| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹52.5 LAccepted-AOC | ₹52.5 L Quoted ₹53.0 L | L1 | Accepted-AOC LOA issued |
| 2 | L2₹53.7 L+₹65,221 (1.23%)Rejected-Finance MINJEE PROPER THANG MINJEE KARGIL KARGIL KARGIL LADAKH 194105 | KARGIL | LADAKH | 194105 | ₹53.7 L+₹65,221 (1.23%) | L2 | Rejected-Finance L2 bidder |
| 3 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | NUN KUN STC ENGINEERING OPC PRIVATE LIMITED L2 | Mukhtar Hussain L1 |
|---|---|---|---|---|---|
| 1.00 | Earth work in excavation by mechanical means (Hydraulic excavator) over areas (exceeding 30cm in depth,1.5m in width as well as10sqm on plan) including getting out and disposal of excavated earth lead up to 50m and lift up to1.5m, as directed by Engineer-in-charge. All kinds of soil | 108.38 | Cum | 230 ₹29,414.33 | 200 ₹25,577.68 Lowest |
| 2.00 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6
gradedstone aggregate 40 mm nominal size derived from natural sources) | 61.2 | Cum | 7,000 ₹5,05,512 | 6,150 ₹4,44,128.4 Lowest |
| 3.00 | Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete. | 82.8 | Sqm | 300 ₹29,311.2 Lowest | 300 ₹29,311.2 Lowest |
| 4.00 | Providing & making Gabion structure with Mechanically Woven Double Twisted Hexagonal Shaped Wire mesh Gabion Boxes as per IS 16014:2012,MORTH Clause 2500, of required size, Mesh Type 10x13 (D=100 mm with tolerance of ± 2%) Zinc coated, Mesh wire diametre 3.0 mm, mechanically edged/selvedged with partitions at every 1m interval and shall have minimum 10 numbers of openings per metre of mesh perpendicular to twist, tying with lacing wire of diametre 2.2mm, supplied @ 3% by weight of Gabion boxes, filled with boulders with least dimension of 200 mm, as per drawing, all complete as per direction of Engineer in-charge. | 1,044 | Cum | 3,900 ₹48,04,488 Lowest | 3,900 ₹48,04,488 Lowest |
Tender Value
₹50.6 L
EMD Value
₹1.0 L
Closing Date
30 Nov 2024, 5:00 pmClosed
Office of GSM P and C Chutak Power Station
Office of GSM P and C Chutak Power Station
Slope Protection Work of left bank of Downstream at Barrage of Chutak Power Station Kargil Work Reserved for Project Affected Families and local bidders from District Kargil
2024_NHPC_835227_1
2024_NHPC
Open Tender
Civil Works
Works
120 days
Chutak Power Station Minji Kargil UT Ladakh
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
NHPC Limited
₹1.0 L
22 Aug 2026
16 Nov 2024
3 Dec 2024
16 Nov 2024
30 Nov 2024
16 Nov 2024
16 Nov 2024 - 29 Nov 2024
stage.html
html • 0.05 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.PDF
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .