Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹0.89Admitted-Finance | ₹0.89 | L1 | Admitted-Finance |
| 2 | L2₹1.25+₹0.36 (40.4%)Admitted-Finance ROOM 202 KHANYAR GRAND QADIR PLAZA MUNAWARABAD LINK ROAD VILLAGE TOWN MUNAWARABAD CITY SRINAGAR SRINAGAR JAMMU AND KASHMIR 190002 INDIA | SRINAGAR | JAMMU AND KASHMIR | 190002 | ₹1.25+₹0.36 (40.4%) | L2 | Admitted-Finance |
| 3 | Not Admitted-Fee/PreQual/Technical 1 BHAT COMPLEX SURTAING RAINAWARI ANANTHNAG JAMMU KASHMIR 192122 UDYAM JK 21 0029272 | ANANTNAG | JAMMU AND KASHMIR | 192122 | - | - | Not Admitted-Fee/PreQual/Technical Others-Annexure A as per nit not uploaded and similar experience also not uploaded |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Others-Annexure A as per NIT not uploaded |
| Sl No | Description | Qty | Unit | ECNOSAFE DESIGNS AND CONSTRUCTIONS PVT. LTD L1 | M/S INNOVATIVE CONSULTING ENGINEERS L2 |
|---|---|---|---|---|---|
| 1.00 | Design, Consultancy, Geotechnical Investigation (minm:2 bore), Preparation of DPR, with Detailed Estimates, along with BOQ, including all Architectural, Structural drawings and all other necessary working drawings including its vetting from IIT/NIT/DIQC and is submission for approval, including the digital layout plan,and fixing the alignment of structure on site by Consultant including site visits as and when required For Construction of road from Nagbal Daraasgah to Hollin Culvert / Extension of road from Hollin Culvert to Astanpora Krawa Including 40 m Span Motorable Bridge over Bishleri Nallah on Banihal Lamber road Phase I (Bridge component including Approach Walls / R/walls as required) (Estimated cost for Consultancy = 1% of work done cost of items for which consultancy is required including all taxes). (Bridge Estimated Cost incl. Approach Walls & R/Walls = Rs 332.38 Lacs) | 1 | No | 0.89 ₹0.89 Lowest | 1.25 ₹1.25 |
Tender Value
Refer Docs
EMD Value
₹10,000
Closing Date
23 Mar 2026, 4:00 pmClosed
Executive Engineer PWD RnB Division Banihal
Executive Engineer PWD RnB Division Banihal
Refer to BOQ
2026_PWDJK_306275_6
112 of 2025-26
Open Tender
Consultancy
Percentage
Executive Engineer PWD RnB Division Banihal
Refer to NIT
3 documents required · 3 mandatory
₹600
Yes
Executive Engineer PWD RnB Division Banihal
₹10,000
Yes
27 Mar 2026
16 Mar 2026
24 Mar 2026
16 Mar 2026
23 Mar 2026
16 Mar 2026
Design, Consultancy, Geotechnical Investigation (minm:2 bore), Preparation of DPR, with Detailed Estimates, along with BOQ, including all Architectural, Structural drawings and all other necessary working drawings including its vetting from IIT/NIT/DIQC and is submission for approval, including the digital layout plan,and fixing the alignment of structure on site by Consultant including site visits as and when required For Construction of road from Nagbal Daraasgah to Hollin Culvert / Extension of road from Hollin Culvert to Astanpora Krawa Including 40 m Span Motorable Bridge over Bishleri Nallah on Banihal Lamber road Phase I (Bridge component including Approach Walls / R/walls as required) (Estimated cost for Consultancy = 1% of work done cost of items for which consultancy is required including all taxes). (Bridge Estimated Cost incl. Approach Walls & R/Walls = Rs 332.38 Lacs)
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.61 MB
BOQ_994586.xls
BOQ • 0.51 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .