Loading…
Loading…
Tender Value
₹12.4 L
EMD Value
₹12,400
Closing Date
11 Jun 2026, 3:00 pm6d left
Executive Engineer- XV
Tirupati
Erection and removal of pendals for various functions at Padala mandapam, deaf & dumb school, SVTCH, free luggage centre & SVITSA at Alipiri, Tirupati for the year 2026-27.
939704
1/EE-XV/TTD/Tpt/2026-27
OPEN - NCB
Civil Engineering Works
TIRUPATHI
6 documents required · 6 mandatory
₹439
₹12,400
27 May 2026
27 May 2026
27 May 2026
Hire charges for erection and removal of Flat roof pendals or Sloped roof pendals as found necessary with Casurinas or Eucalyptus posts girth of 250 mm to 300 mm measured at one metre above ground level after erection of posts, the roof covered with Bamboos double bamboo mats or coconut leaves with thick covering with necessary frame work, coir rope etc., including providing watch and ward and storing water in tubs etc., complete as directed during execution. The posts should be vertical and not curved, should be uniform size without much knots and should be strong (The rate for pendals will be paid as per area of pendals measured on covering plan area) . The rate quoted is including conveyance of all materials and labour charges for fixing, removal, etc., complete. The rate is for below mentioned calendar days.*The relevant conditions of the foot note mentioned at the end of these items/chapter applies. -do- Using thick plastic sheet covering without any scars/ tears and to be leak proof.
- do - For one (1) day
- do - For three (3) days
- do - For seven (7) days
- do - For ten (10) days
Hire charges for providing White ceiling cloth for decorating the pendals and Mandapam with necessary frame work with decorative frills (jallars) around and border and decorative frills (jallars) at the centre with red or green colour or any other attractive colour wherever necessary etc., complete as directed during execution. The ceiling cloth should be pure white in colour and with out any patches and preferably new or neatly washed and should be in good condition through out the Festival or Ustavam period and should be removed after the same is over and should be repaired or replaced as and when torn out by any means including due to rain with out any extra cost .The rate quoted is including conveyance of all materials and labour charges for fixing etc., complete . The rate is for below mentioned calendar days .(The rate for pendals will be paid as per area of pendals measured on covering plan area) Note: If, there is any deviation in the usage of good quality of cloth effecting the pleasing appearance and if the contractor fails to rectify it as per the directions of Engineer in charge, suitable penalty shall be imposed by the Engineer in charge. * The relevant conditions of the foot note mentioned at the end of these items/chapter applies.
- do - For one (1) day
- do - For three (3) days
- do - For seven (7) days
- do - For ten (10) days
Hire charges for providing bunting cloth of white or red or green colour to the Casurinas or Eucalyptus posts etc., complete to the full height and cloth used preferably new or neatly washed and should be in good condition through out the Festival or Utsavam period and should be removed after the same is over as directed during execution and should be repaired without any extra rate if the cloth is spoiled due to any means. The Contractor should allow the Electric and flowers decoration over the cloth done Departmentally without any claim. The rate quoted is including conveyance of all materials (Transportation charges) and labour charges for fixing etc., complete . The rate is for below mentioned calendar days.(The rate for pendals will be paid as per area of pendals measured on covering plan area). Note:- If, there is any deviation in the usage of good quality of cloth effecting pleasing appearance and if the contractor fails to rectify it as per the directions of Engineer in charge, suitable penalty shall be imposed by the Engineer-in-Charge. * The relevant conditions of the foot note mentioned at the end of these items/chapter applies.
- do - For one (1) day
- do - For three (3) days
- do - For seven (7) days
- do - For ten (10) days
Hire charges for erection and removal of barricading with MS pipes at required places with MS pipes of 40mm diameter using 2.45 m long verticals and 3 to 6 metres horizontals.The barricading provided such that it shall be 2m above ground level and 0.45 m pipe embedded in the ground with necessary earth work excavation in all soils up to 0.45m to 0.60 m depth (except rock requiring chiselling). The Horizontals shall be in 3 rows one at 0.50 metres from bottom and balance two rows at 0.70 metres intervals leaving top gap of 0.10 m to 0.15 m and using vertical pipes at a spacing of 2.40 mts to 2.70 mts using special type gripper clamps ("Nandu" clamps) for keeping the both horizontal and vertical intact and joining pins for horizontals.The barrication shall be strongly fixed without any shaking including providing inclined struts wherever necessary including labour charges for all the operations such as loading unloading erection, removal etc., including conveyance charges to site (both ways ) and removing the same after completion of the festival and taking away the material etc.,duly refilling the pits and levelling the surface etc.,complete as directed during the execution. All the clamps shall be covered with rubber sheet for safety, so as to avoid exposure of sharp edges. The rate quoted is including conveyance of all materials and labour charges for fixing etc.,complete . The rate is for below mentioned calendar days.
- do - For One (1) day
- do - For three (3) days
- do - For seven (7) days
- do - For ten (10) days
Hire charges for erection and removal of Shamiyanas with required posts, rope etc., including anchoring the ropes to the ground with suitable anchoring and incidental charges etc., complete as directed during execution. The rate quoted is including conveyance of all materials and labour charges for fixing etc., complete The rate is for below mentioned calendar days. *The relevant conditions of the foot note mentioned at the end of these items/chapter applies.
- do - For one (1) day
- do - For three (3) days
- do - For seven (7) days
- do - For ten (10) days
Hire charges of colour carpets including cost of charges for spreading and folding after completion of the Festival/ Function etc., and the colour carpets should be cleaned every day and to keep neat appearance as directed during execution. The rate quoted is including conveyance of all materials. The rate is for below mentioned calendar days. * The relevant conditions of the foot note mentioned at the end of these items/chapter applies.
- do - For one (1) day
- do - For three (3) days
- do - For seven (7) days
- do - For ten (10) days
Hire charges for providing Rain proof shelters of different spans with clear height of 14' at the ends and suitable height at centre with central unsupported span of ranging 30' to 60'. The shelter shall be provided with adequate MS girders, trusses, purlins, bracings, tie rods, anchorages, bolts & nuts etc., suitably designed with necessary anchors to the ground to withstand heavy wind and rain. The shelter shall be firmly tied with cross anchors at all required places using MS strands etc., using necessary bolts, nuts, etc., The entire roof shall be covered suitably with GI sheets/Aluminium sheets/Galvalume sheets firmly fixed to the purlins etc., with necessary bolts/screws, washers etc., so as to have perfect rain proof roof. Covering shall be made such that the shelter shall be totally rain proof during heavy rains and the rain water shall be properly drained off.(This rate is applicable when structure is provided using roof trusses.)Necessary rain water collection facility and drainage arrangement shall be made. The rate quoted is including conveyance of all materials and labour charges for fixing etc., complete.(The rate for pendals will be paid as per area of pendals measured on covering plan area). The rate is for below mentioned calendar days. * The relevant conditions of the foot note mentioned at the end of these items/chapter applies.
- do - For three (3) days
- do - For seven (7) days
- do - For ten (10) days
Hire charges for providing Aluminium Structure of centre(8mts height) unsupported span of ranging 30' to 50' Aluminium Grade - T3, Pillars of size 150mm x 100mm x 4000 mm height with required Base plates with side and centre rafter dimension of 100mm x 150mm x 4000 mm Length and suitable purlins with adequate supports along with necessary anchors to the ground to with stand heavy wind and rain. The shelter shall be firmly tied with cross anchors at all the required places using necessary bolts, nuts, etc., The entire roof shall be covered suitably with water proof PVC coated Lacquered Finish Fabric firmly fixed to the purlins etc. The rate quoted is including conveyance of all materials and labour charges for fixing etc., complete .(The rate for pendals will be paid as per area of pendals measured on covering plan area). The rate is for below mentioned calendar days.*The relevant conditions of the foot note mentioned at the end of these items/chapter applies.
- do - For three (3) days
Supply of following work men for various miscellaneous works as and when required and as directed during execution of work.
for unskilled man / woman mazdoors
Hire charges for supply, spreading and removing of PVC chairs including loading and unloading. The rate is including maintenance, watch and ward, against theft and fire accidents, repairs and replacement etc., complete during the said period. Rate is including all taxes, Transportation etc., complete. * The relevant conditions of the foot note mentioned at the end of these items/chapter applies.
Hire charges for providing of Banquet chairs for VIPs including loading, unloading, transportation etc., complete. The rate is including maintenance, watch and ward, against theft and fire accidents, repairs and replacement etc., complete during the said period. Rate is including all taxes, Transportation etc., complete . *The relevant conditions of the foot note mentioned at the end of these items/chapter applies.
Hire charges for providing of Stainless Steel Hand wash trough with minimum four taps with necessary waste pipe and fittings for draining waste water including loading and unloading, erection etc. *The rate is including maintenance, watch and ward, against theft and fire accidents, repairs and replacement etc., complete during the said period. Rate is including all taxes, Transportation etc., complete . The relevant conditions of the foot note mentioned at the end of these items/chapter applies.
Hire charges for supply of steel dining tables of size 1’6” x 6’0” including loading and unloading. *The rate is including maintenance, watch and ward, against theft and fire accidents, repairs and replacement etc., complete during the said period. Rate is including all taxes, Transportation etc.,complete *The relevant conditions of the foot note mentioned at the end of these items/chapter applies.
Hire charges for providing Pagodas of 15ft x 15ft size with clear height of 10' at the ends and 14' height at centre. The pagodas shall be provided with adequate MS trusses, purlins, bracings, tie rods, anchorages, bolts & nuts etc., suitably designed with necessary anchors to the ground to withstand heavy wind and rain. The entire roof shall be covered suitably with Fabric firmly fixed to the purlins etc., The rate quoted is including conveyance of all materials and labour charges for fixing etc., complete. *The relevant conditions of the foot note mentioned at the end of these items/chapter applies. for 3 days
Hire charges for providing Pagodas of 20ft x 20ft size with clear height of 10' at the ends and 14' height at centre. The pagodas shall be provided with adequate MS trusses, purlins, bracings, tie rods, anchorages, bolts & nuts etc., suitably designed with necessary anchors to the ground to withstand heavy wind and rain. The entire roof shall be covered suitably with Fabric firmly fixed to the purlins etc., The rate quoted is including conveyance of all materials and labour charges for fixing etc., complete. *The relevant conditions of the foot note mentioned at the end of these items/chapter applies. for 3 days
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
BOQ NIT 1.xls
TENDER_DOCUMENT • 0.05 MB
Conditions Nit 1.doc
TENDER_DOCUMENT • 0.52 MB
Download all tender documents and submit your bid