Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.7 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹2.7 L+₹3,906.80 (1.47%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹2.8 L+₹11,759.47 (4.43%)Admitted-Finance | L3 | Admitted-Finance | ||
| 4 | L4₹2.9 L+₹25,198.86 (9.49%)Admitted-Finance | L4 | Admitted-Finance | ||
| 5 | L5₹2.9 L+₹26,566.24 (10.0%)Admitted-Finance | L5 | Admitted-Finance |
Tender Value
₹4 L
EMD Value
₹8,000
Closing Date
22 Jan 2026, 4:00 pmClosed
EXECUTIVE ENGINEER REW RAJOURI
OFFICE OF EXECUTIVE ENGINEER REW RAJOURI
Please Refer BOQ
2026_RDPR_300571_2
e-NIT No. 248 REW Rajouri of 2025 Dated 14-01-2026
Open Tender
Civil Works
Percentage
90 days
RAJOURI
Please Refer Tender Documents
2 documents required · 2 mandatory
₹500
Executive Engineer REW Rajouri
₹8,000
7 Feb 2026
15 Jan 2026
23 Jan 2026
15 Jan 2026
22 Jan 2026
15 Jan 2026
Select, At Par, Excess (+), Less (-) IOCL
Tender Inviting Authority: OFFICE OF THE EXECUTIVE ENGINEER(REW) DIVISION RAJOURI
Name of Work: Const Of T Road from mohd safeer to gujjar moh lameri east w no 1 with protecton wall and drain Pyt.:- Lamberi East Block :- Lamberi Scheme :- TSP S no.:- 9 P.P :- 4.00 lacs Year 2025-26
Name of the Bidder/ Bidding Firm / Company :
Sl. No. 2424 Item Code / Make Quantity Units Estimated Rate in Rs. P Addition / Deduction Addition / Deduction Values Currency Convertion against each Item Quoted Currency in INR / Other Currency BASIC RATE In Figures To be entered by the Bidder Rs. P Excise Duty VAT Freight Charges ( Unloading & Stacking) Any Other Taxes/Duties/Levies Other Taxes 2 IIIrd Party i.e DGS&D / RITES etc Inspection Charges @0.34%+Service Tax Less for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category TOTAL AMOUNT Rs. P TOTAL AMOUNT With Taxes TOTAL AMOUNT In Words
1 Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shaft ,wells, cesspits and the like not exceeding 10 sqm on plan, aks CUm Excess(+) Full Conversion INR INR Twenty Thousand Nine Hundred & Two and Paise Twenty Seven Only
2 Providing and laying in position cement concrete of M5 grade with Boulders including curing but excluding the cost of centring and shuttering. 70% Concrete CUm Excess(+) Full Conversion INR INR Sixty Two Thousand Two Hundred & Sixty One and Paise Eighty Five Only
3 Providing and laying in position cement concrete of M10 grade with Boulders including curing but excluding the cost of centring and shuttering. 70% Concrete CUm Excess(+) Full Conversion INR INR One Lakh Sixty Seven Thousand &Seventy Seven and Paise Ten Only
4 30% Boulder CUm Excess(+) Full Conversion INR INR Seven Thousand Six Hundred & Eighty Seven and Paise Sixty Eight Only
5 P/L 60mm thick factory made cement concrete interlocking paver blocks of m30 grade sqm Excess(+) Full Conversion INR INR Sixty Five Thousand One Hundred & Ninety Four and Paise Six Only
6 P/L pvc 50mm for weep holes rft Excess(+) Full Conversion INR INR Eight Thousand Four Hundred Only
7 P/L pvc 0.60m dia humepipe including suppling carriage handling rehandling and cost of pipe complete job rm Excess(+) Full Conversion INR
8 Centering and shuttering including strutting, propping etc. and removal of form work for : foundations, footings, bases for columns sqm Excess(+) Full Conversion INR INR Twenty Two Thousand Three Hundred & Thirty Five and Paise Thirty Only
9 Carriage of Sand /Aggragates by 15km MT CUm Excess(+) Full Conversion INR INR Nineteen Thousand Five Hundred & Forty Two and Paise Ninety Two Only
10 Carriage of cement 5km MT CUm Excess(+) Full Conversion INR INR One Thousand Four Hundred & Twenty Seven and Paise Forty Four Only
11 Carriage of stone 5km MT CUm Excess(+) Full Conversion INR INR Two Thousand Nine Hundred & Forty Seven and Paise Twenty Eight Only
12 Add Cost Of Sign Board nos Excess(+) Full Conversion INR INR One Thousand Only
Total in Figures INR Three Lakh Ninety Thousand Six Hundred & Seventy Nine and Paise Ninety Only 4 Construction of chamber for 100mm sluice plates item5 10 Nos
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.41 MB
BOQ_975077.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .