Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.4 CrAccepted-AOC R O 115 SECTOR 24 PHASE III INDUSTRIAL ESTATE BARHI GANNAUR SONIPAT HARYANA | ₹1.4 Cr | L1 | Accepted-AOC AOC |
| 2 | L2₹2.4 Cr+₹95.4 L (66.5%)Rejected-Finance R O VILL KHANAR P O MUNDU TEH THEOG DISTT SHIMLA 171226 | SHIMLA | HIMACHAL PRADESH | 171226 | ₹2.4 Cr+₹95.4 L (66.5%) | L2 | Rejected-Finance Rejected |
| 3 | L3₹2.5 Cr+₹1.1 Cr (76.0%)Rejected-Finance | ₹2.5 Cr+₹1.1 Cr (76.0%) | L3 | Rejected-Finance Rejecred |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | ANEIE ASTECHNO PRIVATE LIMITED L1 | RK Gupta AND CO L3 | Narender Singh L2 |
|---|---|---|---|---|---|---|
| 1.00To operate repair & Maintain all civil struc works and electro mechanical equipment s relating to Sewerage scheme of Paonta Town which consist of Sewerage treatment plant of 0.44 MLD and 1.00 MLD capacity as per latest norms and sewer network for the period of two years in all respect to the entire satisfation of the Engineer-in-charge.Firm should do comply the stringent efficient standards laid down by HP Pollution Control Board terms and conditions as per Annexure A to M alongwith with general terms and conditions Operaton repair & Maintenance shall cover following components. | ||||||
| 1.01 | A) Chemicals (For Five Yers)
i) Alum (for winter season only ) (Say 4 Month).
ii) Lime.
iii) Polyelectrolyte. /or any Other chemicals regd | 5 | P/Year | 1,17,525 ₹5,87,625 | 5,50,000 ₹27,50,000 | 80,000 ₹4,00,000 Lowest |
| 2.00 | Manpower for Operation & Maintenance of STP Zone-I & II Capacity 0.44 MLD & 1.00 MLD for Five years complete in resspect. Total length of STP Zone :- 1 = 5660 Rmt. And Zone –II =15410 Rmt.
i) process Engineer, 2 No.s
ii) Syoervusor cum Manager, 01 No.
iii) Lab Assistant , 02 Nos.
iv) Asstt. Chemist , 02 Nos.
v) Operators. (electrical/Mechanical) , 02 Nos.
vi) Electrician/Fitter. (0.50+0.50)=1 No. (15 days Per Month each). 02 Nos.
Vii) Sweeper, 01 Nos.
viii) Beldar/Gardener/Casual labour. 01 Nos.
ix) Sewer Man, 02 Nos | 5 | P/Year | 24,47,500 ₹1,22,37,500 Lowest | 30,00,000 ₹1,50,00,000 | 43,47,000 ₹2,17,35,000 |
| 3.00 | Maintenance cost for Civil & Mechanical and Electrical equipments complete in all respect. For Zone-Ist. | 5 | P/Year | 1,27,025 ₹6,35,125 | 7,00,000 ₹35,00,000 | 1,18,000 ₹5,90,000 Lowest |
| 4.00 | Maintenance cost for Civil & Mechanical and Electrical equipments complete in all respect. for Zone-IInd. | 5 | P/Year | 1,77,325 ₹8,86,625 Lowest | 8,00,000 ₹40,00,000 | 2,32,777.6 ₹11,63,888 |
Tender Value
₹3.1 Cr
EMD Value
₹3.4 L
Closing Date
26 Sept 2024, 11:00 amClosed
Executive Engineer
Jal Shakti Division Paonta Sahib PO and Tehsil Paonta Sahib District Sirmour HP
Operation and Maintenance of Zone-I Capacity 0.44 MLD and Zone-II Capacity 1.00 MLD) For Five Years
2024_HPIPH_93179_1
PNT-SMR02-720 No. 7981-8080 dated 12-09-2024
Open Tender
Civil Works
Item Rate
1826 days
Paonta Sahib
Please refer to tender documents
9 documents required · 9 mandatory
₹2,500
EE Jal Shakti Division Paonta Sahib
₹3.4 L
Yes
20 Aug 2025
17 Sept 2024
26 Sept 2024
17 Sept 2024
26 Sept 2024
17 Sept 2024
17 Sept 2024 - 26 Sept 2024
Amount
To operate repair & Maintain all civil struc works and electro mechanical equipment s relating to Sewerage scheme of Paonta Town which consist of Sewerage treatment plant of 0.44 MLD and 1.00 MLD capacity as per latest norms and sewer network for the period of two years in all respect to the entire satisfation of the Engineer-in-charge.Firm should do comply the stringent efficient standards laid down by HP Pollution Control Board terms and conditions as per Annexure A to M alongwith with general terms and conditions Operaton repair & Maintenance shall cover following components.
A) Chemicals (For Five Yers) i) Alum (for winter season only ) (Say 4 Month). ii) Lime. iii) Polyelectrolyte. /or any Other chemicals regd
Manpower for Operation & Maintenance of STP Zone-I & II Capacity 0.44 MLD & 1.00 MLD for Five years complete in resspect. Total length of STP Zone :- 1 = 5660 Rmt. And Zone –II =15410 Rmt. i) process Engineer, 2 No.s ii) Syoervusor cum Manager, 01 No. iii) Lab Assistant , 02 Nos. iv) Asstt. Chemist , 02 Nos. v) Operators. (electrical/Mechanical) , 02 Nos. vi) Electrician/Fitter. (0.50+0.50)=1 No. (15 days Per Month each). 02 Nos. Vii) Sweeper, 01 Nos. viii) Beldar/Gardener/Casual labour. 01 Nos. ix) Sewer Man, 02 Nos
Maintenance cost for Civil & Mechanical and Electrical equipments complete in all respect. For Zone-Ist.
Maintenance cost for Civil & Mechanical and Electrical equipments complete in all respect. for Zone-IInd.
Narender Singh
RK Gupta AND CO
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .