Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.7 LAdmitted-Finance | -32.00% | ₹2.7 L | L1 | Admitted-Finance |
| 2 | L2₹2.7 LAdmitted-Finance | -31.00% | ₹2.7 L | L2 | Admitted-Finance |
| 3 | L3₹2.8 LAdmitted-Finance | -28.99% | ₹2.8 L | L3 | Admitted-Finance |
| 4 | L4₹2.9 LAdmitted-Finance | -25.55% | ₹2.9 L | L4 | Admitted-Finance |
| 5 | L5₹2.9 LAdmitted-Finance | -25.20% | ₹2.9 L | L5 | Admitted-Finance |
Tender Value
₹4 L
EMD Value
₹8,000
Closing Date
22 Jan 2026, 4:00 pmClosed
EXECUTIVE ENGINEER REW RAJOURI
OFFICE OF EXECUTIVE ENGINEER REW RAJOURI
Please Refer BOQ
2026_RDPR_300571_2
e-NIT No. 248 REW Rajouri of 2025 Dated 14-01-2026
Open Tender
Civil Works
90 days
RAJOURI
Please Refer Tender Documents
2 documents required · 2 mandatory
₹500
Executive Engineer REW Rajouri
₹8,000
7 Feb 2026
15 Jan 2026
23 Jan 2026
15 Jan 2026
22 Jan 2026
15 Jan 2026
Select, At Par, Excess (+), Less (-) IOCL
Tender Inviting Authority: OFFICE OF THE EXECUTIVE ENGINEER(REW) DIVISION RAJOURI
Name of Work: Const Of T Road from mohd safeer to gujjar moh lameri east w no 1 with protecton wall and drain Pyt.:- Lamberi East Block :- Lamberi Scheme :- TSP S no.:- 9 P.P :- 4.00 lacs Year 2025-26
Name of the Bidder/ Bidding Firm / Company :
Sl. No. 2424 Item Code / Make Quantity Units Estimated Rate in Rs. P Addition / Deduction Addition / Deduction Values Currency Convertion against each Item Quoted Currency in INR / Other Currency BASIC RATE In Figures To be entered by the Bidder Rs. P Excise Duty VAT Freight Charges ( Unloading & Stacking) Any Other Taxes/Duties/Levies Other Taxes 2 IIIrd Party i.e DGS&D / RITES etc Inspection Charges @0.34%+Service Tax Less for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category TOTAL AMOUNT Rs. P TOTAL AMOUNT With Taxes TOTAL AMOUNT In Words
1 Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shaft ,wells, cesspits and the like not exceeding 10 sqm on plan, aks CUm Excess(+) Full Conversion INR INR Twenty Thousand Nine Hundred & Two and Paise Twenty Seven Only
2 Providing and laying in position cement concrete of M5 grade with Boulders including curing but excluding the cost of centring and shuttering. 70% Concrete CUm Excess(+) Full Conversion INR INR Sixty Two Thousand Two Hundred & Sixty One and Paise Eighty Five Only
3 Providing and laying in position cement concrete of M10 grade with Boulders including curing but excluding the cost of centring and shuttering. 70% Concrete CUm Excess(+) Full Conversion INR INR One Lakh Sixty Seven Thousand &Seventy Seven and Paise Ten Only
4 30% Boulder CUm Excess(+) Full Conversion INR INR Seven Thousand Six Hundred & Eighty Seven and Paise Sixty Eight Only
5 P/L 60mm thick factory made cement concrete interlocking paver blocks of m30 grade sqm Excess(+) Full Conversion INR INR Sixty Five Thousand One Hundred & Ninety Four and Paise Six Only
6 P/L pvc 50mm for weep holes rft Excess(+) Full Conversion INR INR Eight Thousand Four Hundred Only
7 P/L pvc 0.60m dia humepipe including suppling carriage handling rehandling and cost of pipe complete job rm Excess(+) Full Conversion INR
8 Centering and shuttering including strutting, propping etc. and removal of form work for : foundations, footings, bases for columns sqm Excess(+) Full Conversion INR INR Twenty Two Thousand Three Hundred & Thirty Five and Paise Thirty Only
9 Carriage of Sand /Aggragates by 15km MT CUm Excess(+) Full Conversion INR INR Nineteen Thousand Five Hundred & Forty Two and Paise Ninety Two Only
10 Carriage of cement 5km MT CUm Excess(+) Full Conversion INR INR One Thousand Four Hundred & Twenty Seven and Paise Forty Four Only
11 Carriage of stone 5km MT CUm Excess(+) Full Conversion INR INR Two Thousand Nine Hundred & Forty Seven and Paise Twenty Eight Only
12 Add Cost Of Sign Board nos Excess(+) Full Conversion INR INR One Thousand Only
Total in Figures INR Three Lakh Ninety Thousand Six Hundred & Seventy Nine and Paise Ninety Only 4 Construction of chamber for 100mm sluice plates item5 10 Nos
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.41 MB
BOQ_975077.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid