Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.6 LAccepted-AOC | ₹7.6 L | L1 | Accepted-AOC L1 |
| Sl No | Description | Qty | Unit | Augustine C D L1 |
|---|---|---|---|---|
| 1.00BUILDING- GF | ||||
| 1.00 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 10.78 | cum | 335.7 ₹3,617.5 Lowest |
| 1.00 | 7.1.1:Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand) | 10.3 | cum | 7,787.2 ₹80,177.01 Lowest |
| 1.00 | OD454791/2025-2026:Laterite neatly dressed stones of size 35x20x20cm in cement mortar 1:6 for
foundation and basemen or nearest size in cement mortar 1:6 for foundation and basement including all cost
of materials, labour charges etc | 5.31 | cum | 6,496 ₹34,493.76 Lowest |
| 1.00 | 5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources) | 1.53 | cum | 9,789 ₹15,006.54 Lowest |
| 1.00 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 8.42 | sqm | 360.4 ₹3,033.13 Lowest |
| 1.01 | OD454793/2025-2026:Laterate masonry with neatly dressed laterate stone of size 35x20x20 cm or nearest size in cement mortar 1:6 for superstructure above plinth level upto floor two level including all cost of materials, labour charges etc. | 11.76 | cum | 7,319.6 ₹86,063.86 Lowest |
| 1.01 | 6.4.2:Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level in all shapes and sizes in:Cement mortar 1:6 (1 cement : 6 coarse sand) | 0.27 | cum | 9,700.7 ₹2,638.59 Lowest |
| 1.01 | 5.9.3:Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform | 38.03 | sqm | 897.1 ₹34,119.4 Lowest |
| 1.01 | 5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers | 15.23 | sqm | 712 ₹10,842.34 Lowest |
Tender Value
₹7.6 L
EMD Value
₹19,066
Closing Date
2 Jun 2026, 5:00 pmClosed
Assistant Engineer
O/O Assistant Engineer LID and EW Section Kottiyoor GP
Annual Plan-kottiyoor G P 127/25-26-Construction of ladies friendly toilet at Ayurveda dispensary chungakkunnu-General Civil Work RETENDER
2026_LSGD_852918_4
AE/LSGD/KTR/ETN/01/2026-27
Open Tender
Civil Works - Others
Item Rate
365 days
KOTTIYOOR GP
Please refer Tender documents.
7 documents required · 7 mandatory
₹1,685
Yes
₹19,066
Yes
2 Sept 2026
26 May 2026
4 Jun 2026
26 May 2026
2 Jun 2026
26 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1BUILDING- GF | |||||
| 1.001 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 1 | cum | - | - |
| 1.002 | 7.1.1:Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand) | 1 | cum | - | - |
| 1.003 | OD454791/2025-2026:Laterite neatly dressed stones of size 35x20x20cm in cement mortar 1:6 for
foundation and basemen or nearest size in cement mortar 1:6 for foundation and basement including all cost
of materials, labour charges etc | 1 | cum | - | - |
| 1.004 | 5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources) | 1 | cum | - | - |
| 1.005 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | - | sqm | - | - |
| 1.006 | OD454793/2025-2026:Laterate masonry with neatly dressed laterate stone of size 35x20x20 cm or nearest size in cement mortar 1:6 for superstructure above plinth level upto floor two level including all cost of materials, labour charges etc. | 1 | cum | - | - |
| 1.007 | 6.4.2:Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level in all shapes and sizes in:Cement mortar 1:6 (1 cement : 6 coarse sand) | - | cum | - | - |
| 1.008 | 5.9.3:Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform | - | sqm | - | - |
| 1.009 | 5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers | 1 | sqm | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.85 MB
viewsbd127_merged.pdf
Tender Documents • 2.50 MB
BOQ_1441259.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .