Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.4 LAccepted-AOC | ₹9.4 L Quoted ₹10.4 L | L1 | Accepted-AOC Work awarded |
| 2 | L2₹11.2 L+₹80,000 (7.69%)Rejected-Finance OPPOSITE VIPUL GAS AGENCY HOSPITAL ROAD SOLAN H P | SOLAN | SOLAN | HIMACHAL PRADESH | ₹11.2 L+₹80,000 (7.69%) | L2 | Rejected-Finance L2 |
| 3 | L3₹11.9 L+₹1.6 L (14.9%)Rejected-Finance | ₹11.9 L+₹1.6 L (14.9%) | L3 | Rejected-Finance L3 |
| Sl No | Description | Qty | Unit | M/S Krishan Electrical L3 | ROYAL ENGINEERING WORKS L2 | M/S THAKUR ELECTRICAL & HARDWARE STORE L1 |
|---|---|---|---|---|---|---|
| 1.00 | Operation of pumping machinery and distribution system of water supply from different Sector storage tank, to different habitations being feeded from LWSS Seola Manjhot Pandoh whose line plan and technical data sheet is attached with, by the contractor through skilled / unskilled manpower i.e. pump operator/Beldar/Helper for running, maintenance and operation of pumping machinery and distribution system contigent to the work, watch and ward of all structures, machinery including rising main, operation of wheels from various tanks at different locations for distribution of water through the laid distribution network and maintaining all records regarding distribution of water to consumers at consumers ends as per the direction of the Engineer-in-charge. | 1 | Job | 11,95,000 ₹11,95,000 | 11,20,000 ₹11,20,000 | 10,40,000 ₹10,40,000 Lowest |
| 2.00Description of main components of the scheme is as under:- Civil works: 1 No pump house, Sump well/ Percolation well. Rising main LWSS Seola Manjot Pandoh: 1st SchemeBooster stage 80 mm dia=80 Rmt 1st stage 100mm dia=810 Rmt. Pumping machinery: LWSS Seola Manjot Pandoh 1st scheme: Booster stage 2x5HP=10HP, 1st stage 2x50HP=100HP. Distribution system: 63000 Rmt.Approx No of Storage tanks: 4 Nos Nos. of habitation= 12 Nos, Total working hours 39 per day: through 6 Nos persons (ANN 1). Indicators to be mentioned: (i) No. of complaints received through different mode such as CM Sankalp E-Samadhan, complaint register and toll free No. etc. (ii) Quality of water lifted per day (iii) No. of pumping hours per day and energy consumption per day | ||||||
Tender Value
₹9.9 L
EMD Value
₹19,780
Closing Date
14 Feb 2026, 3:00 pmClosed
EE JSV Division Jagatkhana
EE JSV Division Jagatkhana
(SH Outsourcing of scheme for operation of Pumping machinery and distribution system of water supply for sector storage tank to different habitation in Tehsil Sadar District Bilaspur (HP) (For One year)
2026_HPIPH_127435_1
NIT-JGT-13434-13533 dated 31.01.2026
Open Tender
Repair and Maintenance Works
Item Rate
365 days
Jukhala
Please refer Tender documents.
3 documents required · 3 mandatory
₹500
₹19,780
23 Jun 2026
4 Feb 2026
14 Feb 2026
4 Feb 2026
14 Feb 2026
4 Feb 2026
Operation of pumping machinery and distribution system of water supply from different Sector storage tank, to different habitations being feeded from LWSS Seola Manjhot Pandoh whose line plan and technical data sheet is attached with, by the contractor through skilled / unskilled manpower i.e. pump operator/Beldar/Helper for running, maintenance and operation of pumping machinery and distribution system contigent to the work, watch and ward of all structures, machinery including rising main, operation of wheels from various tanks at different locations for distribution of water through the laid distribution network and maintaining all records regarding distribution of water to consumers at consumers ends as per the direction of the Engineer-in-charge.
Description of main components of the scheme is as under:- Civil works: 1 No pump house, Sump well/ Percolation well. Rising main LWSS Seola Manjot Pandoh: 1st SchemeBooster stage 80 mm dia=80 Rmt 1st stage 100mm dia=810 Rmt. Pumping machinery: LWSS Seola Manjot Pandoh 1st scheme: Booster stage 2x5HP=10HP, 1st stage 2x50HP=100HP. Distribution system: 63000 Rmt.Approx No of Storage tanks: 4 Nos Nos. of habitation= 12 Nos, Total working hours 39 per day: through 6 Nos persons (ANN 1). Indicators to be mentioned: (i) No. of complaints received through different mode such as CM Sankalp E-Samadhan, complaint register and toll free No. etc. (ii) Quality of water lifted per day (iii) No. of pumping hours per day and energy consumption per day
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.43 MB
TC.pdf
Tender Documents • 0.52 MB
PWD6.pdf
Tender Documents • 0.68 MB
PWD8.pdf
Tender Documents • 1.32 MB
BOQ_188188.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .