Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.8 LAdmitted-Fee/PreQual/Technical/Finance | ₹4.8 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹6.3 LAdmitted-Fee/PreQual/Technical/Finance | ₹6.3 L | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹7.0 LAdmitted-Fee/PreQual/Technical/Finance | ₹7.0 L | L3 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | P T SEBASTIAN L3 | NIDHIN M A L1 | TIMEAHEAD CONSTRUCTIONS L2 |
|---|---|---|---|---|---|---|
| 1.00Mechanical Works in connection with the shutdown of DCDA Acid Plant FACT UC. | ||||||
| 1.01 | Dismantling of (Welded Type) butterfly valve and fixing back serviced butterfly valve with necessary fittings and structural supports at various locations and elevations in DCDA Acid Plant.
The following valves has to be dismantled & fixed back after servicing:
i) No:3 boiler out valve
ii) No.3 boiler bypass valve
NOTE: Servicing of butterfly valve shall be under FACT’s scope.
Size: 1000 MM to 1400 MM
Material : SS | 2 | NO | 1,94,000 ₹2,28,920 | 2,00,000 ₹2,36,000 | 1,10,000 ₹1,29,800 Lowest |
| 1.02 | Debolting and taking down the safety valves of size 4" #300 from steam drum of DCDA No.1 & 2 boiler and fixing back the same after servicing. | 2 | NO | 40,000 ₹47,200 Lowest | 50,000 ₹59,000 | 58,000 ₹68,440 |
| 1.03 | Cutting and welding back manhole dummies of DCDA converter. (Total cost for removing and fixing back the manholes.) | 8 | NO | 1,01,600 ₹1,19,888 Lowest | 1,20,000 ₹1,41,600 | 2,80,000 ₹3,30,400 |
| 1.04 | SS Patch work at various positions of the converter central duct, division plate, shell, etc. in DCDA converter. | 4 | M2 | 68,000 ₹80,240 | 20,000 ₹23,600 Lowest | 20,000 ₹23,600 Lowest |
| 1.05 | Replacing/reinforcing the structures like ring plate, curb angle, skirt plate, supports etc. in the converter. | 0.5 | MT | 30,500 ₹35,990 | 500 ₹590 Lowest | 10,000 ₹11,800 |
| 1.06 | Removing the tray plates of DCDA converter for inspection, cleaning and repair and fixing back the same / new grids and caulking with temperature resistant ropes for sealing after the work. | 100 | NO | 1,10,000 ₹1,29,800 | 10,000 ₹11,800 Lowest | 50,000 ₹59,000 |
| 1.07 | Leveling of tray beams in second bed of the converter. | 5 | NO | 50,000 ₹59,000 | 2,500 ₹2,950 Lowest | 5,000 ₹5,900 |
Tender Value
Refer Docs
EMD Value
₹12,000
Closing Date
20 Jul 2026, 2:00 pmClosed
AGM(P and P)-UC
FACT Ltd Udyogamandal Complex Kochi - 683501.
Mechanical Works in connection with the shutdown of DCDA Acid Plant FACT UC.
2026_FACT_917407_1
3012/2026-2027/E33856
Limited
Miscellaneous Works
Item Rate
30 days
Udyogamandal
This tender is issued on limited tender basis and offers shall be accepted from the vendors on whom the enquiry is issued. Vendors interested in getting our future enquiries may contact Projects and Planning -UC FACT Udyogamandal.
5 documents required · 5 mandatory
₹0
₹12,000
Yes
21 Jul 2026
15 Jul 2026
21 Jul 2026
15 Jul 2026
20 Jul 2026
15 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Mechanical Works in connection with the shutdown of DCDA Acid Plant FACT UC. | |||||
| 1.01 | Dismantling of (Welded Type) butterfly valve and fixing back serviced butterfly valve with necessary fittings and structural supports at various locations and elevations in DCDA Acid Plant.
The following valves has to be dismantled & fixed back after servicing:
i) No:3 boiler out valve
ii) No.3 boiler bypass valve
NOTE: Servicing of butterfly valve shall be under FACT’s scope.
Size: 1000 MM to 1400 MM
Material : SS | 2 | NO | - | - |
| 1.02 | Debolting and taking down the safety valves of size 4" #300 from steam drum of DCDA No.1 & 2 boiler and fixing back the same after servicing. | 2 | NO | - | - |
| 1.03 | Cutting and welding back manhole dummies of DCDA converter. (Total cost for removing and fixing back the manholes.) | 8 | NO | - | - |
| 1.04 | SS Patch work at various positions of the converter central duct, division plate, shell, etc. in DCDA converter. | 4 | M2 | - | - |
| 1.05 | Replacing/reinforcing the structures like ring plate, curb angle, skirt plate, supports etc. in the converter. | 0.5 | MT | - | - |
| 1.06 | Removing the tray plates of DCDA converter for inspection, cleaning and repair and fixing back the same / new grids and caulking with temperature resistant ropes for sealing after the work. | 100 | NO | - | - |
| 1.07 | Leveling of tray beams in second bed of the converter. | 5 | NO | - | - |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.73 MB
BOQ_964096.xls
BOQ • 0.32 MB
Termsandconditions33856.pdf
Tender Documents • 15.07 MB
compliancestatement33856.pdf
Tender Documents • 9.75 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].