Loading…
Loading…
Tender Value
₹2.3 L
EMD Value
₹6,818
Closing Date
15 Jun 2026, 6:00 pm
SM(EE)-II
O/o Airport Director, Tirupati Airport, Renigunta-517520.
Replacement of 5KVA UPS including AICMC of UPS for 8 Years after 2 years of DLP at Power house, Tirupati Airport.
2026_AAI_278445_1
AAI/TPT/ENGG(E)/C-07(25-26)/2
Open Tender
Electrical Works
30 days
Tirupati
Please refer Tender documents.
15 documents required · 15 mandatory
₹1,180
₹6,818
25 May 2026
25 May 2026
17 Jun 2026
26 May 2026
15 Jun 2026
26 May 2026
26 May 2026 - 1 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Supply, Installation, Testing and Commissioning of 5 KVA Floor mounted Online UPS (3-Phase Input and 3-Phase Output) with built-in isolation transformer at output side and without batteries and including making interconnections with existing battery bank of 30 nos. of 12V, 18 AH and as per Technical Specification attached and complete as required. | 1 | Job | - | - | Item1 |
| 2All Inclusive Comprehensive Maintenance Contract of 1No. X 5 KVA UPS System with necessary required spares, quarterly preventive maintenance services and attending breakdowns as and when required etc. and excluding batteries and complete as required. | ||||||
| 2.1 | First year after 2Years of DLP
(Considered 3.78% on SITC cost). | 1 | Per Annum | - | - | Item2 |
| 2.2 | Second year after 2Years of DLP.
(Considered yearly 3.78% Cumulative enhancement on 1st year AICMC rate) | 1 | Per Annum | - | - | Item3 |
| 2.3 | Third year after 2Years of DLP.
(Considered yearly 3.78% Cumulative enhancement on 2nd year AICMC rate) | 1 | Per Annum | - | - | Item4 |
| 2.4 | Fourth year after 2Years of DLP.
(Considered yearly 3.78% Cumulative enhancement on 3rd year AICMC rate) | 1 | Per Annum | - | - | Item5 |
| 2.5 | Fifth year after 2Years of DLP.
(Considered yearly 4.15% Cumulative enhancement on 4th year AICMC rate) | 1 | Per Annum | - | - | Item6 |
| 2.6 | Sixth year after 2Years of DLP.
(Considered yearly 4.57% Cumulative enhancement on 5th year AICMC rate) | 1 | Per Annum | - | - | Item7 |
| 2.7 | Seventh year after 2Years of DLP.
(Considered yearly 5.02% Cumulative enhancement on 6th year AICMC rate) | 1 | Per Annum | - | - | Item8 |
| 2.8 | Eighth year after 2Years of DLP.
(Considered yearly 5.53% Cumulative enhancement on 7th year AICMC rate) | 1 | Per Annum | - | - | Item9 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.59 MB
etenderdocument.pdf
Tender Documents • 7.75 MB
BOQ_325299.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid