Loading…
Loading…
Tender Value
Refer Docs
EMD Value
₹83,095
Closing Date
6 Oct 2026, 6:00 pm
Chief Engineer [C & O], Wanakbori TPS
Supply, Erection, Commissioning and Testing of 20 Meter lighting High Mast Tower in Unit-8 at WTPS-GSECL.
339846
WTPS/S/ET/03/2026/SUPPLY-18 RFQ NO 77475E
Open
Miscellaneous Goods
Supply
Kheda
7 documents required · 7 mandatory
₹2,950
GUJARAT STATE ELECTRICITY CORP. LTD. [NEFT/RTGS/online payment -PAYABLE AT BANK OF BARODA WTPS BRANCH]
₹83,095
6 Oct 2026
31 Aug 2026
7 Oct 2026
31 Aug 2026
21 Sept 2026
31 Aug 2026
No. CODE Cess If Required
SUPPLY(PART-A)
HIGH MAST LIGHTING TOWER SYSTEM
CONSIST OF HEAD FRAME, PULLEY
ASSEMBLY,SUSPENSION SYSTEM WITH
STEEL WIRE ROPE, DOUBLE DRUM
1 WINCH,GALVANIZED LANTERN 4 Set
CARRIAGE, LIGHTENING
ARRESTOR,AVIATION OBSTRUCTION
LIGHTS,INTEGRAL POWER
TOOL,EARTHING PITS
CONTROL PANEL FOR HIGH-MAST
2 4 Numbers
LIGHTING TOWER
350 WATT FLOOD LIGHT FITTING WITH
HIGH INTENSITY, LONG RANGE AND
3 WIDE SPREAD, WEATHER & DUST 48 Number
PROOF ENCLOSURE CONFORMING TO
4 4 CX 25MM ALLUMINIUM CABLE 3000 Meter
Works (Part – B)
Erection, commissioning and testing of High
5 Mast tower with the help of all suitable 4 Job
equipments.
Design casting of suitable shallow foundation
6 for the High mast tower considering safe soil 4 Job
bearing capacity as per measurement.
Laying charges for PVC armored LT cable
7 (16 mm2 to 94 mm2 size from 2-core to 3000 Meter
Excavation of cable trench (size 1mtr deep x
0.5 mtr wide) by digging, filling back,
8 smoothing, leveling and reinstating with soil
for various size of power/control cables,
cable trench
BIDDER’S SIGN WITH SEAL
RFQ- 77475E Page
The overall L1 will be considered as SUPPLY (PART-A) + WORKS (PART-B) = L1 (Total
End Cost).
1. Overall L1 will be considered as SUPPLY + WORKS = L1 (total end cost).
2. The GST shall be paid extra in accordance with applicable GST/norms.
3. GSECL GST No.:24AAACG6864F1ZO
4. GSECL PAN NO.: 24AAACG6864F
5. Party PAN No.:
6. Party Valid GST No.:
7. Provision related to TDS on GST @ 2% shall be made applicable if value exceed contract
threshold limit (i.e. at present threshold limit Rs. 250000/-
BIDDER’S SIGN WITH SEAL
RFQ- 77475E Page
Gujarat State Electricity Corporation Limited
Wanakbori Thermal Power Station, Ta: Galteshwar, Dist: Kheda -388239
Ph: 91-2699-235522 Fax: 91-2699-235607
Email: [email protected] Web site: www.gsecl.in
CIN: U40100GJ1993SGC019988
AN ISO-9001:2015&14001:2015 OHSMS 45001:2018 Certified Power Plant
/// SCOPE OF WORK///
Name of Supply, Erection, Commissioning and Testing of 20 Meter lighting High Mast
Work Tower in Unit#8 at WTPS-GSECL
[ I ]. SUPPLY PORTION:-
1. The scope of work includes manufacture, transportation, installation, commissioning and successful
testing of the complete lighting system, using raising and lowering mechanism type of High mast
towers, including the Civil Foundation works. GSECL, WTPS will only provide the supply part of
schedule -B. However, all items required for the safe and efficient erection & commissioning shall be
provided party.
2. Party has to supply material as per schedule-B supply portion as per technical specification, which to
be mentioned and submitted during submission of your technical bid.
3. Party has to submit document for entry of material in gate duly signed by M/s. GSECL, WTPS
security department as per prevailing GSECL rules.
4. Bidder should be OEM or shall have to submit latest authorized certificate at the time of technical bid
or copy of original purchase proof from the authorized dealer at the time of bulk supply of material.
5. The Party has to quote his offer for only specified make mentioned in tender.
6. Supply of 20 Meters High Mast system with all accessories including but not restricted to the
following, a) Mast shaft in two sections, hot dip galvanized and suitable for wind velocity as per
875 part 3. b) Head frame, steel wire rope of min. 6mm dia. double drum winch, c) Galvanized
Lantern carriage arrangement suitable for 12 nos. luminaries & its control gear boxes and Lightning
finial. d) Integral power tool installed inside base compartment for its operation.
7. Supply of foundation bolts manufactured from special steel along with nuts, washers, anchor plate
and templates.
8. Supply of total 48 Nos. (12 LEDS per Mast Tower). LED food light luminaries and required control
gearboxes suitable for operation on 230 V. 50 HZ, AC. supply.
9. Supply of 02 Nos GI pipe earthling station per High Mast (01 No for Lightening and 01 No for power
switch), i.e. total 08 Nos GI pipe earthling stations to be provided. All connecting earthing strips to be
10. Supply of 3000 meter 4C X 25 mm2 Aluminum Armoured cable for Power distribution
1100VOLTS ALLUMINIUM CABLE 4 CORE X 25 MM2 L.T.PVC stranded aluminum conductor with
HR PVC"C" type insulation, inner & outer sheathing FRLS PVC ST-2 type and GI steel armouring
AS per IS-1554(PART-I) OF 1988 Mark. (Tolerance +/-10%).
11. Supply of control panel housing suitable control circuit for the operation of the mast, precision timer
for automatic On/Off control and required controls for the power tool motor.
Panel details: (A) Panel front door incorporated with indication lamps like R. Y, B for supply
Y, B phase for incoming supply.
12. The luminaries and lamps should be of as per tender specified make only.
BIDDER’S SIGN WITH SEAL
RFQ- 77475E Page
13. Make and details about the aviation obstruction light to be furnished with the offer. Also, Aviation
lighting to be remained on during night hours even High mast tower LEDs are off.
[II] Specifications of the high mast :
(a) Dynamic Loading for the Mast:
Party should consider the following for the design of the lighting mast towers
1 Regional Basic 50 m/sec (180 km/hr) as per 15s 875 (part-3)
Wind speed
2 Gust Factor 1.15 (as specified in IS 875 (Part 3) - 1987)
3 Topography To be taken for Plain Area as specified in IS 875 (Part3) -
configuration
4 Mean probable 25 years
design life
5 Terrain Category Category 1 Class A s per IS 875 (Part 3) –
6 Height Variation The values for different heights viz 10m, 20m & 30m
factor depending upon the height of the mast from ground level to
be taken from IS 875 (Part 3) - 1987 for the category and
class specified.
7 Wind Frontage To be calculated by the manufacturer based on the size of
Area their luminary. To design with minimum one third of the lights
facing one direction
(b) Structure:- The Lighting Mast shall be of continuously tapered, polygonal cross section, at least
sided, based on proven three wire rope systems with double drum, winch, Minimum thickness of
shaft should be 4 mm, presenting a good and pleasing appearance and shall be designed as per
TR7, IS 800 & IS 875 Part 3 1987 and offer relevant standard to give an assured performance and
reliable service. For design of the structure the allowable stresses should be calculated taking into
consideration Pt 3.94 of I5 800 1984 (amended up to date). Structure & design should be supported
by type test report from government of India test lab for its mechanical strength & stability.
(c) Construction:- The mast shall be fabricated from steel plates conforming to IS 2062 or equivalent,
cut and folded to form a polygonal section and shall be telescopically jointed and welded, The mast
shall be delivered in 2 sections (in view of transportation cost). Each section shall be fabricated out
of individual plates duly folded and welded. The dimensions of the mast shall be decided based on
proper design and structural design calculations for the same would be submitted for verification At
site the sections shall be joined together by slip-stressed-t method. No site welding or bolted joint
shall be done on the mast. The minimum overlap distance shall be 1.5 times the diameter at
penetration. The welded connection of the base flange shall be fully developed to the strength of
the entire section. The base flange shall be provided with supplementary gussets between the bolt
holes to ensure elimination of helical stress concentration. For environmental protection of the
mast, the entire fabricated mast shall be hot dip galvanized, internally and externally having a
uniform thickness as per the relevant standards.
(d) Door Opening :-An adequate door opening shall be provided at the base of the mast and the
opening shall be such that it permits dear access to equipment like winches, cables, plug and
socket, etc. and also facilitate nanny removal of the winch. The door opening shall be complete with
a heavy-duty double internal lock with special paddle key. The door opening shall be carefully
designed and reinforced with welded steel section. so that the mast section at the base shall be
unaffected and undue buckling of the cut portion is perverted. Size of door shall be minimum to
avoid the buckling of the mast section under heavy wind conditions.
(e) Lantern Carriage
(i) Fabrication:- A fabricated Lenten carriage shall be provided for fixing and holding the food light
fitting and control gear boxes The Lantern Carriage shall be of special design and shall be of steel tube
BIDDER’S SIGN WITH SEAL
RFQ- 77475E Page
construction, the tubes acting as conduits for wire, with holes fully protected by grommets. The Lenten
Carriage shall be so designed and fabricated to hold the required number of flood light fitting and
control gear boxes, and also have a perfect self balance The Lantern Carriage shall be fabricated in
two / three halves and joined by bolted flanges with steel nuts to enable easy installation or removal
from the erected mast. The entire lantern carriage shall be hat dip galvanized after fabrication. The
inner lining of the carriage shall be provided with protective PVC arrangement, so that no damage is
caused to the surface of the mast during raising and lowering operation of the carriage.
(ii) Junction Box: Weather proof junction box, made of cast Aluminum shall be provided on the
Carriage Assembly as required, from which the inter- connections to the designed number of the flood
light luminaries and associated control gears forced on the carriage shall be made
(iii) Raising and lowering mechanism: - For the installation and maintenance of the luminaries and
lamps, it shall be necessary to lower and raise the Lantern Carriage Assembly. To enable this, a
suitable Winch Arrangement shall be provided, with the winch fixed at the base of the mast the
specially designed head frame assembly at the top.
(f) Winch:- The winch shall be of "Integral Power Tool" type with motor. The winch shall have
provision for manual operatic of the motor. The winch shall be double drum and completely self
sustaining type, without the need for brake shoe. Each driving spindle of the winch shall be
positively locked when not in use. The capacity, operating s load, recommended lubrication and
serial number of the winch shall be clearly marked on each winch. The winch drums shall be
grooved to ensure perfect seat for stable and tidy rope lay, with no chances of rope termination in
the winch shall be such that distortion or twisting is eliminated and at least 5 to 6 turns of rope re
even when the lantern carriage is fully lowered and rested on the rest pads. It shall be possible to
remove the after dismantling through the door opening provided at the base of the mast. The winch
shall be type tested at a reputed institution and the test certificate shall be furnished before supply
certificate shall include the maximum load operated by the winch.
(g) Head Frame :-The head frame is to be designed as a capping unit of the mast, shall be of welded
steel construction, galvanized and extremely after assembly. The top pulley shall be of appropriate
diameter, large enough to accommodate and the multi-core electric cable. The pulley block shall be
made of non-corrodible material, and shall be of die cast Aluminum Alloy (LM-6 synthetic materials
such as plastic or PVC are not acceptable. Self-lubricating bearings and steel shaft shall be
provided to facilitate smooth and maintenance free operator. The pulley assembly shall be fully
protected by a canopy galvanized internally and externally. The head frame with guides and stops
with PVC buffer for docking the lantern carriage.
(h) Stainless Steel Wire Ropes:- The suspension system shall essentially be without any intermediate
joint. The steel wire ropes shall be of us the central core being of the same material. The overall
diameter of the rope shall not be less than 6 mm. The each rope shall not be less than 2400 Kg.
giving a factor of safety of over 5 for the system at full load as per the end constructions of ropes to
the winch drum shall be fitted with telluric The thimbles shall be secured on ropes by compression
splices. Three/Four suspension ropes of stainless steel used in the system with a provision of
compensating disc. There shall be a separate torque- limiting device to protect the wire ropes from
over stretching. It shall be Mechanical load adjusting device. The torque limiter shall trip the load
when it exceeds the adjusted limits. There shall be SL warning the operator once the load is tripped
off. The torque limiter is a requirement as per the relevant stand over all safety of the system.
(i) Electrical System, Cable and Cable Connections A suitable terminal box shall be provided as part
of the contract at the base compartment of the high mast incoming cable. The electrical
connections from the bottom to the top shall be made by special trailing cable. The cable shall be
EPR / PVC insulated and PCP sheathed to get flexibility and endurance. At the top there shall be
junction box to terminate the trailing cable. The system shall have in-built facilities for testing the
BIDDER’S SIGN WITH SEAL
RFQ- 77475E Page
luminaries‟ position. Also, suitable provision shall be made at the base compartment of the mast to
facilitate the operation of electrically operated power tool for raising and lowering of the lantern
carriage assembly. The trailing cables of the lantern carriage rings shall be terminated by means of
specially designed, metal clad, socket provided in the base compartment to enable easy
disconnection when required.
(j) Lightning Arrester :One number heavy duty hot dip galvanized lightning finial shall be provided for
each mast. The lightning finial shall M in length and shall be provided at the centre of the head
frame. It shall be solidly bolted to the head frame conducting path to the centre of the earth through
the mast. The lighting finial shall not be provided on the lantern any circumstances in view of the
safety of the system.
(k) Aviation obstruction:- lights Suitable aviation obstruction lights of approved make shall be
provided on top of each mast. Aviation obstruction remain on during night hours even high mast
tower's LEDS are off.
(l) Earthling Terminals:-Suitable earthling terminals using 12 mm diameter stainless steel bolts shall
be provided at a convenient locate mast, for lightning and electrical protection of the mast.
(m) Feeder pillar Panel.:-The control panels shall be outdoor type, stand mounted, dust and vermin
proof with IP-66 protection. The same out of 14 SWG CRCA sheet steel. The panels shall be given
pre-treatment and powder coated to Siemens G shall be painted black with synthetic paint. Cable
entry shall be at the bottom. The panels shall have knockouts cable. Laminated circuit diagram
shall be pasted inside of the door. Feeder pillar shall have pad locking arrange terminals by 12 mm
dia. bolts shall be provided. Panel shall have a sloping pilot lamps shall be provided and Switch for
auto/on/off/manual mode. Bus bars shall be of copper. Any other accessories for the safe and
efficient operation of the system shall be included by the tenderer.
IV Mandatory Requirements:
a) Illumination design : Area 31400 sq meters approx using radius 100 meter for Each High Mast
with 12 nos. of 1X350 watt LED Flood Lights (Energy 12 lights x 350 watt = 4.2 KW) meeting light
intensity requirements as Illumination Output Average Should be better.
b) Test certificate from a Government of India Test Laboratory for High Mast
c) Test certificate from a Government of India Test Laboratory for Flood light.
d) Structural design calculations for stability of Mast
e) Winch test certificate.
v. Applicable standards:
The following shall be the Reference Standards for the loading of the High Mast
SR. No Code No Title
A IS:875 (Part-il, 1987) Code and practice for design lads (other than
earthquake) for Building & structures
B BSEN 10025AS:2062 Grades of MS Plate
C BS ISO 1461 Hot dip galvanizing
D IS:800-1984 Code of practice for general construction in steal
E TR NO.7 2003 OF ILE,UK Specifications for Mast and foundation
F AISI 316 IS: 2266 Stainless steel wire rope grade Only
Only latest editions should be followed for various Standards as specified above
BIDDER’S SIGN WITH SEAL
RFQ- 77475E Page
Type 350WATT FLOOD LIGHT FITTING WITH HIGH INTENSITY,
LONG RANGE AND WIDE SPREAD, WEATHER & DUST
PROOF ENCLOSURE CONFORMING TO IP-
LED makes Nichia, Philips, Osram, Cree, Samsung
Make of Luminaries Bajaj / Crompton/ Philips / Sigma / Syska / Osram/ Panasonic /
Wipro/ Havells / C&S
No. of LED's Type of LED As per manufacturer design, but Long range and wide spread.
Lumens output >156 Lm/W at 85 degree
Life Span >80000 HRS
Luminary efficacy >90%
Color temperature 6500 K
Ingress Protection IP
Driver Should be constant Current type Design should be as per
luminaries requirement
The voltage variations 110 V AC to 270 V AC
Power factor >0.95 or more
Surge protection 10 KV
Protection Short circuit, Over current , Over voltage, Over Temperature.
VI. Technical Requirement (Luminaries)
350Watt LED Long Range and wide spread type-high intensity for long focus: High Pressure Die Cast
Aluminums Alloy Housing having high conductivity heat sinks, with Powder coating in attractive color
with Toughened front Glass in the front fixed to the die cast aluminum frame which would be fixed to
the housing with Neoprene/ Silicon Rubber gasket by means of stainless-steel screws to render it dust,
water and vermin proof meeting IP66 classification.The luminaries shall be long range, high intensity
and antiglare, energy saving light, dust, moisture and vermin proof and shall have IP-66 protection. The
luminance‟s should be complete with highly polished mirror finish stainless steel reflector, pillar proof
and captive bolting system, incorporated vibration isolators, toughened front glass of minimum 5 mm
thickness, focusing arrangement, neoprene rubber gaskets and steel inserts at threaded portions The
luminary should be complete with LED lamp as per designed rating and its control gear, as laid down in
IS: 9974 Part- and Part-,
Test Certificate: - The flood lights / luminaries should meet the requirements as laid down in IS:
(Parn-5- Sec. V) and IS 13383, Part-3, 1992. The fittings offered should have type test certificate for ail
the parameters laid down in relevant IS code. The luminary should have IP:66 protection. You shall
submit type test certificates for all the parameters laid down in relevant IS codes for the luminaries from
a Government Test House having NABL (National Accreditation Board for testing and calibration
Laboratories, India) approval. The Tenderers have to submit Test certificate for offered Luminary model
and make only, which shall be mentioned in test reports.
VII. Foundation: The foundation shall be as per the drawing approved by the department. Foundation
bolts to be suitably covered to prevent corrosion
VIII. Bill of Materials: (Approved Make)
Sr. no. Description Make Qty.
1 HIGH MAST TOWER MATERIAL WITH CGL/ PHILLIPS/ SIGMA/ WIPRO/ 04 Set
ALL ACCESSORIES C&S/ BPP/ VOLMONT/ SKIPPER/
BAJAJ/UTKARSH
BIDDER’S SIGN WITH SEAL
RFQ- 77475E Page
1.a WINCH AND MOTOR SET WITH ALL ANY ISI STANDARD MAKE 04 Set.
ACCESSORIES
2 CONTROL PANEL ENCLOSURE WITH ANY STANDARD MAKE WITH 04 No.
MOUNTING STAND FOR HIGH-MAST DEGREE OF PROTECTION IP-66
LIGHTING TOWER AND ABOVE
(2.a) SWITCH GEAR OF PANEL….TIMER, CGL/ PHILLIPS/ Lot/HMT
OVERLOAD RELAY, CONTACTOR FOR SIGMA/WIPRO/C&S//L&T/ABB/SCH
LIGHTING & MOTOR, AUTO MANUAL NEIDER ELECTRIC/MINILEC /
SWITCH, PUSH BUTTON, MCBS, SIEMENS / KAYCEE/ TEKNIC/BCH
INDICATION LAMPS, ...ETC
3 350 Watt LED FLOOD LIGHT BAJAJ/ CROMPTON/ PHILIPS/ 48 No.
FIXTURES FOR 04 TOWERS SIGMA/SYSKA/OSRAM/PANASONI
C/ WIPRO/ HAVELLS/ C&S
4 MAKE OF CABLES POLYCAB/ KEI/ FINOLEX/ Lot/ HMT
ANCHOR/ RR CABLE/
HAVELLS/ASIAN/UNIVERSAL
5 AVIATION LIGHTS BAJAJ/ CROMPTON/ PHILIPS/ 04 No.
SIGMA/SYSKA/OSRAM/PANASONI
C/ HAVELLS/ OREVA/ C&S
6 EARTHING MATERIALS ANY STANDARD MAKE Lot/HMT
IX. Control panel for 20 Meter High Mast Tower
1. Type: Outdoor type, shall be provided on trolley with additional canopy
2. IP protection IP
3. Material for console panel Constructed out of 2 mm(min) CRC
4. Main incomer MCCB(TP) of suitable rating
5. Protection of main incomer Earth leakage protection
6. Bus bar 3 Phase, Aluminum of suitable capacity
7. Outgoing feeders MCB (DP), of suitable rating for equal distribution of load in all three
8. Incoming supply system From external 3 phase, 415 V source
9. Incoming from external source shall be received by plug and socket system.
10. Panel detail: (A) Panel front door incorporated with LED indication lamps like R, Y, B, for
incoming supply. The LED light should be fitted on top of the panel for panel illumination with door
on R, Y, B phases for incoming supply. There are separate MCB for individual phase are provided.
11. 1 No. 32 Amp Spare 4-Pole MCB plus ELCB/RCCB should be provided.
12. Timer for automatic ON & OFF of lights should be provided.
1. 4C X 25 mm2 Aluminum Armored cable for Power distribution
BIDDER’S SIGN WITH SEAL
RFQ- 77475E Page
1100VOLTS ALLUMINIUM CABLE 4 CORE X 25 MM2 L.T.PVC stranded aluminum conductor with
HR PVC"C" type insulation, inner & outer sheathing FRLS PVC ST-2 type and GI steel armoring AS
per IS-1554(PART-I) OF 1988 Mark. (Tolerance +/-10%).
2. Wiring should be supported by weather proof conduits or other means and should not infringe
during raising and lowering of tower.
3. Make for Cables:
Universal, Polycab, KEI, Unicab, Ultracab, Havells, APAR, Prestige, Thermo cables, KC
Power tracks, RR cable, RPG, Gasoline, SUYOG, Shyam cable
4. Make for RCBO/RCCB & MCB:
L&T / MDS / Siemens/ Indoasian/ Newtech /Schneider/Loadstar/ABB/C&S
XI. Earthing Terminals:
02 (Two) nos. of separate Suitable earth terminals using 12 mm diameter stainless steel bolts shall
provided at a convenient location on the base of the Mast for lightning and electrical earthling of the
mast. It should be provided separately for each high mast tower.
[ II ]. WORK PORTION:
1. Party has to start work after getting clearance from Engineer in charge.
2. If any part damaged during execution of work is to be replaced by party at their own cost.
3. The man power required to execute the work will be in scope of party
4. The scope of this specification covers the design, manufacture, supply, transportation, Installation,
testing and commissioning of the complete lighting system, using Raising and Lowering type of
Nos. of 20 meters High mast Towers, LED Flood Lights including the Civil Foundation Works. The
tower should be type tested from Govt. of India Test Lab.
5. All types of required wiring, terminations and other related job work at site will be in scope of party
6. Area 31400 sq meters approx using radius 100 meter for Each High Mast with 12 nos. of 1X350
watt LED Flood Lights (Energy 12 lights x 350 watt = 4.2 KW for each high mast tower) meeting
light intensity requirements as Illumination Output should be better. The tenderer should guarantee
the required illumination levels, which will be measured after completion of work. The tenderer
should guarantee the performance of illumination scheme along with material supplied and used for
a period of 12 months from date of successful commissioning of the High Masts.
7. All engineering, designing, erection, commissioning and testing will be in party scope.
8. Erection installation and commissioning of the High Mast system comprising of foundation, mast
and its accessories, aviation warming lamps, earthling, luminaries, control panel etc with the help of
suitable equipments.
9. The type and make of the luminaries and lamp to be famished in the offer. Technical leaflet giving
the dimensions features to be attached with the offer. The fitting and control gear boxes offered
should be suitable for outdoor application and property sealed to prevent rain water entry.
10. After completion of work, party has to carry out the testing of high mast tower in presence of EIC in
all aspects.
11. The decision of the Chief engineer (C & O) WTPS will be final in case of any dispute.
12. Erection, commissioning & Testing of control panel with all internal fitting like MCB, ELCB/RCC
cable glands, connector & cable / Wires connection, etc. with all types of fabrication work.
13. Erection of 350W Flood light with necessary connection as per instruction of EIC.
14. Excavation of cable trench (size: 1meter Deep x 0.5 meter wide) or excavation as per instruction of
EIC by digging, filling back, smoothing, leveling and reinstating with soil for various types of cables.
BIDDER’S SIGN WITH SEAL
RFQ- 77475E Page
The work includes making trench in hard murrum (surface) / Tar road /Cutting tree or vegetation
with Cable laying.
15. Supply of all required gland and consumable to complete the erection work is in the scope of bidder
16. Design supply and construction of M-20 grad (1:2:4 ratio cement concrete) foundation with required
stiffeners & providing Muffing with all require material like cement, greet, sand etc. Cement
concrete foundation 70 % PCC from bottom including all required material & excavation for the High
mast tower with necessary curing and finishing in approved manner. (For 20 mtr. High mast tower).
[With party‟s own material]
17. Supply, Providing Pipe type earthing with 40 mm dia., 1 meter long 'B' grade G.I. pipe & G.I. earth
wire of 8 SWG erected & connected for each high mast tower as directed. (With party‟s Own
18. Supply & providing sufficient amount of salt and charcoal / coke as required for pipe type earthing
as per directives of EIC.(With party‟s Own material).
19. Scope includes commissioning lightening arrestor and aviation lightening.
20. Shifting, transportation of materials from main store/tool room to working site and vice versa shall
have to be done by contractor at his cost.
21. The other related material if it is required which is not mentioned here and in scope of work shall be
procured by the contractor at no extra cost.
22. Contractor has to arrange his own transport facility for his Labours & material.
23. All tools and tackles welding machine, drilling machine, screw driver, testers and safety Appliances
etc. for this work shall be arranged by the contractor.
24. Contractor shall be responsible for any kind of accident, loss occurs to their staff, tools/tackles and
/or damage is done to GSECL properties during work execution. Any loss to GSECL property will
be recovered from contractor bill.
25. Contractor has to follow the safety rules of GOG and GSECL, prevailing labour laws & factory rules
26. Bidder has to register in CLIMS portal and gate entry pass must be approved through CLIMS portal
BIDDER’S SIGN WITH SEAL
RFQ- 77475E Page
Gujarat State Electricity Corporation Limited
Wanakbori Thermal Power Station, Ta: Galteshwar, Dist: Kheda -388239
Ph: 91-2699-235522 Fax: 91-2699-235607
Email: [email protected] Web site: www.gsecl.in
CIN: U40100GJ1993SGC019988
AN ISO-9001:2015&14001:2015 OHSMS 45001:2018 Certified Power Plant
/// SPECIAL TERMS & CONDITIONS ///
Supply, Erection, Commissioning and Testing of 20 Meter lighting High Mast
Tower in Unit#8 at WTPS-GSECL
1. Time Limit:
(a) Supply Portion: 05 Months from the date of issue of LOI including drawing approval.
(b) Work Portion: 06 Months from the date of commencement.
2. Order Validity: The validity of order is 24-Month from the date of commencement of work.
3. Payment Terms:
(a) 80% payment of Ex-works price with 100% taxes, duties& F&I for supply portion shall be released
within 30 days on receipt of material at WTPS site in good conditions and as per technical
specifications.
(b) After successfully installation & commissioning, testing of High Mast Tower, 20% payment towards
supply portion shall be released along with 100% payment of works portion within 30 days from the
submission of final bill.
For payment bidder has to register in VMS System through vms.guvnl.com. For registration following
documents are required. After registration vendor have to upload the invoice in the VMS system for
smooth functioning of payment.
Documents required for VMS Registration:
(1) PAN Copy
(2) GST Certificate Copy
(3) Email ID
(4) Full Name of Vendor
If any query regarding registration please mail to [email protected];
4. Penalty:
Any delay that take place in supply and/ or erection, testing and commissioning activities beyond
contractual cutoff date/ stipulated period (Time limit) of the order shall be subjected to penalty (not
liquidated damages) at the rate of 1/2% of the contract price/order price per week or part thereof on
delayed portion or part thereof subject to be a maximum of 10% of the total contract value/order value
on delayed portion (i.e. End cost including GST & Cess as applicable).
5. Security Deposit: Contractor shall have to pay Security Deposit @ 5 % of the order End Cost value
within 10 (Ten) days from the date of issue of L.O.I.
6. Guarantee/Warrantee :
(a) Supply item: The guarantee period for supply item will be 12 months from the date of
commissioning and 18 months from date of receipt of material whichever is earlier for sr no.(1,2 and4).
Guarantee Period of 350 watt LED (Sr No.3) will be 5 year from date of testing after commissioning of
High mast tower. Party has to give free replacement for defective/failed LED till guarantee period.
(b) Works: The guarantee period for workmanship will be 12 months from the date of commissioning.
7.Performance Bank Guarantee:
You shall have to give performance guarantee for entire project valid for 12 months from the date
BIDDER’S SIGN WITH SEAL
RFQ- 77475E Page
of completion of testing and demonstration, and bank guarantee for 05 % of the order value
against standard performance guarantee shall be submitted on non-judicial stamp paper of
Rs.300.00 as per the prescribed form enclosed herewith
8. FAILURE TO EXECUTE ORDER:
If at any stage, the Bidder fails to complete the subject work / found unsatisfactory and applied
man-power found not sufficient, the same will be completed by GSECL by departmentally or by
other agency at the risk and cost of Bidder even at higher rates. The additional expenditure
incurred by GSECL for completion of work with 15% supervision charges will be recovered from
their bills / security deposit or any other payment due to them.
9. If the services of the Bidder are found unsatisfactory, GSECL shall be exercising its discretionary
power to cancel the order in accordance with the rules by issuing 30 days notice. If Bidder fails to
execute the order satisfactory, the order will be got executed / carried out / completed through other
agency for balance period of contract at risk and cost of Bidder and if required to pay higher rates, in
that case, difference of rates will be recovered from Bidder. Bidder will not be entitled any
compensation or damages or losses, whatsoever, on account of such termination of the contract.
10. CONTRACT AGREEMENT & INDEMNITY BOND:
Successful Bidder has to enter into a contract agreement & indemnity bond on a stamp paper of
Rs.300/- each as per standard Performa of GSECL on receipt of the work order. The cost of the
stamp paper and agreement shall be borne by the successful Bidder. The agreement shall be
signed by authorized person of company with the common seal of company.
11. AMICABLE SETTLEMENT:
Any dispute, difference, controversy or claim between the Parties arising out of or relating to this
contract with reference to the construction, interpretation. breach.termination or validity thereof
(hereinafter referred as "the Dispute") shall, upon the written request of either Party be referred to
the authorized representatives of the Disputing Parties for resolution. The authorized
representatives shall promptly meetand attempt to negotiate in good faith a resolution of the
Dispute within thirty days of the service of the request.
12. ARBITRATION:
If the Parties fail to amicably resolve the disputes or differences or contrary claims as indicated
herewith in sub clause (22) of Clause_, arising under or in connection with the present works
contracts, whether pertaining to works contracts alone or works and procurement both, the same
shall be referred to arbitration under the Gujarat Public Works Contracts Disputes Arbitration
Tribunal Ac!
13. EXTENSTION OF ORDER:
The GSECL reserve the right to extend the order as per GSECL rules/DOP.
14. In case of any dispute or discrepancy, the decision of Chief Engineer [C & O], GSECL - WTPS will
be final & binding to the Bidder.
15. Subletting of tender is not permitted.
16. The Bidder shall strictly adhere the Labour Laws in force from time to time regarding license,
payment of wages, insurance, liabilities, pension scheme, provident fund, paid leave facilities,
compensation on account of accident etc. for labour‟s, personnel engaged by agency for execution
of the work.
17. The General Terms & Conditions Applicable for Projects (GT & CAPS) will be in-force and
applicable to this contract.
18. Quoted rates are to be firm. Hence, any price escalation will not applicable.
19. All tools and tackles welding machine, drilling machine, screw driver, testers and safety appliances
etc for this work shall be arranged by the contractor.
BIDDER’S SIGN WITH SEAL
RFQ- 77475E Page
20. Contractor should take all necessary precautions during execution of the work and all labours of the
contractor should utilize all types of safety appliances (PPE) during work to prevent the accident as
per factory acts/rules.
21. The work is to be carryout on height hence if any accident occurs during execution of work then
contractor will be held responsible. He should take risk policy as per rules.
22. Contractor shall comply with the factory act / labor laws and safety law in force from time to time
and all safety & security rules and regulation of GSECL.
23. Contractor has to make all arrangements etc required resources like supervisor, well conversant
skilled man power and material and may visit to site for assessment of work at WTPS before bidding
at his risk and cost.
24. If at any stage the Contractor fails to complete the job, the same will be got done through other
agency at contractors risk and cost and additional expenditure incurred will be recovered from
contractor.
25. In case of any accident, during execution of work the compensation payable is to be made by
contractor. Corporation will not be held responsible for any fatal/ nonfatal accident contractor‟s
persons and any legal complication thereafter during work.
26. Loading / unloading, shifting and transportation of required all items / dismantled items from Main
store/sub store to site are in scope of contractor. Crane and truck will be arranged by party to
execute works.
27. Contractor will responsible for any damage of the Corporations property while carrying Out the job
and cost of damage will be recovered from contractor.
28. Electrical supply will be given for above work free of cost at one point only by the GSECL.
29. The general tender rules & regulation of the GSECL for contract work shall be applicable. The
contractor is deemed to have gone through it & considered to be fully of these conditions mentioned
in the booklet. All the terms & conditions of work contract booklet of GSECL shall be applicable to
the contractors in general. All the rules & regulations of former GEB shall be applicable to the
contractors of GSECL also.
30. GSECL reserve the right to terminate this contract at any time if the work is not carried Out /
completed within time frame / not satisfactory and the same should be awarded to Other party at
contractor own risk and cost.
31.Bidders are advised to visit WTPS site in his interest on his own before bidding so as to make them
conversant with actual site condition. Any change in rate /term and condition at later stage/execution
stage shall not be entertained.
32. Party shall have to make his own arrangement for storing the material in safe custody.
33. Contractor will have to provide responsible persons contact number at site and at office whom we
should contact as & when GSECL need to discuss any work-related matter during work execution.
He should be conversant with this type of industrial wiring work and capable to communicate and
coordinate the matter.
34. Contractor has to work as per instruction of Engineer in charge.
35. The labor laws in existence and which may modify from time to time shall be binding by you.
36. Rates are quoted to be firm. Hence no price and labor escalation will be applicable.
37. All consumables, like cotton waste, kerosene, diesel / rustolene, welding electrodes, Oxyacetylene/
gas shall be arranged by you at his own cost.
38. Party has to submit test certificate from competent Authority regarding over load testing as per
safety norms & submit load Testing Certificate as per IS: 3938 before work starts.
39. Party has to supply all the required/sundry materials (i.e. bolts, nuts, screw, washers, etc) for above
mentioned replacement of spares without any extra cost.
40. Detailed drawing with dimensions of foundation , High mast structure , Panel , computer aided
design of area to be illuminated , catalogue of offered make of luminaries , winch and aviation light
to be submitted along with technical bid.
41 Documentation - Detailed Panel as- built drawing and O&M manual, one soft copy and three hard
copies have to submit by party.
BIDDER’S SIGN WITH SEAL
RFQ- 77475E Page
42.Party has to submit detailed drawing of Panel with dimension and single line diagram, High mast
structure design, foundation for high mast tower with dimensions & computer aided design area to
be illuminated.
43. GSECL shall not be responsible for any loss of life, permanent or temporary disability to any person
or any of the workman, supervisors working on the job and the contractor himself due to accident
and of any other such hazardous accident or damage materials, equipments of the contractor due
to accident, no compensation will be paid by Ms. GSECL for the reasons at stated above.
44. OEM should provide spares and technical support for minimum 10 years after commissioning of
High mast tower on chargeable basis after completion of guarantee period.
45. Party has to supply material as per schedule-B supply portion as per technical specification, which
to be mentioned and submitted during submission of bidder technical bid.
46. Party has to submit document for entry of material in gate duly signed by M/s. GSECL, WTPS
security department as per prevailing GSECL rules.
47 Bidder should be OEM or shall have to submit latest authorized certificate at the time of technical
bid or copy of original purchase proof from the authorized dealer at the time of bulk supply of
48.The Party has to quote his offer for only specified make mentioned in tender.
BIDDER’S SIGN WITH SEAL
RFQ- 77475E Page
Gujarat State Electricity Corporation Limited
Wanakbori Thermal Power Station, Ta: Galteshwar, Dist: Kheda -388239
Ph: 91-2699-235522 Fax: 91-2699-235607
Email: [email protected] Web site: www.gsecl.in
CIN: U40100GJ1993SGC019988
AN ISO-9001:2015&14001:2015 OHSMS 45001:2018 Certified Power Plant
/// SCHEDULE – A ///
Supply, Erection, Commissioning and Testing of 20 Meter lighting High
Mast Tower in Unit#8 at WTPS-GSECL
Bidder’s scope for materials / tools / machineries at WTPS:
[1] The bidder has to arrange all required special tools-&-tackles and testing equipment etc. to
complete the subjected work.
[2] Provide High skilled, experienced, qualified & efficient personnel for the said work.
[3] Personnel protective equipments for their personnel safety in all respect.
[4] Supply all item as mentioned in Schedule -B
[5] Other sundry which are not mentioned in Schedule –B ,but required to complete the work
Material provided at free of cost by GSECL – WTPS:
[1] Provide 3-phases, 4-wires, 415 volts power supply at one mutually agreed point.
[2] Construction water for construction of foundation of HMT.
Facility given on Chargeable basis by GSECL – WTPS:
[1] Workshop facility, if available.
[2] Hospital Facility in case of any emergency.
BIDDER’S SIGN WITH SEAL
RFQ- 77475E Page
Gujarat State Electricity Corporation Limited
Wanakbori Thermal Power Station, Ta: Galteshwar, Dist: Kheda -388239
Ph: 91-2699-235522 Fax: 91-2699-235607
Email: [email protected] Web site: www.gsecl.in
CIN: U40100GJ1993SGC019988
AN ISO-9001:2015&14001:2015 OHSMS 45001:2018 Certified Power Plant
/// PRE QUALIFING CRITRIA///
Name of Supply, Erection, Commissioning and Testing of 20 Meter lighting High Mast Tower in Unit#8 at
Work WTPS-GSECL
GENERAL/COMMERCIAL CRITERIA:-
1 Details submission for Payment of Tender fee & EMD (As per Tender terms and condition)
The bidder has to submit copy of Active GSTIN registration and PAN No. along with technical bid.
2 Tenders submitted without Active GSTIN by the bidders, the offer will be rejected without entering into
further correspondence.
3 PF Code No. & PF registration certificate.
4 Copy of Last three-year ITR
Details of registered partnership deed in case of partnership firm and activities of association and
5 memorandum of association in case of company and notarized copy of same should be submitted
along with bid.
6 Submission of Third-party inspection certificate (annexure-1)
7 Submission of un conditional tender
TECHNICAL CRITERIA:-
The bidder should produce certificate / document as evidence for experience of having successfully
completed/on going similar works carried out satisfactorily for minimum one year in last seven years
period in government / semi-government / state electricity boards / corporation body / private limited
company / public limited company which tenders are invited should be either of the following:
Three similar completed works costing not less than the amount equal to INR.
Two similar completed works costing not less than the amount equal to INR. 13,84,915 OR
One similar completed works costing not less than the amount equal to INR.
The similar work means the work of Supply Erection, Commissioning, Testing and complete turnkey
execution of High Mast Towers.
The experience of work carried out by bidder as sub-contractor to the other agency may not be
considered.
Details of minimum tools & tackles, equipment in possession relevant to the job and technical
personnel required as per subjected work.
BIDDER’S SIGN WITH SEAL
RFQ- 77475E Page
4 Bidders must have to submit valid Electrical contractor license.
1. Financial qualification criteria:
1) The Average Annual Turnover of the bidder shall not be less than INR. 8,30,949 during
the preceding three (3) financial years as one date of Techno-Commercial bid opening.
2) Net worth of the bidder shall not be less than 100% of the bidder's paid- up share capital as on
the last day of the preceding financial year. In case the Bidder meets the requirement of
Net worth based on the strength of its Subsidiary (ies) and/or Holding company and/or
Subsidiaries of its Holding Companies wherever applicable, the Net worth of the Bidder and
its Subsidiary (ies) and/or Holding company and/or Subsidiary (ies) of the Holding Company, in
combined manner should not be less than 100% of their total paid up share capital. However
individually, their Net worth should not be less than 75% of their respective paid share capitals.
Net worth in combined manner shall be calculated as follows:
Net worth (combined)= (x1 +x2+X3)/(y1 +y2+y3) X 100, where x1, x2, x3 are individual net worth
which shall not be less than 75 % of the respective paidup share capitals and y1, y2, y3 are
individual paid up share capitals.
3) In case the bidder is not able to furnish its audited financial statements on stand-alone
entity basis, the unaudited unconsolidated financial statements of the bidder can be
considered acceptable provided the bidder further furnishes the following documents for
substantiation of its qualification.
• Copies of the unaudited unconsolidated financial statements of the bidder along with copies
of the Audited consolidated financial statements of its Holding Company.
• A Certificate from the CEO/CFO of the Holding Company, stating that the unaudited
unconsolidated financial statements form part of the Consolidated Annual Report of the
4) In cases where audited results for the last preceding financial year as on the date of
techno-commercial bid opening are not available, the financial results certified by a
practicing Chartered Accountant shall be considered acceptable. In case, Bidder is not able to
submit the Certificate from practicing Chartered Accountant certifying its financial parameters, the
audited results of three consecutive financial years preceding the last financial year shall be
considered for evaluating the financial parameters. Further, a Certificate would be required
from the CEO/CFO, stating that the financial results of the Company are under audit as on the
date of Techno-commercial bid opening and the Certificate from the practicing Chartered
Accountant certifying the financial parameters is not available.
5) The bidder must submit Average Annual Turnover and Net worth Certificate in support of
Financial QR, duly certified and verified for authenticity from Independent Statutory Auditor
of their company I Practicing Charted Accountant/ C.A. Firms I TPIA (Third-Party Inspection
Agency) empanelled I approved by GSECL along with copy of Annual Audited Accounts of last
three years
Note for point No.1, 2, 3 & 4:
i. Other income shall not be considered for arriving at annual turnover.
ii. "Holding Company" and "Subsidiary Company" shall have the meaning ascribed to them as per
Companies Act of India, in vogue.
BIDDER’S SIGN WITH SEAL
RFQ- 77475E Page
Net worth means the sum total of the paid-up share capital and free reserves. Free reserve means
all reserves credited out of the profits and share premium account but does not include reserves
credited out of the revaluation of the assets, write back of depreciation provision and amalgamation.
Further, any debit balance of Profit and Loss account and miscellaneous expenses to the extent not
adjusted or written off, if any, shall be reduced from reserves and surplus.
(1) All the pages of tender & submitted documents must be duly signed & stamped by bidder.
(2) Deviation if any will be clearly brought out.
BIDDER’S SIGN WITH SEAL
RFQ- 77475E Page
Gujarat State Electricity Corporation Limited
Wanakbori Thermal Power Station, Ta: Galteshwar, Dist: Kheda -388239
Ph: 91-2699-235522 Fax: 91-2699-235607
Email: [email protected] Web site: www.gsecl.in
CIN: U40100GJ1993SGC019988
AN ISO-9001:2015&14001:2015 OHSMS 45001:2018 Certified Power Plant
GENERAL TERMS & CONDITIONS
Name of Supply, Erection, Commissioning and Testing of 20 Meter lighting High Mast
Work Tower in Unit#8 at WTPS-GSECL.
[A] - GENERAL CONDITION OF CONTRACT :
1) LABOUR LAWS
a) Person below the age of 18 years and above 60 years should not be employed for the
b) No female worker shall be employed in the night shift between 7.00 P.M. to 6.00 A.M.
c) The contractor shall maintain a valid labour license under the contract labour (Regulation
and Abolition) Act for employing necessary man power to be required by contractor. In the
absence of such license the contract shall be liable to be terminated without assigning any
reasons thereof.
d) The contractor shall at his own expense comply with all labour laws and keep the
G.S.E.C.L. Indemnified in respect thereof. Some of the major liabilities under various
labour and industrial laws, which the contractor shall have to comply, which are as under:
I) Payment of contribution by way of employee‟s contribution towards provident fund, family
pension scheme, deposit linked insurance scheme, administrative charge etc., at the rates
made applicable from time to time by Govt. of Gujarat /Govt. of India and other statutory
authorities.
II) Payment of deposit in respect of each contract labour at the rate applicable of with the
offices of Commissioner of Labour as per the contract labour (Regulation and Abolition)
III) License fee as prescribed under the contract labour (Regulation and Abolition) Act and
rules framed there under depending upon the number of workmen employed by
contractor.
IV) Identity cards as prescribed under the factories Act shall be issued to workmen.
VI) Payment of retrenchment compensation, Notice pay and other liabilities as per Industrial
Disputes Act. Any payment to the contractor's employees arising out of any claim or
disputes under the Industrial Dispute Act 1947 or any other labour laws
VI) Payment of compensation in case of accidental injury shall be made as per the Employee
Compensation Act,
VII) If the female workmen are more than 30 numbers engaged then provision of crèches and
Maternity leave as per the provision of the Maternity benefit Act, 1961shall be complied.
VIII) Contractor shall comply the Provision laid down under the payment of Bonus Act, 1965 to
the Concern workmen and submit the relevant records to GSECL.
The above are some of the major liabilities of the contractor in addition to other liabilities
prescribed under the various labour laws in force from time to time from statutory Authorities
like State Government / Central Government, which the contractor shall have to comply.
2) PROVIDENT FUND AND FAMILY PENSION SCHEME (EPF – M & P Act 1952)
The contractor shall submit along with his bill (month wise) statement regarding deductions against
employees‟ provident fund and family pension scheme in respect of each concerned employee.
Provident fund and family pension scheme at the rate of 12 % of wages (or at the rates made
BIDDER’S SIGN WITH SEAL
RFQ- 77475E Page
applicable by the Government time to time). The contractor‟s contribution and his workers
contribution towards provident fund, family pension scheme and all charges thereof shall deposited
by the contractor with Concern Regional Provident Fund Commissioner on monthly basis.
3) PAID LEAVE FACILITY:
Paid leave facility at the rate of one day for every 20 days worked by the contract, labour shall be
provided the contractor to his workers. It shall be duly verified and approved/certified by the
authorized officer of the GSECL.
4) The contractor shall employ adequate number of experienced staff at site for daily supervision and
for maintaining of various registers and records required under the law and contracts. No payment
for such supervision shall be admissible.
5) CONTRACTOR TO INDEMNIFY THE GSECL
The contractor shall indemnify and keep indemnified the GSECL, and every member, officer and
employees of the GSECL, also Engineer-in-charge and his staff against all actions, proceedings,
claims, demands, costs and expenses whatsoever arising out of or in connection with the matter
referred in above clauses and elsewhere and against all actions, claims demands, cost and
expenses which may be made against the GSECL by any workman/ employees of contractor or
any sub contractor and or from any liability any wise to any workman/employees of the contractor
or sub-contractor under any laws, rules or regulation having in force of law including but not limited
to claims against the owner under employees compensation Act, 1923. The Employee‟s Provident
Fund Act.1952, and/or the contract labour (Abolition and Regulation) Act,
The GSECL shall not be liable for or in respect of or in consequence of any accident or injury to
any workmen or other person in the employment of the contractor or his sub-contractor, and the
contractor shall indemnify and keep indemnified the GSECL against all such damage and
compensation and against all claims, demands proceedings costs, charges and expenses
whatsoever in respect of or in relation thereto.
6) EMPLOYEE'S COMPENSATION & EMPLOYER'S LIABILITY INSURANCE
The contractor has to take Employee Insurance under the Employee Compensation Act, 2010 for
all workmen engaged by him for GSECL work contract (Location & Order wise) and copy of the
same shall be produced to GSECL prior to start work.
Insurance shall be affected for all the contractor‟s employees engaged in the execution of these
contracts. If any of the work is sublet, the contractor shall required the sub-contractor to provide
Employee's compensation and Employer's liability insurance for the latter's employees unless
such employees are covered under the contractor‟s insurance. It shall be liability of contractor
for employees of his sub-contractor.
7) Any other rules and regulation, conditions, Circulars etc., that are in force at present and that may
be framed by the GSECL From time to time in connection with contracts will be binding and
acceptable to contractor.
8) The contractor must possess separate P.F. code for the above subject work.
9) All relevant records i.e. registers, forms, valid licenses etc shall be maintained up to date as per
applicable all labour laws and kept ready at GSECL site office for inspection at any time or
submitted in-time to the concerned authorities as per contract labour Act, Factory Act. etc... By
contractor.
10) It is the responsibility of the contractor to ensure that contractor‟s employees maintain strict
discipline as regards security, methods of safe working etc, and not to cause any hindrance to
smooth running of power station or in execution of duties by GSECL staff. Any lapse in this regard
will be viewed seriously and contract is liable to be terminated. If any of contractor‟s staff is found
unsuitable or not behaving properly, the contractor shall have to remove him from the work-site on
demand by GSECL. The contractor shall have to strictly observe the rules and conditions specified
in the enclosed works contract booklet of the GSECL, which are not modified hereunder. To keep
BIDDER’S SIGN WITH SEAL
RFQ- 77475E Page
harmonious industrial relations amongst contract labours is the sole responsibility of the contractor.
Any breach of the same will be viewed seriously.
11) Before starting the work, the contractor should contact Industrial Relation Officer/ Labour Welfare
Officer for fulfilling Labour Laws Compliances and obtaining the gate passes of all contract
labourers.
12) The contractor shall deposit 15 days salary at the rate of last drawn salary for every completed
year of services for each worker for the liabilities of the gratuity. (* applicable to ARC/BRC works
contract only)
BOCW is applicable for All works carried out on outside factory premises i.e. colony area & other
than factory premises
All such contractors shall be register under The Building & other Construction Workers (Regulation
of employment and condition of service) Act, 1996 and The Gujarat Building & other Construction
Workers (Regulation of employment and condition of service) Rules, 2003 before execution the “
Building or other construction work “
Contractor shall obtain Gate passes for the work of carries on in Colony area & other than factory
premises from Security Section.
Follow the following procedure at each milestone for the execution of works contract.
(A) On Commencement of Contractual Work:
(1) The Contractors shall have to obtain Photo-Gate-Pass before the commencement of contractual
work awarded. Contractor shall have to apply for the gate passes in triplicate in a prescribed
application form which is to be available from Security Section for the entry of workmen in the
premises of GSECL including Colony premises.
(2) Such application shall have to be proceed for the approval of Factory Manager. After obtaining
approval of Factory Manager, contractor shall have to prepare the Gate Passes and obtain the
signature of Factory Manager.
(3) If Labours are required to be engaged in Emergency during Public Holiday , Contractors can
apply for Temporary Gate-Pass for the maximum period of only three days with
recommendation of respective EE/SE and the same shall have to be regularized after following
the procedure of Gate Pass applications on the office working day from HR Department. It is to
note that No Temporary Gate-Pass shall be issued for the work other than acute emergency to
carry out the work in power station premises.
(4) The Contractor shall have to obtain the Group Insurance Policy under the Employee
Compensation Act, 1923 prior to commencement of work.
(5) The Contractor who intend to engaged 50 or More than 50 labours to Carry out the awarded
contractual work then necessary - Form No. V under the Contract Labour (R& A) Act, 1970 /
Form No. VI under the Interstate Migrant worker (employment regulation) rule 1979 as
applicable is to be obtained from HR Department for the purpose of obtaining Labour License
from the Licensing Authority.
(B) During Contractual Work under the progress:
(1) Bill Recording Officer of User department shall have to ensure as to whether contractor has
engaged minimum number of contract workmen per day as per the terms of work order.
BIDDER’S SIGN WITH SEAL
RFQ- 77475E Page
(2) All Contractors shall have to make the payment of wages to the Contract Labours engaged by
them, on or before 7th of every month through Nearest Nationalized Bank compulsory,
preferably situated in the premises of Wanakbori TPS. The Contractor shall provide copy of
Bank Statement duly stamped by the Concerned Bank as a token of proof towards payment of
Wages to HR Department.
(3) All Contractors has to comply & maintain statutory documents / registers at site under the
provision of labour laws & EPF Act.
(C) Submission of Statutory documents to ensure the compliances:
1) The Contractor shall have to submit following statutory documents, work order wise, under
the labour laws and EPF to the recording officer of user department for ensuring the
compliances of provision of labour laws and EPF Act for the respective execution of contract
period and same is required to be forwarded to HR Department in Prescribed format.( Copy
site (duly signed & stamp by Contractor ) - Form XVI
Copy of Wage Payment Sheet – with signature of workmen, duly signed & stamped by
Contractor - Form XVII
Copy of Bank Statement of Wage Payment (duly signed & Stamp by Concern Bank)
Copy of PF Challan along with ECR Statement
Copy of Gate Pass Permission ( duly signed by Authorities ) -
Copy of Valid Labour License ( If Applicable in case of More than 9 manpower Engaged by
Contractor for said work ) ( First Time)
Form No. XIII – Register of workers employed by Contractor
Form-C Bonus Register
Form-19 Leave with wages Register
Form No. XVI & Wage Register – Form No XVII as Prescribed under the Contract Labour (R&A) Act,
[B] - CIRCULAR – I
The following are the major obligations to be fulfilled by the Contractors as per the Contract Labor
(R&A) Act 1970 and rule mentioned there under:
1. The contractor should not be allowed to engage ten or more contract laborers without initiating to
obtain the labour license under the Contract Labour Act from the Assistant Commissioner of
Labour, Nadiad (the said number i.e., ten or more includes Supervisor and other staff.).
2. The contractors shall have to obtain group insurance under WC Act before starting the work.
3. All Contractors shall have to make the payment of wages to the Contract Labours engaged by
them, on or before 7th of every month through Nearest Nationalized Bank compulsory, preferably
situated in the premises of Wanakbori TPS area in case of ARC /BRC works Contract. The
Contractor shall submit the copy of Bank Statement duly stamped by the Concerned Bank as a
token of proof towards payment of Wages to HR Department. In Case of Non ARC/ BRC works
contract, it is also expected the same practice to be adopt by the contractor. If any problem arise for
payment of wages through bank, same be informed to chief engineer (Gen) and after approval the
payment shall be disbursed in presence of the GSECL representative and obtain their signature in
Wages Register - Form No. XVII prescribed under the Contract Labour (R&A) Act, 1970. Prior to
that Contractor shall intimate the Date, Time & Mode of Payment in advance to LWO / IRO.
BIDDER’S SIGN WITH SEAL
RFQ- 77475E Page
Contractor has also required to get the wage register of respective month certified from LWO / IRO
as per the provision laid down under the Contract Labour (R&A) Act,
4. Payment to contract laborers has to be made through Bank/ Cheque/ RTGS only. Wages rates for
contract laborers are applicable as per the terms and conditions of the license. The contractor shall
have to pay wages to workers as notified by Government of Gujarat., from time to time.
5. It should be ensured that all the labours engaged by contractor are covered under the provident
fund scheme and employee‟s pension scheme and their contribution are remitted regularly to the
concerned RPFC. The Xerox copies of challan along with ECR in this regards should be submitted
regularly in G.S.E.C.L. office.
6. In case the contractor having more than one contract in the same TPS, the contractor shall have to
submit contract wise separate list of the workmen to the concerned Officer.
7. The contractor shall have to pay wages to workers as notified by Government of Gujarat., from time
The above instructions should be followed scrupulously to avoid undue litigation for non Compliance of
Labour Law
CIRCULAR-2
It has been directed by our HO that, no new labor contract be entrusted to any agency without getting
prior approval from Member (Administration). Further the existing contract, on their expiry, may not be
extended without approval of the Member (Administration) from HO, Vadodara.
In light of the instruction conveyed by HO, it is necessary to check up the following documents of each
and every contractor before awarding the contract to these contractors. For preliminary checking of
valid contractors, the following documents are required to be checked by the concern DE/EE/SE. On
their checking the same and by recommending the number of labors, gate pass will be issued by the
Sr. Security officer. But before awarding and finalizing any contracts, following information must reach
to IRO for his confirmation the contracts should be awarded.
1. The contractor should not allowed to engage ten or more contract labors without initiating to obtain
the labor license under the Contract Labor Act from the assistance commissioner of labor, Nadiad
(The same number i.e. ten or more includes Supervisor and other staff).
2. Number of days of the contract should be informed first before allowing the contract to start.
Because on the completion of sixty days, the contract labor becomes liable to CPF as per
Provident Fund Act 1952. Hence we should avoid such work as far as possible. The Contractor
also must go for group insurance under WC Act before starting the work.
3. The contract laborers must be paid minimum wages as per notification issued by competent
authority under the said Act from time to time upon issuance of Circular by Chief Engineer, WTPS.
The above instruction must be followed scrupulously to avoid labour liabilities under Contract labor
[C] - GENERAL SAFETY RULES / NORMS” TO BE OBSERVED BY THE CONTRACTORS
All the contractors working at Wanakbori Thermal Power Station shall have to strictly observe the
following Safety Rules. Concerned Contractors are responsible for informing & observance of these
rules by their supervisors/employees/labours as well as the supervisors/ employees/ labours of
agencies/ sub-Contractors engaged, if any, by them for the work contract awarded to them. Prior to
commencement of the work, Contractor shall have to submit a written assurance on their letterhead
to the concerned Sectional Head / Engineer-in-charge that they have thoroughly gone through
these Rules, have educated their employees / employees of their sub contractor and will strictly
BIDDER’S SIGN WITH SEAL
RFQ- 77475E Page
observe the said Rules while execution of work under work contract awarded to them. They will
have to indemnify the Corporation for any loss or damage / accident / injury to the Corporation‟s
property / employee or employee of their own in default of non - observing these rules.
(01) Contractor should issue photo gate pass for their workers from GSECL Factory Manager as per
Gujarat Factories rules, 1963 & details shall be filled up in GSECL gate pass format as per
Aadhar card /Election card id proof & to follow the gate pass issue procedure through concern
department EE & SE, Security Officer, LWO/IRO/DGM, Factory Medical Officer, Safety
Officer/Dy. Safety Officer & Factory Manager.
(02) In case of emergency, temporary photo gate pass shall be issued by Security Officer only for
three days with prior permission of Factory Manager only. More than three days, Permanent
photo gate pass procedure shall be completed by contract agency for their contract workers.
(03) Certificate of Fitness of employment in hazardous process & operations in form no.33 of Gujarat
Factories rules, 1963 shall be issued by GSECL Factory Medical Officer for all contractor workers
before commencement of work & examination responsibility shall be taken by contractor as well
as concerned Head of Department .Pre-employment & Periodical medical examination of
contractor workers shall be carried out in form no.32 from GSECL Factory Medical Officer after
every six (06) months of contractor with their contractor workers. Contractor shall be fulfilled all
health requirements before commencement of work. After completion of medical examination in
form no.32/33, GSECL Factory Medical Officer shall be signed in contract worker gate pass
procedure format.
(04) Contract worker gate pass will issue after completion of safety induction 3D animation movie &
Training record is to be maintained in IMS/OHSAS training format by TK Office/LWO.
(05) As per Gate pass format of GSECL, Safety Officer/Dy. Safety Officer shall be checked the issue
PPE to contract workers as per nature of job, Form no.10 of lifting tools and tackles, Driving
license, Electrical contractor license, Electrical trade qualifications, Safety induction training, SOP,
supervisor qualifications etc. After fulfillment of all Safety compliances, Safety Officer/Dy. Safety
Officer shall be signed in Contract worker Gate pass procedure format.
(06) Work Contract shall be completed by principle contractor/agency/person who is awarded the work
order. Subletting of contract shall be allowed only if prior approval of Power station chief before
execution of work. Contractor/agency shall be submitted the entire subletting contract documents
with gate pass application through concern department EE & SE, LWO/DGM, and Safety
Officer/Dy. Safety Officer & Factory Manager.
(07) Under The Conditions Framed Under Rule-45 Of The Indian Electricity Rules,
Valid Electrical contractor License shall be submitted to concern electrical department
EE/SE/Electrical Safety Officer/ Safety Officer/Factory Manager at the time of apply gate pass by
agency/party with latest renewal from Chief Electrical Inspector, Gandhinagar- Gujarat. Electrical
License photocopy shall be checked by Concerned HOD of Electrical Department/Electrical Safety
Officer/Dy.Safety Officer/ Safety Officer/Factory Manager.
(08) As per nature/requirement of job/work, qualified supervisor shall be engaged by contract agency &
qualification certificate with experience certificate shall be submitted to concern
EE/SE/LWO/IRO/DGM/ Dy. Safety Officer /Safety Officer/Factory Manager at the time of apply
gate pass.
BIDDER’S SIGN WITH SEAL
RFQ- 77475E Page
(09) As per rule 3 of CEA regulation ,2010: Designating person(s) to operate and carry out the work on
electrical lines and Apparatus, Contract person/worker possesses a certificate of competency or
electrical work permit, issued by the Appropriate Government. That means, Electrical trade
Qualification of contract worker/person like ITI-wireman/ Electrician, Diploma (Elect), BE/B. TECH
(Elect), ME/ M. TECH (Elect) shall be submitted to concern EE/SE/LWO/IRO/DGM, Dy.Safety
Officer/ Safety Officer/Factory Manager at the time of apply for photo gate pass procedure.
(10) As per nature of job/work & during capital overhauling work /Annual overhauling work /24X7 round
the clock work/major shut down work, Qualified Safety Officer/Manager/Supervisor (BE/Diploma
(Elect/Mech/Civil) + PDIS-Post Diploma in Industrial Safety) shall be engaged by contractor during
dangerous operations/dangerous works as well as day to day dangerous activities, safety
supervision, tool box talk, Safety awareness program, SOP preparation with hazards & its control
measures with each step , checking of lifting tools & tackles, hydra mobile crane, Safety
precautions, coordination with Safety Department etc.
(11) License of driver shall be submitted with gate pass issue application as per nature of vehicles & to
follow the Motor vehicle Act, 1988, the Central Motor Vehicles (Amendment) Rules, 2016 as well
as Gujarat Motor Vehicles rules, 1989 & driver license shall be checked every day by security shift
in charge before entry in the Factory premises.
(12) SOP with JSA (Job Safety Analysis) shall be prepared by contractor through competent person as
per GFR, 1963 or Qualified Safety Officer as per GFR, 1963 with 05 years experiences. SOP will
review & approve by concern JE/DE/EE/SE/Elect. Safety Officer/Dy. Safety Officer /Safety
Officer/Factory Manager before execution of work.
(13) It is compulsory to use standard make Personal Protective Equipment (P.P.Es.) as per the job
requirement. Do not work without use of required P.P.Es. Contractor is responsible to provide
standard make (ISI/DGMS/CE/EN/ANSI approved) & to checked standard/make in PPE issue
format by concern JE/DE/EE/SE/Safety Officer/Factory Manager. Personal Protective Equipment /
Safety Gadgets suitable to give sufficient protection against hazards involved in their work / job to
their staff, as per the job requirement and insist / enforce their workers to put on the same while at
The ongoing work is liable to be stopped at any time if your contract workers/staffs found working
without P.P.Es. Following is the list of various P.P.Es (as per ISI/DGMS/CE/ EN/ ANSI approved
only) to be used for various works / worksites.
In any work, Contractor shall be issued the minimum 05 nos. of PPEs like Safety Shoes, Safety
Helmet, Safety goggles, Mask & Reusable Ear plug to their workers/supervisor compulsory & it will
check by concern section HOD &Dy. Safety Officer /Safety Officer at the time of gate pass
procedure.
List of safety equipment
Industrial Safety Helmet For protection of head against falling objects or
during fall of person from height. Yellow Colour
helmet is used for contract worker with agency logo.
Safety Goggles/welding For protection of eyes against flying particles / dust,
goggles/chemical splash goggles chemical splash, welding spark, arc, flashover etc.
Full Face shield For protection of face against flying particles / dust,
chemical splash, spark, arc, flashover etc.
Reusable Earplug / Ear muffs. For ear / hearing system protection while working in
high noise level area.
Chemical suit/Gas tight suit /Fire For body protection against chemicals, oils, sharp
BIDDER’S SIGN WITH SEAL
RFQ- 77475E Page
proximity suit/FR Boiler Suit edged objects, heat, hot objects etc.
Safety Hand Gloves For protection of hands against chemicals, oils,
sharp edged objects, heat, hot metals/objects,
electricity etc.
Safety shoes/ Gum Boots with For protection of leg/feet against falling objects,
Oil/Chemical/water/heat/ Electrical sharp edged objects, heat, hot metals/objects,
resistance etc. electricity etc..
Safety Belt(full body hardness with For fall prevention while working at heights or in
double lanyard & shock absorber) / depth, working in vessel or in confined space.
Rope / Life line / Fall arrestor etc.
Dust Mask/Respirator with valve(FFP2) Protection of respiratory system against dust.
Chemical Cartridge Respirator with full Protection against toxic chemical fumes /
face mask type A2B2E2K2 gases/vapors/dust etc.
Trolley mounted Airline respirators with Working in oxygen deficient zone or confine space
full face mask area
Portable Single gas detector like Working in hazardous storage/process area
Chlorine, Ammonia, Hydrogen, etc
Portable Multi gas Detector Working in oxygen deficient zone & use in entry of
( LEL,O2,CO,H2S,SO2, etc) confine space & Major fire
Automatic voltage detector To check the present voltage or induction voltage of
electrical equipment/ bus/switch gears from
(one) feet distance before starting the any electrical
Auto darkening welding helmet (EN 379 The new auto darkening welding helmet combines
& EN 175 Level-B) with PAPR as per legendary Speed glass quality and auto darkening
EN 12941:1998, class TH2 and technology with an innovative wide-view grinding
AS/NZS 1716 visor to give welders an all-in-one solution for more
flexibility, precision, and efficiency.
Respiratory System is a combined face and
breathing protection device, for increased comfort
and safety in welding. The unit is equipped with a
particle filter which removes particles from the air.
The unit provides a constant airflow independent of
filter combinations and clogging. The unit can also
be equipped with a gas filter (for example A1B1E1).
The unit supplies air to the head top via the
connecting breathing tube. The airflow creates a
slight positive pressure which together with the
sealing to the face prevents particles and other
contaminants from entering the head top.
(14) All PPEs (as per ISI/DGMS/CE/EN/ANSI approved only) Should issued by party/agency/contractor
to their contractor workers as per nature of job and allotment of PPE list shall be submitted to
Safety Officer, Wanakbori on his letter head as per below mentioned format by Contractor before
commencement of work through concerned JE,DE,EE/SE .
Sub: Issue of PEE to Contractor workers
Sub of work Order:
Work order no.
Name of Agency:
Date of Commencement:
Time limit for work order:
Sr. Name of Desi Name of Name of IS Make Qt Unit Date Receivin
no. workers gnati Section PPE :Code of y of g
on under work no. of PPE issue signature
BIDDER’S SIGN WITH SEAL
RFQ- 77475E Page
execution PPE
01 Safety Nos.
Safety Nos.
Reusable Pair
Dust Nos.
Safety Pair
(15) Shift Security Inspector/Security Officer shall be checked Safety Shoes & Safety Helmet of all
contractor workers at entry gate of Factory Premises & shall entered contractor workers with
Safety Shoes & Safety Helmet with photo ID Gate Pass.
(16) Shift Security Inspector/Security Officer shall be checked validity of Gate pass of all contractor
workers on daily basis.
(17) During the work execution, one trained & competent supervisor of agency should always remain
present at work site. Concern JE/DE of GSECL shall be supervised the contract work as per SOP.
(18) Approved NABL laboratory calibration certificates of electrical/mechanical/Civil/C&I/
Environment survey/Chemical etc measuring /testing equipments/instruments which are used
during contract work shall be submitted before starting the work & shall be checked by concern
JE/DE/EE before starting work & it‟s record shall be maintained in concern section.
(19) The contractor shall take all the required safety measures prior to commencement of work on
dangerous substances, machineries or area at which cautionary notice is displayed and obtain
“Line Clear” or “Work Permit” through the concern Department / Section JE/DE and shall be
informed to concern section JE/DE for closed/ returned after completion of work.
(20) Safety talk/Safety work instructions shall be given to contractor workers by concern JE/DE
regarding hazards of specific work, risk & it‟s control measure (mentioned in HIRA) before starting
the job work and records shall be maintained for each & every job works.
(21) Display Safety instructions shall be strictly followed by all workers who are working in factory
(22) Material Safety Data Sheet of each chemical shall be available with Chief Chemist/Control room
& work related Chemical information shall be taken by contractor & contractor workers from
Concern EE/Chief Chemist before starting of chemical handling work.
(23) The contractor shall be checked & securely covered or securely fenced any opened fixed vessel,
sump, tank, pit or opening in ground or in floor which, by reason of its depth, situation,
construction or contents ,is or may be a source of danger before starting the work each & every
days or after interval/recess. Contractor supervisor shall be informed to concerned HOD regarding
any unsafe conditions.
(24) Prohibition of smoking, fires, lights, spontaneous ignition substance, matches; fuses, mobile
phone etc are to be strictly followed by all workers who are working in factory premises.
BIDDER’S SIGN WITH SEAL
RFQ- 77475E Page
(25) Prior to carrying out welding, gas cutting, furnace heating or any other hot work job, remove all the
inflammable material lying at or nearby worksite or cover it properly by suitable protective
covering. Also, special care shall be taken before carrying out such job & see that all possible
contributing factors to set fire shall be removed / vanished prior to commencement of the work.
Advance intimation shall be given to concerned section / fire section to commence the work in fire
prone areas. They should also keep ready all the First Aid Fire Extinguishers / equipments & fire
extinguishing media / material like sand / water buckets or other appropriate equipment at such
(26) While carrying out work in confined space or inside vessel, obtain necessary “Confined Space /
Vessel Entry Permit” from concerned department prior to commencement of the work.
For lighting in such areas, only 24-volt (ISI certified & with proper guard) hand lamp shall be used.
For taking care of the persons working inside the confined space / vessel, a supervisor / person
capable to keep continuous watch on person(s) working inside, assist them in case of emergency
or arrange to get immediate outside help, shall remain present at entry point. Use full body safety
belt without failed.
While working inside sewage, trench or in-depth, a person to warn outsiders / entrants / passers
etc shall remain available near entry point or the entry point shall be cordoned by a barricaded
tape with a cautionary notice. After completion of the works, all the lids / covers / grills / grits
opened, shall be re-fixed / re-placed in the original position as it were prior to commencement of
the work and leave the work place in safe condition in all respect, so as to prevent accident to
fellow workers.
(27) The contractor shall see that he / his persons do not work on or block (by stacking material, spare
parts, tools-tackles, equipments etc), any passages / walkways / gangways / aisles / staircases /
ladders / lifts or any other approaches / roads leading to plans or its auxiliaries, on which there is
traffic movements or possible traffic movements in case of emergency. Such passages are meant
for safe escape in the event of emergency. If it is utmost necessary to carry out work in such area
with blocking of passage, prior permission of Competent Authority or the Engineer-In-Charge shall
be obtained. To demarcate / declare the area as “UNSAFE”, cordon it using barricading tape &
display suitable caution notice or keep a person to restrict / divert the traffic on this route through
other safe passage.
(28) Prior to use power / electrically operated hand tools / equipments / machines / gadgets like
welding machine, hand grinder, hand drill etc, ensure for its safe operation & use it only if it is
found safe to use. Do not use defective, unsafe or improperly maintained equipments.
(29) The electrical power supply required to run such equipments shall not be taken directly at their
own but shall be obtained through concerned Electrical Maintenance Departments or their
authorized persons or under their observations / guidance only. The Electrical Section shall
provide temporary electrical connection up to contractor‟s Mains Board on which it is compulsory
to install mains switch, ELCB & fuses of adequate capacity. All such equipments shall invariably
be earthed adequately to prevent electrical shock, sparking, short circuit etc. Power cord to be
used shall be of adequate capacity, without any joint & shall consist of earth wire also. Hence, it is
necessary to use adequate capacity 3-wire power cord for single & 5-wire power cord for three
phase power connections. The plugs, receptacles, pins, holders etc shall be of adequate capacity
& safe to use.All electrical & mechanical equipment / tools-tackles viz. welding machine, cutting
machine, Grinder, Drill, Chain Pulley Blocks, Hook chooks etc required to be used during work
execution shall be of standard make & bear ISI certification mark on it. The consumables like
BIDDER’S SIGN WITH SEAL
RFQ- 77475E Page
welding electrodes, grinding wheels / discs etc which has specific prescribed life span shall not be
used in any case if its expiry date is over.
(30) Non-Sparking Non-Magnetic electrical hand tools and tool kits shall be used by Electrical
contractor for safe use in areas where hazardous, flammable, or combustible vapors, liquids,
dusts, or residues may be present in Gas Based power plant and list of tools and tackles shall be
submitted with technical bid. Non-Sparking Non-Magnetic electrical hand tools and tool kits shall
be checked by JE/DE before commencement of Electrical work.
(31) Before using lifting machines / tackles (like C.P.Bs., Hook chooks, winch, forklift, mobile crane,
EOT crane etc) & its attachments (like D-shackles, slings, U-clamps, Eye bolts or any fixtures), it
shall be checked and used only if found safe to use. Also, ensure that these are tested, examined
& certified in form no.10 by Competent Person as per the Factory act-1948 & Gujarat Factories
Rules and its validity do not expire. Further, it shall be fixed properly and firmly prior to lifting the
weight. Valid Test certificate of all Lifting machines used by Contractor to be submitted to Dy.
Safety Officer/ Safety Officer before commencement of work through concerned EE/SE.
(32) Metal Scaffoldings to be used for working at height shall be of adequate size & capacity. Obtain
the work permit when working at height. While climbing on such scaffolding or working on any
structure at height, use of full body safety belt /full body hardness with double lanyard &fall
arrestor & Helmet is compulsory. It is also necessary to fasten chinstraps of the helmet.
(33) Contractor or their employee shall not interfere in day-to-day routine plant activities / works except
the work assigned to them, shall not loiter in the areas other than their work jurisdiction, as well as
shall not temper / operate / touch the machineries/equipments/auxiliaries with which they are not
concerned. Also, the contractor shall strictly instruct their staff for not to sit or take rest
at/near/below running plants, auxiliaries, systems or any place which is risky, hazardous & prone
to accident.
(34) The cylinders containing poisonous / toxic or inflammable / explosive gas like Oxygen, Acetylene,
LPG, Hydrogen, Ammonia, Chlorine, CO2etc shall be handled safely taking due care. To handle /
shift such cylinders a special trolley /cage meant for it must be used but in no case it should be
(35) In Gas Based Power station/Hydrogen storage area /Hydro carbon fumes-vapor generated area,
Spark arrestor (as per approved manufacturer of CCOE, Nagpur) shall be provided on each
vehicle by party/agency and it will check by shift security in charge before entry of vehicles in the
factory premises.
(36) No women or young person shall be employed or permitted to work in Lead-compound area like
battery room etc. as per schedule VI of GFR
(37) No women or young person shall be allowed to clean, lubricate or adjust any part of a prime
mover or of any transmission machinery while the prime mover or transmission machinery is in
motion. Examination or operation of motion machinery shall be made or carried out only by a
specially trained adult male worker wearing tight fitting clothing as per section 22 of factories act
BIDDER’S SIGN WITH SEAL
RFQ- 77475E Page
(38) In all risky job, before start the work, contractor should obtain General Safety Work Permit through
concerned section from Shift –in-charge well in advance.
(39) In case of noticing smoke or fire during their work execution, they shall make immediate efforts to
extinguish / control it and simultaneously inform the Fire Station Mobile No as well as Station Fire
Officer or Emergency Control room no which is displayed at prominent place of factory like Main
Security Gate, All unit control room, Canteen area, Safe Assembly points, Fire Station, All security
gates, Occupational Health Centre.
(40) In case of any injury / accident while working, it shall immediately be reported to Safety
Department through concerned Sectional Head / Engineer. The prescribed Form No.
21&ANNEXURE may be obtained from concerned section or Dy.Safety Officer/Safety Officer.
In case of any electrical accident, it shall immediately be reported to Electrical Safety Officer
through concern Sectional Head / Engineer. The prescribed Electrical accident form no. A as per
electricity act-2003 & Form No. 21 & ANNEXURE as per Gujarat Factories rules shall be filled up
by concern department JE/DE with written consent of contractor. The Form may be obtained from
concerned Electrical section or Electrical Safety Officer. Electrical accident investigation shall be
carried out by Electrical Safety Officer with Factory Manager.
After any reportable accident, Contract agency shall be submitted the fitness certificate of injured
person with endorsement of GSECL factory Medical Officer to LWO/Dy.Safety Officer/Safety
Officer/Electrical Safety Officer then after injured person may allow for work.
(41) For any incident occurred but have no injury to any persons should also reported as per GSECL
format and informed to Dy. Safety Officer/Safety Officer as Near Miss Incident.
(42) Safety penalty shall be imposed against Offences by contract workers: If any contract worker
worked in a factory contravenes any provision of Factories act or any rules or orders made there
under ,imposing any duty or liability on workers, contractor/agency shall be punishable with fine
which mentioned as under.
Sr. Description of penalty Amount
(i) Work without PPEs Rs.300/- per person
(ii) Work without work Safety permit like working at height, Rs.1000/- per day
confine space entry, hot work etc.
(iii) License of driver as per type of vehicles not registered. Rs.750/- per person
(iv) Welding work without flashback arrestor/double gauge Rs.1000/- per set
regulator set
(v) Operate Portable power tool without ELCB Rs.1000/-per equipment
(vi) Work without qualified Supervisor as per nature of job Rs.1000/-per day
like mechanical, electrical, civil, C&I, chemical etc.
(vii) Work without SOP & JSA Rs.2000/-per day
(viii) Work without test report of lifting machines / tackles Rs.2000/- per equipment
(like C.P.Bs., Hook chooks, winch, forklift, mobile crane,
EOT crane etc) & its attachments (like D-shackles,
slings, U-clamps, Eye bolts or any fixtures) in Form
No.10 of Gujarat Factories Rules,1963
(ix) Work without Double liner Safety belt during working at Rs.3000/-per person
Height work, work without anchoring in hook/line line
(x) Work without 24 Volt supply in Confine space area Rs.3000/-per person
Safety Penalty is to be imposed directly by individual Dy. Safety Officer/Safety Officer/Electrical
Safety Officer and Factory Manager/Occupier against violation of statutory requirements and
BIDDER’S SIGN WITH SEAL
RFQ- 77475E Page
penalty will be recovered through RA bill. Photograph/CCTV camera footage is to be put up with
penalty note by imposed individual officer.
(43) Party will damage any fire equipments or property or machinery in factory during execution of
work, total damage cost will be recovered from party RA bill and recovery Office note put up by
concern HOD.
(44) All the relevant labour and industrial laws shall also be followed compulsorily.
(45) After completion of work, cotton waste, grease, oil, unused material, welding rod pieces, scrap etc.
are to be removed by contractor and scrap shall be deposited to scrap yard of Main Store.
(46) For performance evaluation of contractor, safety factors of work accident, fire incident & near miss
accident will be considered. Steps can be taken to review the job assignment up to cancellation for
negligence.
(47) Over & above these, contractor shall have to follow all the safety requirements /rules & regulations
/ norms and legal provisions laid down in various statutes. Particularly the provisions of The
Factories Act-1948 & the Gujarat State Factories Rules-1963 (Amended up to date), The
Electricity Act-2003 & rules, BOCW Act/Rules shall be followed strictly. The contractor shall also
obey the rules / regulations / instructions of the local Competent Authority for safety & health
requirements.
(48) The above rules shall be scrupulously followed and where required, Contractor /contractor
workers may contact to the Dy. Safety Officer/Safety Officer/Electrical Safety Officer in case of
any ambiguity or needs further guidance in this regard.
BIDDER’S SIGN WITH SEAL
RFQ- 77475E Page
Contract Labour Information Management System (CLIMS)
GSECL has developed a Contract Labour Information Management System (CLIMS)- a
comprehensive digital platform designed to manage all activities related to contract labour
transparently and efficiently.
The primary objectives of CLIMS are to save time for both agencies and GSECL personnel, to
ensure full legal and regulatory compliance and to reduce the operational burden on agencies,
allowing them to focus on their core activities. To ensure the successful implementation and
operation of CLIMS, the following guidelines are hereby issued.
A. Gate Pass:
l. CLIMS is a web-based system that can be accessed by agencies from any location using a
desktop, laptop, or mobile device.
2. To begin using the system, agencies must register by entering their EPO (E Urja Order)
number. All other necessary details are automatically fetched from the E-Urja system.
3. The issuance of gate passes for contract labour is managed entirely through CLIMS. Agencies
can generate and track gate passes within the system.
4. In order to enable gate pass issuance, agencies are required to input and upload the
necessary details of their contract labourers into the system.
5. Once the required information is submitted, the gate pass approval process is initiated and
managed through the system. The request automatically moves through the predefined workflow
levels. Agencies can monitor the real-time status of their gate pass applications via CLIMS.
6. Upon completion of all required approvals within the system, the gate pass is issued to the
B. Attendance and wages of workers:
1. Once contract workers gate passes are approved in the system, they are required to be
registered in Bio-Metric/Face Reader Punching machines by HR Department.
2. The attendance of all contract workers can be monitored and maintained through CLIMS by
contractors.
3. Access to data of Bio-Metric is given to agencies. It should be the duty of agencies or his
supervisor to ensure the supply of specified number of manpower and to ensure their Bio-Metric
punching and reporting at the location of work.
4. Attendance register and wage register of the worker will be generated by CLIMS from the login
of agency only.
C. Compliance to various labour laws:
l. All the contractors have to comply various labour laws and they shall submit the attached
Declaration-cum Indemnity Bond before staring of work. This Bond may also be made part of
ensuing tenders/contracts.
2. Contractors shall upload the CLIMS generated previous month attendance sheet, wage register
duly signed by workers, wage bank statement, ECR copy, PF Challan and Remittance slip.
3. The said submitted documents in CLIMS will go to user department, after verification of
completeness of documents, user department will forward it to HR Department for further
verification and approval.
4. If the documents are complete, HR Department will approve in CLIMS and send to Account
Department for further process of bill.
5. If non-compliance is found in submitted documents, it will be returned to user department in
CLIMS with specific remarks and user department will forward it to contractor for compliance. In
such cases, 75% of the bills may be released subject to a maximum ceiling of 20% of the contract
values. Such system of payment shall be allowed only for 3 monthly Running Accounts (RA) bills
BIDDER’S SIGN WITH SEAL
RFQ- 77475E Page
(Maximum cumulative amount up to 20% of the contract value) of the contractor in a period
contract (AMC) of 12 months or 6 RA bills in a period contract (BMC) of 24 months if there is non-
compliance. All other RA bills and specifically final bill shall not be processed if the previous &
current compliances are not made by contractor. No such relaxation will be granted for non-
periodic, one time or overhauling type contract.
D. Special Case:
In case of work order issued for expert services to PSU or OEM/OES following procedure may be
1. If officers / specialized manpower / expert Engineers from Govt / Semi Govt Companies / PSUs
/ OEM/OES/foreign experts are deployed for short-term, specialized, or ad-hoc technical /
consultancy services (e.g., commissioning, maintenance, consultancy or inspections), concerned
Engineer In-Charge (EIC) shall certify the same
2. The EIC must obtain following documents from the concerned Govt / Semi Govt Companies /
PSUs/OEM/OES etc:
(i) Declaration cum undertaking (As Per Annexure-A) that visiting experts are their regular
employees with documentary proof, and
(ii) Declaration towards compliance of applicable labour laws.
The above documents shall be submitted along with the bill / Invoices by EIC to HR department
for the purpose of HR clearance in lieu of the procedure at Clause -C above.
SIGNATURE OF CONTRACTOR
WITH SEAL & DATE
Chief Engineer (C&O)
GSECL, WTPS
BIDDER’S SIGN WITH SEAL
RFQ- 77475E Page
Annexure A
Declaration –cum-Undertaking
This is to certify and declare that Shri [Employee's Full Name] , son/daughter of [Father's Name], is
a permanent/regular employee of [Company Name], employed in the capacity of [Designation].
His/Her Employee ldentity Card is attached herewith for reference.
It is further declared that his/her Universal Account Number (UAN) under the Employees'
Provident Fund and Miscellaneous Provisions Act, 1952, is IUAN Number] as applicable
We hereby undertake and declare that:
1. We have complied with all applicable provisions of all the labour laws , including but not
limited to the Employees' Provident Fund and Miscellaneous Provisions Act, 1952; the
Employees' State lnsurance Act, 1948; the Payment of Wages Act, 1936; the Payment of
Bonus Act, 1965; the Contract Labour (Regulation and Abolition) Act, 1970; the Minimum
Wages Act, 1948; and other relevant labour and industrial legislations, in respect of Shri
[Employee's Full Name] as applicable to us.
2. We further undertake to produce, as and when required, all statutory records, registers,
Challans , and returns as proof of compliance to the Gujarat State Electricity Corporation
Limited (GSECL) or any other statutory/government authority.
3. We hereby indemnify GSECL in respect of any civil or criminal liability which may arise due
to any non-compliance of the law of the land in respect of our above-mentioned
This Declaration-cum-Undertaking is issued in good faith and to the best of our knowledge and
belief and shall be binding upon us.
Authorised Signatory,
For [Company Name]
[Authorised Signatory Name]
IDesignation]
[Seal/Stamp of Company]
[contact Details]
BIDDER’S SIGN WITH SEAL
RFQ- 77475E Page
JSA for: Supply, Erection, Commissioning and Testing of 20 Meter lighting High Mast Tower in Unit#8
at WTPS-GSECL.
Section: Unit-8 ( E&I-8,)
Job Step Hazard Risk Control Measures Responsibility
Erection, Commissioning Electrical High Care to be taken to Contractor or
and Testing of 20 Meter shock isolate the equipment Contractor‟s
lighting High Mast Tower Before work. Supervisor
Electrical supply though
Proper insulated cord
cable with proper
plugging wire to be used
with properly earthing
should be provided.
Lamp with proper guard
to be used in working
Confined space area 24V
hand lamp with guard
should be used.
Risk assessment in job
is to be done before work
PPE should be used as
work requirement.
Close supervision
Slip/Trip /Fall High To be vigilant Contractor or
of person Use safety belt. Contractor‟s
from height Toolbox talk to contractor Supervisor
worker for hazard related to
work should be given before
Failure of High Crane / Hydra / Hoist/ Contractor or
tools /tackles Chain pulley block etc... Contractor‟s
( Lifting tools, must be operated by Supervisor
spanner & experienced operator.
instruments) Confirm Crane / Hydra /
Hoist/Chain pulley block
has been used as per
safe working load
conditions as mentioned
in their certificates.
Form no 10 must
available for lifting
machine is to be used
Close supervision
Toolbox talk to contractor
worker for Hazard related
to work should be given
BIDDER’S SIGN WITH SEAL
RFQ- 77475E Page
before starting.
NOTE: Required check list should be filled up by contractor at time of work execution.
Prepared by
Reviewed by Checked by Approved by
EE Safety officer SE Factory Manager Chief Engineer
SIGNATURE OF CONTRACTOR Chief Engineer (C&O)
GSECL-WTPS
WITH SEAL & DATE
BIDDER’S SIGN WITH SEAL
RFQ- 77475E Page
Gujarat State Electricity Corporation Limited
Wanakbori Thermal Power Station, Ta: Galteshwar, Dist: Kheda -388239
Ph: 91-2699-235522 Fax: 91-2699-235607
Email: [email protected] Web site: www.gsecl.in
CIN: U40100GJ1993SGC019988
AN ISO-9001:2015&14001:2015 OHSMS 45001:2018 Certified Power Plant
APPLICATION FORM FOR PHOTO GATEPASSES OF CONTRACTOR & CONTRACT
01 Name And Address of The Firm
02 Name And Mobile No. Of The Contractor & Site In-charge
03 Work Order No. & Date
04 Subject of Work
05 Name of Section
06 Duration/period of Work
07 Date of commencement
08 Contract agreements/ subletting work contract documents with
approval copy
09 Total No. of Workmen required for this work order (In Figure and Local: Out State :
words) is to be given on letterhead of contractor Male: Male:
Female: Female:
10 Labour License /IMSW License Obtained for No. of Labours and
validity thereof.
11 BOCW Registration No. and date
12 Insurance Obtained for No. of Labours and validity thereof
13 Detail of P.F. Code No.
CERTIFICATE
I, ……………………………………Prop./Manager/In-Charge of M/s. ……………………………….give
assurance that all the details related to labours as per the attached list herewith are true and also give
assurance that none of the labours are involved in any anti-social activities or having criminal records. I
am solely responsible if any dispute will arise in future.
Signature of Sub Contractor with Rubber Stamp Signature of Contractor with Rubber Stamp
Name : Name :
For Office Use Only
M/s. ……………………………………………………………………………………………………..will be
issued Gate Pass for the Work Order mentioned in the List attached herewith for the …………Nos.
of Labours
for the period of ………………. to ……………………(03 months only).Documents are checked &
verified as per GSECL photo gate pass procedure.
Executive Engineer ( ) Superintending Engineer ( )
Signature with Stamp Signature with Stamp
BIDDER’S SIGN WITH SEAL
RFQ- 77475E Page
Electrical Safety Officer Safety Officer/Dy. Safety Officer
Factory Medical Officer: to maintain record in form no.32 &
Security Officer
Factory Manager/Occupier
Senior Security Officer: To issue gate pass & maintain record of gate passes. If any remark put
up by any officer, it will convey to Factory Manager & Occupier.
Following details shall be provided by Contractor on Company’s letter pad
Work Order No.& Date:
Subject of Work:
No. Engineers/Labors:
Details of Contractor & Contract Labour
Sr. Full Name of Permanent Present Date of Employees PF Identification
No. Worker as per Address of Address of Birth / Code No. Mark on Body
id proof Worker Worker Age
LIST OF DOCUMENTS ARE ATTACHED WITH APPLICATION FOR PHOTO GATEPASSES OF
CONTRACTOR & CONTRACT WORKERS
Sr. Description of documents Attached
No. YES/NO
1 Copy of Work Order
2 Copy of P. F. Code No.
3 Insurance Policy as per subject of work order under the Workmen Compensation
4 Contract agreements/ subletting work contract documents with approval copy
5 Filled Gate Pass Application Form and List of Labours in 1 Copy.
6 Self-attested Copy of Id proof of Aadhar card or Election voting card or driving
license or Passport only
7 List of Indian Standard or International Standard mark PPEs provided to contract
worker in prescribe Format as per nature of hazardous process and operations.
PPE undertaking of Contract Agency which submitted in work tender.
8 GSECL 3D animation Safety Induction movie showing attendance sheet copy
9 Final Safe Operating Procedure -SOP with JSA (Job Safety Analysis) signed
documents which submitted in work tender.
10 Qualification of work Supervisor, Safety supervisor, Safety Officer
11 Electrical Contractor License, Form-I& Electrical trade person qualifications copy in
Electrical work only which submitted in work tender.
12 Gujarat BOCW registration in Form-II copy if applicable
13 Form no.10: Prescribed for report of examination of the lifting machines like CPB,
winch machine, wire rope slings D-shackles, belt slings, chain slings, eyebolts,
polyester web/round sling etc of all capacities if used.
14 Driver license of LMW, Mobile crane, tractor, fork lift photo copy, RTO Fitness
certificate in from no.33, PUC certificate, Vehicle insurance policy, spark arrestor if
15 Approved NABL laboratory calibration certificates of electrical/mechanical/Civil/C&I/
BIDDER’S SIGN WITH SEAL
RFQ- 77475E Page
Environment survey/ Chemical etc. measuring /testing equipment‟s /instruments if
16 Copy of Police Verification in respect of each contract workers
Signature of Sub Contractor with Rubber Stamp Signature of Contractor with Rubber
Name: Name:
BIDDER’S SIGN WITH SEAL
RFQ- 77475E Page
Annexure “B”
DECLARATION CUN INDEMNITY BOND
(On Rs.300/- Non Judicial Stamp Paper duly notarised)
THIS DECLARATION CUM INDEMNITY BOND made at ------------------------- (mention location) by
M/S. ------------------------- having its Reg. office at------------------------------------------------------(hereinafter
referred to as “Contractor” which expression Shall unless it be repugnant to the context or
meaning thereof, be deemed to mean and include their respective assigns, successor, executors,
subcontractors and/or administrators) of the ONE PART in favour of
M/S Gujarat State Electricity Corporation Limited having its power Station at Wanakbori Thermal
Power Station (hereinafter referred to as the “Company” ), which expression shall unless it be
repugnant to the context or meaning thereof be deemed to mean and include its assigns,
successors) of the OTHER PART.
WHEREAS the COMPANY has entered into a contract with the Contractor for the work of”----------------
--------------------------------------------„‟ under order No: ------------------------- dated-------------------------
“hereinafter called the “Contract”);
AND WHEREAS it is one of the essential conditions of the Contract that the Contractor shall comply
with all the provisions of the Labour& Industrial Laws, as may be applicable from time to time for the
discharge and completion of the works and completion of the Works and Services covered under said
Contract Labour (R & A) Act 1970,Child Labour (Prohibition and Regulation) Act 1986,The Employees
Provident Funds & Miscellaneous Provisions Act,1952,Employees State Insurance Act 1948, Minimum
Wages Act,1948,Payment of Bonus Act,1965,Payment of Act,1936, Employees Compensation
Act.1923, Factories Act,1948 and other Labour Laws, Rules, Notifications and Codes which are at
present applicable to the contractor and which may be applicable during the tenure of the contract
(hereinafter referred as the „Laws‟).
AND WHEREAS the Contractor has agreed to execute this Declaration cum Indemnity Bond to this
effect and has agreed to indemnify and Company, it‟s Directors, Officers and employees and
representatives indemnified and hold harmless against all third party claims, charges, penalties, fines,
expenses ,losses, damages costs, suits or any other levy against the Company and/or the
management due to the failure of the Contractor to observe or follow all applicable laws.
NOW THIS DEED WITNESSETH AS UNDER:
1. The Contractor hereby declares that all acts, deeds, actions, activities, conduct and lapse, delays,
misdeeds, faults, breaches, inactions etc done by his assigns, successors, executors, subcontractor
and/ or administrators shall be construed to be have been done by the contractor and he
alone shall be liable for such acts, inactions etc.
2. In consideration of the Company awarding the Contract to the Contractor subject to the
condition of execution of this Declaration cum Indemnity bond, the Contractor declares and
represents to the Company that the Contractor has obtained all Statutory registrations,
Certificates, licenses and approvals required under the Laws enabling the Contractor to
execute the Contract in a legal and lawful manner.
3. That in the event of any liability arising out of failure to observe or non-compliance of any
such „Laws‟ by the Contractor in connection with the Performance of the contract, the
Contractor shall bear all the resultant whatsoever liability (ies), if any arising out thereof and that
the company , its Directors, Officers and employees, representatives, shall not be liable for any such
liability(ies). The Contractor agrees to indemnify and keep the Company and its Directors, Officers
and employees, representatives indemnifies, defend and hold harmless, against all losses, costs,
damages, claims, penalties, interest, expenses, demands, fines, legal liability, causes of action,
injury to persons, suits etc., which may be suffered, incurred, undergone and / sustained by the
Company including the Costs and expenses that may be incurred in defending any such
liability(ies) claim(S), Proceeding (S) etc. that maybe made or taken or taken or arise on the
same by any Person, body, authority, government, judicial / quasi - judicial authority due
to the failure or non-compliance of any such laws and rules there under (including any
amendments in acts, laws, statutes & rules there under) of whatsoever kind and nature arising
out of or in any way connected with, whether or not such acts or omissions are actual or
alleged, active or passive with regard to the discharge of the said Contract.
BIDDER’S SIGN WITH SEAL
RFQ- 77475E Page
4. The Contractor further declares that in case of any suit / claim / right
/ damages / compensation / fine / levy / charges / expenses / losses / penalties / costs raised by
the third party, including contract labours engaged by the contractor, he shall join such
proceedings in such Suit/Court/Tribunal/Authority and effectively defend the same.
5. The Contractor hereby agree and undertakes to make good any loss, damage, claims, suits,
demands, decrees, expenses that the Company may suffer to the fullest satisfaction of the
Company and if the Contractor fails to make good the same then the Company shall have
the right to recover the same and or any other loss sustained, without any restriction or
limitation, together with any other incidental expenses, costs, and all incidental logistic
expenses etc that may be suffered by the Company from the Contractor and the Contractor
hereby further confirms and declares that this Declaration cum Indemnity Bond is irrevocable
and shall be final and binding on it / him heirs, executors, administrators, legal
representatives, successors, subcontractors and assigns, wherever the context applies. any
claims, demands, shall be adjusted against any amount due and payable to the Contractor
and the Company shall have the right to withhold any amounts due and payable to the
Contractor, till the settlement of such claims, disputes to the Contractor towards discharge of
such claims, obligations etc.
6. This Declaration cum indemnity bond shall be in accordance with the laws of India and any dispute
between the parties with regard to this Declaration cum Indemnity Bond shall be resolved through
the dispute resolution process mentioned in the General Conditions of the Contract (GCC).
IN WITNESS WHEREOF, the said Contractor has hereunto set their hand the day and year first
hereinabove written.
SIGNED SEALED AND DELIVERED
By the within named “CONTRACTOR”
(Authorised Signatory)
Rubber Stamp of Firm/Company
Name: Designation: Date:
In presence of Witness
Name & Address of Witness Signature
SIGNATURE OF CONTRACTOR
WITH SEAL & DATE
BIDDER’S SIGN WITH SEAL
RFQ- 77475E Page
ANNEXURE – I
On Stamp Paper of Rs.300/-
CONTRACT AGREEMENT
This agreement is made at WTPS the ______________ day of____________________ In the
Christian year Two thousand Twenty four between_______________
[here in after referred to as “THE CONTRACTOR” which expression shall unless excluded by or
repugnant to the contract include its successors or permitted assigns] of the one part and the Gujarat
State Electricity Corporation Ltd. having their Head Office at Sardar Patel Vidyut Bhavan, Race Course,
BARODA – 390 007 [ herein after called “The G.S.E.C.L. which expression shall unless excluded by or
repugnant to the context include its successors or assigns] of the other part.
WHEREAS the aforesaid G.S.E.C.L. has accepted the tender of the aforesaid contractors for
________________________________ as per G.S.E.C.L. Order
No.____________________________ hereinafter called “the Works” and more particularly described
enumerated or referred to in the specification, terms and conditions prescribed in the order letter,
covering letter and other letters and schedule of price which for the purpose of identifications have
been signed by Shri____________________________________ on behalf of the Contractors and
by________________________________on behalf of the G.S.E.C.L. a list whereof is made out in the
schedule hereunder written and all of which said documents are deemed to form part of this contract
and included in the expression “the Works” wherever herein used, upon the terms and subject to the
conditions hereinafter mentioned.
AND WHEREAS THE G.S.E.C.L. has accepted the tender of the contractors for the construction of the
said works for the sum of Rs.________________ [Rupees :_____________________________
________________] upon the terms and subject to the conditions herein mentioned.
NOW THIS AGREEMENT WITNESSES AND IT IS HEREBY AGREED AND DECLARED THAT :-
1. The contractors shall do and perform all works and things in this contract mentioned and
described or which are implied therein or thereform respectively or are reasonably necessary for
the completion of the works as mentioned and at the times, in the manner and subject to the
terms, condition and stipulations contained in this contract, and in consideration of the due
provision, execution, construction and completion of the works agreed to by the contractors as
aforesaid, the G.S.E.C.L. doth hereby covenant with the contractor to pay all the sums of money
as and when they become due and payable to the contractors under the provisions of the
contract. Such payments to be made at such times and in such manner as is provided by the
2. The conditions and covenants stipulated herein before in this contract are subject to and without
prejudice to the rights of the G.S.E.C.L. to enforce penalty for delays and / or any other rights
whatsoever including the right to reject and cancel on default or breach by the contractors of the
BIDDER’S SIGN WITH SEAL
RFQ- 77475E Page
condition and the convenant as stipulated in the general conditions, specifications, forms, or
tender schedule, drawing, etc., attached with G.S.E.C.L. Order No._______________
The contract value, extent of supply delivery dates, specification, and other relevant matters may
be altered by mutual agreement and if so altered shall not be deemed or constructed to mean or
apply to affect or alter other terms and conditions of the contract and the general conditions and
the contract so altered or revised shall be and shall always be deemed to have been subject to
and without prejudice to said stipulation.
List of documents forming part of the contract :
In witness whereof the parties hereto have set their hands and seals this day and month year first
above written
1. Signed, Sealed and delivered by :
[Signature with Name, designation & official seal]
for and on behalf of M/s.____________________________
In the presence of the name, Full address &Signature :
2. Signed, Sealed and Delivered by :
(Signature with Name, Designation & official seal) For and behalf of Gujarat State Electricity
Corporation Ltd., VidyutBhavan, Race Course, Baroda – 390
In the presence of Name, Full Address & Signature:
BIDDER’S SIGN WITH SEAL
RFQ- 77475E Page
INTEGRITY PACT
OUR ENDEAVAOUR
To create an environment where Business Confidence is built through Best Business Practices and is
fostered in an atmosphere of trust and respect between providers of goods and services and their
users for the ultimate benefit of society and the nation.
GSECL’S COMMITMENT PARTY’S COMMITMENT
1 To maintain the highest ethical standards 1 Not to bring pressure recommendations
in business and professions. from outside GSECL to influence its
2 Ensure maximum transparency to the 2 Not to use intimidation, threat,
satisfaction of stakeholders. inducement or pressure of any kind on
GSECL or any of it‟s employees under
any circumstances.
3 To ensure to fulfill terms of 3 To be prompt and reasonable in fulfilling
agreement/contract and to consider the contract, agreement, legal obligations.
objectively the view point of parties.
4 To ensure regular and timely release of 4 To provide goods and/or services timely
payments on due dates for work done. as per agreed quality and specifications at
minimum cost to GSECL.
5 To ensure that no improper demand is 5 To abide by the general discipline to be
made by employees or by any one on maintained in our dealing.
our behalf.
6 To give maximum possible assistance to 6 To be true and honest in furnishing
all the venders/ suppliers/service information.
provider and other to enable them to
complete the contract in time.
7 To provide all information to 7 Not to divulge any information, business
suppliers/contractor relating to details available during the course of
contract/job which facilitate him to business relationship to others without the
complete the contract/job successfully in written consent of GSECL.
8 To ensure minimum hurdles to 8 Not to enter in to carter/syndicate
venders/suppliers/ contractors in /understanding whether formal /non
completion of agreement/contract/ work formal so as to influence the price.
Chief Engineer (C&O)
GSECL -WTPS
BIDDER’S SIGN WITH SEAL
RFQ- 77475E Page
DECLARATION FORM
ON LETTER HEAD OF SUPPLIER
Subject: Supply, Erection, Commissioning and Testing of 20 Meter lighting High Mast Tower
in Unit#8 at WTPS-GSECL.
Reference No.:- WTPS/S/TECH/RFQ -77475E/E&I-8
1. I/We hereby declare that I/We have carefully & thoroughly studied the entire tender placed on
the website and General terms & conditions, technical specification, PQR and other documents
of the tender mentioned under reference along with the Commercial terms and conditions.
2. I/We hereby confirm and certify that the offer submitted by me/us is strictly in accordance with
the GSECL‟s Tender specifications, Guaranteed Technical Particulars and drawing as
mentioned in the Tender Specifications. There is no commercial or Technical deviation (except
the deviations shown in respective Annexure-12 of Technical Deviations of this tender
document) in the offer from the Board‟s Tender Specification. I undertake to abide by the
GSECL‟s Technical specification / Guaranteed Technical Particulars / Drawing, I undertake to
supply materials strictly as per the GSECL‟s Technical specification / Guaranteed Technical
Particulars / Drawing, even if any technical deviations are mentioned by me. I also undertake
to abide by all commercial conditions of the GSECL, including delivery schedule. I have
submitted all the annexure-1 to 15,form of integrity pact etc along with the technical Bid dully
filled along with all the details”
3. I / We, hereby declare that our Technical Bid is strictly in line with the Tender specifications
(except the deviations shown in Annexure-12 of Technical Deviations of this tender document).
4. I / We also agree that additional conditions / deviations, if any, found in the Commercial terms
& conditions (except the deviations shown in Annexure-12 of Technical Deviations of this
tender document) our offer shall be out rightly rejected without assigning any reason thereof.
5. I/We hereby abide to execute the contract agreement & submitted the same along with the
acceptance of LOI and the same will be acceptable to me/us.
6. I/We hereby accept and confirm that any dispute on this regard shall not be entertained by the
7. The full value of the “Earnest Money Deposit” paid herewith should be absolutely forfeited to
the Corporation, should I/ we do not deposit the specified amount of specified Security Deposit
within 10 Days from receipt of the Letter of Intent.
8. If, I fail to submit all required documents with application or tender copy ( in each tender ) then
my tender will be cancelled, which is binding to me.
authorized signatory of M/s ______________________________________________ here by
certify that M/s _________________________________________________ and their
proprietor / any partner / any directors of the firm is not stop deal and / or banned for business
dealing and / or black listed by GUVNL and / or their any subsidiary company viz. GSECL /
GETCO / DGVCL / MGVCL / UGVCL / PGVCL as well as Government and / or Semi
Government company / department.
10. We here by confirm that we have not stake in one or more other agencies / bidders who are
participating in same tender and if it is found that the submitted information / declaration are
wrong in the tender / enquiry as stated in tender terms, than we will be disqualified
automatically &it will be accepted to us. EMD / SD will be forfeited. More over if GSECL shall
take stern action including stop dealing with our firms which is also accepted to us
Seal of the Firm Signature of the Tenderer with Designation.
BIDDER’S SIGN WITH SEAL
RFQ- 77475E Page
[On Company’s Letter Head]
Annexure –
(Require for Price Justification, if Necessary)
(UNDERTAKING IN REGARD TO QUOTED PRICE)
(All Bidders will have to furnish the following undertaking duly filled in, for all the quoted
items/works of the tender along with online Technical Bid)
Ref.: Tender No……………. / Gem Bid. No.
We, the undersigned, hereby declare and undertake that we have not accepted or executed
any Letter of Acceptance (LOA) or Purchase Order (PO) at a unit ex-works price/any work at
rate lower than the rate offered in this tender in any station of GSECL/GUVNL/ & Subsidiaries/
CPSU / SPSU/IPP etc. during the period from six (6) months prior to two (2) months after the
bid submission date of this tender.
We also understand that LOA / Purchase Order placed by any station of GSECL/GUVNL
Subsidiaries/ CPSU/SPSU/IPP etc. on the basis of above undertaking shall not be considered
as „offered‟ price for the tender items in subsequent tender, if it is not within period mentioned
I/We accept above undertaking.
Seal of the Firm Signature of the Tenderer
With Designation
BIDDER’S SIGN WITH SEAL
RFQ- 77475E Page
<On the letterhead of the vendor/ payee>
To, Date : __________
Subject : Declaration for TDS/TCS under the Income Tax Act (IT Act)
Reference : Provisions of S. 206AB/ 206CCA/139AA of the IT Act
Dear Sirs,
This is with reference to the determination of appropriate Tax deduction at source (TDS) or Tax
collected at source (TCS) as per the provisions of the Act i.e. Section 206AB/ 206CCA/139AA of the IT
Act. In relation to the said provision of the Act: I / We, having status of <<mention status i.e.
Individual/Company/ Firm etc.)>>hereby declare and confirm that: -
a) I/We have<<mention PAN>>Permanent Account Number (PAN) under the IT Act.(Copy of
PAN card is enclosed herewith.)
b) I/We have linked / will be linking Aadhar number with PAN as required under section 139AA (2)
read with Rule 114AAA.latest by 30th June
c) I/We have/have not filed income tax returns (ITR) for two previous years immediately prior to
the year in which tax is required to be deducted and for which last date of filing of income tax
return is expired u/s139(1) of the Act.
I/ We am/ are hereby attaching a copy of acknowledgment of ITR filed for any one of previous
two financial years of which due date u/s139(1) is expired, as proof of filing ITR. (Strike out full
sentence if not filed IT returns)
d) The aggregate amount of Tax Deductible at Source (TDS) and Tax Collectible at Source (TCS)
exceed/don‟t exceed Rs. 50,000 or more in each of the two aforesaid previous years in my/our
case (Vendor has to provide the extract of its Form 26AS if copy of ITR is not provided as
e) I/ We shall, indemnify the Company for any consequences arising out of any acts of commission
or omission including incorrect declaration basis which the Company would act upon.
I/We agree that Company shall determine applicability of section 206AB/206CCAof the IT Act
based on the aforesaid declaration/documents filed by me/us and would deduct TDS/TCS
accordingly. The decision of Company shall be final and acceptable to me/us. Strikeout
whichever is not applicable.
Thanking you,
Yours faithfully,
<<Signature>>
< Full Name of Vendor & seal >
BIDDER’S SIGN WITH SEAL
RFQ- 77475E Page
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
General Commercial Terms and Conditions-n procure.pdf
NIT RFQ- 77475E E AND I -8.pdf
TECHNICAL BID RFQ- 77475E E AND I -8.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .