Income tax TDS will be deducted at a source while making payments of bills
4 In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per
Govt. G.R.: PRC-10/2017 Cement Consumption/16/C Date:11/05/2017 as stated in
S.O.R. therefore in R.C.C. items where there is a change as per actual mix design the cost
of difference of cement consumption have been deducted from the rate of original item
at the rate of input rate mentioned in all the tender.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
SBD-100 RD 5-11-2026.pdf
BOQ 100 RD.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .