Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹1.2 L
EMD Value
₹2,000
Closing Date
30 Nov 2026, 4:00 pm7d left
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
DEPUTY EXECUTIVE ENGINEER, CAPITAL PROJECT ELECTRICAL SUB DN NO 21, GANDHINAGAR
All in Comprehensive Maintenance Contract for Water Cooler and RO installed Sector 18 to 30 (Residential Building) (2nd Attempt)
366209
05/02 OF 2026/2027
Open
Electrical and Maintenance Works
Works
Gandhinagar
8 documents required · 8 mandatory
₹600
DEPUTY EXECUTIVE ENGINEER, CAPITAL PROJECT ELECTRICAL SUB DN NO 21, GANDHINAGAR
₹2,000
17 Nov 2026
17 Nov 2026
17 Nov 2026
30 Nov 2026
17 Nov 2026
90 days
Name of Work All in Comprehensive Maintenance Contract For Water Cooler And RO Installed at Sector-18 to
(Residential Building), Gandhinagar. [2nd attempt]
Fund Head : 4216 Housing M&R SR
Sr. No. Item No. Particulars. Qty. Rate Amount
Deputy executive Engineer Executive Engineer
C.P Electrical R & B Sub Dn 21 C.P Electrical Division
Gandhinagar. Gandhinagar.
Name Of Work :- All in Comprehensive Maintenance Contract For Motor Pumpset Installed at Sector-18 to
(Residential Building), Gandhinagar [2nd attempt]
Item Estimated Rate in Rs.
Item Description Unit Amount in Rs.
No. Quantity in Figure In Word
All inclusive comprehensive maintenance cost for the
period of one year for the Reverse Osmosis water
purification system up to 50 Ltr/ Hr capacity.Inclusive
replacing and cleaning of membranes , change of filter
uPVC pipe fitting and booster pump replacing one time in
twelve month and servicing of RO System of following
capacity( 6 Services in Twelve months )
(C) 50 Ltr Capacity
8 Nos. 11,111.01 Each
All inclusive comprehensive maintenance cost for the
period of one year for the water Cooler of following
( Note: (1) The All inclusive comprehensive maintenance
cost covers the yearly maintenance cost of the electrical
machineries with material & Labour cost including
preventive maintenance. The cost covers entire installation
from outlet of main switch to electrical machine.(2) All
2 inclusive comprehensive maintenance cost of Split type Air
conditioners & Water coolers covers the yearly
maintenance & preventive maintenance with all required
painting materials & labours. including sheet metal work,
refrigerant gas , compressor & all the contains parts. The
cost covers entire installation from outlet of main switch to
(B) 120 / 150 Ltr capacity
8 Nos. 3,339.06 Three Hundred Each
Thirty Nine And
RUPEES IN WORDS Rupees One Lakh(s) Fifteen Thousand Six Hundred And Paise Fifty Six Only
I/We am/are willing to carry out the work at(No above rates allowed) ____________% below ___________________________________
__________________percent (Should be written in figures and words) below the tendered rates mentioned above.
Amount of my/our tender works out as under :
Estimated amount put to tender Estimated amount put to tender
Deduct……………………….. % Below Add……………………….. % Above
In words In words
1 I/We hereby declare that I/We have visited the site, fully exquisite myself/ourselves with the local situation regarding materials and
other factors pertaining to the work before submitting this tender.
2 I/we hereby declare that I/We carefully studied the conditions of specifications and other tender documents of this work and agree to
execute the same accordingly.
3 A tender with any overwriting in percentage (should both in word and figures) rejected out right.
4 Insertions and/or corrections in the percentage quoted ( both in word and figures) resulting into increase in the value of the work shall
be rejected outright unless it is authenticated by the office opening the tender at the time of opening of tender.
5 Dismentaling the existing material taken by contractor as mention rates.
Signature of Contractor
Deputy executive Engineer Executive Engineer
C.P Electrical R & B Sub Dn 21 C.P Electrical Division
Gandhinagar. Gandhinagar.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
amc condition.pdf
G S T LTR.pdf
GR.pdf
PQ creteria with form 3a.pdf
schedule a and b.pdf
STANDARD BIDDING DOCUMENT.pdf
Tender Notice - 5.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .