Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹46,674.44Admitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹49,008.16+₹2,333.72 (5.00%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹46,674
EMD Value
₹1,167
Closing Date
12 Oct 2026, 2:00 pmClosed
Assistant Executive Engineer
KWA, PH Sub Division, Valakom
OandM - Water Supply Schemes-JICA Assisted KWSS to Meenad and Adj Villages -Rectifying air valve leak on the 300 mm Transmisson Main towards Pothakulam OHSR , locating and clearing valave chamber, placing newly casted slab for securing valve chamber
2026_KWA_874407_1
WRD/KWA-CE(SR)/TR/17492/26_23
Open Tender
Civil Works - Water Works
Percentage
30 days
Parippally - paravoor road near Panchayth office P
Please refer Tender documents.
5 documents required · 5 mandatory
₹335
₹1,167
15 Oct 2026
29 Sept 2026
13 Oct 2026
29 Sept 2026
12 Oct 2026
29 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Valve clearing and casting and fixing cover slab | |||||
| 1.001 | OD99322/2026-2027:Charges for clearing the valve chamber and placing the casted cover slab after the required curing period, including removal of debris, soil and other obstructions, cleaning the chamber, handling and positioning the cured RCC cover slab in proper alignment using a hydraulic excavator, including all labour, machinery, tools and tackles, incidental charges, and traffic diversion and control arrangements during the execution of the work, as per the direction of department officers. etc complete: | 2 | 1 nos | 8,214.44 | ₹16,428.88 |
| 1.002 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 1.26 | sqm | 386.16 | ₹486.56 |
| 1.003 | 100.8.1:Fencing one side of trenches, 1.50m height with two rows of 10cm plastic caution tape in vertical casuarina pole (girth 15cm to 24cm) fixed at 2m intervals. | 3 | metre | 32.23 | ₹96.69 |
| 1.004 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 1.48 | cum | 9,235.97 | ₹13,623.06 |
| 1.005 | OD99321/2026-2027:Removing the damaged air valve ball and replacing it with a new 100 mm air valve ball, including dismantling and removal of the existing damaged ball, supply and fixing of new air valve ball, valve nut, bolts, rubber gasket and all necessary accessories, including labour, tools and tackles, and testing of the valve after replacement, as per the direction of departmental officers. etc complete: | 1 | 1 nos | 5,916.34 | ₹5,916.34 |
| 1.006 | 16.78.1:Construction of granular sub- base by Providing close graded Material conforming to specifications, mixing in a mechanical mix plant at OMC, Carriage of mixed material by tippers to work site, for all leads & lifts, spreading in uniform layers of specified thickness with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per specifications and directions of Engineer-in- Charge.With Material conforming to Grade - I ( size range 75 mm to 0.075 mm) having CBR Value- 30 | 2.4 | cum | 3,333.28 | ₹7,999.87 |
| 1.007 | 15.59:Dismantling of flexible pavement ( bituminous courses ) by mechanical means and disposal of dismantled material up to a lead of 1 kilo metre, as per direction of Engineer-in-charge. | 0.8 | cum | 436.3 | ₹349.04 |
| 1.008 | 15.43.2:Dismantling manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in-Charge:Bituminous road | 4 | sqm | 443.5 | ₹1,774 |
stage.html
html • 0.02 MB
finance_1483950.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
KWAGeneralConditionsforeTenderingV5.pdf
PDF • 0.69 MB
Tendernotice_1.pdf
PDF • 0.06 MB
BOQ_1483950.xls
BOQ • 0.31 MB
doc.pdf
Tender Documents • 0.48 MB
Corrigendum.pdf
PDF • 0.43 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .