Loading…
Loading…
Tender Value
Refer Docs
EMD Value
₹6.1 L
Closing Date
25 Sept 2026, 6:00 pm3d left
HOD (Procurement)
Rate Contract for Engineering Consultancy Services for Small Connectivity Projects
342228
GTL/PROC/2026/08/O/505
Open
Consultancy Services
Service
Gandhinagar
15 documents required · 14 mandatory · 1 optional
₹10,000
GSPL TRANSMISSION LIMITED
₹6.1 L
7 Sept 2026
7 Sept 2026
7 Sept 2026
25 Sept 2026
7 Sept 2026
GSPL TRANSMISSION LIMITED Pre-bid Queries form for the tender "Rate Contract for Engineering Consultancy Services for Small Connectivity Projects" Tender No.: GGTL/PROC/2026/08/O/505
Sr. No. Bid Reference Bidder’s Queries/ Observation/Comments GSPL's Response
Section Clause No. Clause heading Page no. Original Clause as per Tender doc.
Name of Bidder:
For example Section-II 4.0 Language of bid 13 Contract Value shall mean the price payable to the Contractor under the Contract for the full and proper performance of his contractual obligations. abc xyz
1 Queries must be submitted in this format only through e-mail on GSPL's contact details before deadline of query submission schedule.
Section VII : Schedule of Rates (SOR) Rev-0 Rate Contract for Engineering Consultancy Services for Small Connectivity Projects Tender Ref No.: GTL/PROC/2026/08/O/505
Category of Registration in GST(Tick whichever is applicable)
Registered (Normal)
Registered (Composition Levy)
Type of Supply Under this Contract (Tick whichever is applicable)
Normal Supply of goods and services
Composite supply
Sr. No. Item Description HSN (Eight digit)/SAC (Six digit) Unit of Measure Qty. Unit Rate Total Basic Amount
A B C D E F G = D X F
1 ENGINEERING INCLUDING DETAILED ENGINEERING
A PIPELINE LAYING PER KM 101 30,774 3,108,174
B MODIFICATION / HOOK-UP AT DISPATCH STATION WITHOUT METERING FACILITY (WITH/WITHOUT LAUNCHER-RECEIVER) PER STATION 14 49,765 696,710
C MODIFICATION / HOOK-UP AT DISPATCH STATION WITH METERING FACILITY (WITH/WITHOUT LAUNCHER-RECEIVER) PER STATION 13 99,524 1,293,812
D STATION WITH CONTROL ROOM BUILDING AND BOUNDARY WALL PER STATION 2 74,646 149,292
E CUSTOMER END STATION WITH METERING FACILITY PER STATION 13 129,375 1,681,875
F HEATING SKID EACH 1 129,375 129,375
2 OWNER'S ENGINEERING (OE) MANMONTH 248 58,471 14,500,808
3 CONSTRUCTION SUPERVISION (CS) INCLUDING PROJECT MANAGEMENT(PM) MANMONTH 389 93,605 36,412,345
4 RFP PREPARATION LS 4 153,871 615,484
5 RFP PREPARATION FOR HOT TAP AND STOPPLE-IN WORKS LS 1 153,871 153,871
6 RFP PREPARATION FOR METERING SKID INCLUDING ENGINEERING LS 4 153,871 615,484
7 RFP PREPARATION FOR HEATING SKID LS 1 153,871 153,871
8 RFP PREPARATION FOR LONG LEAD ITEMS I.E. LINE PIPES, VALVES, IJ, SCADA, TELELCOM , ANALYZER [H2S, MOISTURE] ETC. LS 2 153,871 307,742
9 EXTRA RATES FOR MAN-DAY FOR ANY WORK RELATED TO PROJECT WORK, EXCLUDING TRAVEL, LODGING AND BOARDING EXPENSES. UNIT RATE 1 4,924 4,924
Total Base Price : =====> 59,823,767
Bidder to quote % Discount over Total Basic Amount (figures to be entered in % only)
Bidder to quote % Accreation over Total Basic Amount (figures to be entered in % only)
Total Quoted Price Excluding GST 59,823,767
Bidder to mention GST in % here =====>
Total in Words:
Bidder's Seal & Signature
1 Base rates are provided, bidder to quote % (-) Discount or % (+) Accreation only. Bidder shall strictly quote as per price bid format (latest revision) only. Any bid not conforming to the price bid formats shall be liable for rejection.
2 Bidders are required to visit site facilities to make themshelves fully aware of GTL installations. Given Schedule of Rates (SOR) to be treated in conjunction with scope of work/services and other tender terms and conditions in totality.
3 SOR line item 3 includes scope briefly covering site construction management & supervision of construction works including inspection, commissioning assistance, store management, project management, contract management and other site related activities.
4 For SOR line item 3, Engineers will include all discipline engineers, HSE engineers, Planning engineers, Project Manager, Construction Manager etc.
5 For any additional RFP, qty. shall be ammended on need basis.
6 Any visits from Consultant's head office to the Project site shall include minimum no. of 5 visits for 2 persons (5 x 2 = 10 Man-days) for each connectivity project during engineering/execution/completion stage shall be included in quoted prices. If visits exceed beyond 10 Man-days, then it shall be payable as extra work in line with Price Bid Format. Any visits from Gandhinagar (local) office to site shall not be considered as extra work during the course of the project execution till completion of the project. No extra payment on account of travelling and other expenses by consultant shall be paid for visit to GTL office.
7 GTL reserve the Right to use the Technical specification/ QAP's for purchase of materials either through the construction (or) directly from vendors through bidding process.
8 Engineering shall be paid per km of the pipeline length of a proposed project. The total maximum pipeline length of a single Proposed Project shall be 25 Km.
9 For visit outside India (if any) the man-day charges and out of pocket expenses (including travel, boarding & lodging) shall be paid at actuals.
10 Contract shall be valid for 2 years from date of award. Further, contract prices shall be valid till the handover of the last project under this ARC to GTL.
11 Estimated quantities mentioned in the SOR is for evaluation purpose only. Payment shall be made based at actual on certified quantity/services. All invoices shall be raised in INR.
12 All prices are inclusive of all taxes, duties (other than GST), out of pocket expenses like travelling, lodging, boarding, local conveyance etc. However, while raising invoices, the amount shall be bifurcated to show GST as well as surcharge component separately. Proper invoices shall be raised.
13 Owner shall deduct all necessary taxes from source before making the payment and no further payment / compensation shall be made for such deductions.
14 In case of mixed supply,composite supply and works contract a single rate of GST shall be applicable.
15 In case of vendors registered under composition levy scheme separate charge of GST shall not be applicable.
17 GTL reserves the right to reject any bid without any reason whatsoever.
18 Price bid shall only be uploaded on (n)Procure portal in Stage-3 of tender. If bidder, at the time of uploading of tender documents on (n)Procure portal submits price bid in any of the previous stages (Primary-EMD/Bid Fee, Secondary-Technical), then such bid shall be liable for rejection.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
GTL EMD Format.pdf
Pre-bid queries form.xlsx
XLSX
RFP PMC ARC 2026.pdf
Scope of Work.pdf
Section-VII SOR.xlsx
XLSX
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .