Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹37.1 LAccepted-AOC | 1 | Accepted-AOC agreement executed | |
| 2 | 2₹37.9 L+₹81,804.12 (2.20%)Rejected-AOC KERALA KL | KANNUR | KERALA | 670001 | 2 | Rejected-AOC agreement executed | |
| 3 | 3₹38.5 L+₹1.4 L (3.80%)Rejected-AOC | 3 | Rejected-AOC agreement executed | |
| 4 | 4₹39.5 L+₹2.4 L (6.34%)Rejected-AOC | 4 | Rejected-AOC agreement executed | |
| 5 | 5₹40.5 L+₹3.4 L (9.14%)Rejected-AOC MANNIL HOUSE KODAKKAD MANNARKKAD | MANNARKKAD | PALAKKAD | KERALA | 5 | Rejected-AOC agreement executed |
Tender Value
₹43.1 L
EMD Value
₹50,000
Closing Date
23 Jul 2021, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer
Executive Engineer PWD ROADS DIVISION PALAKKAD
DEPOSIT-Deposit work - KWA WS Project division - Menonpara Kanjikode road 4/500 - 5/080 and concrete in kanjikode bazar road - Restoration estimate-Work-General Civil work
2021_PWD_430472_1
PWD/RB/1999/2021-2022
Open Tender
Civil Works - Roads
Item Rate
90 days
Palakkad
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,760
Yes
₹50,000
Yes
15 Sept 2021
15 Jul 2021
26 Jul 2021
15 Jul 2021
23 Jul 2021
15 Jul 2021
60 days
Amount
Restoration
3.6:Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m
3.19.1:Loosening of the ground upto a level of 500 mm below the sub-grade level, watered, graded and compacted in layers to meet requirement of table 300-2 for Compacting original ground supporting sub-grade construction.
4.2.A.2:Construction of granular sub-base by providing graded material, spreading in uniform layers with a motor grader on a prepared surface, mixing by mix in-place method with rotavator at OMC, and compacting with a vibratory roller to achieve the desired density, complete as per clause 401. Grading-IV - For lower sub-base - Mix in Place Method
4.12:Providing, laying, spreading and compacting graded stone aggregate to Wet Mix Macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.
12.4:Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
12.8.2.C:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications RCC Grade M20 - With Batching Plant, Transit Mixer and Concrete Pump - ( Without formwork)
5.2.c:Providing and applying tack coat with bitumen emulsion (RS) using emulsion pressure distributor at the rate of 0.30 - 0.35 kg per sqm on the prepared Cement Concrete pavementcleaned with mechanical broom.
5.6.2.a:Providing and laying bituminous concrete with 80-100 TPH hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with a bituminous binder( NRMB) @ 5.4 percent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level, and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects For Grading - II (13.2 mm Nominal Size)
55.24:Providing and laying bituminous concrete with 80-100 TPH hot mix plant producing an average out put of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder (NRMB) @ 5.4 percent of mix and filler, transporting the hotmix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause NO. 507 complete in all respects (using 7% shredded plastic) Grading - II (13.2 mm nominal size)
REJEEV P K
K.O.Jose
MT abdul zubair
ABDUL NASAR. M
VINAY SREENIVAS
NANDAKUMAR K
Bidder Name
MT abdul zubair
REJEEV P K
A N JAYAPRASAD
K.O.Jose
NANDAKUMAR K
VINAY SREENIVAS
ABDUL NASAR. M
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_610941.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .