Dy.Minicipal Commissioner - West Zone
Making New RCC roads In Motera And Sabarmati Area Of Sabarmati Ward, West Zone.
281010
8/25-26 (T.N.121)
Open
Civil Works - Others
Works
Ahmedabad
4 documents required · 0 mandatory · 4 optional
₹1,500
Yes
Municipal Commissioner, Ahmedabad
₹50,000
Yes
26 Feb 2026
26 Feb 2026
26 Feb 2026
6 Mar 2026
26 Feb 2026
2. Tender Estimated Cost Rs.49,99,405.31(exclusive of GST). GST will be paid extra by
AMC/Authority at prevailing rate to the contractor.
1% of the Tender Cost in the form (Rs.50,000.00)
3. Earnest Money
(D.D./Pay Order / Local Micr Check/B.G.)
4 Tender Fee Rs Demand Draft of Rs.1500.00
S.D. and Retation 5 % of Tender Amount and @ 2% of the value of work done will
5 be deducted from each RA bill. It will be released along with
release of payment of Final Bill.
6. Time-Limit 12 months
7. Validity Period 120 Days
(i) Last Date of Submission of the
a) In Sealed cover in duplicate copies by Registered Post A.D,
(ii) Mode of Sending or by Courier.or hand delivery
b) Tender sent by ordinary post will be rejected out right.
(iii) Description essential to be
a) Name of work, Tender Notice No. & Tender No.
made on sealed cover b) Date of receiving tender by Corporations.
(iv) Mode of quoting rates in
The Price bid shall be submitted online only.
Schedule of Quantities and Rates It shall not be submitted Physically.
9. Date of Opening Dt.07.03.2026, 15:00 PM
Submission of EMD. Tender fee and other Documents during office
Place of Submission & Opening of
10. hours: On Dt.07.03.2026 &12:00 pm West Zone, 2nd Floor, A.M.
Tender Office, Dr. Ramanbhai Patel Bhavan, Usmanpura.Ahmedabad
Municipal Corporation, W.Z. Office, Ahmedabad-380013.
(1) Rs.1000/- per day (for tenders amounting upto 10 Lakhs), (2)
Rs.2500 per day (for tenders amounting above 10 Lakhs and
11. Penalty Due to Delay of work
upto 30 Lakhs), (3) Rs.5000 per day (for all tenders amounting
above 30 Lakhs) but not more then 10% of bill
12. Defect Liability As per ‘B-1 Form Close
Time permitted to start parts of Whenever a work is allotted by Engineering staff, whether minor or
work major of part thereof of any amount, the contractor shall be bound
to start the works within 48 hours of intimation of work.
Communication done telephonically via SMS, Via Whatsapp and
through letter / E-mail shall be considered legal and binding for the
same. Failure of comply to start the works in 48 hours of intimation
as above by contractor the contractor shall be levied penalty of (1)
Rs.1000/- per day (for tenders amounting upto 10 Lakhs), (2)
Rs.2500 per day (for tenders amounting above 10 Lakhs and upto
30 Lakhs), (3) Rs.5000 per day (for all tenders amounting above
30 Lakhs). Three times failures by contractor shall make
contractor responsible to be black listed unless and otherwise
justified properly in writing / binding within 15 days of last notice of
14. ftuLx[t¾xhlu «J<obtl GST yjd&e åþfJJtbtk ytJNu
The staff of the contractor shall wear safety jackets,
shoes, helmets etc. while on duty and any violation will attract
a fine of Rs. 5,000/- for each incident.
15 Safety Failure to erect safety signage or trying to carry out
the works without proper precautions/safety measures as
required will attract a fine of Rs. 5,000/- for each incident.
Contractor's Sign Addl.C.E.(west zone)
As per Government of Gujarat G.R.No.- EMD/10/2021/7729/DMO Dt.28/06/2021 & Circular of
Finance Department, AMC No.41, Date: 08/02/2022, approved Banks are...
(A) Guarantee issued by following banks will be accepted as SD/EMD on permanent basis. All
nationalized Banks
(B) Guarantees issued by following banks will be accepted as SD/EMD for the period up to
March- 31, 2022. The validity cut-off date in the GR is with respect to the date of issue of
Bank Guarantee irrespective of the date of termination of Bank Guarantee.
1 Commercial Banks :-
5. Kotak Mahindra Bank
6. IndusInd Bank
8. Tamilnadu Mercantile Bank
9. Ujjivan Small Finance Bank
10. A U Small Finance Bank
11. Federal Bank
12. Equitas Small Finance Bank
13. Bandhan Bank
14. Standard Chartered Bank
15. City Union Bank
2 Co-operative and Rural Banks Of Gujarat :-
1. The Mehsana Urban Co-operative Bank Ltd
2. The Ahmedabad Mercantile Co-Operative Bank Ltd
3. Nutan nagrik Sahakari Bank Ltd
4. The Kalupur Commerical Co-operative Bank Ltd
5. Rajkot Nagarik Sahakari Bank Limited
6. The Gujarat State Co-Operative Bank
7. Sarswat Bank
8. Saurashtra Gramin Bank
bu.Bgwrl.frb§h©e, ybœtJtœ Bgwrl. ftuvtuhuNllt mhfgwjh lk.-81, Bþsc <btb
«fthle fLMx[¾Nlle yu¾xeJexebtk BþÏg ftuLx[t¾xh, mc ftuLx[t¾xhlt su bswhtu ftbdehe fh<t
ntug <u <btb bswhtuLþk øþsht< rcÕz´d yuLz y^h fLMx[¾Nl Jfombtk hSMxuNl fhtJÔþ
AHMEDABAD MUNICIPAL CORPORATION
TERMS & CONDITION
( B ) GENERAL TERMS & CONDITIONS
1. Scope of Bid
1.1 The Ahmedabad Municipal Corporation hereinafter called "the Employer" invites Tender
document for the construction of works (as defined in these documents, hereinafter referred to as
"the Works") detailed in the table given in the IFB.
1.2 The Works consist of: “as Above "
Source of Funds
1.1 The expenditure on these Works will be met by AHMEDABAD MUNICIPAL
3. Eligible Bidders
3.1 This invitation for bids is open to bidders who has necessary bid capacity and who meet the
following requirements:
A bidder shall not be under a declaration of ineligibility for corrupt or fraudulent practice.
The bidders shall have a registration with State PWD, and/or CPWD for "E1" class and or
equivalent. If contractor is not registered with AMC in the relevant class, on award of
contract he shall be required to register himself with AMC within 3 month's time.
Bidders shall provide such evidence of their continued eligibility satisfactory to the Employer, as the
Employer shall reasonably request.Subject to Submition of Succsesful Submition as per Clause –II
4. Eligible Material, Equipment and Services
4.1 At the Employer's request, the bidder having offered the lowest evaluated financial bid may be
required to provide evidence of the origin of materials, equipment, and services to the satisfaction of
4.2 For purposes of Sub Clause 4.1, "origin" means the place where the materials are mined, grown,
produced or manufactured; similarly for equipments and from where the services are provided.
5. Qualification of the Bidder
To be qualified for award of Contract, bidders shall:
a) Submit a written power of attorney authorizing the signatory of the bid to commit the bidder;
General information
All individual firms must complete the information in this form. Nationality information shall be
provided for all owner(s) or applicant(s) that are partnership or individually owned firms.
1 Name of firm:
2 Head office address With Contact no.:
3 Local office address (if any) With Contact no.:
4 Telephone/ Contact With name :
5 E-mail address:
6 Place of incorporation/registration:
7 Year of incorporation/registration:
Additional information regarding litigation, debarment, arbitration, etc.
Authorised Signeture Bidder
5.3 Disqualification
Even though the Bidders may meet the above criteria, they are subject to be disqualified for any of
the following reasons:
a) Misleading or false representation in the forms, statements and attachments submitted and
included in document.
b) Record of poor performance such as abandoning the work, rescinding of contract for which the
reasons are attributable to the non-performance of the contractor, consistent history of litigation
awarded against the applicant or financial failure due to bankruptcy.
c) Has been identified by the Employer as poor performer in implementation of ongoing AMC
d) The bidder fill (tender) in percentage rate above or below and total amount (both in figures and
d) The bidder fill (tender) in percentage rate above or below and total amount (both in figures and
words) only in E-Tender (Online) Not to fill in hard copy of Tender documents
5.4 Debarment/Black listing
Notwithstanding the above, the Employer may debar or blacklist any of the bidder(s) for their
misleading or false representations in the forms statements etc. for the period to be decided by the
6. One Bid per Bidder
6.1 Each bidder shall submit only one bid per contract package either by himself or as a partner in a
joint venture. A bidder who submits or participates in more than one bid for a contract package will
be disqualified.
7. Bidding Documents
The bidder is expected to examine carefully the contents of all the above bid documents. Failures to
comply with the requirements of bid documents will be at the bidder's own risk. Pursuant to Clause
16, bids which are not substantially responsive to the requirements of the bidding documents will be
8. Language of Bid
The bid, and all correspondence and documents related to the bid exchanged between the bidder and
the Employer shall be written in the English language. Supporting documents and printed literature
furnished by the bidder may be in another language provided they are accompanied by an accurate
translation of the relevant passages in the English language, in which case, for purposes of
interpretation of the bid, the English translation shall prevail.
9.1. Unless stated otherwise in the bidding documents, the Contract shall be for the whole works as
described in bidding documents, based on the percentage rate amount in the Bill of Quantities
submitted online by the bidder.
9.2. The bidder shall fill (tender) in percentage rate above or below and total amount (both in
9.2. The bidder shall fill (tender) in percentage rate above or below and total amount (both in
figures and words) for overall items of the Works provided in the Bill of Quantities
10. Bid Validity
10.1 Bids shall remain valid as per Instruction to Bidders (ITB) after that deadline date for bid
submission specified in Clause. The Employer as non-responsive shall reject a bid valid for a
shorter period.
10.2 In exceptional circumstances, prior to expiry of the original bid validity period, the Employer
may request the bidders to extend the period of validity for a specified additional period. The
request and the responses thereto shall be made in writing or by fax. A bidder may refuse the
request without forfeiting his bidder agreeing to the request will not be required or permitted to
modify his bid but will be required to extend the validity of his Bid Security for the period of
the extension, and in compliance with Clause 2 ( Financial Terms & Conditions) in all
11. Format and Signing of Bid
11.1 The bidder shall prepare two copies of the documents comprising the bid as described in
Instructions to Bidders.
11.2 The bid shall be typed or written in indelible ink and shall be signed by a person or persons
duly authorized to sign on behalf of the bidder.
11.3 The bid shall contain no alterations, omissions or additions, except those to comply with
instructions issued by the Employer, or as necessary to correct errors made by the bidder, in
which case the person or persons signing the bid shall initial all such corrections.
11.4 All witnesses and sureties shall be persons of status and probity and their full names,
Occupations and addresses shall be printed below their signatures.
12. Deadline for Submission of Bids
Bids must be received by the Employer at the address specified above not later than the time and
date specified in the NIT.
Any bid received by the Employer after the deadline for submission of bids will be returned
unopened to the bidder.
14. Signing of Agreement
At the same time that the Employer notifies the successful bidder that his bid has been accepted, the
Employer will direct him to submit the Performance Security and attend the Employer's office on a
date determined by the Employer for signing the Form of Agreement.
15. The selection process will lay high emphasis on the ability and competency of contractors to do
high quality work within the given time schedule.
16. The onus of providing, all necessary company / project related information, in appropriate
manner and medium, so as to demonstrate the competency of the bidder and to allow proper
evaluation, will rest entirely on the Bidder.
17. All clause shall be operative from the date of issue of work order and up to the expiry of original
and extended time limit.
18. Legal Condition:-
Corrupt or Fraudulent Practices
The Employer will reject a proposal for award if he determines that the Bidder recommended for
award has engaged in corrupt or fraudulent practices in competing for the contract in question.
The Employer will declare the firm ineligible, either indefinitely or for a stated period of time, to
be awarded a contract by AHMEDABAD MUNICIPAL CORPORATION if it at any time
determines that the firm has engaged in corrupt or fraudulent practices in competing for the
contract, or during execution.
“corrupt practice” means behavior on the part of officials in the public or private sectors by
which they improperly and unlawfully enrich themselves and/or those close to them, or
induce others to do so, by misusing the position in which they are placed, and it includes the
offering, giving, receiving, or soliciting of anything of value to influence the action of any
such official in the procurement process or in contract execution; and
“fraudulent practice” means a misrepresentation of facts in order to influence a Procurement
process or the execution of a contract to the detriment of the Borrower, and includes
collusive practice among bidders (prior to or after bid submission) designed to establish bid
prices at artificial non-competitive levels and to deprive the Borrower of the benefits of free
and open competition.
Municipal Commissioner reserves the rights to reduce/increase the scope of work and contract
without assigning any reason thereof.
If Ahmedabad Municipal Corporation is convinced that the Bidder has resorted to material
misrepresentation or provided fraudulent information / statement, the said Bidder will be liable
for disqualification / rejection at any stage.
Proof for fulfillment of eligibility criteria should be submitted along with Tender volume. If the
Tender volume is submitted without valid documents and without proof of eligibility criteria it
will be rejected.
Those who do not meet with the eligibility criteria need not submit the Tender document.
Tenders, which do not fulfill all or any of condition or are submitted incomplete in any respect or
are conditional tenders, will be rejected.
Contractor shall be responsible to obey all Labour Laws, Environmental and Safety Laws.(the
existing laws as well as framed from time to time). Any penalties laid due to violation of such
laws shall be directly deducted from the contractor's outstanding.
19. Administrative Conditions:-
Safety and Signage
Contractor has to arrange for the complete safety of the persons working for project, users of the
road i.e. public and vehicles also. All the arrangements of traffic drums, metal / fiber cones,
traffic blinkers, traffic signs as per design, safety tapes etc. to be arranged at site. Necessary
florescent marking on traffic signs to be provided so that it should be visible at night. During
night working hours safety in charge personnel shall be provided with florescent jackets. This
shall be Provided at no extra cost by the bidder under attaché with specified in the tender
documents under payable iteme.
Liaison with local authority for electrical connections for the AMC
The contractor is responsible for liaison with local authority for change in supply connection or
new connection on behalf of AMC. It includes filling the necessary application to power Supply
Company, follow up and getting the supply, filling the necessary test reports to the power supply
company. All official fees including security deposits and other expenses shall be of initially
paid by the contractor. AMC may support to get the temporary connection and may at its
diseretien get the same converted to permanent connection at the same of AMC if desired
do,and contractor shall as no extra cost support the same. In this case AMC my be as the
remaining cost subject to approval.
20 :- CONTINGENT FEE:
The Contractor warrants that he has not employed any person to solicit or secure the contract
upon any agreement for a commission, percentage, brokerage or contingent fee. Breach of this
warranty shall give the Municipal Commissioner the right to cancel the contract or to take
any other measure as the Municipal Commissioner may deem fit. The warranty does not apply
to commissions payable by the contractor to establish commercial or selling agent for the
purpose of securing business.
No officer, employer of the Municipal Corporation be admitted to any share or part of this
contract or to any benefit that may rise there from.
21:- OVERPAYMENT AND UNDERPAYMENT:
Whenever any claim fourths payment of a sum to the Municipal Corporation arises out of or
under this Contract against the contractor the same may be deducted by the Municipal
Corporation from any sum then due or which at any time thereafter may become due to the
contractor under this contract and failing that under any other contract with the Municipal
Corporation or from any sum due to the contractor with the Municipal Corporation (which may
be available with Municipal Corporation), or from his retention money, or he shall pay the
claim on demand. The Municipal Corporation reserves the right to carry out post payment audit
and technical examination of the final bill including all supporting vouchers, abstracts, etc.
The Municipal Corporation further reserves the right to enforce recovery of any over payment
when detected not withstanding the fact that the amount of the final bill may be included by the
If as a result of such audit and technical examination any over payment is discovered in respect
of any work done by the Contractor or alleged to have been done by him under the contract, it
shall be recovered by the Municipal Corporation from the contractor by way of all the means
prescribed above or if any under payment is discovered by the Municipal Corporation, any
amount due to the contractor under this contract or under payment may be adjusted against any
amount then due or which may at any time thereafter become due before payment is made to
the contractor from him to the Municipal Corporation on any other contract account
If, at any time, there should be evidence of any lien or claim for which owner might have
become liable and which is chargeable to the contractor, the owner shall have the right to retain
out of any payment then due or thereafter to become due an amount sufficient to completely
indemnify the owner against such lien or claim or if such lien or claim be valid the owner may
be or become due and payable to the contractor. If any lien or claims remaining, unsettled after
all payments are made, the contractor shall refund or pay to the owner all money that the latter
may be compelled to pay in discharging such lien or claim including all cost and reasonable
Contractor shall not sub-let the work without permission of the authority.
Joint venture and subcontracting shall not be allowed under this tender
Addendum or corrigendum conveying any change or correction in respect of the work shall form the
part of the contract documents. The full consideration shall be given to such addendum or
corrigendum before submission of tender duly filled in by the contractor. Therefore, the contractors
shall have to kindly refer the tender for such addendum or corrigendum published by AMC through
its website www.amc.nprocure.com & www.nprocure.com 48 hours prior to the deadline of
submission of the tender. Tenderers shall verify the number of addendum issued and enclose the
same with the tender documents , failing which the tenders shall be liable for rejection and no any
complaint in respect to this shall be entertained under any circumstances.
Seal and Signature of the Bidder Addl. City Engineer
Date: (West Zone)
AHMEDABAD MUNICIPAL CORPORATION
TERMS & CONDITION
( C ) FINACIAL CONDITION
1. Cost and Currencies of Bidding
The bidder shall bear all costs associated with the preparation and submission of his bid and the
Employer will in no case be responsible or liable for those costs.
Currencies of Bid and Payment
The rates and the prices shall be quoted by the bidder entirely in Indian Rupees
All payments including advances, if any, shall be made in Indian Rupees.
2. Earnest Money Deposit :-
2.1 Bank guarantees (and other instruments having fixed validity) issued as surety for the bid shall
be valid for 28 days beyond the validity of the bid.
2.2 The EMD of the unsuccessful bidders, except for L1,L2 and L3 bidders, will be returned as
promptly as Early as possible as but not later than 28 days after the expiration of the period of bid
2.3 The EMD of the successful bidder, along with second and third lowest tenders, will be returned
when the bidder has furnished the required performance security and signed the agreement.
2.4 Earnest Money Deposit may be forfeited
a) if the bidder withdraws his bid during the period of bid validity;
b) in the case of a successful bidder, if the bidder fails within the specified time limit to
i) Furnish the required Performance Security or
ii) Sign the Agreement.
3. (A) Security Deposit :-
Within 15 (fifteen) Working days of the date of receipt of the Letter of Intent (LOI) the
successful bidder shall deliver to the Employer, a Initial Security Deposit Shall be submitted as
per C.E. Circular.in the form of a Bank Guarantee/ DD/Locle MICR cheque for an amount
equivalent to 5% (five percent) of the Contract Price .
Failure of the same shall make the contractor liable for any penalty as decided by AMC. At present a
policy is framed by Audit department of AMC to charge 4% interest for the balance period and
discontinuity period.
The Security Deposit to be provided by the successful bidder in the form of a bank guarantee
as per format shall be issued as per Memorendum of work.
(E) Retention :-
a). Retention @ 2% of the value of work done will be deducted from each RA bill. It will be
released along with release of payment of Final Bill.
4. Approved Bank: - As per Annexer -I
5. No advance for machinery or materials will be given.
6. Mobilization advance will not be given.
7. Quantities in B.O.Q. may vary up to any extent and contractor shall not claim any extra rate for
8. Penalty: - 10 percent of the balance work on Date of Completion Date or extended time
limit. & As per AMC Rule
9. Tax, Duties on Materials
All charge on account of Octroi ,excise duties, terminal tax, sales tax. Service tax, VAT
(exculding GST) etc. on material procurement or any other component for the works from any
source shall be borne by the contractors.
Special Clause:
As per construction works welfare cess Act – 1996 non-refundable one percent of tender amount
shall be deducted against works welfare cess.
Seal and Signature of the Bidder Addl. City Engineer
Date: (West Zone)
General terms & conditions
1. Tenderer should be registered in PWD/ in Govt. R&B /CPWD / AMC or equivalent
registration with any other state Govt. or institutions. Copy of registration should be attached with
tender document. Tenderer who was not registred in AMC must be get registred in panel of
approved AMC contractor.
2. A booklet of FORM B-1 of Gujarat State Roads & Building Department / Water Resources
Department with the correction slips made up to 15-08-1999 may be referred. (only English version)
Clause No. -2 liquidated damages for delay shall be overrule by A.M.C.’s M.C.circular no.- 9 dt.
3. In the specification “as directed" / "approved" shall be taken to mean "as directed /
"approved" by the Engineering in charge.
4. Wherever a reference to any Indian standard appears in the specifications, it shall be taken to
mean as reference to the latest edition of the same of force on the date of agreement.
5. In "Mode of measurement" in the specifications wherever a dispute arises in the absence of
specific mention for a particulars point / aspect, the same in the relevant Indian Standards shall be
6. All measurement and computations, unless otherwise specified shall be carried out nearest to
the following limits :-
i) Length, width and depth, Height 0.01 Meter
ii) Areas 0.01 Sq.mts.
iii) Cubic contents 0.01 Cu. mts.
In recording dimensions of work, the sequence of length, width and height (Depth) or thickness shall
7. Definite particulars covered in the items of work, though not mentioned or elucidate in its
specifications shall be deemed to be included therein.
8. Approval of the samples of various materials given by the Engineer in charge or AMC's
Consultant shall not absolve the contractor from the responsibility of replacing defective materials
brought on site or materials used in the work found defective at a later date. The contractor shall
have no claim to any payment or compensation whatsoever on account of any such materials being
rejected by the Engineer in charge.
9. The contractor’s rate for the item of work shall be for the work completed in all respect.
10. All materials including those of electrical shall be got approved by the Engineer in charge/
Architect before using them in the work.
11. Materials as and when rejected by the Engineer in charge or AMC's Consultant shall be
removed from the site of work within 24 hours.
12. All work shall be carried out in a manner as per standard engineering practice.
13. All tools, templates, machinery and equipment for correct execution of the work as well as
for checking lines, levels, alignment of the works & all precautionary measures during execution
shall have to be kept in sufficient numbers and in good working condition at the site of the work. All
excavated trench shall be kept covered with barricade and caution tap.
14. Special modes of the construction not adopted in general Engineering practice, if proposed to
be adopted by the contractor shall be considered only if the contractor provided satisfactory evidence
that such special mode of construction and completion of work to the required strength and quality.
Acceptance of the same by the Engineer in charge shall not however, absolve the contractor from the
responsibility of any adverse effect and concordance of adopting the same in the course of exaction
or completion of the work.
15. The contractor shall be responsible for observing the rules and regulation imposed under the "Minor
Mineral Act", and such other laws and rules prescribed by the Government from time to time.
16. All necessary safety measures and precautions (incl. those laid down in the various relevant
Indian Standard) shall be taken to engrave the safety of men, materials and machinery on the work
and also of the work itself.
17. Quantity measured in the tender is approximate. It may increase or decrease looking to the
quantum of actual work for which no any claim shall be entertained by A.M.C.
18. Contractor shall have to execute extra item if required or as per need of AMC.
19. The work in general shall be carried out as per standard specifications of the relevant items to
be executed & as per the instruction of Engineer in charge & as per the guidance of AMC's
Consultant for this project.
20. The general terms & conditions of the contract shall be applicable & shall be binding on the
contractor. The contract agreement shall have to be executed between AMC & the agency to which
work is awarded for execution.
21. For Tender amounting below 10 lakh LOI shall be issues within 3 days after received of
sanctioned tender and resolution.Within 10 days contractor has to submit SD and after reciveing SD
Work order shall be issue to contractor and the time limit shall be start from the date of issue of the
written work order to the contractor.
For Tender amounting above 10 lakh LOI shall be issues within 3 days after received of
sanctioned tender and resolution .Within 15 days contractor has to submit SD and after reciveing SD
work order shall be issue to contractor and the time limit shall be start from the date of issue of the
written work order to the contractor.
Security Deposit of 5% of sanctioned tender amount shall be deposited by pay order / demand
draft / cheque or Bank Guarntee of nationalized bank/scheduled bank only. Contractor shall have to
sign contract paper with AMC. The contractor shall be fined 4% of interest per year for delay in
submission of S.D and shall be deducted from contractor’s bill.
22. In case of any ambiguity in specifications mentioned in this tender, the interpretation given
by M.C. Or His Designeted Officer will be final and binding to the Contractor.
23. The contractor shall take no advantage of any apparent error or omission in drawing or
specification and the Engineer -in-charge shall make such corrections and interpretations as
necessary to fulfill the intent of the plants and specifications.
24. The quantities of items in BOQ (Bill of Quantities) may vary in case of necessity arises.
25. All prevailing taxes/duties chargeable by State Govt./Central Govt. and the Municipal
Corporation. will be payable by the contractor.
26. No any kind of price rise / price escalation / price variation for cement, steel or labour shall
27. Contractor is requested to see the site physically before tendering. He is also requested to
quote the rates keeping in view of all the points mentioned in relevant pages of tender documents.
28. Water Supply: The contractor shall arrange at his own cost, a suitable supply of piped water
for the construction of the works and provide a satisfactory supply of potable water for drinking,
washing, sanitation and cleaning down. The contractor will be responsible for all the costs where
applicable of connection, meter installation, water consumed, water required for testing purposes,
disconnection and the laying, maintenances and ultimate removal of any distribution system around
29. Electricity: Electric supply will be made available at the site by the Contractor and the
contractor must make his own arrangements with the Corporation and Electricity Supply Authorities
and with other contractors to connect and to take a supply from such services, paying all costs in
connection therewith.
The Contractor shall be entitled to use supply Electricity as may be available on the site for purpose
of the work and shall pay such charges as is fixed by the appropriate supply Authorities.
In case there is any delay in supply of power site of any interruption or fault in the power during the
work. No compensation shall be paid for idle labor staff, machineries and for use of diesel operating
sets etc. as the case may be.
30. Tenders shall submit all the valid/certified documents in support of their initial/eligibility
criteria mentioned above along with the bid. They shall have also to submit the income tax clearance
certificate and solvency certificate.
31. No advance such as secured advance machinery advance, mobilization advance or materials
advance will be given.
32. The contractor shall get the electrical works executed through the authorized Government
approved licensed electrical person or firm in appropriate category in accordance to contractual
33. The electrical works shall be carried out strictly in accordance with the directives issued by
Engineer in charge.
34. Contractors shall not have any dispute or claim for any kind of compensations
(i) If the quantity stipulated in the tender items varies or the scope of work changes &
thereby total amount of work increases/ decreases.
thereby total amount of work increases/ decreases.
(ii) If the work gets delayed/ postponed for some administrative/ technical decision what so ever.
35. In case of any dispute, decision of Municipal Commissioner shall be final and binding on the
36. Tenders which do not fulfill all or any of conditions or are submitted incomplete in any
respect will be rejected. Municipal Commissioner reserves the right to increase/decrease the scope of
work. No any claim to that effect shall be entertained. The Municipal Commissioner also reserves
the right to reject any or all the tenders without assigning any reason thereof.
37. The contractors are requested to quote their rates considering above tender conditions.
38. The contractor shall have to execute the contract agreement after received work order.
Even though in special case, If work is not started because of monsoon or any other special
reason (like site is not available and due to unavoidable circumstances arise), after evaluation of
situation the actual date of starting of work will be consider after approval of Dy.M.C. (West zone)
39. The Contractor shall not claim for increase or decrease in the quantity of the BOQ item or the
40. The R.A bill / final bill payment shall be made as per the latest A.M.C policy / circular for
the work done by the contractor.
41. Conditional tenders will not be accepted.
42. Contractor has to provide more then one number of gangs as per the works allotted and in
case of non providing of gangs and machinery at all sites ant any given time shall be trearted as
delayed by contractor and penalty shall be levied on per day delay as mentioned. (the amount shell
be as instructed earlier based on the tender amount).
43. Recovey and mention that the work allotment shall be considered valid based on call/whats
app/letter/email/massage.
Signature of contractor with seal Additional City Engineer (W.Z)
Date Ahmadabad Municipal Corporation
ybœtJtœ BGþrlrmvj ftuvotuhuNl
ftb btxulwk xftJthe œh Jt¤wk xuLzh ylu ftuLx[tfx
xuLzhh btxule Nh<tuu
1 y: yt xuLzh su <u Jdolt y.Bgw.ftu y&Jt fuLî{ y&Jt htsg mhfthle btLg gtœelt ftuLx[fxhtu Che NfNu.dJobuLxlt btLg
ftuLx[[tfxhu y.Bgw.ftuvtuo. bt btLg ftuLx[[tfxhtu le gtœebtkk hSMxuNl fhtJJtlwk hnuNu.
1 c: btLg ©uKelt ftuLx[tfxh <hefu ltuk^Kelwk «btKvºtle MJ «btKe< fhuj lfj xuLzh mt&u stuzJtle hnuNu.
1 f: xuLzhhle jtgft<
ftb sJtcœth xuLzhh <ubs su xuLzhh mwaJuj ftuLx[tfxhle ©uKebtk ytJ<t ntug <ubs ftb fhJt mûtb ntug <ublu s
ytvJtbtkk ytJNu. ftb yvt<t vnujt ftuLx[tfxhu ftb mkk<tu»tfthf <ubs xtRb jebexbtkk vwÁk fhJt sYhe mJj<,ylwCJ,
ûtb<t ylu VtgltLmegj hemtumo hsw fhJtlt hnuNu.
1 z: ybœtJtœ Bgwrlrmvj ctuzo XhtJ lk - 3836,<t.25/11/2011 &e b¤uj bkswhe ylwmth <&t mexe.Rsluh
mh¾gwjh,lk -17,<t.09/12/2012 bwsc ybœtJtœ Bgwrlrmvj ftuvtuohuNlbtk ftuLx[t¾xh hSMxuNl Ve,heLgwyj Ve
<&t yvd{uzuNl Ve ylu btv œkztu ægtlbtk htFe <u bwsc ybj fhJtltu hnuNu.
1 R: xuLzh Ch<t vnujt xuLzhhu mtRx rlheûtK fhe juJwk. xuLzhh ftblt «fth, ngt< hM<t, vtKe btdo, mkkath ylu
JvhtNlt ceò hM<tytu&e mkk<wÐ ntuJtlwk btle juJtbtkk ytJNu. xuLzhhu ftblu mtRx ylu rcÕzekkd(fu su ftb fhJt, ftb vwhwk
fhJt <&t ftblt buRxulLm btxu cltJuj ntug).<ubs xuLzhhu yt mtRxlt ftb btxu, rcÕzekkd btxu, gtzo, zevtu btxule
søgt vtu<tle he<u bu¤Je juJtle hnuNu. (xuLzhlwk ftb fhJt, ftb vwhwk fhJt <&t ftblt buRxulLm btxule søgt)
2: yt ftble mbg bgtoœt xuLzhbtk sKtÔgt bwscle hnuNu. (bubtuhuLzbbt sKtJuj «btKu)
3: xuLzh Jujezexe rvhegz xuLzhbtk sKtÔgt bwsc hnuNu. (bubtuhuLzbbt sKtJuj «btKu)
4: xuLzh Ch<e JF<u yluoMxble ChJtle hnuNu.
xuLzh Vtubo ylu ylwmwrabtkkle œhufu œhuf Ftje søgt xuLzh Chlthu Chuje yt mt&u btufjujt œM<tJus vh< fhJtlt hnuNu.
6: ftuLx[tfxhtuyu leaule ctc<tu ft¤SvwJof JtkkaJt rJlkk<e Au.
1) J^w fu ytuAtle xftJthelt œh Nçœtu <ubs ytkkfztbtkk ytvJt.
2) ftuR fkkvlelu ltbu xuLzh juJtbkkt ytÔgwk ntug <tu fkkvle J<e xuLzh vh mne fhlth Ôgrf<lu yr^f]< fh<wk bwFðgthltbwk
xuLzh mt&u hsw fhJtlwk hnuNu.
3) Bgwrl.ftuvtuohuNllt «J<obtl rlgbtu ylwmth yluMxble ChJtle hnuNu.ylu xuLzh mt&u cezJtle hnuNu.
4) ftuLx[tfxhu RLfbxuût mkkckr^< vtl lkch <&t cukf zexuRj ytvJtle hnuNu.
5) ftuLx[tfxh vtmu ydtWlt ylwCJt ykdult «btKvºttule lfj xuLzh mt&u hsw fhe NfNu.
6) xuLzh Nh<tu ylu MvuNeVefuNl <&t CtJ vºtflt œhuf vtlt ylu rJd<tu vh ftuLx[tfxhu mne fhJe.
7) <btb mw^tht, AufAtf ylu Dwkxujt jFtK vh ftuLx[tfxhu xwkfe mne fhJe.
7: AufAtf xuLzh Chlthlu sKtJJtbtkk ytJu Au fu xuLzh œM<tJustult jFtKbtk ftuR AufAtf fu VhuVth fhJt œuJtNu lrn ylu
ytJe ftuR AufAtf fu VuhVth juJtNu lrn, <ultkk jFtKbtkk ftuR Cwwj ntug <tu <ult vh l Dwkx<t Ftuxt jFtK fu ytkkfzt vh Auftu
bthelu <ult mtawk jFtK fu ytkkfzt MvÐ Wfju <u he<u jFJt. «ðguf mw^tht vh xwkfe mne fhJe.
8 y: xuLzh hsw fh<tkk vnujt Ftm fhelu xuLzhbtk œNtoJuj mwaltytulwk vtjl fhJtbtkk ytÔgw lrn ntug <tu xuLzh ybtLg
dKJtbkkt ytJNu <ule ltuk^ juJt rJlk<e Au. J¤e yt Vtubolwk bwFv]ƒ ylu ftuLx[tfxhtult btdoœNol btxu mtbtLg rlgbtu
ylu mwaltytu vK ft¤SvwJof JtkkaJt rJlkk<e Au.
1) ftuRvK fthK œNtoÔgt rmJtg ftuRvK fu c^t xuLzhtu yMJefth fhJtltu nf yctr^< hnu Au.
8 c: Wvhle ctc<tu Wvhtkk< xuLzh leault mkkstudtubtkk <h< ybtLg XhJtlu vtºt &Nu.
1) xuLzh Chlth, rlg< ftb y&Jt ftb btxu bkswh fhuj y&Jt CtJ vºtflt ftuR ftuz y&Jt vîr< y&Jt rJd<tubtkk
bwfuj Nh< y&Jt mw^thtbtkk ftuR VuhVth mwaJ<t ntug.
2) xuLzhlwk ftuR vtlwk fu vtlt ftZe ltkkÏgwk/ltkkÏgt ntug fu cœÕgwk/cœÕgt ntug.
3) c^t mw^tht J^tht y&Jt atukxtzuje ftvjeytu Wvh xuLzh Chlthu xwkfe mne l fhe ntug.
4) xuLzhbtk <ubKu ftuR AufAtf fhe ntug, ylu
5) xuLzh Chlth y&Jt vuZele ctc<btkk œhuf Ctdeœth y&Jt <u ykkdulwk bwFðgthltbwk ^htJlth Ôgrf< mne l fhu y&Jt
xuLzhbt <u btxu htFJtbtkk ytJuje søgtbtkk mne/mneytu Wvh ftuR mtûteyu mtF fhe l ntug.
8 f: Nh<e xuLzh MJefthJtbtk ytJNu lne.
8 z: xuLzh MJefthJw , hœ fhJw, ftulu ytvJw ylu fgt CtJ&e ytvJw <u ykdu Bgwrl. frb§h©eltu rlKog ytFhe hnuNu. ftuR fthKmh
stu ftuLx[tfxhlu ftb l ytve Nftg <tu <u ykkdu ftuLx[tfxh ftuRvK «fthltu lwfNtle fu J¤<hltu nff œtJtu fhe NfNu lrn fu
ftgœtfeg ftgoJtne yt ykkdu &R NfNu lrn. xuLzh bkswh >ltu y&o ftb ytve s œuJtlwk Au <uJtu &R NfNu lrn.
9: rJmkkdr< ylu rnmtc stud:
nt& ^hJtlt ftbtule ctc< œNtoJ<t CtJ vºtf btklt sÚ&t ylu hfble ftuRvK Cwjawf leault rlgbtu ylwmth mhCh
fhJtbtkk ytJNu.
1) xuLzh Chlthu œhlt Ftltbtkk sKtJuj Nçœtu ylu ytkkfzt Jåau ftuR ymkkdr<lt fumbtkk Nçœtubtkk sKtJuj hfb btLg htFJtbtkk
2) yufb œh ylu sÚ&tlt Ftuxt dwKtfthlt fthKu ftble ctc<tu œNtoJ<e CtJ vºtf lt Ftltbtkk&e hfbbtkk Cwj sKtg
<tu yufb œh btLg htFJtbkkt ytJNu ylu œhlt yt^thu dwKtfth mw^thJtbkkt ytJNu.
3) yufblt Ftltbtkk&e <ubs ytd¤ Fuka<t mhJt¤tle <btb Cwjtu mw^thJtbkkt ytJNu.
4) ctc<tu y&Jt mhJt¤t mtbu vwhu ytkkfzu fhuj ftuR vK ctc< ægtlbtkk juJtbtkk ytJNu lrn.
10y: ftbltu «tud{um mbg bgtoœt bwsc fhJtltu hnuNu.
xuLzhbtk ftuLx[t¾xh îtht Chujt CtJ <btb «fthlt su <u «J<o<t mhfthe xuût mrn<lt CtJ dKJtbtk ytJNu. ylu
<ubtk atjw ftb œhBgtl su ftuR VuhVth &Nu <ultu J^thtu awfJJtbtk ytJNu lrnk.
10c: mûtb m•tt îtht xuLzhle bkswheltu XhtJ vtzgt ctœ ( LOI) ytvJtbtk ytJNu ðgth ctœ rœl - 15 btk rm¾gtuhexe
zevtuÍex sbt fhtJJtle hnuNu. rm¾gtuhexe zevtuÍex btuze ChJtlt rfMmtbtk Bgwrl.ftuvtuohuNlbtk «J<obtl rlgb ylwmth
ftgoJtne fhJtbtk ytJNu.
10f: bkswh &guj xuLzhle mbgbgtoœtbtk ftbdehe vqKo l &tg <tu mbgbgtoœt ctœlt FhuFh ctfe ftble hfblt 10% juFu
(jefJezexe zubuSm) vulÕxe Jmwj fhJtbtk ytJNu.
xuLzh Chlthu yu Jt< mbS juJtle hnuNu fu <uKu xtkkfujt œh vwhtk &gujt ftb btxult Au ylu <ubtk bswhe, vtjF, ÃjtLx,
œuFhuF,mhJem-ftbdehe, Jes¤e, htugÕxe ylu ytufx[tug Jduhu ykkNu <btb Faoltu <&t sYh sKtg <tu ylu ðgthu
ht<vt¤elt ftblu juJt c^t J^thtlt Faoltu mbtJuN &Nu ylu xtkkfujt CtJ fu œh fh<t J^thtle ftuR awfJKe ykkdult
<ublt ftuR œtJt ægtlbtkk juJtNu lnekk ylu xuLzh Chlth Ftuxe hswyt<lu fthKu y&Jt ftuR Ôgrf<yu(vAe<u ctkk^ftb
rJCtdltu fboathe ntug fu l ntug)<ublu ytvuje btne<elu yt^thu vtA¤&e ftuR œtJt hsw fhJt nfœth hnuNu lnekk. <ublw
xuLzh ChJt <&t <ubtkk swœt swœt CtJ ylu œh ChJt btxu sYhe yuJe <btb btne<e vtu<tlt vûtu l bu¤Je NfJtlu fthKu
vtu<u xuLzh hsw fhJtlu je^u y&Jt <ubtkk&e WCt &<t ftuR stuFb fu sJtcœthebtkk&e Axfe NfNu lnekk. mœh ftbbtk ftuR
vK ò<lt ctk^ftblt bxehegj Wvh CtJ J^thtu ytvJtbtk ytJNu lrnk.
11 c: ftuLx[tfxhtulu vubuLx / hlekd cej Bgwrl. frb§h©elt su <u «J<obtl rlgb bwsc fhJtbt ytJNu.<&t Bgwrl.
frb§h©e/mexe Rsluh©e lt su <u JF<ltk mh¾gwjh «btKu ftbdehe/ybj fhJt ckDlf<ot hnuNu.
11 f: ftuLx[t¾xhlt œhuf hlekd cejbtk&e ftuLx[t¾xhlu awfJJtle &<e fwj hfb Wvh (xuLzh bwsclwk vubuLx +
yu¾x[t ytRxb) 2 % juFu hexulNl ble ftvJtbtk ytJNu su VtRlj cejbtk vh< ytvJtbtk ytJNu.
11 z: htsg / fuL÷ mhfth©elt JF<tuJF<lt ftgœt bwsc su ftuR hfble fvt< fhJtle &Nu <u bwsc ftuLx[[tfxhlt cejbtkk&e
fvt< fhJtbt ytJNu.
12: yu)fhth mkkc^e œM<tJustu fhthlt ydðglt Ctd dKtNu ylu <u mD¤t mne<lt fhth mbd{ ftblu jtdw vzNu.
ce)xuLzhbtk œNtoJuj ftb mkkck^e œM<tJusbtkk œNtoJuj rJd<btkk rJmkkd<<tlt rfMmtbtk leau œNtoJuj ¢btlwmth
œM<tJusbtkk œNtoJuj rJd< d{tng htFJtbkkt ytJNu.
yu) yufb ylu fœ
2) xuLzh Vtubolwk CtJvºtf
z[tuRkdbtk fœ, ytfth, ytkkfzt fœta Ftuxt ntug <tu btvujtkk fœ, ytfthlu ylwmhJwk.
2) xuLzh Vtubole ylwmwra-ce
Cwj Chujt fu Ftuxt JKollt rfMmtbtkk yt mkkck^e Wvhefûttyu rJmkkd<<t ykdule ltuk^ bwfe
yuze.me.R/zu.Bgwrl.frb./Bgwrl.frb.le bkswhe bu¤JJtbtk ytJNu ylu <u bwsc fhJtbkt ytJuj rlKog ykkr<b
dKJtbkkt ytJNu.
13 : xuLzhhu z[tuRkd fu MvuNeVefuNlbtkk hnuje ftuR ûtr< fu Ftbeltu duhjtC juJtle fturNN l fhJe ylu Rsluh Rl-atsuo Ãjtl
<&t MvuNeVefuNlle ûtr<ytu mw^thJe <&t <ulwk mtawk y&oDxl fhtJJwk.
14 : yt Wvhtk< y.Bgw. ftuvtuo. lt slhj ftuLx[tfx fLzeNl vK btLg htFJle hnuNu.
15 : yufe JF<u yuf fh<t J^w søgtytuyu ftb NY fhJtltu Jfo ytuzoh b¤u <tu ftb yuf mt&u s c^u NY fhJw vzNu.
16 :atjw ftbu mrJom jtRllu lwfNtl l &tg <u he<u ftb fhJtlw hnuNu. stu ftuR mrJom jtRllu lwfNtl &Nu <tu <ule mkvwKo
sJtcœthe (òlbtj) ftuLx[tfxhle vtu<tle hnuNu. mtRx Wvh ftb œhBgtl bswhtu fu sl<tlt ftuR btKmlt òlbtj lu
lwfNtl &tg <ule sJtcœthe ftuLx[tfxhle hnuNu.vtujem Vhegtœ &tg <tu <ule sJtcœthe vK ftuLxtfxhle hnuNu. CuFz
Dme l vzu <ule sJtcœthe vK vtujem Vhegtœbt ftuLx[tfxhle hnuNu.CuFz Dme l vzu <u btxu mjtb<elt vdjt (suJt fu
œtuhzwk ctk^e bswh Ftztbtkk W<thJt, mtuhekkd ylu Mx[[xekkd fhJt rJduhu) je^t Jdh bsqhlu Ftztbtkk W<thNu <tu ftuLx[[tfxh s
vtujem Vhegtœbt sJtcœth hnuNu ylu Bgwrl.ftuvtuohuNlltu ftuRvK MxtV ytlt btxu sJtcœth hnuNu lrn.ytxjwk mbSlu
s xuLzh ChJwk. Bswhtultu rJbtu vK W<thJtu.
17 : ftuLx[tfxh îtht xuLzhbt œNtoJuj MveNeVefuNl bwsc MxtLzzo bxehegÕm MvuNeVefuNl bwsc jtJJtlt hnuNu.<&t sYh
sKtg <tu xuMxekd fhtJJtlwk hnuNu.<&t yt ykdu «Joðbtl Bgwrl.ftuvtuohuNlt rlgb bwsc bxehegÕm fu ceò xuMxed hevtuxo
ftuLx[tfxhu vtu<tlt Fauo ftuvtuohuNl sKtJu <u søgtyu fhtJJtlt hnuNu. bxehegÕm jtJJt fu jR sJtltu mkvwKo Fao
ftuLx[tfxhu CtudJJtltu hnuNu.
18 : M&¤ vrhrM&r< / sYhegt< bwsc ftb fhtJ<t xuLzhlt ytRxblt sÚ&tbtk J^ ^x &tg <tu rlgb ylwmth <u ykdu ftb
fhJt ftuLx[tfxh ck^tgujt Au.
19: mtRx vh jtJJtbtk ytJuj btj mtbtl hesufx fhJtbt ytJu <tu <whk< rœl 1btk vh< jR sJtltu hnuNu.
yLg&t <ule lwfNtlle sJtcœthe ftuLx[tfxhle hnuNu.
20 :ftuLx[tfxhlu su ftuLx[tfx ytvJtbtk ytJu Au.<ubt mhfth©elt «Joðbtl rlgb bwsc ve.yuV/juch
yufx/vtujemlt ftgœtlw vtjl fhJtlwk hnuNu <&t yt ykdu Bgwrl.ftuvtuohuNl îtht su btne<e btkdJtbtk ytJu <u ytvJtle
21: ftuRvK ftgœtfeg jexeduNl ybœtJtœ Nnuhle ftuxobt hnuNu.
22: btj su <u Mxtumo Wvh y&Jt mtRx Wvh jtuftulu lz<h l &tg <u he<u mwalt bwsc W<thJtltu <ubs dtuXJJtltu hnuNu.
23: ftuR vK mhfthe fhJuht ChJtle <btb sJtcœthe ftuLx[tfxhle hnuNu.
24: yt xuLzhbtkk stu ftuR ytRxb hne dR ntug <tu <u y&tJ M&¤ M&e<e bwsc xuLzhbtk mbtJuN l ntug <uJe J^thtle ftbdehe
fhJtle &tg <uJt rfMmbtk Bgwrl.ftuvtuohuNlt «Joðbtl rlgb ylwmth J^thtle ytRxblt CtJ lffe fhJtbtk ytJNu ylu <u
bwsc awkfJKe fhJtbtk ytJNu.
25: atjw ftb œhBgtl «tuxufNlle mkvwKo sJtcœthe ftuLx[[tfxhle hnuNu. subtkk vevzt,œtuhzt, Cgmwaf ctuzo,ÃjtMxef vxe,rJ.
ftuLx[tfxhu jtJJtlwk ylu mtaJJtlwwk hnuNu. ylu ftuRvK yfMbt< &Nu <tu <ule mkkvwKo sJtcœthe ftuLx[tfxhle hnuNu.
26: M&¤ Wvh atjw ftbdehe œhBgtl ftb fhlth ftuLx[tfxhlt bswh / fboathe y&Jt yLg Ôgrf<lt yfMbt<lt rfMmbtk
juch yufx bwsc fhJtle &<e ftgoJtne <&t vtujem ftgoJtnele sJtcœthe ftuLx[tfxhle hnuNu.
27: stu MxtV mqalt ytvu <u bwsc mwalt vtu&e ftuLx[tfxhu htFJtle hnuNu. <ubt œhhtus fhuj ftbdehe <&t yr^ftheytuyu
ftb mw^thJt fu vtu{d{um J^thJtlt ltuk^ fhuj ntug <tu <ulwk ftuBÃjtgLm ytvJtlwk hnuNu ytJe ltu^lt sJtc l &gu fu <u «btKu
M&¤ Wvh ybj l &gu ftuLx[tfxhlu vulÕxe fhJtle mððtt yuze.mexe yuLSlehgh©elu hnuNu.
28: œhuf ytRxblt MvuNeVefuNl ybœtJtœ Bgwrlrmvj ftuvtuohuNlltk bkswh &guj <&t btLg htFuj MvuNeVefuNl Nh<tu
bwsc hnuNu su ytRxbbtk MvuNeVefuNl l ntug <uJt mkstudtubtk yuze. mexe.yuLSlegh©eltu rlKog ytFhe hnuNu.
Jtuxhekd fhJtbtk lrn ytJu fu œhhtus J^thtltu zucheÍ WvtzJtbtk lrn ytJu <tu ftuLx[tfxhlt Fauo ylu sutFbu Jdh ltuxemu
Jtuxhekd fhtJJtbtk <&t zucheÍ WvtzJtbtk ytJNu ylu cejbtkk&e hfb ftve juJtbtk ytJNu.
29: juch JuÕVuh Vkkz btxu ntjbtkk htsg mhfth©eyu fhuj nwfb bwsc 1%(yuf xft) hfb cejbtk&e ftve juJtbt ytJNu.
30: su ftbtubtk atubtmtlt mbgdt¤tlu ctœ ytvJtle Nh<tultu WÕjuF ntug ðgtk atubtmtltu vehegz <t.15 swl &e
mÃxuBch Mþ^eltu dKJtbtk ytJNu. yt mbg œhBgtl ftuLx[tfxh îtht ftbdehe fhe Nftg <ub l ntug <tu <u mbgdt¤tu ctœ fhe
ftble mbgbgtoœt dKJtbtk ytJNu <&t sYhegt< Bþscle xtEb jebex J^the vK ytvJtbtk ytJNu.
31: ftuLx[tfxhu «J<obtl ybœtJtœ Bgw. ftuvtuohuNl lt JF<tuJF< lt mhfgwjh bwsc ve yuV,Jux <&t ylu muÕm xuût lu
jd<t vwhtJt vubuLx fh<e JF<u sYh vzu&e hsw fhJtlt hnuNu.
32: dwsht< mhfth©elt ©b ,futuNÕg rJftm htusdth rJCtdlt XhtJ ¢btf :LED/WRT/e-
file/11/2024/0293/M2 mraJtjg,dtk^eldh,<t.15.02.2024 bwsc fboathe ©bgtudele studJtR
vhevwKo &tg <u mwrlrµ< fhJtlwk hnNu.
yufhthlwk Vtubo
1) nwk/ybu yt&e yufhth fhwk Awk/fheyu Aeyu fu yt xuLzh hsw fh<tkk vnujtkk buk/ybu M&¤le bwjtft< je^e Au ylu
ftblu jd<t btjmtbtl, bswhe ylu ceS ctc<tulu jd<e M&trlf vrhrM&r<le ò<-btne<e bu¤Je Au.
2) nwk/ybu yt&e yufhth fhwk Awk/fheyu Aeyu fu yt ftuLx[tfxhtule Nh<tu rJd<tu ylu xuLzhlu jd<t œM<tJustu
ft¤SvwJof yÇgtm fgtuo Au ylu <u bwsc <ultu ybj fhJt mkkb< Awk/Aeyu.
ftuLx[tfxhle mne - rm¬tu yuze.mexe yuLSlegh
btuctEj lkch mt&u (vrùb Ítul)
AHMEDABAD MUNICIPAL CORPORATION
ENGGNIERING DEPARTMENT
GENERAL SPECIFICATION
Time limit for the work shall be 18 months (Including Monsoon) after the order to start the works.
Progress of work should be in proportion to time limit. The details of reinforcement of R.C.C. work
shall be as per design and instructions of Add. City Engineer and his order will be considered final.
The contractor shall have to maintain account of steel, cement and other materials that may
be brought by him on site. This account shall be regularly maintained and kept open for inspection
by Municipal Staff. Watering of all the items shall be as per instructions otherwise no payment shall
be made to contractors. Mixing of concrete shall be done by concrete mixer machine. Arrangements
of binding vibrator for R.C.C. works if required shall have to be made by the contractor .
The contractor shall be remain responsible for Workmen’s compensation if any accident. The
contractor shall arrange for barricading at night and arrangement of Pagi at night to direct the traffic.
He shall be responsible for any damage to public. If any incident happen, during the execution of
work. In case of dispute for unseen or overlooked items the decision of the Dy. City Engineer shall
be final. The contractor shall have to give site clean of all rubbish during the work and at the time of
completion of work and hand over the site with final finishing of the work as directed. All the
rejected materials shall be removed from site within 24 hours by contractor at this risk and cost.
Debris shall have to cart daily from site.
For mixing mortar either for masonry or for plaster or for any other purpose contractor shall
have to prepare through of bigger size and mix the mortar in the required proportion. In on case he
shall be allowed to mix the mortar either on floor or any finished surfaces. The contractor shall have
to make his own arrangement for water required for the work.
If any extra item crops up during the progress of work the same shall be carried out by the
contractor and he shall be paid at the rate fixed by Add.C.E. as per the rate analysis based on latest
SOR or if item is not available in SOR than based on current market rates. In case of extra item
decision of Add. City Engg. shall remain final regarding rate.
If in the interest of the Corporation it is necessary to change either any site or the design of the
propose work the contractor shall carry out the same at his quoted rates without charges any extra
and the contractor will have to carry out the works and he will be paid at the rate quoted by him. No
claim for extra rate for subsequent changes in site and design is entertained.
The cubical contents of the cement bag shall be taken as 1-20 cft. Per bag and the contractors shall
have to prepare the measures boxes according to this measure.
Octroi exemption passes shall not be given for any materials required for the work. Contractor will
be fully responsible for compliance of the various provisions under contract Act. 1970 and the Rules
framed the to under.
The tender for the work shall remain open for a period (120) days from the date of opening of the
tenders for this work and that the tenderer shall not be allowed to withdraw on modify the offer on
his own during the period. If any tenderer withdraw or makes any modifications or addition in the
terms and conditions of his tender not acceptable to the Municipal Corporation the Municipal
Corporation shall without prejudice to any right or remedy be at liberty to forfeit in full the said
earnest money and black list the contractor.
If work is not started within specified time limit the penalty as per rule & tender condition delay of
start shall be recovered separately from the immediate bills payable to the contractor. Contractor has
to make his own arrangement for procurement of steel and cement.
Contractors should note the following conditions carefully:-
i) Conditional tender shall not be accepted.
ii) All tenders are to be submitted in duplicate without which the tenders are liable to be
iii) In case of tender downloaded from website, tender fee & EMD should be submitted in form
of demand draft
iv) Condition of Form - B1 Standard Specification of material & code of practice will be
applicable. Form B1 can be is available in website. Specification shall be as per ' R& B
Dept. - Govt. of Gujarat booklets of Building Works & and Road Works Specifications
published by Gujarat Book Depot, Sector-21. Gandhinagar.
CONTRACTOR'SSIGNATURE
ADDL.CITYENGINEER
& STAMP (West Zone)
AHMEDABAD MUNICIPAL CORPORATION
ENGINEERING DEPARTMENT (WEST ZONE)
of Making New RCC roads In Motera And Sabarmati Area Of Sabarmati Ward, West Zone
Sr. No. Quantity Item Description Per Amount in Rs.
Box cutting in all sorts of soil & murrum incldg.
1 1086 conveyaning , breaking clods spreading the stuff 127.13 Cmt
as & where dire. With in a lead of 50 mt . from
end of cutting.
Conveyance charge of earth , lime, murrum,
2 1369 building rubbish, manual garbage, sludge, 52.42 Cmt.
excavated rock ,fly ash,aggregate of any kind etc.
comp.up to 5.0 Km. lead
Dismantling the following including loading,
unloading and disposal of unserviceable material
for all lead or as directed by Engineer-In-Charge
3 and stacking the serviceable material and
backfilling the resulting trenches and pits
a. 15 central verge -kerb stone 8 Rmt
Dismantling tiled or stone floors laid in
b 2300 mortar including stacking of serviceable 27.44 Smt
material and disposal of uservicalble
material with all lead and lifts.
Demolition & disposal of unservisable material
c 15 with all lead and lift for unreinforeced concrete. 348.1 Cmt
Demolition of brick work & stone masonry
including stacking of serviceable materials and
disposal of unserviceable materials with all lead
and lift (1) In cement mortar.
Demolition including stacking of serviceable
e 15 materials and disposal of unserviceable materials 604.74 Cmt
with all lead and lift. (I) R.C.C work.
Providing and laying in position Ready Mixed M-
250 grade concrete for reinforced cement conctere
work, using cement content as per approved
Design Mix manufactured in fully automatic
batching plant and transported to site of work
intransit mixer for a lead up to 10 kms having
continuous agitated mixer, manufactured as per
4 397 mix design of specified grade for reinforced 4853.56 Cmt
cement concrete work including pumping of
R.M.C. from transit mixer to site of laying,
excluding the cost of centering shuttering
finishing and reinforcement including cost of
admixtures in recommended proportions as per
IS:9103 to accelerate/ retard setting of concrete,
improve work ability without impairing strength
and durability as per direction of theEngineer-in-
charge. Without Fly Ash (Min cement level as per
latest IS456 shall be maintained) (Cement level
Provdg. Form work of ordinary timber planking so
as to give a rough finish incl. centering,
shuttering, strutting and propping etc.height of
5 165 propping and centering below supporting floor to 99.79 Smt
ceiling not exceeding 4 M & removal of the same
for in situ reinforced concrete and plain concrete
work in (A) Foundation, footing, base of column
& mass concrete
Providing TMT bar reinforcement for R.C.C
6 6944 works includings bendings, binding and placing in 63.1 KG
position complete upto floor two level.
P/A Trimix with dewatering machine and floater
7 2546 machine on constructed RCC work incl.cost of 48.21 Smt
machine and labour etc comp as directed.
(Approved Rate)
Making 15 mm groove in RCC work on road and
8 1653 filling it with polysulfied selant and finished it 26.78 Rmt
good incl.all labour charges etc comp as directed.
(Approved Rate)
Raising of Exisiting manhole. Item includes,
cutting of existing road surround by manhole by
dimond cutter machine,dismantling of road in
confined area by breakermachine and Carting of
dismantled materi raise the manhole at road level
in CM 1:3.Item also included fixing of manhole
9 50 fram at exact road level by using master emaco S 6815.32 No.
488 trowelable fiber rein forced thixotropic repair
mortar material, laying of concreret made from
master emaco S 346 Flowable Micro concrete
material in desired thickness and plate compactor
machine rate also included necessary plaster at
inside of manhole in CM 1:3 in 20 mm thickness
on raised brickworkal. Item also includes nessary
RCC Precast M.H.Frame & Cover Manufacture
supply & Delivery at store or at side of work
10 Precast RCC M200 Frame & Cover Suitable to
drainage M.H. and as per type design & Drawing
including cost of reinforcement M.S. Angles or
Flat , cutting mold work etc.
50 Frame Suitable for 50 Cm opening of MH 1314 No.
Providing and laying cement concrete 1:3:6 (1
11 364 Cement :3 coarse sand : 6 hand broken stone 2339.59 Cmt.
aggregate 40 mm nominal size) and curing
complete. excluding cost of form work in
Provdg. & laying cement concrete 1:5:10 (1
cement : 5 coarse sand : 10 hand broken
stone aggregates 40 mm nominal size) 1802.24 Cmt
and curing complete excluding cost of
Providing and Laying of Rubber Moulded
Paver Block Grey/Coloured 60 mm thick, M-35
Grade of any size ; shape (Usually Uni-Paver
Blocks) using black trap good quality
aggragate of 20 mm nominal size for footpath,
parking areas, service lanes and other
areas as mentioned in the drawing /
instruction of engineer in charge. Cost
includes formworks using rubber mould, Rate
providing and laying paver blocks as per
required grading and specification. The paver
block shall be mechanically compacted. The
work of paving blocks shall be executed in
line and level by skill mason of flooring work
only. It should be laid in such a way that the no
cutting of the paver block to be necessary. if
cutting of paver block necessary then it
should be cut by machine only and carting.
The finished surface of the paver block shall
have resonably good, plain finished. Paver blocks
shall be compacted and shall be relaid if
necessary. Gravel or such type of materials shall
not be allowed for production.
Laying on 5cms thick sand beddding.
Paver Block Providing and laying shot
blasted Non - interlocking, Paver blocks of
specified thickness, size, grade of concrete and
colour machine made and blasting by
automatic shot blasting machine and high
density of as per approved sample of approved
make for footpath, parking areas, service
lanes,cross over and other areas as mentioned in
the drawing. Including providing and laying
50 mm thick averave bedding layer of coarse
sand below paver block as per required grading
and specification. Laid paver block shall be
mechanically compacted. The work of the paving
14 50 blocks shall be executed in line and level by 669.65 Smt
skilled mason of flooring work only. Small size
of paver block with same specification shall be
used at residue or at end. It should be laid in such
a way that the no cutting of the paver block to be
necessary. If cutting of paver block shall be
required , than cut by machine only and laying
to be done by skilled flooring mason. The
finished surface of the paver block shall have
coarse sand Texture Finish. Pave blocks shall be
compacted and shall be re-laid if necessary.
Actual laid area shall be measured and paid
without any wastage. (A) 60 mm thick M-35
Providing & Supplying ISI Standard RCC pipes
(of sulphate resisting cement) in a standard
lengths of following class & dia meter suitable for
socket-spigot type including all taxes , insurance,
transporation, freight charges, octroi, inspection
charges, loading, unloading, conveyance to
departmental stores, staking etc complete (IS
458:1989) Cltss NP-3, test pressure 0.7/kg/sqcm.
Rate also includes supplying RCC collar for RCC
15 pipes including taxes, carting, loading, unloading,
etc complete. Including labour work for lowering,
laying, jointing, RCC pipes loading, unloading,
etc complete. Including labour work for lowering,
laying, jointing, RCC pipes in CM 1:1 1/2 of
following diameters in proper position, grade and
alignent at all as directed by engineer in charge.
inlcuding conveyance from store to site of work
labour giving hydraulic testing and all necessary
testing as per IS code (RCC pipe Horizontal cast)
33 300 mm diameter 888.37 Rmt
Constructing Bombay Pattern Type Catch Pit of
size 0.60 x 0.60depth up to 1 mt including
excavation, B.B.C.C. (1:5:10), 23 cmsthick brick
16 33 maso. wall in the prop. of CM (1:6) with 40 mm 3110.8 Nos
thickIPS flooring in the prop M15 at bottom and
15 mm thick cementplaster inside the catch pit in
the proportion of CM (1:3) with outjali etc. comp.
CatchPit Jali (Heavy duty) Fixing P/F FRC catch
17 42 pit jali with frame 600mm x 600mm clear opening 1377.64 Nos
etc. comp.. As directed by engineer in charge
Extra rate over item of excavation of earth for
excavation of asphalt pavement / RCC of
thickness up to 0.20 meter including demolishing
the asphalt carpet, metal,s oiling/cutting
Reinforcement etc.comp. with stacking the
material as directed.
Up to 0.30 meter (By any type of Breaker
b 868 Machine or R.C.C.Cutter machine including cost 177.76 Smt
of operator, fuel, & transportation etc complete.
CONTRACTOR'S SIGNATURE ADDL.CITY ENGINEER
& STAMP (West Zone)
AHMEDABAD MUNICIPAL CORPORATION
Invitation for Bid (IFB)
1. The AHMEDABAD MUNICIPAL CORPORATION, (Hereinafter called “the Employer”)
invites sealed Tender document from reputed and qualified bidders for the construction of
Works detailed in the Table below:-
Sr.No Name of Works Approximate Bid Security Completio n
value of works (Rs.) Period
1 Making New RCC roads In 49,99,405.31 50,000.00 12 Month
Motera And Sabarmati Area Of
Sabarmati Ward, West Zone
2. T e n d e r (a complete set of bidding document) fee shall be Rs.1500/- in the form of
Demand Draft / Pay Order from any Nationalized Bank in favor of MUNICIPAL
COMMISSIONER, Ahmedabad, payable at Ahmedabad, which shall be non refundable. The
fees shall be paid at the time of submitting the tender.
3. Interested bidders shall download the tender documents from website
http://amc.nprocure.com and http://nprocure.com. tender fee as mentioned in clause 2 above
shall be paid by the bidder at the time of bid submission.
4. All bids must be accompanied by Bid Security of the amount specified for the Works in the
above Table payable at Ahmedabad and drawn in favor of AHMEDABAD MUNICIPAL
CORPORATION, Ahmedabad. Bid Security will have to be in any one of the forms as
specified in Clause of ITB (Instructions to Bidders).
5. All Bids must be delivered to Assistant Manager "North West Zone, Zonal Office", Nr.
Atithi Hotel, Bodakdev Ahmedabad. Not later than 18:00 PM Dt.06.03.2026 upto
Seal and Signature of the Bidder Addl. City Engineer
AHMEDABAD MUNICIPAL CORPORATION
ENGINEERING DEPARTMENT
GENERAL CONDITION
1. Contractor shall produce the relevant registration certificate of AMC / State Govt /Central
2. Contractor shall register the work to labour commissioner as per labour act.
3. Contractor shall not sub-let the work without permission of the authority
4. Contractor should have sufficient skilled and unskilled laborers so that he shall start work at
different sites simultaneously. Contractor's having labour force available during festivals
shall only apply. Contractor can not stop the work due to on availably of labour force. In case
progress is delayed, contractor shall be penalized 0.1% of Tender amount per day for work
done after time limit, maximum up to 10% for remaining work.
5. Bitumen rate difference will be paid as per tender conditions, if applicable.
6. Advance payment / machinery advance will not be paid.
7. Payment of running bill will be made as per recent A.M.C. policy in force.
8. No extra payment will be made due to increase of central / state Govt. Taxes.
9. If the work is not completed within time limit the penalty will be recovered from immediate
bills of contractors.
10. If the material i.e. MH cover C.C block etc. supplied from Municipal Corporation store then
contractor shall not claim for any extra rate for non execution of such item, partly/fully.
11. In the specifications, "as directed"/"Approved" shall be taken to mean, "as
directed"/approved" by the Engineer-in-charge.
12. Wherever a reference to any Indian Standard appears in the specifications, it shall be taken to
mean as a reference to the latest edition of the same in force on the date of agreement.
13. In "Mode of Measurement" in the specifications wherever a dispute arises in the absence of
specific mention of a particular point or aspect, the provisions on these particular points, or
aspects in the relevant Indian Standards shall be referred to.
14. All measurements and computations, unless otherwise specified, shall be carried out nearest
to the following limits:
(i) Length, width and depth (height)------- 0.01 Meter.
(ii) Areas -----0.01 Sq. Mt.
(iii) Cubic Contents ------0.01 Cu.Mt.
15. The distance, which constitutes lead, shall be determined along the shortest practical route
and not necessarily the route actually taken. The decision of the Engineer-in-charge in this
regard shall be taken as final.
16. Where no lead is specified, it shall mean "all leads"
17. Lift shall be measured from plinth level.
18. Definite particulars covered in the items of work, through not mentioned or elucidated in it,
specifications shall be deemed to be included there in.
19. Reference to specifications of materials as made in the detailed specification of the items of
work is in the form of a designation containing the number of the specification of the
material and prefix 'M' e.g. 'M-5'.
20. Approval to the samples of various materials given by the Engineer-in-charge shall not
absolve the contractor from the responsibility of replacing defective material brought on site
or materials used in the work found defective at a later date.
21. The contract rate of the item of work shall be for the work completed in all respects.
22. No collection of materials shall be made before it is got approved from the Engineer-in-
23. Collection of approved materials shall be done at site of work in a systematic manner.
Materials shall be stone at site of work in a systematic manner. Materials shall be stored in
such a manner as to prevent damage, deterioration or intrusion of foreign matter and to-
ensure the preservation of their quality and fitness for the work.
24. Materials, if and when rejected by the Engineer-in-charge, shall be immediately removed
from the site of work within 24 hours.
25. No materials shall be stored prior to, during and after execution shall be kept in sufficient
numbers and in good working condition on the site of the work.
26. All works shall be carried out in workmanlike manners per the best techniques for the
particular item.
27. All tools, templates, machinery and equipment for correct execution of the work as well as
for checking lines, levels, alignment of the works during execution shall be kept in sufficient
numbers and in good working condition on the site of the work.
28. The mode, procedure and manner of execution shall be such that it does not cause damage or
over loading of the various components of the structure during execution or after completion
of the structure.
29. All necessary safety measures and precaution (including those laid down in the various
relevant Indian Standards) shall be taken to ensure the safety of men, materials and
machinery on the works as also of the work itself.
30. The testing charges of all materials shall be borne by the Contractor unless recovery at one
percent towards testing charges is separately made.
INSTRUCTION TO TENDERERS
TENDER VALIDITY PERIOD:
The tender shall be kept valid for acceptance for a period of One Hundred Twenty Calendar
days (120) from opening of price bids.
SECURITY DEPOSIT
Within 10 days of receipt of Acceptance from the Corporation, the successful tender shall
furnish to the Corporation Security Deposit of 5% (Five Percent) of the contract price cheque or
Bank Guarantee, pay order, or demand draft of Nationalized Banks and Schedule Banks only.
CONTRACTOR'S SIGNATURE ADDL.CITY ENGINEER
& STAMP (West Zone)
AHMEDABAD MUNICIPAL CORPORATION
ENGINEERING DEPARTMENT
GENERAL SPECIFICATION
Time limit for the work shall be 12 month period after the order to start the works. Progress of work
should be in proportion to time limit.
The contractor shall be remain responsible for Workmen’s compensation if any accident. The
contractor shall arrange for barricading at night and arrangement of Pagi at night to direct the traffic.
He shall be responsible for any damage to public. If any incident happen, during the execution of
work. In case of dispute for unseen or overlooked items the decision of the Dy. City Engineer shall
be final. The contractor shall have to give site clean of all rubbish during the work and at the time of
completion of work and hand over the site with final finishing of the work as directed. All the
rejected materials shall be removed from site within 24 hours by contractor at this risk and cost.
Debris shall have to cart daily from site.
For mixing mortar either for masonry or for plaster or for any other purpose contractor shall have to
prepare through of bigger size and mix the mortar in the required proportion. In on case he shall be
allowed to mix the mortar either on floor or any finished surfaces. The contractor shall have to make
his own arrangement for water required for the work.
If any extra item crops up during the progress of work the same shall be carried out by the contractor
and he shall be paid at the rate fixed by Add.C.E. as per the rate analysis based on latest SOR or if
item is not available in SOR than based on current market rates. In case of extra item decision of
Add. City Engg. shall remain final regarding rate.
If in the interest of the Corporation it is necessary to change either any site or the design of the
propose work the contractor shall carry out the same at his quoted rates without charges any extra
and the contractor will have to carry out the works and he will be paid at the rate quoted by him. No
claim for extra rate for subsequent changes in site and design is entertained.
The cubical contents of the cement bag shall be taken as 1-20 cft. Per bag and the contractors shall
have to prepare the measures boxes according to this measure.
Octroi exemption passes shall not be given for any materials required for the work. Contractor will
be fully responsible for compliance of the various provisions under contract Act. 1970 and the Rules
framed the to under.
The tender for the work shall remain open for a period (120) days from the date of opening of the
tenders for this work and that the tenderer shall not be allowed to withdraw on modify the offer on
his own during the period. If any tenderer withdraw or makes any modifications or addition in the
terms and conditions of his tender not acceptable to the Municipal Corporation the Municipal
Corporation shall without prejudice to any right or remedy be at liberty to forfeit in full the said
earnest money and black list the contractor.
If the work is not carried out within the specified time limit. from the date of order to start the work
the penalty of Rs.- (As per Form - B1) per day of delay shall be recovered from the immediate bills
payable to the contractor. Contractor has to make his own arrangement for procurement of steel and
Contractors should note the following conditions carefully:-
1. Conditional tender shall not be accepted.
2. All tenders are to be submitted in duplicate without which the tenders are liable to be
3. In case of tender downloaded from website, tender fee & EMD should be submitted in form
of demand draft or in cash.
4. Condition of Form - B1 Standard Specification of material & code of practice will be
applicable. Form B1 can be is available in website. Specification shall be as per ' R& B Dept.
- Govt. of Gujarat booklets of Building Works & and Road Works Specifications published
by Gujarat Book Depot, Sector-21. Gandhinagar. CONTRACTOR'S SIGNATURE
ADDL.CITY ENGINEER & STAMP (North West Zone) Mobile No.:-
CONTRACTOR'S SIGNATURE ADDL.CITY ENGINEER
& STAMP (West Zone)
AHMEDABAD MUNICLPAL CORPORATION
MAHANAGAR SEVA SADAN
Clause : 1 Contractor shall not employ any child having age 5 to 15 years as it is prohibited by Child
Labour Prohibition and Regulation Act 1986. Hon'ble Supreme Court has given certain guide
lines and as per the guide lines. If child labour is employed on the site work, the contractor
shall have to deposit Rs. 20,000.00 (Rupees Tw enty thousand only) in the child labour
welfare fund. If the employer refuses to deposit then action will be taken for contempt of
Supreme Court Judgement and also will be prosecuted by concerned authority. Because of
the breach of any provision of child labour prohibition and regulation Act 1986 by the
Contractor & Municipal Corporation becomes liable to pay any amount then the Municipal
Corporation shall recover the said amount from the contractor.
Clause : 2 The Standing Committee has decided to deduct 1/2% amount from each running bill as
per its Reso. No. 1783 Date 06--02-97, but the Municipal Corporation Board has recently
decided that the actual testing charge is taken and the remaining amount is refundable at the
time of final bill (As per Muni. Board Reso. No. 123 dated 25-02-97)
Clause : 3 Contractor has to follow prevailing Labour act and has to maintain labour register
acordingly,and has to follow other govt.rules.
Clause : 4 Quantity taken in tender are tentative and may differ as per execution of work. No claim
shall be entertain regarding QUANTITIES.
* MODIFICATION OF DOCUMENTS
Modification of specifications and correction/corrigendum in respect of the work if required will be
made by A.M.C. The same shall be placed on A.M.C website which may be downloaded by the
tendrers enclosed along with the tender duly signed. These shall form a part of tender. The tenderer
shall not add or amend the text of any of the documents except in so far as may be necessary to
comply with any addendum.
* ADDENDAUM / CORRIGENDUM .
Addendum or corrigendum conveying any change or correction in respect of the work shall form the
part of the contract documents. The full consideration shall be given to such addendum or
corrigendum or correction before submission tender duly filled in by the contractor. Therefore, the
contractor shall have to watch such addendum or corrigendum or correction published by A.M.C
through its website www.egovamc.com. Tenderes shall verify the number of addendum issued and
enclose the same with the tender documents,failing which the tender shall be liable for rejection and
no any complaint in respect to this shall be entertained under any circumstances.
CONTRACTOR'S SIGNATURE ADDL.CITY ENGINEER
& STAMP (West Zone)
AHMEDABAD MUNI CIPAL CORPO RATI ON ENGI NEER DEP ARTMENT
TECHNICAL SPECIFICATION
Name of Work ;- Making New RCC roads In Motera And Sabarmati Area Of
Sabarmati Ward, West Zone
Following technical specifications shall be applicable to the relevant items of BOQ
Item No. 1 :: Box cutting the road surface to proper slope and camber for making a base
for road work including removing the excavated stuff and depositing on the
road side slope as directed upto 200 Mt.lead
Road way excavation shall consists of excavation in all sorts of soil incl. removal and satisfactory disposal of all
excavated materials and necessary for the construction of roadway, side ditches and water ways, in accordance with the
requirements of those specifications and in the lines, and cross sections shown on the drawings of indicated by the
Engineer. This work shall include the hauling and stacking of or hauling to sites of also the disposal of unsuitable cut
materials in specified manner the training and finishing of the road way.
Construction operations :
After the site has been cleared, the limits of excavation shall be set out true to lines, curves slopes grades and sections as
shown on the drawings or as directed by the Engineer. The contractor shall provide all labour survey instruments and
materials, such as strings, pegs, nails, bamboos, stones, lime mortar, concrete etc. required in connection with the setting
out of works and establishment of bench marks. The contractor shall be responsible for the maintenance of bench marks
and other marks and stacks as long as they required for the work in the opinion of the Engineer.
Excavation – General :
All excavation shall be carried out in conformity with the directions laid here in under and in a manner approved by the
available from excavation are satisfactorily utilized as decided upon before hand.
The earthen shoulders of the road shall be excavated to match the profile or the chamber of the asphalt road.
The excavation shall conform to the lines, grades side sloes and levels shown on the drawings or as directed by the
Engineer. The contractor shall not excavate outside the slopes or below the established grades or loosen material outside
the limits of excavation. Subject to the permitted tollerance any excess depth excavated below the specified levels on the
roadway shall be made good at the cost of the contractor with suitable material of similar characteristics to that removed
and compacted to the requirements.
All debris and loose material on the slopes of cuttings shall be removed. No back filling shall be allowed to obtain
required slopes excepting that when boulders or as directed by the Engineer. While doing so, care shall be taken to see
the no portion of the existing payment, pavement designated to the retained, is loosened or dis-loosened or disturbed.
Dispose of Excavated Material :-
If there be any stone in the excavated materials, suitable for rubble packing, road metal or for building or any other
Municipal purposes, it shall be separated and stated above, and without extra charges.
Preservation of Property :
The contractor shall take all reasonable precautions for the protection and preservations of any or all existing road side
trees, drains, sewers or other subsurface drains, pipes, conduits and any other structure under or above ground. the
excavation for the road work will be paid on the basis of sectional measurements irrespective of the work.
Measurement shall be paid by Cmt basis.
Item No: 2 Conveyance charge of earth, lime, murrum, building rubbish, manure, garbage,
sludge, excavated rock, fly ash, aggregates of any kind executed outside the road
site. Rate also includes spreading & levelling etc complete. Internal conveyance
above 50 mt done within the work site is not payable.
f) Lead From 5 Km to 10 Km.
g) Lead From 10 Km to 15 Km.
All the surplus earth etc. shall be carried away immediately from the site of work to a place within 5km. distance or as
directed and ordered by the Engineer, so as not to cause any inconvenience to the public traffic finding which in view of
public safety and traffic convenience. The corporation shall carry out the work by any other agency at the contractor’s
risk and cost. If the instructions are not completed within 7 days from the date of order to cart the surplus materials and
clear the site, the said work shall be carried out by the Municipal Corporation at the risk and cost of the contractor and no
claim or dispute shall be entertained in this respect.
If the filling in trenches after settlement of the earth filling in trenches is to be done and the same shall be carried out by
the contractor without asking any extra rate. The contractor shall have to cart the surplus earth after the trenches we will
watered and refilled with the sand. The rate of carting including carting of brickbats, metal, rubble vegetable and
garbage, if necessary to clear the road surface.
The rate shall be for a unit of one cubic meter.
Item No.3 : Dismantling the following including loading, unloading and disposal of
unserviceable material for all lead or as directed by Engineer-In-Charge and stacking
the serviceable material and backfilling the resulting trenches and pits complete.
Mode of measurement.
(A) central verge -kerb stone
Mode of measurement
Measurement shall be paid by Rmt. basis
(B) Dismantling tiled or stone floors laid in mortar including stacking of
serviceable material and disposal of uservicalble material with all lead and
Mode of measurement
Measurement shall be paid by Smt. basis
(C) Demolition & disposal of unservisable material with all lead and lift for
unreinforeced concrete. (AMC sor)
Mode of measurement
Measurement shall be paid by Cmt. basis
(D) Demolition of brick work & stone masonry including stacking of serviceable
materials and disposal of unserviceable materials with all lead and lift (1) In
Mode of measurement
Measurement shall be paid by Cmt. basis.
Item No.4 Providing and laying in position Ready Mixed M-250 grade concrete for
reinforced cement conctere work, using cement content as per
approved Design Mix manufactured in fully automatic batching plant
and transported to site of work intransit mixer for a lead up to 10 kms
having continuous agitated mixer, manufactured as per mix design of
specified grade for reinforced cement concrete work including pumping
of R.M.C. from transit mixer to site of laying, excluding the cost of
centering shuttering finishing and reinforcement including cost of
admixtures in recommended proportions as per IS:9103 to accelerate/
retard setting of concrete, improve work ability without impairing
strength and durability as per direction of theEngineer-in-charge.
Without Fly Ash (Min cement level as per latest IS456 shall be
maintained) (Cement level 450 kg )
Providing and laying in position Ready Mixed M-250 grade concrete for reinforced
cement conctere work, using cement content as per approved Design Mix manufactured in
fully automatic batching plant and transported to site of work in transit mixer for a lead up to
10 kms having continuous agitated mixer, manufactured as per mix design of specified grade
for reinforced cement concrete work including pumping of R.M.C. from transit mixer to site
of laying, excluding the cost of centering shuttering finishing and reinforcement including
cost of admixtures in recommended proportions as per IS: 9103 to accelerate/retard setting of
concrete, improve workability without impairing strength and durability as per direction of
the Engineer - in - charge. Without Fly Ash (Min cement level as per latest IS 456 shall be
Mode of measurement shall be in Cmt.
Item No:5 Providing formwork of ordinary timber planking so as to give a rough finish including
centering, shuttering and propping etc. height of propping and centering below supporting
floor to ceiling not exceeding 4.00mt and removal of the same for insitu reinforced concrete
and plain concrete work in (A) Foundations, footings, bases of columns etc. and mass concrete.
Providing Formwork of ordinary timber planking so as to give a rough finish including
centering shuttering strutting and propping etc. Height of propping and centering below supporting
floor to ceiling not exceeding 4 M. and removal of the same for in situ reinforced concrete and plain
concrete work in. (A)Foundations Footings Bases of Columns etc. and Mass concrete.
Mode of measurement shall be in Smt.
Item No: 6 Providing TMT Bar FE500D reinforcement for R.C.C. Work including bending,binding and
placing in position complete upto floor two level. (As Per Road Tender)
TMT bars shall conform to M-18. Mild steel binding wires shall conform to M-21
The work shall consist of furnishing and placing reinforcement to the shape and dimensions
shows as on the drawings or as directed.
Steel shall be clean and free from rust and loose mill scale at the time of fixing in
position and subsequent concreting.
Reinforcing steel shall conform accurately to the dimensions given in the bar bending
schedules shown on relevant drawings. Bars shall be bent cold to specified shape and
dimensions or as directed using a proper bar bender, operated by hand or power to attain
proper radius of bends. Bars shall not be bent or straightened in a manner that will injure the
material. Bars bent during transport or handling shall be straightened before being used on
the work. They shall not be heated to facilitate bending. Unless otherwise specified, a ‘U’
type hook at the end of each bar shall invariably be provided to main reinforcement. The
radius of the bend shall not be less than twice the diameter of the round bar and the length
of straight part of the bar beyond the end of the curve shall be at least four times the
diameter of the round bar. In case of bars which are not round and in case of deformed bars,
the diameter shall be taken as the diameter of circle having an equivalent effective area. The
hooks shall be suitably encased to prevent any
splitting of the concrete.
All the reinforcement bars shall be accurately placed in exact position shown on the
drawing and shall be securely held in position during, metal hangers, supporting wires or
other approved devices at sufficiently close intervals,. Bars shall not be allowed to sag
between supports nor displaced during concreting or any other operations of the work. All
devices used for positioning shall be of noncorrodible material. Wooden and metal supports
shall no extend to the surface of concrete, except where shown on drawings. Placing of
broken stone or brick and wooden blocks shall not be allowed. Pieces of broken stone or
brick and wooden blocks shall not be used. Layers of bars shall be separated by spacer
bars, precast mortar blocks or other approved devices. reinforcement after being placed in
position shall be maintained in a clean condition until completely embedded in concrete.
Special care shall be exercised to prevent any displacement of reinforcement in concrete
already placed. To prevent reinforcement from corrosion, concrete cover shall be provided
as indicated on drawings. All the bars producing from concrete and to which other bars are
to be spliced and which are likely to be exposed for a period exceeding 10 days shall be
protected by a thick coast of neat cement grout.
Bars crossing each other where required shall be secured by binding wires
(annealed) of size not less than 1 mm in such manner that they do not slip over each other at
the time of fixing and concreting.
As far as possible, bars of full length shall be used. In case this is not possible,
overlapping of bars shall be done directed. When practicable, overlapping bars shall not
touch each other, but be kept apart by 25 mm or 1.25 mm times the maximum size of the
coarse aggregate whichever is greater by concrete between them. Where not feasible,
overlapping bars shall be bound with annealed wires not less than 1 mm thick twisted tight.
The overlaps shall be staggered for different bears and located at points along the span
where neither shear nor bending movement is maximum.
Whenever indicated on the drawings or desired by the Engineer- in-charge, bars shall
be joined by coup lings which shall have a cross-section sufficient to transpit the full stresses
of bars. The ends of the bars that are joined by coupling shall be upset for sufficient length
so that the effective cross section at the base of threads is not less than norma l cross-
section of the bar. Threads shall be standard threads. Steel for coupling shall conform to I.S.
When permitted or specified on the drawings, joints of reinforcement bars shall be
butt-welded so as to transmit their full stresses. Welded joints shall preferably be located at
points when steel will not be subject to more than 75 percent of the maximum permissible
stresses and welds so staggered that at any one section not more than 20 percent of the
rods are welded. Only electric are welding using a process which excludes air from the
molten metal and conforms to any or all other special provisions for the work shall be
accepted. Suitable means shall be provided for holding bars securely in position during
welding. It shall be ensured that no voids are left in welding and when welding is done in two
or three stages, previous surface shall be cleaned properly. Ends of the bars shall be
cleaned of all loose scale, rust, grease, paint and other foreign matter before welding. Only
competent welders shall be employed on the work. the M.S. electrodes used for welding
shall conform to I.S. 814. Welded pieces of reinforcement shall be tested. Specimen shall be
taken from the actual site and their number and frequency of test shall be as directed.
For the purpose of payment, the bar shall be measured correct upto 100 mm. length
and weight payable worked out at the rate specified below :
1. 6mm. x 0.22 Kg./Rmt 8. 20mm. 2.47 Kg./Rmt
2. 8mm. x 0.39 Kg./Rmt. 9. 22mm. 2.98 Kg./Rmt
3. 10mm x 0.62 Kg./Rmt 10. 25mm. 3.85 Kg./Rmt
4. 12mm x 0.89 Kg./Rmt 11. 28mm. 4.83 Kg./Rmt
5. 14mm x 1.21 Kg./Rmt 12. 32mm. 6.31 Kg./Rmt
6. 16mm x 1.58 Kg./Rmt 13. 36mm. 7.99 Kg./Rmt
7. 18mm x 3.00 Kg./Rmt 14. 40mm 9.86 Kg./Rmt.
M/s. shall be on kg. basis.
Item No: 7 P/A Trimix with dewatering machine and floater machine on constructed RCC work incl.cost of
machine and labour etc comp as directed.
Mode of Measurement shall be on Smt. Basic.
Item No:8 Making 15 mm groove in RCC work on road and filling it with polysulfied selant and finished it
good incl. all labour charges etc comp as directed.
Mode of Measurement shall be on RMT basis
Item No: 9 Raising of Exisiting manhole. Item includes, cutting of existing road surround by manhole by
dimond cutter machine,dismantling of road in confined area by breakermachine and Carting of
dismantled material. Item also includes nessary brick work toraise the manhole at road level in
CM 1:3.Item also included fixing of manhole fram at exact road level by using master emaco S
488 trowelable fiber rein forced thixotropic repair mortar material, laying of concreret made
from master emaco S 346 Flowable Micro concrete material in desired thickness and plate
compactor machine rate also included necessary plaster at inside of manhole in CM 1:3 in
mm thickness on raised brickwork.
Mode of Measurement shall be on No. Basis.
Item No: 10 RCC Precast M.H.Frame & Cover Manufacture , supply & Delivery at store or at side of work
Precast RCC M200 Frame & Cover Suitable to drainage M.H. and as per type design &
Drawing including cost of reinforcement M.S. Angles or Flat , cutting mold work etc. Frame
Suitable for 50 Cm opening of MH
The rate includes fixing the M.11 seat cover supplied by contractor incl. carting to the work side &
fixing in C.C. 1:2:4 finishing etc. complete as directed by Engineer in charge.
The rate shall be on No.. basis.
Item No : 11 Providing and laying Cement Concrete 1:3:6 (1- Cement : 3- Coarse sand : 6- Hand broken stone
aggregates 40mm nominal size) and curing complete
Before starting the concrete the bed of the foundations trenches shall be cleared of all loose
materials and watered and rammed as directed. The proportion of cement, sand and hand broken
stone aggregates shall be one part of cement, 3 parts of coarse sand, 6 parts of hand broken stone
aggregates and shall so measured by volume. The concrete shall be mixed in a mechanical mixer at
the site of work. Hand mixing may however be allowed for smaller quantity of work if approved by
the Engineer-incharge. When hand mixing is permitted by the Engineer-in charge in case of
breakdown of machinery’s and in the interest of the work. it shall be carried out on a water tight
platform and care shall be taken to ensure that mixing is continued until the mass is uniform in
colour and consistency. The quantity of water shall be sufficient to produce a dense concrete of
required workability for the purpose. The concrete shall be handled from the place of mixing to the
final position in not more than 15 minutes by the method as directed and shall be placed into its final
position, compacted and finished within 30 minutes of mixing with water i.e. before the setting
commences. The concrete shall be laid in layers of 15 cms. to 20 cms. The concrete shall be rammed
with heavy iron rammers and rapidly to get the required compaction and to allow all the gaps to be
filled with mortar. After the final set, the concrete shall be kept continuously wet, if required by
pounding for a period of not less than 7 days from the date of placement The concrete shall be
measured for its length breadth and depth, limiting dimensions to those specified on plan or as
directed. Mode of measurements shall be on CMT basis
Item No.12 Providing and laying cement concrete 1:5:10 (1- Cement : 5- fine sand : 10-
graded brick bat aggregates 40mm nominal size) and curing complete.
Before starting the concrete the bed of the foundations trenches shall be cleared of all
loose materials and watered and rammed as directed. The proportion of cement, sand
and hand broken stone aggregates shall be one part of cement, 5 parts of coarse sand,
10 parts of hand broken stone aggregates and shall so measured by volume. The
concrete shall be mixed in a mechanical mixer at the site of work. Hand mixing may
however be allowed for smaller quantity of work if approved by the Engineer-
incharge. When hand mixing is permitted by the Engineer-in charge in case of
breakdown of machinery’s and in the interest of the work. it shall be carried out on a
water tight platform and care shall be taken to ensure that mixing is continued until
the mass is uniform in colour and consistency. The quantity of water shall be
sufficient to produce a dense concrete of required workability for the purpose. The
concrete shall be handled from the place of mixing to the final position in not more
than 15 minutes by the method as directed and shall be placed into its final position,
compacted and finished within 30 minutes of mixing with water i.e. before the setting
commences. The concrete shall be laid in layers of 15 cms. to 20 cms. The concrete
shall be rammed with heavy iron rammers and rapidly to get the required compaction
and to allow all the gaps to be filled with mortar. After the final set, the concrete shall
be kept continuously wet, if required by pounding for a period of not less than 7 days
from the date of placement The concrete shall be measured for its length breadth and
depth, limiting dimensions to those specified on plan or as directed. Mode of
measurements shall be on CMT basis.
Item No.13 :- Providing and Laying of Rubber Moulded Paver Block Grey/Coloured 60 mm
thick, M-35 Grade of any size ; shape (Usually Uni-Paver Blocks) using black trap
good quality aggragate of 20 mm nominal size for footpath, parking areas, service
lanes and other areas as mentioned in the drawing / instruction of
engineer in charge. Cost includes formworks using rubber mould, Rate
providing and laying paver blocks as per required grading and specification.
The paver block shall be mechanically compacted. The work of paving blocks
shall be executed in line and level by skill mason of flooring work only. It
should be laid in such a way that the no cutting of the paver block to be
necessary. if cutting of paver block necessary then it should be cut by
machine only and carting. The finished surface of the paver block shall have
resonably good, plain finished. Paver blocks shall be compacted and shall be relaid
if necessary. Gravel or such type of materials shall not be allowed for production.
Laying on 5cms thick sand beddding.
Mode of measurement
Measurement shall be paid by Smt. basis.
Item No: 14 Paver Block Providing and laying shot blasted Non - interlocking, Paver blocks of
specified thickness, size, grade of concrete and colour machine made and blasting by
automatic shot blasting machine and high density of as per approved sample of approved
make for footpath, parking areas, service lanes,cross over and other areas as mentioned in the
drawing. Including providing and laying 50 mm thick averave bedding layer of coarse sand
below paver block as per required grading and specification. Laid paver block shall be
mechanically compacted. The work of the paving blocks shall be executed in line and level by
skilled mason of flooring work only. Small size of paver block with same specification shall be
used at residue or at end. It should be laid in such a way that the no cutting of the paver block to
be necessary. If cutting of paver block shall be required , than cut by machine only and laying
to be done by skilled flooring mason. The finished surface of the paver block shall have
coarse sand Texture Finish. Pave blocks shall be compacted and shall be re-laid if necessary.
Actual laid area shall be measured and paid without any wastage. (A) 60 mm thick M-35
SAMPLING AND TESTING PROCEDURES FOR PAVER BLOCKS.
INTERNAL – Average of minimum 3 samples per 5000 Blocks.
Essential – Minimum 2 Blocks per 10000 bocks. Average of minimum 8 blocks per site.
1. Sampling For Testing
Sampling for testing of paver blocks shall be done in accordance with Appendix-A.
Compressive Strength
Testing for compressive strength shall be undertaken in accordance with Appendix-B.
The average compressive strength of the bocks tested shall be 40 N/Sqmm.
Abrasion Resistance
Testing for abrasion shall be in accordance with IS 1237 (Specifications for Cement Concrete Floor
Tiles) – Appendix C.
Flexural Strength
Testing for flexural shall be n accordance with IS 1237 (Specifications for Cement Concrete Floor
Tiles) – Appendix D.
Water Absorption
Testing for water absorption shall be in accordance with IS 2185:1979 : Part I (Specifications for
Concrete Masonry Units) – Appendix E.
Sampling of Paver blocks.
1. Method of sampling :
Before laying paver blocks, each designated section comprising not more than 50000 blocks, shall be
divided into ten approximately equal groups. Three blocks shall be drawn from each group.
Marking and identification :
All samples shall be clearly marked at the time of sampling in such a way that the designated section
of part thereof, and the consignment represented by the sample, are clearly defined.
The sample shall be dispatched to the approved test laboratory taking precaution to avoid
damage to the paving in transit. Protect the paving from damage and contamination until they have
been tested. The testing shall be carried as soon as possible, after the sample has been taken. As soon
as practicable after sampling. The samples shall be stored in water at 20 degree C 5 degree C for
24 hours prior to testing.
The rate shall be for a unit of one Square meter.
Mode of Measurement shall be on SMT basis.
Item No: 15 Providing & Supplying ISI Standard RCC pipes (of sulphate resisting cement) in a
standardlengths of following class & dia meter suitable for socket-spigot type including all
taxes ,insurance, transporation, freight charges, octroi, inspection charges, loading,
unloading,conveyance to departmental stores, staking etc complete (IS 458:1989) Class NP-3,
test pressure0.7/kg/sqcm. Rate also includes supplying RCC collar for RCC pipes including
taxes, carting,loading, unloading, etc complete. Including labour work for lowering, laying,
jointing, RCC pipesin CM 1:1 1/2 of following diameters in proper position, grade and
alignent at all as directed by engineer in charge. inlcuding conveyance from store to site of
work labour giving hydraulic testing and all necessary testing as per IS code (RCC pipe
Horizontal cast)
The RCC pipes shall be procured as per ISS for B Class type specifications using best materials,
first class workmanship as per IS 458/1971.
The proportion of concrete shall be one part of cement to 2 parts sand and 4 parts of black trap agg.
mix. of suitable size to as to produce uniform concrete through out thickness of the pipes.
Reinforcement in from of bars straight and class wise shall be provided as perIS458 calcifications.
RCC spunpipe collars for the pipes shall be made in the same manner. The internal dia meter of the
collar shall be sufficiently large to allow a perfect joint around the outside of the pipes with cement
mortar and other plastic materials.
Pipes shall be laid are fully into trenches and shall be made to rest evenly on specially prepared
formation or on concrete bed and for the purpose to extra rate shall be given making extra
excavation for bed and in the sides of the trenches.
All joints shall be thoroughly fitted using spun yarn of approved quality for the groove in the length.
For each joint yarn shall be dipped in hot asphalt. The joint shall be properly cleaned and moistered
and the collar shall be kept in position by means of wedges. Semidry cement mortar of prop. 1:1
shall be forced into joints and chucked completely by means of special cutting tools until the whole
space is full. The mortar shall be sprayed around the collar joints so as to completely encase the
After the joints have thoroughly set, the Engineer or his Assistant may inspect the joints, and if he
has any doubt as to their soundness be may required the contractors to cut open and clear away the
cement of any joint that he may select and to make good the same at their expenses provided that,
unless some defect be found, they shall be required to open more than one joints in 18mt(60') of
pipe, though if defect be found the Engineer direct them to open as many joints as he may deem
necessary, the joints made one day will not as a rule, be inspected until the following day and the
cement may has sufficient time to set well before being covered up.
Trenches shall not be filled until alignment and levels are examined by the Engineer or his
subordinates and the permission for refilling is granted.
The M/s shall be on Rmt. Basis.
Item No.16 Constructing Bombay Pattern type Catchpit of size 0.60 x 0.60 depth up to 0.75 mt
including excavation, B.B.C.C. (1:5:10), 23 cms thick brick maso. wall in the prop. of
CM (1:6) with 40 mm thick IPS flooring in the prop M15 at bottom and 15 mm thick
cement plaster inside the catchpit in the proportion of CM (1:3) with out jali etc. comp.
Constructing Bombay Pattern type Catchpit of size 0.60 x 0.60 depth up to 0.75 mt including
excavation, B.B.C.C. (1:5:10), 23 cms thick brick maso. wall in the prop. of CM (1:6) with 40 mm
thick IPS flooring in the prop M15 at bottom and 15 mm thick cement plaster inside the catchpit in
the proportion of CM (1:3) with out jali etc. comp. as directed The M/s shall be on NO basis.
Item No.17 CatchPit Jali Fixing P/F FRC catchpit jali with frame 600mm x 600mm clear opening etc.
comp.. As directed by engineer in charge...
Carting and Fixing M.H., Chamber or Catchpite Seat and Cover in line and level to match exisisting
road level in C.C. 1:2:4 and finishing smooth, watering and protecting for 7 days etc. complete as
directed. M.H. seat cover will be supplied by Contractor.
Item No: 18 Extra rate over item of excavation of earth for excavation of asphalt pavement / RCC
of thickness up to 0.20 meter including demolishing the asphalt carpet, metal,s
oiling/cutting Reinforcement etc.comp. with stacking the material as directed.
up to 0.20 meter thickness (By Manual)
Up to 0.30 meter (By any type of Breaker Machine or R.C.C.Cutter machine including cost of operator, fuel, &
transportation etc complete.
0.30 meter & above (By any type of Breaker Machine or R.C.C.Cutter machine including cost of operator, fuel, &
transportation etc complete.
Extra rate for excavation of asphalt payment of any thickness including demolishing the asphalt carpet,
metal, soiling etc. complete with stacking the materials as directed. The road surface of asphalt shall
carefully be opened to full width as directed by the Engineer in charge so as to remove all cracks or other
damaged portions of road either manually or with the soiling shall be first be stripped off for the whole
width of trenches. All the materials shall be separately deposited in such places as may be determined by
the Engineer-in-charge. In case rubble not being so deposited or being mixed up with the excavated
materials will not be allowed for refilling. The cost of materials shall be charged from the contractor. The
decision of the C.E. shall be final and binding to the contractor.
Mode of measurement
Measurement shall be paid by Smt basis.
Seal and Signature of the Bidder Add.CityEngineer(West Zone)
Amdavad Municipal Corporation
ybœtJtœ BGþrlrmvj ftuvotuhuNl
vr©b Ítul - Esluh Ftðþ
1. Ft<t îtht «t&b LOI (juxh ytuV RLxebuNl) RMgw fhJtbtk ytJNu. LOI (juxh ytuV RLxebuNl)
bégt ctœ rœl-10 btk 5 % (vtka xft) juFu auf&e / rzbtLz z[tVTx / vu ytuzoh / luNljtEÍz cukf
duhkxe&e zevtuÍex Che fhthvºt fhJtltu hnuNu. <u ctœ Jfo ytuzoh RMgw fhJtbtkk ytJNu ylu
Jfoytuzohle <theF&e mbg bgtoœt NÁ &guj dKJtbt ytJNu <ub A<tk vK ftb NY fhJtbtk lrn
ytJu <tu rlgbtlwmth ftgoJtne fhJtbt ytJNu.
2. Nh<e xuLzh MJefthJtbtk ytJNu lrn.
3. xuLzh Jujezexe 120 r>Jm hnuNu.
4. xuLzh MJefthÔþk, h> fhÔþk, ftulu ytvÔþk ylu fgt CtJ&e ytvÔþk, <u ykdu zu. BGþrl. frb.©e ltu rlKog
5. xuLzh Chuj ftuLx[t¾xh vife ftuEvK ftuLx[t¾xhlu vK yt CtJu ftb ytvJtbtk ytJu <tu ceò btLg
ftuLx[t¾xh Jtk^tu jE NfNu lrn.
6. yufe JF<u yuf fh<tk Jæþ søgtytuyu ftb NY fhJtltu Jfoytuzoh b¤u <tu ftb yuf mt&u s c^u NY
fhÔþk vzNu. yuf ftb ÃþÁ &tg vAe cesw ftb NY fheyu yuÔþk atjNu lrn.
7. atÕþ ftbu ftuE vK mrJom jtEllu LþfNtl l &tg <u he<u ftb fhÔþk vzNu, òu ftuE mrJom jtEllu
LþfNtl &Nu <tu <ule mkÃËKo sJtc>the (òlbtjle) ftuLx[t¾xhle vtu<tle hnuNu. mtEx vh ftb
>hBgtl bswh fu sl<tlt ftuE btKmlt òl btj fu LþfNtl &tg <ule sJtc>the ftuLx[t¾xhle
hnuNu. vtujem Vhegt> &tg <tu <ule sJtc>the vK ftuLx[t¾xhle hnuNu. CuFz ^me l vzu <ule
sJtc>the vK vtujem Vhegt>btk ftuLx[t¾xhle hnuNu. CuFz ^me l vzu <u btxu mjtb<elt vdjtk
(suJt fu >tuhzwk ctk^e bsqh Ftztbtk W<thJt, mtuh´d ylu Mx[x´d fhJt rJduhu) je^t Jdh bsqhlu
Ftztbtk W<thNu <tu ftuLx[t¾xh s vtujem Vhegt>btk sJtc>th hnuNu ylu BGþrl. ftuvtuohuNlltu ftuEvK
MxtV ytlt btxu sJtc>th hnuNu lrn.ytxÕþk mbSlu s xuLzh ChÔþk.
8. yt xuLzh su <u Jdolt btLg gt>elt ftuLx[t¾xhtu Che NfNu. dJbuoLxlt btLg ftuLx[t¾xhu y.BGþ.ftuvtuo.
btk btLg ftuLx[t¾xhle gt>ebtk hSMx[uNl ðþhk< fhtJÔþk vzNu.
9. yt Wvhtk< y.BGþ.ftuvtuo.lt slhj ftuLx[t¾x fLzeNl vK btLg htFJtle hnuNu. Vtubo ce-1le Nh<tu
ck^lf<to hnuNu. ftb htuz ylu rcÕz´d Ftðþk - øþsht< htßglt MvuNeVefuNl «btKu fhJtLþk hnuNu
<&t MxtVle Mþalt vK mtEx Wvh atÕþ ftbu ægtlbtk juJtle hnuNu. ce-1 Vtubo <&t MvuNeVefuNl
øþsht< çþf Mxtuh, mu¾xh-21, dtk^eldh Ft<u&e ftuLx[t¾xhu ò<u bu¤Je juJtltu hnuNu. <u Jtkaelu vAe
10. ftuLx[t¾xhlu vubuLx BGþrl. ftuvtuo. Ltt rl<erlgb Bþsc fhJtbtk ytJNu.
11. ftuEvK ftg>tfeg jexeduNl yb>tJt> Nnuhle ftuxobtk hnuNu.
12. bxehegj fu ceò xuMx´d hevtuxo ftuLx[t¾xhu vtu<tlt Fauo ftuvtuohuNl sKtJu <u søgtyu fhtJJtlt hnuNu.
yt ykdultu mkÃËKo Fao <&t BGþrl. MxtVlu juctuhuxhe Mþ^e <&t buLGþVu¾ah´d søgt Mþ^e jtJJt jE
sJtltu Fao vK ftuLx[tfhu CtudJJtltu hnuNu.
13. juch yu¾x «btKu hSMx[uNl ykdu ybj fhJtltu hnuNu <&t fuxjt juch jtJNtu <u vK sKtJJtLþk
hnuNu. juch yu¾x «btKu ftgoJtne lrn &E ntug <tu <u btxu ftuLx[t¾xh mkÃËKovKu sJtc>th hnuNu.
14. btj su <u Mxtumo Wvh y&Jt mtEx Wvh Mþalt Bþsc W<thJtltu <ubs dtuXJJtltu hnuNu.
15. muÕm xuût, ytu¾x[tug, mhatso, yLg xuût fu yLg ftuEvK fhJuht ChJtle sJtc>the ftuLx[t¾xhle
16. atEÕz juch yuBvjtug fhe NftNu lrn.
17. ftuLx[t¾xh îtht yuze.mexe.Rsluh©e / zu. mexe. Rsluh©ele mwalt bwsclt bxehegjltk muBvj hsw
18. ftuLx[t¾xhu atÕþ ftbu mtEx Wvh zeSxj fubuht&e ftb atÕþ > vnujtk, åttÕþ ftbu <&t ftb ÃËKo
>lt Vtuxtud{tV BGþrl. yturVmbtk ytvJtlt hnuNu.
19. ftuEvK fthKmh xuLzh h> fhJtbtk ytJu <tu ftuLx[t¾xh <u ykdu ftuEvK «fthltu n¬ >tJtu fu J¤<hle
btkdKe fhe NfNu lrn. yt Nh< MJeftgo ntug <ubKu s xuLzh ChÔþk.
20. bxehegÕm suJt fu hu<e, #xtu, mebuLx, vtEv, rJduhu MxtLzzo bxehegÕm MvuNeVefuNl «btKult
jtJJtlt hnuNu. ßgtk ftuE atuFJx l &E ntug ðgtk ytE.yum. ftuz «btKu bxehegÕm jtJJtLþk <&t
xuMx´d fhtJJtLþk hnuNu.
21. htßg / fuL÷ mhfth©elt JF<tu JF<lt ftg>t Bþsc su ftuE hfble fvt< fhJtlt nwfb
mhfth©eyu fhuj ntuE <u Bþsc ftuLx[tfxlt cejbtk&e fvt< fhJtbtk ytJNu.
22. juch JuÕVuh Vkz btxu ntjbtk htßg mhfth©eyu fhujt nwfb Bþscle hfb cejbtk&e ftve juJtbtk
Wvhtu¾< Nh<tu <&t rlgbtu buk ft¤SÃËJof Jtkae Au ylu blu fçËj bksqh Au.
ftuLx[tfxhle mrn <&t me¬tu yuze.mexe Rsluh (v.Ítul)
yu.yth.me. xuLzh- Nh<tu
1. yu.yth.me. xuLzhbtk Jfoytuzh ytÃgt ctœ ftb NY fhJtle mbgbgtoœtbtk ftuLx[tfxh îtht ftb NY fhJtle
òK fgto ctœ 24 fjtflt ftb NY lrn fhJtbtk ytJu <tu yLg ftuLx[tfxh vtmu btfuox hux&e ftuLx[tfxhlt Faou
ylu stuFbu ftbdehe fhtJJtbtk ytJNu.
2. ftuLx[tfxhlu Jfoytuzoh ytÃgt ctœ yu.yth.me. «fthlkw xuLzh ntuR ftble sYhegt< bwsc xujeVtulef òK fhe
su <u ftb NY fhJt fnuJtbtk ytJNu ylu su ftble òK fgtolt 24 fjtfbtk NY fhJtbtk lrn ytJu ylu rlg<
mbgbgtoœtbtk vwKo fhJtbtk lrn ytJu <tu su <u ytRxblt SOR CtJ&e 1.5 dKe vulÕxe Jmwj juJtbtk
3. ºtK fu J^w Jth Wvh bwscle yLg ftuLx[tfxh vtmu&e ftbdehe fhtJJtle Vhs vzNu ylu/y&Jt ºtK fu J^w
Jth vulÕxe fhJtle Vhs vzNu <tu <u mkstudtubtk ftuLx[tfxhlu çjufjeMx fhJtbtk ytJNu sule ykr<b m•tt
Bgw.frb¹lh©elu hnuNu.
AHMEDABAD MUNICLPAL CORPORATION
MAHANAGAR SEVA SADAN
Clause : 1 Contractor shall not employ any child having age 5 to 15 years as it is prohibited by Child Labour Prohibition
and Regulation Act 1986. Hon'ble Supreme Court has given certain guide lines and as per the guide lines. If child labour
is employed on the site work, the contractor shall have to deposit Rs. 20,000.00 (Rupees Tw enty thousand only) in the
child labour welfare fund. If the employer refuses to deposit then action will be taken for contempt of Supreme Court
Judgement and also will be prosecuted by concerned authority. Because of the breach of any provision of child labour
prohibition and regulation Act 1986 by the Contractor & Municipal Corporation becomes liable to pay any amount then
the Municipal Corporation shall recover the said amount from the contractor.
Clause : 2 The Standing Committee has decided to deduct 1/2% amount from each running bill as per its Reso. No.
Date 06--02-97, but the Municipal Corporation Board has recently decided that the actual testing charge is taken and the
remaining amount is refundable at the time of final bill (As per Muni. Board Reso. No. 123 dated 25-02-97)
Clause : 3 Contractor has to follow prevailing Labour act and has to maintain labour register acordingly,and has to
follow other govt.rules.
Clause : 4 Quantity taken in tender are tentative and may differ as per execution of work. No claim shall be entertain
regarding QUANTITIES.
* MODIFICATION OF DOCUMENTS
Modification of specifications and correction/corrigendum in respect of the work if required will be made by A.M.C.
The same shall be placed on A.M.C website which may be downloaded by the tendrers enclosed along with the tender
duly signed. These shall form a part of tender. The tenderer shall not add or amend the text of any of the documents
except in so far as may be necessary to comply with any addendum.
* ADDENDAUM/CORRIGENDUM .
Addendum or corrigendum conveying any change or correction in respect of the work shall form the part of the contract
documents. The full consideration shall be given to such addendum or corrigendum or correction before submission
tender duly filled in by the contractor. Therefore, the contractor shall have to watch such addendum or corrigendum or
correction published by A.M.C through its website www.egovamc.com. Tenderes shall verify the number of addendum
issued and enclose the same with the tender documents,failing which the tender shall be liable for rejection and no any
complaint in respect to this shall be entertained under any circumstances.
Clause : 5 SCHEDULE OF MAINTENANCE
To keep paver blocks and footpaths durable, safe, and aesthetically pleasing, a structured maintenance schedule is
essential. Pavers are "interlocking" systems, meaning their strength relies on the sand in the joints; if the sand disappears,
the blocks move and eventually crack.
Below is a comprehensive maintenance and repair schedule categorized by frequency.
1. Common Defects & Repair Actions
When inspections reveal issues, use this guide to determine the repair method:
A. Sunken or Uneven Blocks (Settlement)
Cause: Poor base compaction or water washing away the bedding sand.
Repair: 1. Carefully lift the affected blocks using a flat-head screwdriver or paver extractor.
2. Add additional bedding sand to the base and compact it.
3. Re-install the blocks and sweep new sand into the joints.
B. Missing Joint Sand (The "Linchpin" of Pavers)
Cause: Rain, wind, or aggressive power washing.
Repair: Sweep Polymeric Sand into the joints. This sand contains a binder that hardens when misted with
water, making it resistant to washouts and weeds.
C. Cracked or Chipped Blocks
Cause: Heavy vehicle impact or freeze-thaw cycles.
Repair: Individual blocks should be replaced. This is why it is recommended to keep "attic stock" (extra
blocks) from the original installation to ensure a color match.
2. Checklist for Footpaths
Contractor shall execute maintenance works as directed by the client and through self-inspection under the
instruction of Engineer-In-Charge.
Surveying of footpaths and paver blocks shall be undertaken as and when required on the designated roads and
chawls, as instructed by Engineer-In-Charge.
The inspection schedule shall be aligned with the following categories of complaints, with priorities determined
by the Engineer-In-Charge:
o CCRS complaints
o Complaints from MLSs/ Councilors
o Complaints from Officials
The specific roads and chawls shall be surveyed as per below schedule as specified.
o The contractor shall visit the ward office once a week to obtain details of the roads scheduled
for inspection and conduct a survey of footpaths and paver blocks, as directed by the Engineer-
in-Charge (EIC)
The Contractor shall adhere to the maintenance schedule outlined in the tender documents and comply with the
prevailing AMC circulars of SOM issued from time to time.
Contractor's Sign Addl.C.E.(westzone)
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Tender No. 121.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .