| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹26.7 LAccepted-AOC | ₹26.7 L | L1 | Accepted-AOC AGREEMENT EXECUTED |
| 2 | L2₹26.8 L+₹6,107.75 (0.23%)Rejected-Finance | ₹26.8 L+₹6,107.75 (0.23%) | L2 | Rejected-Finance Resolution no. 10(1)) dated 20/09/2025 |
| 3 | Rejected-Technical | - | - | Rejected-Technical L3 |
| 4 | Rejected-Technical | - | - | Rejected-Technical L4 |
| Sl No | Description | Qty | Unit | Kurian Joseph L1 | Kadavil Constructions L4 | JOYAN CONSTRUCTIONS L3 | jayaprakash kk L2 |
|---|---|---|---|---|---|---|---|
| 1.00BUILDING CONSTRUCTION | |||||||
| 1.00 | 2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared | 376.25 | sqm | 18 ₹6,772.5 | 19 ₹7,148.75 | 18.19 ₹6,843.99 | 15 ₹5,643.75 Lowest |
| 1.00 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 32.99 | cum | 325 ₹10,723.05 | 371 ₹12,240.77 | 359.72 ₹11,868.6 | 290 ₹9,568.26 Lowest |
| 1.00 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 11.75 | cum | 7,200 ₹84,571.2 Lowest | 7,936.89 ₹93,226.71 | 7,932.89 ₹93,179.73 | 7,250 ₹85,158.5 |
| 1.00 | 2.25:Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. | 7.63 | cum | 300 ₹2,289.9 | 318.47 ₹2,430.88 | 318.47 ₹2,430.88 | 250 ₹1,908.25 Lowest |
| 1.00 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 26.81 | sqm | 360 ₹9,652.32 | 386.16 ₹10,353.72 | 386.16 ₹10,353.72 | 275 ₹7,373.3 Lowest |
| 1.01 | 5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers | 119.03 | sqm | 690 ₹82,130.01 | 762.88 ₹90,804.84 | 762.88 ₹90,804.84 | 600 ₹71,417.4 Lowest |
| 1.01 | 5.9.6:Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts | 2.4 | sqm | 910 ₹2,184 | 1,008.55 ₹2,420.52 | 1,008.55 ₹2,420.52 | 900 ₹2,160 Lowest |
| 1.01 | 5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources) | 24.92 | cum | 9,500 ₹2,36,740 Lowest | 10,488.77 ₹2,61,380.15 | 10,488.77 ₹2,61,380.15 | 10,950 ₹2,72,874 |
| 1.01 | 5.9.19:Centering and shuttering including strutting, etc. and removal of form for:Weather shade, Chajjas, corbels etc., including edges | 14.8 | sqm | 950 ₹14,063.8 Lowest | 1,021.94 ₹15,128.8 | 1,021.94 ₹15,128.8 | 950 ₹14,063.8 Lowest |
Tender Value
₹29.7 L
EMD Value
₹50,000
Closing Date
17 Sept 2025, 6:00 pmClosed
Assistant Engineer
Office of The Assistant Engineer, LSGD Section, Ettumanoor Municipality
Annual Plan-ETMR-741/25-Construction of smart Anganawadi in div. No 45 ward 16 ETTUMANOOR MUNCIPALITY General Civil Work
2025_LSGD_795422_1
E1-9/AE/ETMR/25-26 (27)
Open Tender
Civil Works - Buildings
Item Rate
365 days
Ettumanoor
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,760
₹50,000
4 Dec 2025
9 Sept 2025
18 Sept 2025
9 Sept 2025
17 Sept 2025
9 Sept 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .