Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹12.9 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹13.3 L+₹39,739.10 (3.09%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L3₹13.4 L+₹56,025.61 (4.35%)Admitted-Fee/PreQual/Technical/Finance C O C CLASS CONTRACTOR GORUMAHISANI | BALANGIR | ODISHA | 767001 | L3 | Admitted-Fee/PreQual/Technical/Finance | ||
| 4 | L4₹13.5 L+₹62,703.08 (4.87%)Admitted-Fee/PreQual/Technical/Finance A T U V 05 P O BURJA P S UMERKOTE DIST NABARANGPUR ODISHA | NABARANGPUR | ODISHA | L4 | Admitted-Fee/PreQual/Technical/Finance | ||
| 5 | L5₹13.5 L+₹65,146.06 (5.06%)Admitted-Fee/PreQual/Technical/Finance | L5 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹16.3 L
EMD Value
₹16,300
Closing Date
9 Jun 2026, 5:00 pmClosed
Project Administrator
Integrated Tribal Development Agency, Nabarangpur
Construction of Additional Class Room at Sunabeda Ashram School under Umerkote Block
2026_STSCD_129747_43
ITDANBG-02/26-27
Open Tender
Civil Works - Buildings
Percentage
180 days
Nabarangpur
D and C Class
2 documents required · 2 mandatory
₹6,000
₹16,300
Yes
7 Jul 2026
26 May 2026
16 Jun 2026
26 May 2026
9 Jun 2026
26 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | RCC work of M-20 grade with 20mm and down grade black hard granite (crusher broken) stone chips incuding watering and curing etc. complete as per direction of Engineer-in charge.
FIRST FLOOR
a) Columns | 44.1 | Cum | 304.93 | ₹13,447.19 |
| 1.1 | b) Lintel Bend | 47.07 | Cum | 672.6 | ₹31,661.2 |
| 1.2 | c) Stair Case | 14.73 | Cum | 5,929.25 | ₹87,348.97 |
| 1.3 | d) Chajja | 14.02 | Cum | 5,618.6 | ₹78,750.72 |
| 1.4 | e) Roof Beam | 8.91 | Cum | 6,825.15 | ₹60,812.09 |
| 1.5 | f) Roof slab | 4.2 | Cum | 7,695.45 | ₹32,321.12 |
| 1.6 | SECOND FLOOR
a) Columns | 4.01 | Cum | 18,496.9 | ₹74,184.13 |
| 1.7 | b) Roof Beam | 2.38 | Cum | 14,488.6 | ₹34,505.11 |
| 1.8 | c) Roof slab | 9.95 | Cum | 1,257.7 | ₹12,507.83 |
| 2 | Supplying, fitting and placing uncoated HYSD bars reinforcement tying the grills, straighten placing them in position including cost of bindings wire 18 to 20mm gauge including cost of HYSD bar with conveyance and royalty etc. complete and as per technical specification and as directed by the Engineer-in-Charge.
FIRST FLOOR | 3.03 | Cum | 17,513.95 | ₹53,060.26 |
stage.html
html • 0.03 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.49 MB
BOQ_592701.xls
BOQ • 0.27 MB
DTCN2.pdf
Tender Documents • 2.73 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .