Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.5 CrAccepted-AOC HARIDWAR | ₹1.5 Cr | L1 | Accepted-AOC yes |
| 2 | L2₹1.6 Cr+₹3.4 L (2.23%)Rejected-Finance 518 4 SAINI COLONY ROORKEE | ₹1.6 Cr+₹3.4 L (2.23%) | L2 | Rejected-Finance no |
| 3 | L3₹1.6 Cr+₹6.9 L (4.44%)Rejected-Finance 2 FRIENDS ENCLAVE SHAH NAGAR DEHRADUN | ₹1.6 Cr+₹6.9 L (4.44%) | L3 | Rejected-Finance no |
Tender Value
₹1.4 Cr
EMD Value
₹2.7 L
Closing Date
9 Sept 2024, 12:00 pmClosed
SE EDC Srinagar Garhwal
SE EDC Srinagar Garhwal
Replacement of Bare Conductor LT Line by Aerial Bunch Cable on 11 Kv Rathuadhab feeder at various villages under EDD Nainidanda on Semi Turnkey Basis
2024_UPCL4_75029_1
E-Tender no.27/EDC(s)/2024-25
Open Tender
Electrical Works
Turn-key
180 days
Srinagar
Replacement of Bare Conductor
LT Line by Aerial Bunch Cable
on 11 Kv Rathuadhab feeder at
various villages under EDD
Nainidanda on Semi Turnkey
Basis
3 documents required · 3 mandatory
₹11,800
EE ETD Srinagar Garhwal
₹2.7 L
7 Jan 2025
28 Aug 2024
10 Sept 2024
28 Aug 2024
9 Sept 2024
28 Aug 2024
Amount
Material
Stay Clamp For ST Pole SP- 21/10 Of Size 50x6 sqmm duly red oxide painted with suitable size with fitted Nut and Bolts and washer as per specification of UPCL
MS Half Clamp For LT DB For ST Pole SP- 21/10 Of Size 25x3 sqmm duly red oxide painted with suitable size with fitted Nut and Bolts.
3 Phase LT Distribution Box With inbuilt panel lock, Al Bus Bar RYB 25x6mm,Al Busbar N 40x6mm
1 Phase LT Distribution Box With inbuilt panel lock, Al Bus Bar RYB 25x6mm,Al Busbar N 40x6mm
Insulated piercing connector size 70-70/35-35 sqmm for line to line tapping
Insulated piercing connector size 70/35 sqmm to 16 sqmm for energising disribution box
Dead End Clamp With I Hook.(Insulated)
Suspension Clamp With I Hook.(Insulated)
LT Wire Neutral Connector PG Clamp 50/25-25sqmm single bolt as per UPCL specificationfor energising distribution box
LT Wire Neutral Connector PG Clamp 50-50/25-25sqmm single bolt as per UPCL specification for line to line tapping
Head shink type end caps suitable for LT ABC
Lug size 16 Sqr Mm
Lug size 50 Sqr Mm
1x16 sq mm XLPE insulated Al. Cable for energising the distribution boxes
1x50 sq mm XLPE insulated Al. Cable for energising the distribution boxes
LT AB Cable 3x35+1x25 Sqr mm
LT AB Cable 1x35+1x25 Sqr mm
Holding clamp for J-hook
Mid span Joint
Various type Nut and Bolt.
Labour
Cartage of ST Pole SP-21 pole from Store Centre Kotdwar/Risikesh/ Dehradun to Work Site with Stacking site in 1Km Distance Including Loading & unloading (distance 5kms-225 kms)
ST Pole SP-21
ST Pole SP-10
Head Load Cartage of ST Pole SP-21 From Road Site to work site distance approx 3.0 km By Man Power
ST Pole SP-21
ST Pole SP-10
Cartage of small Line material from Store Centre Dehradun /Kotdwar to road Side Including loading & unloading (distance 5kms-2225 kms)
Head Load Cartage of Road Site to work site distance approx 3.0 km By Man Power
LT AB Cable 3x35+1x25 Sqr Mm
LT AB Cable 1x35+1x25 Sqr Mm
Erection charge of ST Pole SP-21/10 pole in long span as per UPCL norms
ST Pole SP-21
ST Pole SP-10
Fixing and Grouting of stay Complete Work
Removing & Reconnection of Single phase/Three phase LT Consumer Service Connection
Painting of poles
ST Pole SP-21
ST Pole SP-10
Dismantling of Old ACSR weasel Conductor from existing LT line including Re Rolling cartage from worksite to JE Store after Head Load cartage from different site.
LT line 3 Phase 4 Wire
LT line 2 Phase 3 Wire
LT line 1 Phase 2 Wire.
Head load cartage of dismantled old ACSR Weasel Conductor from work site to road side
Back cartage of dismantled old ACSR Weasel Conductor from JE Store to Rishikesh store
Laying stringing and sagging of AB cable including fixing of piercing Connector, dead end clamp with I hook, suspension clamps in all complete work.
LT AB Cable 3x35+1x25 Sqr Mm
LT AB Cable 1x35+1x25 Sqr Mm
Laying and fixing of 1x16/50 sq mm XLPE insulated Al. Cable for energising the distribution boxes
Installation of LT Distribution Box complete work Three Phase
Installation of LT Distribution Box complete work One Phase
Lopping chopping of tree Branches
Fixing of Holding clamp and stay clamp
Fixing of Nuts and Bolts
Straightening of tilted pole
Fixing of Aluminium Lugs
VIKAS ELECTRICALS AND CONSTRUCTION
UTTARANCHAL FORGINGS INDUSTRY
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .