Loading…
Loading…
Tender Value
₹2.6 L
EMD Value
₹6,000
Closing Date
20 Jun 2026, 10:00 am
Executive_Engineer_NTKMD_PHED
Utility_Bldg__Beside_Delhi_Public_School_AA_ID_New_Town_Kol_700156
Repairing of ATS Panel (132kW Pump no. 1) and pumping machineries (200kW Pump no. 1) with allied works for Clear Water Pump House (Phase-I) at WTP in New Town under NTK Project.
2026_PHED_1025530_4
PHE/NTKMD/e-01 of 2026-27
Open Tender
Project Work
30 days
WORK
Please refer Tender documents.
5 documents required · 5 mandatory
₹6,000
28 May 2026
28 May 2026
22 Jun 2026
28 May 2026
20 Jun 2026
28 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1Dismantling of 132kW ATS from its base after disconnection of power line for repairing to Kolkata workshop includes carrying, forwarding, loading & unloading along with back carriage, all complete as per direction of the EIC. | ||||||
| 2 | Repairing of the Auto transformer 132kW at the work includes opening the coil from ATS and dismantling the same & rewinding by new copper wire (3 nos. coil) with double Nomex insulation, varnishing (DC-994), supply & fixing of Nomex interlayer, reassembling of the coil after winding & fixing the top core along with necessary connection and testing of the auto transformer all complete as per direction of EIC. (The rate has been derived after deducting the cost of old damaged Cu wire). | - | ITEM | 0.29 | - | - |
| 3Fitting fixing of the ATS starter inter connection, socketing, control circuit and power circuit, testing to the entire satisfaction of the EIC. | ||||||
| 4Withdrawing of 200kW (Pump no. 1) Centrifugal pump part by part from underground basement of the pump house by existing hoisting arrangement with expert mechanic and Laboure after decoupling of pump & motor and disconnection of pump from suction and delivery line complete the job as per direction of EIC. | ||||||
| 5Dismantling of pump part by part at pump house for necessary repairing of the same as per direction of EIC. | ||||||
| 6.01 | Supply & delivery of following materials for pump :-
Bearing (Model : 6311 2Z L 140 C3) FAG | - | NOS. | - | - | - |
| 6.02 | J Bolt (10 mm x 150 mm) (MS) | - | NOS. | - | - | - |
| 7Repairing of Bearing Housing includes metalizing machining, grinding, as per direction on both ends DE / NDE all complete as per direction of EIC. | ||||||
| 8Re-assembling the above pump with existing servicable spares and newly supplied spares as in item no 6.01 above by skilled mechanic and service engineer. | ||||||
| 9Making of RCC foundation for Pump no. 1 (Size : Length 2565 mm x Breadth 910 mm x Height 260 mm), Levelling after fixing of Base plate with foundation bolt, nut to the entire satisfaction of the EIC. | ||||||
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.94 MB
Tendernotice_2.pdf
PDF • 0.90 MB
Tendernotice_3.pdf
PDF • 0.55 MB
Tendernotice_4.pdf
PDF • 0.04 MB
BOQ_2520014.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid