Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹16.2 LAccepted-AOC | L1 | Accepted-AOC L1 ACCEPTED |
| Sl No | Description | Qty | Unit | MOHAMMED MUTHU IBRAHIM L1 |
|---|---|---|---|---|
| 1.00CIVIL WORKS | ||||
| 1.00 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 29.75 | cum | 283.9 ₹8,444.89 Lowest |
| 1.00 | OD138301/2023-2024:Dry rubble masonry with hard stone in foundation and plinth including leveling up with
cement concrete 1:6:12 (1 cement :6 Coarse Sand:12 graded stone aggregate 20mm nominal size) including
cost of bond stone and through stone. | 23.36 | cum | 4,045.32 ₹94,482.49 Lowest |
| 1.00 | 7.1.1:Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand) | 9.05 | cum | 6,887.74 ₹62,340.93 Lowest |
| 1.00 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size) | 11.86 | cum | 6,515.02 ₹77,281.17 Lowest |
| 1.00 | 2.25:Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. | 30.45 | cum | 247.18 ₹7,526.38 Lowest |
| 1.01 | 50.2.25.1:Filling with contractor's own earth ( excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m as per direction of site Engineer-in-charge | 17.48 | cum | 502.7 ₹8,789.21 Lowest |
| 1.01 | 5.9.3:Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform | 118.03 | sqm | 779.87 ₹92,048.06 Lowest |
| 1.01 | 5.9.19:Centering and shuttering including strutting, etc. and removal of form for:Weather shade, Chajjas, corbels etc., including edges | 28.92 | sqm | 862.85 ₹24,953.62 Lowest |
| 1.01 | 5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers | 50.5 | sqm | 621.2 ₹31,370.6 Lowest |
Tender Value
₹16.9 L
EMD Value
₹42,372
Closing Date
22 Nov 2024, 3:00 pmClosed
Executive Engineer
Executive Engineer PWD Building Division Thrissur
MLA-SDF-Nattika LAC-2022-23- Construction of building for New Vijaya Kerala Library in ward 13 of Valappad Grama Panchayath-Phase 1-WORK-General Civil Work
2024_PWD_693635_2
21/2024-25/EE/TSR
Open Tender
Civil Works - Buildings
Item Rate
300 days
valappad
Please refer Tender documents.
10 documents required · 10 mandatory
₹2,760
Yes
₹42,372
Yes
14 Nov 2025
8 Nov 2024
25 Nov 2024
8 Nov 2024
22 Nov 2024
8 Nov 2024
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1101256.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .