Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.3 LAccepted-Finance | L1 | Accepted-Finance L1 | |
| 2 | L2₹14.8 L+₹55,000 (3.86%)Accepted-Finance | L2 | Accepted-Finance L2 | |
| 3 | L3₹16.0 L+₹1.7 L (12.2%)Rejected-Finance 65 905 SEBASTIAN ROAD KALOOR KALOOR ERNAKULAM KERALA 682017 | ERNAKULAM | KERALA | 682017 | L3 | Rejected-Finance L3 |
| Sl No | Description | Qty | Unit | SYNERGY POWER TECH L1 | SATHEESH KUMAR S L2 | POZITIVE POWER INDIA PVT LTD L3 |
|---|---|---|---|---|---|---|
| 1.00Electrification | ||||||
| 1.00 | OD96657/2025-2026:Supplying Installation, Testing and Commissioning of 10 KWp on-grid Solar Photovoltaic Power Plant conforming to various applicable standards BIS, IEC, MNRE guidelines, the Central Electricity Authority Regulations and CPWD Specifications as amended up to date, consisting of
TOPCon Monoperc half cut solar cells module,
net metering facility,
necessary control equipments,
protections, earthing,
cabling,
mounting structure,
junction boxes,
power conditioning units,
Distribution panels,
grid connecting arrangement,
conduits,
Pipes, cable trays and other accessories etc. as required.
a) High Energy Efficiency Solar Photovoltaic Module of capacity 540Wp or above, manufactured in India, conforming to IS 14286/IEC 61215, IS/IEC 61730-Part-1, IS/IEC 61730-Part-2. Solar Photovoltaic Module conversion efficiency shall not be less than 21.5% at STC with temperature coefficient of Pmax better than -0.30% per °C. PV modules used in solar power plants/ systems must have Linear output warranty of 25 Years (Max 1% degradation in Year 1, ? 0.4% annually from Year 2 to 25) . Solar Modules shall be designed to operate in relative humidity upto 100% with temperature between -10 °C and +85 °C. Further, each PV module used in any solar power project must have Radio frequency identification tag with information such as name of manufacturer, month and year of manufacturing, country of origin (separately for Solar cell and module),I-V curve, Unique Serial No and Model No of the module, Wattage, Im, Vm and FF, name of test lab issuing IEC certificate,the Solar PV modules must be manufactured using fully indigenous solar cells and components, meeting strict Domestic Content Requirement (DCR) rules,Must be listed in MNRE ALMM List-I (Modules) and List-II (Cells) .
b)Power Conditioning Unit (PCU) of 350- 800 V DC Input voltage range and 415 V AC, three phase, 4 wire, 50Hz +/- 2.5 Hz, output voltage suitable to generate AC with a variation of 10% at nominal voltage,Topology -String Inverter, Transformerless . Power with efficiency not less than 98% as per IEC 61683 / IS 61683 , total harmonic distortion less than 3% and suitable for ambient temperature from 0 to 50 °C, Minimum IP65 (For outdoor or indoor installation) as per IEC 60529 , Built-in Wi-Fi / GPRS data logger with remote monitoring portal access. , MPPT, switching devices IGBT/MOSFETs and controller Microprocessor /DSP. PCU/inverter shall be capable of complete automatic operation including wake-up, synchronization & shutdown. The PCU shall be able to withstand unbalanced load conforming to IEC standard with shutdown/standby mode. It must be provided with grid islanding along with manual disconnect pole isolation switch besides automatic disconnection. Minimum protections: Anti-islanding (IEEE 1547/IEC 62116), DC reverse polarity, AC/DC short circuit, over-voltage/under-voltage, over-frequency/under-frequency, ground fault protection and other protections as per applicable standards(IS 16221 (Part 1 & 2) / IEC 62109, IS 16169 / IEC 62116 ). LCD/LED display of minimum parameters: DC input voltage, DC current, AC Voltage and current (all 3 phases, in case of 3 phase), Instantaneous & cumulative AC output power, Daily DC energy produced and other parameters applicable standard. Communication interface RS 485 / RS 232
c) Module mounting structure: The roof top solar plant generation units shall be installed by using Hot-dip galvanized rigid steel (Minimum coating thickness 80 microns as per IS 4759) or High-strength Anodized Aluminium structural components. The mounting structure would be Designed to withstand wind loads up to 150 km/h (or as per local IS 875 Part 3 wind zone regulations), Fixed tilt optimized to maximize annual yield based on the site's exact latitude. . All the structure shall be design as per applicable BIS code and the material shall also confirm the applicable BIS Code. Structural material shall be corrosion resistant and electrolytically compatible with the materials used in the module frame, fasteners ,all bolts, nuts, washers, and structural fasteners must be made of Stainless Steel (SS 304). The suitable arrangements for maintenance and cleaning shall be provided.
d)Array junction box & Main junction box with IP68 rated with minimum 3 bypass diodes (IEC 62790 ) protection and termination arrangement for incoming and outgoing cable along with glands, lugs and other accessories etc. as required. Each junction box shall be made of GRP/FRP/Powder Coated Aluminium /cast aluminium alloy with full dust, water & vermin proof arrangement with High quality Suitable capacity Metal Oxide Varistors (MOVs) (semiconductor diode with resistant applied voltage)/ surge arrestors and suitable Reverse Blocking Diodes, isolation switches isolate the DC input to Inverter, copper bus bar etc.
e) Surge Protection Devices (SPD): Type-II SPDs must be integrated on both the DC side (inside DCDB/Inverter) and AC side (inside ACDB) to shield equipment from lightning induced surges (IEC 61643-11).
Earthing System: Separate, dedicated earthing pits with maintenance-free copper-bonded earth electrodes:
DC Surge Protection & Array structure earthing.
Inverter enclosure & ACDB/DCDB body earthing.
Lightning Protection System (LPS) earthing.
Earth Resistance: The measured grid loop resistance of the earthing system must remain less than 1 Ohm.
Lightning Arrestor: lightning arrestor installed at the highest point of the terrace to protect the complete kWp footprint
f) Cables: Connections & Interconnections by required size IR/UV protected XLPE insulated copper conductor 1.1 kV grade armored power and control cables(ISI Marked) along with supplying & fixing of necessary channel/conduit, GI cable trays, supports, lugs, thimble and other accessories etc. as required.
g) DC Distribution Board And AC Distribution Panel Board: IP65, free standing, metal cladded, having copper bus bar, having required protection and control gears, connection interconnection, etc. as required.
The contractor shall submit BIS Registration Proof for both modules and the inverter, a Structural Stability Certificate vetted by a registered Chartered Structural Engineer . For the warranty of the solar grid-tie inverter and panels, the contractor shall submit a letter of warranty confirmation from the respective brands, mentioning the serial numbers of the specific products installed at the site. | 10 | kW | 47,500 ₹4,75,000 Lowest | 49,000 ₹4,90,000 | 53,300 ₹5,33,000 |
| 1.00 | OD96660/2025-2026:Supplying Installation, Testing and Commissioning of 20 kWp on-grid Solar Photovoltaic Power Plant conforming to various applicable standards BIS, IEC, MNRE guidelines, the Central Electricity Authority Regulations and CPWD Specifications as amended up to date, consisting of
TOPCon Monoperc half cut solar cells module,
net metering facility,
necessary control equipments,
protections, earthing,
cabling,
mounting structure,
junction boxes,
power conditioning units,
Distribution panels,
grid connecting arrangement,
conduits,
Pipes, cable trays and other accessories etc. as required.
a) High Energy Efficiency Solar Photovoltaic Module of capacity 540Wp or above, manufactured in India, conforming to IS 14286/IEC 61215, IS/IEC 61730-Part-1, IS/IEC 61730-Part-2. Solar Photovoltaic Module conversion efficiency shall not be less than 21.5% at STC with temperature coefficient of Pmax better than -0.30% per °C. PV modules used in solar power plants/ systems must have Linear output warranty of 25 Years (Max 1% degradation in Year 1, ? 0.4% annually from Year 2 to 25) . Solar Modules shall be designed to operate in relative humidity upto 100% with temperature between -10 °C and +85 °C. Further, each PV module used in any solar power project must have Radio frequency identification tag with information such as name of manufacturer, month and year of manufacturing, country of origin (separately for Solar cell and module),I-V curve, Unique Serial No and Model No of the module, Wattage, Im, Vm and FF, name of test lab issuing IEC certificate,the Solar PV modules must be manufactured using fully indigenous solar cells and components, meeting strict Domestic Content Requirement (DCR) rules,Must be listed in MNRE ALMM List-I (Modules) and List-II (Cells) .
b)Power Conditioning Unit (PCU) of 350- 800 V DC Input voltage range and 415 V AC, three phase, 4 wire, 50Hz +/- 2.5 Hz, output voltage suitable to generate AC with a variation of 10% at nominal voltage,Topology -String Inverter, Transformerless . Power with efficiency not less than 98% as per IEC 61683 / IS 61683 , total harmonic distortion less than 3% and suitable for ambient temperature from 0 to 50 °C, Minimum IP65 (For outdoor or indoor installation) as per IEC 60529 , Built-in Wi-Fi / GPRS data logger with remote monitoring portal access. , MPPT, switching devices IGBT/MOSFETs and controller Microprocessor /DSP. PCU/inverter shall be capable of complete automatic operation including wake-up, synchronization & shutdown. The PCU shall be able to withstand unbalanced load conforming to IEC standard with shutdown/standby mode. It must be provided with grid islanding along with manual disconnect pole isolation switch besides automatic disconnection. Minimum protections: Anti-islanding (IEEE 1547/IEC 62116), DC reverse polarity, AC/DC short circuit, over-voltage/under-voltage, over-frequency/under-frequency, ground fault protection and other protections as per applicable standards(IS 16221 (Part 1 & 2) / IEC 62109, IS 16169 / IEC 62116 ). LCD/LED display of minimum parameters: DC input voltage, DC current, AC Voltage and current (all 3 phases, in case of 3 phase), Instantaneous & cumulative AC output power, Daily DC energy produced and other parameters applicable standard. Communication interface RS 485 / RS 232
c) Module mounting structure: The roof top solar plant generation units shall be installed by using Hot-dip galvanized rigid steel (Minimum coating thickness 80 microns as per IS 4759) or High-strength Anodized Aluminium structural components. The mounting structure would be Designed to withstand wind loads up to 150 km/h (or as per local IS 875 Part 3 wind zone regulations), Fixed tilt optimized to maximize annual yield based on the site's exact latitude. . All the structure shall be design as per applicable BIS code and the material shall also confirm the applicable BIS Code. Structural material shall be corrosion resistant and electrolytically compatible with the materials used in the module frame, fasteners ,all bolts, nuts, washers, and structural fasteners must be made of Stainless Steel (SS 304). The suitable arrangements for maintenance and cleaning shall be provided.
d)Array junction box & Main junction box with IP68 rated with minimum 3 bypass diodes (IEC 62790 ) protection and termination arrangement for incoming and outgoing cable along with glands, lugs and other accessories etc. as required. Each junction box shall be made of GRP/FRP/Powder Coated Aluminium /cast aluminium alloy with full dust, water & vermin proof arrangement with High quality Suitable capacity Metal Oxide Varistors (MOVs) (semiconductor diode with resistant applied voltage)/ surge arrestors and suitable Reverse Blocking Diodes, isolation switches isolate the DC input to Inverter, copper bus bar etc.
e) Surge Protection Devices (SPD): Type-II SPDs must be integrated on both the DC side (inside DCDB/Inverter) and AC side (inside ACDB) to shield equipment from lightning induced surges (IEC 61643-11).
Earthing System: Separate, dedicated earthing pits with maintenance-free copper-bonded earth electrodes:
DC Surge Protection & Array structure earthing.
Inverter enclosure & ACDB/DCDB body earthing.
Lightning Protection System (LPS) earthing.
Earth Resistance: The measured grid loop resistance of the earthing system must remain less than 1 Ohm.
Lightning Arrestor: lightning arrestor installed at the highest point of the terrace to protect the complete kWp footprint
f) Cables: Connections & Interconnections by required size IR/UV protected XLPE insulated copper conductor 1.1 kV grade armored power and control cables(ISI Marked) along with supplying & fixing of necessary channel/conduit, GI cable trays, supports, lugs, thimble and other accessories etc. as required.
g) DC Distribution Board And AC Distribution Panel Board: IP65, free standing, metal cladded, having copper bus bar, having required protection and control gears, connection interconnection, etc. as required.
The contractor shall submit BIS Registration Proof for both modules and the inverter, a Structural Stability Certificate vetted by a registered Chartered Structural Engineer . For the warranty of the solar grid-tie inverter and panels, the contractor shall submit a letter of warranty confirmation from the respective brands, mentioning the serial numbers of the specific products installed at the site. | 20 | kW | 47,500 ₹9,50,000 Lowest | 49,500 ₹9,90,000 | 53,300 ₹10,66,000 |
Tender Value
₹14.8 L
EMD Value
₹37,023
Closing Date
10 Nov 2026, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer
Office of Executive Engineer, PWD Electrical Division, Thiruvananthapuram 695033
GENERAL Grid Tied Solar Photovoltaic Generating System Anchuthengu CHC SITC of 30 KWp Grid Tied Solar Photovoltaic generating System at Community Health Centre Anchuthengu Chirayinhezhu LAC Thiruvananthapuram General Electrical Work
2026_PWD_885121_1
PWD/BLDG/EST/12618/2025
Open Tender
Electrical Works
Item Rate
180 days
Thiruvananthapuram
Please refer Tender documents.
10 documents required · 10 mandatory
₹2,760
Yes
₹37,023
Yes
24 Nov 2026
3 Nov 2026
13 Nov 2026
3 Nov 2026
10 Nov 2026
3 Nov 2026
60 days
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Electrification | |||||
| 1.001 | OD96657/2025-2026:Supplying Installation, Testing and Commissioning of 10 KWp on-grid Solar Photovoltaic Power Plant conforming to various applicable standards BIS, IEC, MNRE guidelines, the Central Electricity Authority Regulations and CPWD Specifications as amended up to date, consisting of
TOPCon Monoperc half cut solar cells module,
net metering facility,
necessary control equipments,
protections, earthing,
cabling,
mounting structure,
junction boxes,
power conditioning units,
Distribution panels,
grid connecting arrangement,
conduits,
Pipes, cable trays and other accessories etc. as required.
a) High Energy Efficiency Solar Photovoltaic Module of capacity 540Wp or above, manufactured in India, conforming to IS 14286/IEC 61215, IS/IEC 61730-Part-1, IS/IEC 61730-Part-2. Solar Photovoltaic Module conversion efficiency shall not be less than 21.5% at STC with temperature coefficient of Pmax better than -0.30% per °C. PV modules used in solar power plants/ systems must have Linear output warranty of 25 Years (Max 1% degradation in Year 1, ? 0.4% annually from Year 2 to 25) . Solar Modules shall be designed to operate in relative humidity upto 100% with temperature between -10 °C and +85 °C. Further, each PV module used in any solar power project must have Radio frequency identification tag with information such as name of manufacturer, month and year of manufacturing, country of origin (separately for Solar cell and module),I-V curve, Unique Serial No and Model No of the module, Wattage, Im, Vm and FF, name of test lab issuing IEC certificate,the Solar PV modules must be manufactured using fully indigenous solar cells and components, meeting strict Domestic Content Requirement (DCR) rules,Must be listed in MNRE ALMM List-I (Modules) and List-II (Cells) .
b)Power Conditioning Unit (PCU) of 350- 800 V DC Input voltage range and 415 V AC, three phase, 4 wire, 50Hz +/- 2.5 Hz, output voltage suitable to generate AC with a variation of 10% at nominal voltage,Topology -String Inverter, Transformerless . Power with efficiency not less than 98% as per IEC 61683 / IS 61683 , total harmonic distortion less than 3% and suitable for ambient temperature from 0 to 50 °C, Minimum IP65 (For outdoor or indoor installation) as per IEC 60529 , Built-in Wi-Fi / GPRS data logger with remote monitoring portal access. , MPPT, switching devices IGBT/MOSFETs and controller Microprocessor /DSP. PCU/inverter shall be capable of complete automatic operation including wake-up, synchronization & shutdown. The PCU shall be able to withstand unbalanced load conforming to IEC standard with shutdown/standby mode. It must be provided with grid islanding along with manual disconnect pole isolation switch besides automatic disconnection. Minimum protections: Anti-islanding (IEEE 1547/IEC 62116), DC reverse polarity, AC/DC short circuit, over-voltage/under-voltage, over-frequency/under-frequency, ground fault protection and other protections as per applicable standards(IS 16221 (Part 1 & 2) / IEC 62109, IS 16169 / IEC 62116 ). LCD/LED display of minimum parameters: DC input voltage, DC current, AC Voltage and current (all 3 phases, in case of 3 phase), Instantaneous & cumulative AC output power, Daily DC energy produced and other parameters applicable standard. Communication interface RS 485 / RS 232
c) Module mounting structure: The roof top solar plant generation units shall be installed by using Hot-dip galvanized rigid steel (Minimum coating thickness 80 microns as per IS 4759) or High-strength Anodized Aluminium structural components. The mounting structure would be Designed to withstand wind loads up to 150 km/h (or as per local IS 875 Part 3 wind zone regulations), Fixed tilt optimized to maximize annual yield based on the site's exact latitude. . All the structure shall be design as per applicable BIS code and the material shall also confirm the applicable BIS Code. Structural material shall be corrosion resistant and electrolytically compatible with the materials used in the module frame, fasteners ,all bolts, nuts, washers, and structural fasteners must be made of Stainless Steel (SS 304). The suitable arrangements for maintenance and cleaning shall be provided.
d)Array junction box & Main junction box with IP68 rated with minimum 3 bypass diodes (IEC 62790 ) protection and termination arrangement for incoming and outgoing cable along with glands, lugs and other accessories etc. as required. Each junction box shall be made of GRP/FRP/Powder Coated Aluminium /cast aluminium alloy with full dust, water & vermin proof arrangement with High quality Suitable capacity Metal Oxide Varistors (MOVs) (semiconductor diode with resistant applied voltage)/ surge arrestors and suitable Reverse Blocking Diodes, isolation switches isolate the DC input to Inverter, copper bus bar etc.
e) Surge Protection Devices (SPD): Type-II SPDs must be integrated on both the DC side (inside DCDB/Inverter) and AC side (inside ACDB) to shield equipment from lightning induced surges (IEC 61643-11).
Earthing System: Separate, dedicated earthing pits with maintenance-free copper-bonded earth electrodes:
DC Surge Protection & Array structure earthing.
Inverter enclosure & ACDB/DCDB body earthing.
Lightning Protection System (LPS) earthing.
Earth Resistance: The measured grid loop resistance of the earthing system must remain less than 1 Ohm.
Lightning Arrestor: lightning arrestor installed at the highest point of the terrace to protect the complete kWp footprint
f) Cables: Connections & Interconnections by required size IR/UV protected XLPE insulated copper conductor 1.1 kV grade armored power and control cables(ISI Marked) along with supplying & fixing of necessary channel/conduit, GI cable trays, supports, lugs, thimble and other accessories etc. as required.
g) DC Distribution Board And AC Distribution Panel Board: IP65, free standing, metal cladded, having copper bus bar, having required protection and control gears, connection interconnection, etc. as required.
The contractor shall submit BIS Registration Proof for both modules and the inverter, a Structural Stability Certificate vetted by a registered Chartered Structural Engineer . For the warranty of the solar grid-tie inverter and panels, the contractor shall submit a letter of warranty confirmation from the respective brands, mentioning the serial numbers of the specific products installed at the site. | 10 | kW | - | - |
| 1.002 | OD96660/2025-2026:Supplying Installation, Testing and Commissioning of 20 kWp on-grid Solar Photovoltaic Power Plant conforming to various applicable standards BIS, IEC, MNRE guidelines, the Central Electricity Authority Regulations and CPWD Specifications as amended up to date, consisting of
TOPCon Monoperc half cut solar cells module,
net metering facility,
necessary control equipments,
protections, earthing,
cabling,
mounting structure,
junction boxes,
power conditioning units,
Distribution panels,
grid connecting arrangement,
conduits,
Pipes, cable trays and other accessories etc. as required.
a) High Energy Efficiency Solar Photovoltaic Module of capacity 540Wp or above, manufactured in India, conforming to IS 14286/IEC 61215, IS/IEC 61730-Part-1, IS/IEC 61730-Part-2. Solar Photovoltaic Module conversion efficiency shall not be less than 21.5% at STC with temperature coefficient of Pmax better than -0.30% per °C. PV modules used in solar power plants/ systems must have Linear output warranty of 25 Years (Max 1% degradation in Year 1, ? 0.4% annually from Year 2 to 25) . Solar Modules shall be designed to operate in relative humidity upto 100% with temperature between -10 °C and +85 °C. Further, each PV module used in any solar power project must have Radio frequency identification tag with information such as name of manufacturer, month and year of manufacturing, country of origin (separately for Solar cell and module),I-V curve, Unique Serial No and Model No of the module, Wattage, Im, Vm and FF, name of test lab issuing IEC certificate,the Solar PV modules must be manufactured using fully indigenous solar cells and components, meeting strict Domestic Content Requirement (DCR) rules,Must be listed in MNRE ALMM List-I (Modules) and List-II (Cells) .
b)Power Conditioning Unit (PCU) of 350- 800 V DC Input voltage range and 415 V AC, three phase, 4 wire, 50Hz +/- 2.5 Hz, output voltage suitable to generate AC with a variation of 10% at nominal voltage,Topology -String Inverter, Transformerless . Power with efficiency not less than 98% as per IEC 61683 / IS 61683 , total harmonic distortion less than 3% and suitable for ambient temperature from 0 to 50 °C, Minimum IP65 (For outdoor or indoor installation) as per IEC 60529 , Built-in Wi-Fi / GPRS data logger with remote monitoring portal access. , MPPT, switching devices IGBT/MOSFETs and controller Microprocessor /DSP. PCU/inverter shall be capable of complete automatic operation including wake-up, synchronization & shutdown. The PCU shall be able to withstand unbalanced load conforming to IEC standard with shutdown/standby mode. It must be provided with grid islanding along with manual disconnect pole isolation switch besides automatic disconnection. Minimum protections: Anti-islanding (IEEE 1547/IEC 62116), DC reverse polarity, AC/DC short circuit, over-voltage/under-voltage, over-frequency/under-frequency, ground fault protection and other protections as per applicable standards(IS 16221 (Part 1 & 2) / IEC 62109, IS 16169 / IEC 62116 ). LCD/LED display of minimum parameters: DC input voltage, DC current, AC Voltage and current (all 3 phases, in case of 3 phase), Instantaneous & cumulative AC output power, Daily DC energy produced and other parameters applicable standard. Communication interface RS 485 / RS 232
c) Module mounting structure: The roof top solar plant generation units shall be installed by using Hot-dip galvanized rigid steel (Minimum coating thickness 80 microns as per IS 4759) or High-strength Anodized Aluminium structural components. The mounting structure would be Designed to withstand wind loads up to 150 km/h (or as per local IS 875 Part 3 wind zone regulations), Fixed tilt optimized to maximize annual yield based on the site's exact latitude. . All the structure shall be design as per applicable BIS code and the material shall also confirm the applicable BIS Code. Structural material shall be corrosion resistant and electrolytically compatible with the materials used in the module frame, fasteners ,all bolts, nuts, washers, and structural fasteners must be made of Stainless Steel (SS 304). The suitable arrangements for maintenance and cleaning shall be provided.
d)Array junction box & Main junction box with IP68 rated with minimum 3 bypass diodes (IEC 62790 ) protection and termination arrangement for incoming and outgoing cable along with glands, lugs and other accessories etc. as required. Each junction box shall be made of GRP/FRP/Powder Coated Aluminium /cast aluminium alloy with full dust, water & vermin proof arrangement with High quality Suitable capacity Metal Oxide Varistors (MOVs) (semiconductor diode with resistant applied voltage)/ surge arrestors and suitable Reverse Blocking Diodes, isolation switches isolate the DC input to Inverter, copper bus bar etc.
e) Surge Protection Devices (SPD): Type-II SPDs must be integrated on both the DC side (inside DCDB/Inverter) and AC side (inside ACDB) to shield equipment from lightning induced surges (IEC 61643-11).
Earthing System: Separate, dedicated earthing pits with maintenance-free copper-bonded earth electrodes:
DC Surge Protection & Array structure earthing.
Inverter enclosure & ACDB/DCDB body earthing.
Lightning Protection System (LPS) earthing.
Earth Resistance: The measured grid loop resistance of the earthing system must remain less than 1 Ohm.
Lightning Arrestor: lightning arrestor installed at the highest point of the terrace to protect the complete kWp footprint
f) Cables: Connections & Interconnections by required size IR/UV protected XLPE insulated copper conductor 1.1 kV grade armored power and control cables(ISI Marked) along with supplying & fixing of necessary channel/conduit, GI cable trays, supports, lugs, thimble and other accessories etc. as required.
g) DC Distribution Board And AC Distribution Panel Board: IP65, free standing, metal cladded, having copper bus bar, having required protection and control gears, connection interconnection, etc. as required.
The contractor shall submit BIS Registration Proof for both modules and the inverter, a Structural Stability Certificate vetted by a registered Chartered Structural Engineer . For the warranty of the solar grid-tie inverter and panels, the contractor shall submit a letter of warranty confirmation from the respective brands, mentioning the serial numbers of the specific products installed at the site. | 20 | kW | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
finance_1508981.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.04 MB
BOQ_1508981.xls
BOQ • 0.31 MB
viewsbd.pdf
Tender Documents • 1.63 MB
MOM.pdf
Other Document • 0.07 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .