| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹10.8 LAccepted-AOC | 1 | Accepted-AOC L1 | |
| 2 | 2₹12.6 L+₹1.8 L (16.9%)Rejected-AOC | 2 | Rejected-AOC L2 | |
| 3 | 3₹13.3 L+₹2.5 L (22.7%)Rejected-AOC | 3 | Rejected-AOC L3 |
| Sl No | Description | Qty | Unit | Jayan V.P L2 | m.a.muhammed L1 | HARSHAD T M L3 |
|---|---|---|---|---|---|---|
| 1.00Canal left side intermediate wall | ||||||
| 1.00 | 15.2.2:Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:4:8 or leaner mix ( including equivalent design mix) | 7.3 | cum | 1,554.43 ₹11,347.34 | 1,321.26 ₹9,645.2 Lowest | 1,632.15 ₹11,914.7 |
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 45.9 | cum | 257.63 ₹11,825.22 | 218.98 ₹10,051.18 Lowest | 270.51 ₹12,416.41 |
| 1.00 | 60.7.9:RR with Departmental. Stone - Random rubble masonry using departmental rubble in foundation and plinth including through and bond stone and levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) upto plinth level with Cement mortar 1:6 (1 cement : 6 coarse sand). | 0.53 | cum | 6,174.34 ₹3,241.53 | 5,248.18 ₹2,755.29 Lowest | 6,483.05 ₹3,403.6 |
| 1.00 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 45.9 | cum | 7,932.89 ₹3,64,119.65 | 6,742.95 ₹3,09,501.41 Lowest | 8,329.53 ₹3,82,325.43 |
| 1.00 | 4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns | 271.54 | sqm | 356.16 ₹96,711.69 | 328.23 ₹89,127.57 Lowest | 373.96 ₹1,01,545.1 |
| 1.01 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 1,560.92 | kilogram | 112.43 ₹1,75,494.46 | 95.56 ₹1,49,161.71 Lowest | 118.05 ₹1,84,266.84 |
| 1.01 | 5.1.3:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 59.28 | cum | 9,963.93 ₹5,90,701.63 | 8,469.34 ₹5,02,096.35 Lowest | 10,462.12 ₹6,20,236.32 |
| 1.01 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 1 | cum | 9,235.97 ₹9,235.97 | 7,850.57 ₹7,850.57 Lowest | 9,697.77 ₹9,697.77 |
Tender Value
₹12.7 L
EMD Value
₹31,771
Closing Date
7 Mar 2026, 5:00 pmClosed
Roshni S S
CIP Subdivision, Pazhayannur
GENERAL-Flood damages 2024-Urgent Rectification of damaged d/s intake and LBMC ch 0/000km to ch 22/950km.-General Civil Work
2026_Irrig_841839_1
IRR/IA/TR/5817/2024_5_1_1/1
Open Tender
Civil Works - Canal
Item Rate
270 days
Cheerakuzhy
Please refer tender documents
8 documents required · 8 mandatory
₹2,760
Yes
₹31,771
Yes
16 May 2026
28 Feb 2026
9 Mar 2026
28 Feb 2026
7 Mar 2026
28 Feb 2026
28 Feb 2026 - 7 Mar 2026
Canal left side intermediate wall
15.2.2:Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:4:8 or leaner mix ( including equivalent design mix)
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil
60.7.9:RR with Departmental. Stone - Random rubble masonry using departmental rubble in foundation and plinth including through and bond stone and levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) upto plinth level with Cement mortar 1:6 (1 cement : 6 coarse sand).
4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources)
4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
5.1.3:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size derived from natural sources)
4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1419937.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.05 MB
fot.pdf
Tender Documents • 0.25 MB
epay.pdf
Tender Documents • 0.23 MB
ipact.pdf
Tender Documents • 0.23 MB
affid.pdf
Tender Documents • 0.24 MB
sbd.pdf
Tender Documents • 2.48 MB
BOQ_1419937.xls
BOQ • 0.30 MB
preliminaryagreement.pdf
Tender Documents • 0.19 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .