Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹18.8 Cr
EMD Value
₹10 L
Closing Date
27 Oct 2026, 1:00 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Superintending Engineer,Eastern Highway Circle
Purta Bhavan, Salt Lake, Kolkata-700091 1st Floor, Room No.104 and 105
Old Jessore road from Doltala to Ganganagar from 0.00 kmp to 1.80 kmp (excluding 252 m Nowai Bridge Portion) Widening and Strengthening work under Barasat Highway Division I in the district of North 24 Parganas (2nd Call)
2026_WBPWD_5077890_2
WBPWD/PW(R)/SE/EHC/NIT-07 of 2026-27
Open Tender
CIVIL WORKS
Percentage
180 days
North 24 Parganas
Please refer Tender documents.
5 documents required · 5 mandatory
₹10 L
Yes
Superintending Engineer,Eastern Highway Circle
6 Oct 2026
6 Oct 2026
29 Oct 2026
6 Oct 2026
27 Oct 2026
9 Oct 2026
9 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1(A) Cost of Road Work : | |||||
| 1.01 | Clearing and Grubbing Road Land
Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, sapling sand trees girth upto 300mm, removal ofstumps of trees cut earlier and disposal of unserviceable material sand stacking of serviceable material to be used or auctioned,upto alead of 1000metres including removal and disposal of top organic soil not exceeding 150mmin thickness. (Reference to MoRT&H's specification clause 201)
By Mechanical Means
In area of light jungle | 1.55 | Hec | 50,633.31 | ₹78,481.63 |
| 1.02 | Cold Milling of Bituminous Pavement
Cold Milling of Bituminous Pavement surface upto the required depth by mechanical means using milling machine, without disturbing the under lying layers, to proper line and level, cleaning the surface properly after milling and removing the loose materials, stacking the milled materials for re-use, necessary guarding, barricading & lighting, including hire charges of machinery, cost of fuel and labour and other incidental charges all complete and as per direction of Engineer-in-Charge.
For depth upto 100mm | 8,552.7 | Sqm. | 42.02 | ₹3,59,384.45 |
| 1.03 | Box cutting or filling in Road embankment in all sorts of soil including spreading the spoils properly over the flank as necessary or on berm to approximate grade & camber and rolling the sub-grade with power roller to proper camber and grade as per direction and satisfaction of Engineer-in-charge including uprooting and removing plants and jungles when and where necessary.
Depth up to 150 mm. | 21,826.8 | Sqm. | 14.54 | ₹3,17,361.67 |
| 1.04 | Box cutting or filling in Road embankment in all sorts of soil including spreading the spoils properly over the flank as necessary or on berm to approximate grade & camber and rolling the sub-grade with power roller to proper camber and grade as per direction and satisfaction of Engineer-in-charge including uprooting and removing plants and jungles when and where necessary.
Depth above 150mm | 78,638.4 | Sqm. | 19.19 | ₹15,09,070.9 |
| 1.05 | Supplying and Laying in the particular pattern of cement concrete block pavements with BIS certification and spacer nib of size and shape with aspect ratio as per IS 15658 with cement concrete grade not less than M40 on the prepared base course of specified CBR as mentioned in design and drawing with a cushion of bedding sand of 30 to 50 mm thick (grading of the bedding sand as per clause 6.5.1 of IRC SP-63) and filling up the gaps between two paver block with joint filling sand (the grading of the joint filling sand will be as per clause 6.5.2) complete as per IRC SP - 63 with proper confinement of bedding and joint filling sand, compaction,levelling and filling up of the edge gaps with mortar. Type I, II,III, IV should be as per design requeirment or instruction of E-I-C.
Type - II (100 mm thickness) inter locking system | 7,740 | Sqm. | 1,880.69 | ₹1,45,56,540.6 |
| 1.06 | Sand (Fine, Yellow) Filling in Foundation Trenches with good local sand free from earth not exceeding 150 mm compacted thickness including inundating each layer by profuse water and porking and rammimg layer by layer. Quality of sand is to be approved by the Engineer-in-charge.(Reference to MORT&H's specification 304). | 4,814.28 | Cum. | 1,579.07 | ₹76,02,085.12 |
| 1.07 | Granular Sub-base with Graded Material (Table:- 400-1)
Plant Mix Method
Construction of granular sub-baseby providing graded material such as crushed Stone depending upon the required grading spreading in uniform layers with motor grader on prepared surface, mixing by appropriate mechanical mixure (with controlled addition of water), and compacting with vibratory roller to achieveat least 98%of themaximum dry density for the material determined as per IS:2720 (Part 8), complete as per clause 401
Grading-V Material
Using Pakur Variety of stone aggregates of required sizes | 3,010.86 | Cum. | 2,939.55 | ₹88,50,573.51 |
| 1.08 | Granular Sub-base with Graded Material (Table:- 400-1)
Plant mix Method
Construction of granular sub-baseby providing graded material such as crushed stone depending upon the required grading spreading in uniform layers with motor grader on prepared surface, mixing by appropriate mechanical mixure (with controlled addition of water), and compacting with vibratory roller to achieveat least 98%of themaximum dry density for the material determined as per IS:2720 (Part 8), complete as per clause 401
Grading-III Material
Using Pakur Variety of stone aggregates of required sizes | 1,161 | Cum. | 2,903.69 | ₹33,71,184.09 |
| 1.09 | Wet Mix Macadam
Providing, laying, spreading and compacting graded stone aggregate conforming to the grading of table 400- 13 revised vide table 2 of IRC : 109 (2015) to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density .The thickness of a single compacted layer shall not be less than 75 mm.(Reference to MoRT&H's specification 406.
Using Pakur Variety of stone aggregates of required sizes | 5,444.5 | Cum. | 2,994.24 | ₹1,63,02,139.68 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.93 MB
Order07.pdf
Other Document • 3.55 MB
2911_ii.pdf
Tender Documents • 0.54 MB
BOQ_5176490.xls
BOQ • 0.38 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .