Loading…
Loading…
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹84,652
EMD Value
₹2,116
Closing Date
23 Oct 2026, 2:00 pm5d left
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
ASSISTANT ENGINEER
AE LSGD VYTHIRI GP
Vythiri GP-Pr No.315-24-Renovation of water tank at PDP Colony-Re etender.
2026_LSGD_879670_19
01/26-27/TEN/AE/ LID AND EW/VGP
Open Tender
Civil Works - Others
Item Rate
VYTHIRI
Please refer Tender documents.
8 documents required · 8 mandatory
₹555
Yes
₹2,116
Yes
15 Oct 2026
15 Oct 2026
24 Oct 2026
15 Oct 2026
23 Oct 2026
15 Oct 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1WATER TANK AND PLATFORM | |||||
| 1.001 | 18.48:Providing and placing on terrace (at all floor levels) polyethylene water storage tank :ISI 12701 marked, with cover and suitable locking arrangement and making necessary holes for inlet, outlet and overflow pipes but without fittings and the base support for tank. | 5,000 | Litre | - | - |
| 1.002 | OD424363/2025-2026:DISMANTLING DR - Dismanling , clearing away and carefully stacking materials useful for reuse for any thickness of walls in DR masonry including disposal of debris within a distance of 150m. | 2.43 | cum | - | - |
| 1.003 | OD420630/2023-2024:DR PACKING Under foundation - Dry stone packing under foundation with department blasted rubble including conveyance of material and labour charges etc. complete as per direction of departmental officers at site. | 2.19 | cum | - | - |
| 1.004 | 5.1.3:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 1.37 | cum | - | - |
| 1.005 | 4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns | 6.72 | sqm | - | - |
| 1.006 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 68.25 | kilogram | - | - |
| 1.007 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 0.27 | cum | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.07 MB
Tendernotice_2.pdf
PDF • 0.03 MB
Tendernotice_3.pdf
PDF • 0.04 MB
BOQ_1496544.xls
BOQ • 0.30 MB
affi.pdf
Tender Documents • 0.06 MB
preli.pdf
Tender Documents • 0.07 MB
viewsbd_merged.pdf
Tender Documents • 1.76 MB
fot.pdf
Tender Documents • 0.02 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .