Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹18.2 LAdmitted-Finance 00 MUKUNDPUR PAHO DOMANPUR MUKUNDPUR PAHO MIRZAPUR UTTAR PRADESH 231306 | MIRZAPUR | UTTAR PRADESH | 231306 | ₹18.2 L | L1 | Admitted-Finance |
| 2 | L2₹18.4 L+₹25,946.20 (1.43%)Admitted-Finance AT ARGADA DISTT RAMGARH JHARKHAND | ₹18.4 L+₹25,946.20 (1.43%) | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M/S ADITYA ENTERPRISES L1 | Maa Katyayani Enterprises L2 |
|---|---|---|---|---|---|
| 2.00A) Complete repairing and rewinding of 01 MVA ,11KV/3.3KV,Power Transformer make-Marsons,S.No.8577 installed at Sarubera Project under Kuju Area. | |||||
| 3.00 | cost of copper wire/strip with DGC covering size 9SWG or 5.00 mm | 750 | KG | 1,660.5 ₹12,45,375 Lowest | 1,684 ₹12,63,000 |
| 4.00 | Insulation cost @15% of cost of copper | 1 | L/S | 1,86,806.25 ₹1,86,806.25 Lowest | 1,89,450 ₹1,89,450 |
| 5.00 | Labour cost @15% of cost of copper | 1 | L/S | 1,86,806.25 ₹1,86,806.25 Lowest | 1,89,450 ₹1,89,450 |
| 6.00 | Cost of Insulation Resistance (IR) test,Polarization Index (PI) test & High postest & Dissolved gas analysis test through NABL | 1 | JOB | 12,850 ₹12,850 Lowest | 13,020 ₹13,020 |
| 7.00 | Less Scrap value @60% copper wire | 1 | L/S | 7,47,225 ₹-7,47,225 Lowest | 7,57,800 ₹-7,57,800 |
| 8.00 | CCPOH@10% | 1 | L/S | 88,461.25 ₹88,461.25 Lowest | 89,712 ₹89,712 |
| 9.00B) Complete repairing and rewinding of 500 KVA ,11KV/440V,Distribution Transformer installed at colony substation of Sarubera Project under Kuju Area. | |||||
| 10.00 | cost of copper wire/strip with DGC covering | 390 | KG | 1,660.5 ₹6,47,595 Lowest | 1,684 ₹6,56,760 |
| 11.00 | Insulation cost @15% of cost of copper | 1 | L/S | 97,139.25 ₹97,139.25 Lowest | 98,514 ₹98,514 |
Tender Value
Refer Docs
EMD Value
₹25,100
Closing Date
7 Aug 2026, 6:55 pmClosed
SO(ENM)
GM UNIT KUJU
A) Complete repairing/rewinding of 01MVA 11KV/3.3KV Power transformer B) Complete repairing/ rewinding of 500KVA 11KV/440V transformer C)Rewinding and installation of 11KV/415V,15KVA Transformer at different locations of Sarubera Project.
2026_CCL_362378_1
GM (K)/EnM/eTender/26-27/38
Open Tender
Electrical and Maintenance Works
Item Rate
30 days
GM UNIT KUJU
2 documents required · 2 mandatory
₹25,100
31 Aug 2026
22 Jul 2026
8 Aug 2026
22 Jul 2026
7 Aug 2026
22 Jul 2026
22 Jul 2026 - 29 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 2 | A) Complete repairing and rewinding of 01 MVA ,11KV/3.3KV,Power Transformer make-Marsons,S.No.8577 installed at Sarubera Project under Kuju Area. | - | - | - | - |
| 3 | cost of copper wire/strip with DGC covering size 9SWG or 5.00 mm | 750 | KG | - | - |
| 4 | Insulation cost @15% of cost of copper | 1 | L/S | - | - |
| 5 | Labour cost @15% of cost of copper | 1 | L/S | - | - |
| 6 | Cost of Insulation Resistance (IR) test,Polarization Index (PI) test & High postest & Dissolved gas analysis test through NABL | 1 | JOB | - | - |
| 7 | Less Scrap value @60% copper wire | - | L/S | - | - |
| 8 | CCPOH@10%(mailto:CCPOH@10%25塹ᴻ䡿ⲯ嶂藄挧ꮥ) | 1 | L/S | - | - |
| 9 | B) Complete repairing and rewinding of 500 KVA ,11KV/440V,Distribution Transformer installed at colony substation of Sarubera Project under Kuju Area. | - | - | - | - |
| 10 | cost of copper wire/strip with DGC covering | 390 | KG | - | - |
| 11 | Insulation cost @15% of cost of copper | 1 | L/S | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 2.92 MB
BOQ_375280.xls
BOQ • 0.26 MB
corrigendum.pdf
PDF • 0.48 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .