Tender Value
₹64.4 L
EMD Value
₹64,417
Closing Date
1 Oct 2026, 4:00 pm4d left
The Superintending Engineer
Erection of (1) 01 no. of 400/220KV, 500MVA, ICT -5 bay Work (2) 400kV Bus Extension (A,B & C) work (3) Erection of 220kV Palanpur Line-2 bay with 220kV Bus Extension Work at 400KV Kansari ss under Palanpur Circle
344059
PTC/ET/96/2026
Open
Electrical Goods/Equipment
Works
Banaskantha
19 documents required · 19 mandatory
₹5,900
Gujarat Energy Transmission Corporation Ltd
₹64,417
11 Sept 2026
11 Sept 2026
11 Sept 2026
1 Oct 2026
11 Sept 2026
Name of work: Erection of (1) 01 no. of 400/220KV, 500MVA, ICT -5 bay Work (2) 400kV Bus
Extension (A,B & C) work (3) Erection of 220kV Palanpur Line-2 bay with 220kV Bus Extension
Work at 400KV Kansari ss under Palanpur Circle.
To create environment where Business confidence is built though best business practices and is fostered in an
atmosphere of trust and respect between providers of goods and services and their users for the ultimate benefit of
society the nation.
GETCO COMMITEMNT PARTY’S COMMITEMENT
To maintain the highest ethical standards in Not to bring pressure recommendations outside
business and professional GETCO to influence its decision.
Ensure maximum transparency to the Not to use intimidation, threat, inducement or
satisfaction of stakeholders. pressure of any kind on GETCO or any of its
employees under any circumstances.
To ensure to fulfil the terms of agreement / To be prompt and reasonable in fulfilling the
contract and to consider objectively the contract, agreement, legal obligations.
viewpoint of parties.
To ensure regular and timely release of To provide goods and / or services timely as
9payment on due dates for work done. per agreed quality and specifications at
minimum cost of GETCO.
To ensure that no improper demand is made by To abide by the general discipline to be
employees or by anyone on our behalf. maintained in our dealings.
To give maximum possible assistance to all the To be true and honest in furnishing information
Vendors / Suppliers / Service provider and including payment to agents / sub-agent.
other to enable them to complete the contract
To provide all information to suppliers / Not to divulge any information, business details
contractors relating to contract / Job which available during the course of business
facilitate him to complete the contract / job relationship to others without the written
successfully in time consent of GETCO.
To ensure minimum hurdles to Vendors / Not to enter into carter / syndicate /
suppliers / contractors in complete of understanding whether formal / non formal so
agreement / contract / work order. as to influence the price.
Seal & Signature Seal & Signature
(GETCO Authorized Signatory) (Party’s Authorized Person)
Seal and signature of bidder
TENDER NOTICE No: PTC/ET/96/2026
Superintending Engineer, Palanpur invites “On line Tenders” (e-tendering) for the Erection of (1)
01 no. of 400/220KV, 500MVA, ICT -5 bay Work (2) 400kV Bus Extension (A,B & C) work (3)
Erection of 220kV Palanpur Line-2 bay with 220kV Bus Extension Work at 400KV Kansari ss
under Palanpur Circle. from registered Contractors. Bidders should fulfil the all the qualification
criteria. Otherwise their bids will not be considered & price bid will not be opened. All the bidders
should have valid e-tender vender registration. Tender Papers & Specifications may be
down loaded from Web site https://tender.nprocure.com For view, down load and on line
submission) and GUVNL / GETCO web sites (For view & download only). “All the relevant
documents of tender to be submitted online only including EMD & tender fee.
“NO COURIER SERVICE OR HAND DELIVERY” will be allowed.
Estimated Time Tender E.M.D.
Sr. Name of Work Cost Rs. Limit Fee Rs. Rs.
Erection of (1) 01 no. of 400/220KV, Rs. Rs.5000.00+ Rs
500MVA, ICT -5 bay Work (2) 400kV 6441677.2 03 GST 18%
CDD/ Bus Extension (A,B & C) work (3) 3 month 900.00=5900.00
ET/30 Erection of 220kV Palanpur Line-2 bay
/2026 with 220kV Bus Extension Work at
400KV Kansari ss under Palanpur
On line (E-tendering) tender/ offer submission last date Dt As per N Code
up to 16.00 hours only (This is mandatory)
Date of opening of on – line opening at 16.01 Dt As per N Code
2 Hours.(If Possible)
3 Tentative Date of on – line opening of Price bid Shall be intimated separately.
Seal and signature of bidder
1. Bidder has to upload scanned copies of original (Notarized / self-attested copies of original –
as specified in tender document) documents with bid and no physical documents to be submitted
by bidder except Tender fee, EMD. All the online Annexures i.e. Annexure - 1 to 10 and price bid,
other tender documents must be submitted/attached online only.
2. Bidders have to submit Technical bid as well as Price bid in electric format only on above mentioned
website till the date and time shown above. However, of anywhere in tender documents submission
of other than this document physical submission mentioned to be overlooked.
3. The EMD amount should be paid either by Payment of EMD by RTGS/NEFT/on line shall be
encouraged. In case of payment through RTGS/NEFT bidder has to mail following details to
[email protected]. The transection slip of payment made by RTGS/NEFT is to be
uploaded in Nprocure with tender documents.
Sr No Required Details
1 Name & Address of the bidder
2 Bidder GST No
3 Tender No with due date
4 Mode of Transfer
5 Ref. ID with Bank Details
7 Payment against (Tender Fee/ EMD)
Bidder has to provide all above details by email on the same date of payment so that
receipt can be generated.
4. GETCO beneficiary Bank Details as under
1 Name of Account Holder Gujarat Energy Transmission Corporation Ltd.
2 Account No. ‘01740200000624
3 Name of Bank Bank of Baroda
4 Branch Code PALANP
Transmission Circle, 66kv S/S Campus,
5 Address of Office Abu Highway,
6 IFSC Code BARB0PALANP (Fifth Digit is zero)
7 PAN No AABCG4029R
8 TAN No AHMG02636E
9 GST No 24AHMG02636E1DV
5. In case short submission of documents with bid and / or clarification if any required from the bidder, the
required details / documents may be asked from bidder in physical form.
6. It shall be sole responsibility of the bidder that the uploaded scanned documents (in PDF from) remain
legible and should not be password protected.
Seal & Signature of Bidder
7. All the relevant scanned documents as per requirement of the tender are to be upload through online
only on n procure portal including Tender fee, EMD and attested Integrity Pact. (All tender documents
including Price bid are not to be submitted with the physical documents including Tender fee, EMD and
Integrity Pact).
8. Tender will be evaluated on Data / Details / Documents of the online offer only.
9. It is mandatory for all the bidders to upload their tender documents by on line (E-tendering) in
scheduled time.
10. The bidders are required to fill up all the online annexure / forms. This is intended for transparency
and speedy evaluation of the bids. Instead of simply confirming / attached in bid, the Bidder shall fill in the
particulars against appropriate place in respect of each line appearing in each online annexure. Wherever
required, bidder shall invariably have to upload supporting authentic documents in the online bid.
(In the absence of required details in the online annexure, the owner has every right to evaluate the bids
accordingly and bidder cannot raise any objection against any point during evaluation.)
11. Bidders are requested to remain in touch with the web-site for any amendment / corrigendum or
extension of due date etc
12. The Earnest Money Deposit and tender fee will be accepted by NEFT/RTGS/Online on any
Nationalized Bank only
13. The GETCO reserves the right to award the work to one or more bidders, considering their technical
and financial capacity OR to reject any or all tenders or accept any tender without assigning any reason
Any technical questions, information and clarifications that may be required pertaining to this enquiry
should be referred to:
The S u p e r i n t e n di ng Eng i n ee r
Gujarat E ne rg y Tra n sm i s si on C o r p o r at i o n
Limited, Circle Office, Aroma Circle,
Palanpur, - 385
GETCO reserves the right to reject any OR all tenders without assigning any reasons thereof.
Yours faithfully,
Superintending Engineer GETCO, Palanpur
To view the PDF file please use “Acrobat Reader” soft ware which can be downloaded from “Adobe”
In case bidder needs any difficulty in accessing / submission of on line bid / clarification or if
training required for participating in online tender, they can contact the following office:
(n) Procure Cell, (n) code solutions-A division of GNFC Ltd.,
403, GNFC Info tower, S.G. Road,
Bodakdev Ahmedabad – 380054 (Gujarat)
Fax: 079-26857321 / 40007533, Email: [email protected]
Seal & Signature of Bidder
Document Code Part
Tender Notice - I
Instructions to Tenderers ITB I
General Conditions of Contract GCC I
Erection Conditions of Contract ECC I
5. Special Conditions of
Contract with Declaration
6. General Information SCC I
Technical Specifications TSP II
8. Bid Form BF III
Seal & Signature of Bidder
INSTRUCTIONS TO BIDDERS
A. INTRODUCTION
1.0 General Particulars
1.1 The G u j a r a t E n e r g y T r a n s m i s s i o n C o r p o r a t i o n L t d . , B a r o d a
h e r e i n a f t e r called ‘ OWNER’ or ‘GETCO’ i n t e n d s t o receive b i d s f or Erection of
(1) 01 no. of 400/220KV, 500MVA, ICT -5 bay Work (2) 400kV Bus Extension (A,B & C) work
(3) Erection of 220kV Palanpur Line-2 bay with 220kV Bus Extension Work at 400KV
Kansari ss under Palanpur Circle. . as detailed in the accompanying specifications in
accordance with Terms and Conditions herein. The bids shall be prepared and furnished as
per these Instructions.
2.0 Qualification Requirement
1 Registration: Bidder shall be strictly a GETCO registered contractor of E1 and above class
1. Bidder shall have executed minimum 01no. of 220/66KV or higher voltage class
substation with state or central Transmission Utility or major industries
equivalent nos. of 220KV or higher voltage class Transformer/Feeder bays at same or
different locations. Substations include minimum two nos. of feeder bays, one no. of
transformer bay with at least 1 Nos 220kV bus Extension Work.
2. The bidder shall have valid Electrical Contract License and approved
vendor of GETCO/ STU/ CTU, registered under sales-Tax Act, service tax act and should
have CPF/ PF registration certificate Attested Xerox copy of work orders executed from
GETCO and satisfactory completion certificate from respective department should be
3. Solvency: Latest bank solvency certificate from any Nationalized/Scheduled Bank of
a sum of minimum 20 % of the estimated cost shown in the tender.
4 Provident Fund Code: Separate provident fund code number towards firm registered
with Regional P. F. Commissioner.
5 Profit & Loss Account Statement: The Bidder should submit certified Xerox audited
copy of the Balance sheet with profit and loss account of last three Years.
6 Nature of Firm: Attested copy of Partnership Deed, Power of Attorney, if any, for
signing the bid documents in case of partnership firm & self-affidavit for proprietorship
firm. All such documents shall have to be NOTARISED.
7. GST Registration: The Bidder should have to take registration under the “GOODS AND
SERVICE TAX(GST)”. Bidder has to register online in given link before bidding. Link for
the same is www.getcogujarat.com/. The certified Xerox copy of such registration
shall have to be submitted along with the bid by the bidder.
8. I.T. PAN CARD: The bidder should submit the attested zerox copy of PAN Card of their
10. Electrical contractor’s license: The bidders should submit the attested copy of GOG
Electrical Contractor licenses of firm with latest validation.
11. Welfare cess registration: As per welfare cess act. Bidder shall be registered under
welfare cess. & have to be submitting along with the bid. Also, bidder has to take
registration of said site and submit the same to this office.
11. List of Tools & Tackles.
The bidders must be attach submitted all above documents scanned copy on n-procure and
certified/self-verified copy of all documents submit with on-line Technical bid.
Seal & Signature of Bidder
Check list for Documents submission
MANDATORY TO UPLOAD ONLINE ONLY (PDF FILE)
Sr No Particulars Check
01 Scan of Online payment receipt
02 Scan of Online payment receipt
03 Documents as per QR
04 Annexures 1 to
05 Integrity Pact form
06 Experience as per QR
2.2 The above cited requirements are only indicative. The owner reserves the right to requisition
any other relevant information and also reserves the right to reject the Bid proposal of any
Bidder, if in the Owner’s opinion the Qualification data is incomplete and Bidder is not
qualified to perform the Contract satisfactorily.
3.0 Bidding Costs
All costs/expenses in the preparation and submission of the Bid (including any post Bid
discussions/presentations) shall be fully borne by the Bidder. Owner will not be
responsible/ liable for these costs irrespective of the course and conclusion of this Bidding.
B. BID DOCUMENTS
4.0 Details of Documents
4.1 The following Bid documents apart from Invitation to Bid detail the material and equipment
specifications/characteristics, the bidding procedures and the terms & conditions of contract:
a. Instructions to Bidders (ITB-Part I)
b. General Conditions of Contract (GCC-Part I)
c. Erection Conditions of Contract (ECC-Part I)
d. Special Conditions of Contract (SCC-Part I)
e. Technical Specifications (TSP-Part IIA)
f. Technical Data Sheets (TDS-Part IIB)
5.0 Knowing the Bid Documents
5.1 Every intending B id der is to examine and understand a l l instructions, f o r m s , terms,
conditions a n d specifications in the Bid Documents and fully know himself all the conditions
and contents therein, which may in any manner, affect the scope & content of work and the
costs thereof. Submission of a Bid not substantially responsive to the Bid Document in all
respects and/or failure to furnish all information required by the Bid Document may entail
rejection of the Bid at the Bidder’s risk.
6.0 Clarifications on Bid Documents
6.1 In case an intending Bidder finds any discrepancy or omission in the documents and
specifications or is in doubt as to the true meaning of any part, he shall make a request, in
writing not later than the date of pre Bid d i s c u s s i o n t o the owner in triplicate. The o w n e r
w i l l i s s u e e x p l a n a t i o n s , i n t e r p r e t a t i o n s and clarifications as deemed fit in writing
as a response to this request. On receipt of such interpretations/clarifications, the Bidder may
Seal & Signature of Bidder
submit his Bid within the date and time stipulated in the Bid invitation, all such explanations,
interpretations and clarifications from the Owner shall be deemed as part of Bid Documents
and shall invariably accompany the Bidder’s proposal.
6.2 Any verbal/telephonic clarifications and information given by the Owner or his employee (s) or
his representative(s) will not in any way be binding on the Owner.
7.0 Amendment of bidding document:
7.1 At any time prior to the deadline for submission of Bids the Owner may, for any reason,
whether at his own initiative or in response to a clarification requested by the intending
Bidder, modify the Bidding Document with amendment(s).
7.2 The amendment will be notified in writing or Fax /web site to all intending Bidders who
have received the Bidding Document at the address contained in the letter of request for
issue of bidding document from the Bidders. Owner will bear no responsibility or liability
arising out of non-receipt of the same in time or otherwise.
7.3 In order to afford prospective bidders reasonable time in which to take the amendment into
account in preparing their bids, the Owner may, at his discretion, extend the deadline for the
submission of bids.
7.4 Such amendments, clarifications etc. shall be binding on bidders and will be given due
consideration by the Bidders while they submit their bids and shall invariably enclose such
documents as a part of the bid.
C. PREPARATION OF BIDS
8.0 Language of Bid:
8.1 The Bid prepared by the Bidder and all correspondence and documents relating to the Bid,
exchanged by the Bidder and the Owner, shall be written in the English language, provided
that any printed literature furnished by the Bidder may be written in another language so
long as accompanied by an English translation of its pertinent passages. Failure to comply
with this may disqualify a bid. For purposes of interpretation of the bid, the English translation
Bidders have to make the Bid in the formats furnished with this Document. Verbatim without
adding any printed/type written text of their own.
9.0 Local Conditions:
9.1 It will be imperative on each Bidder to fully inform himself of all local conditions and factors,
which may have any effect on the execution of the Contract covered under these documents
and specifications. The Owner shall not entertain any request for clarifications from the
bidders, regarding such local conditions.
9.2 It must be understood and agreed that such factors have properly been investigated and
considered while submitting t h e pr oposals. No c l a i m f o r f inancial a d j u s t m e n t t o
the Contract awarded under these specifications and documents will be entertained by
the owner. Neither any change in the time schedule of the Contract nor any financial
adjustments arising thereof shall be permitted by the Owner, which are based on the lack of
such clear information or its effect on the cost of the works to the Bidder.
10.0 Documents comprising the Bid:
Requirements etc. furnished in the Bidding Documents, indicating, for the services to be
Seal & Signature of Bidder
rendered, a brief description of services, quantity and price.
10.2 The Bidder shall also submit documentary evidence to establish that the Bidder meets the
Qualification Requirements as detailed in Clause 2.0 above and Special Conditions of
Contract (including Clause 11 of I TB).
10.3 All Tender Documents/ formats are to be returned completed and filled in all respects and
signed by the Company Authorized Signatory wherever specified.
10.3 The Bid Guarantee shall be furnished in a separate cover in accordance with clause specific
11.0 Scope of the proposal
11.1 The Scope of the proposal shall be on the basis of a single Bidder’s responsibility,
completely covering all the equipment erection and other installation services specified under
the accompanying Technical Specifications. It will include among others as specified therein
the following:-
e) Receipt of equipments and material from Kansari R&M store/Kansari Const. store or
any GETCO construction store and transporting, storage, preservation and conservation
of equipment at the Site.
f) Pre-assembly, if any, erection, testing and commissioning of all the equipment.
g) Reliability tests and performance and guarantee tests on completion of commissioning.
11.2 As specified in the Special Conditions of Contract, no deviation whatsoever to certain
conditions of the bidding documents permitted by the Owner and therefore, the Bidders are
advised that while making Bid Proposals and quoting prices these conditions may
appropriately be taken into consideration. Bidders are required to furnish a certificate in this
regard as per the format provided in Special Conditions of Contract in a separate sealed
envelope containing Bid security, which shall accompany the Technical Bid. Any Bid not
accompanied by such certificate shall be rejected by the Owner and shall not be opened.
11.3 Bids not covering the above cited entire scope of works may be treated as incomplete and
hence rejected.
11.4 The Bidder shall complete all the schedules & annexure in the Bid Proposal Sheets,
Technical Data Sheets and specified elsewhere. The Qualifying Data should be filled in
the required schedule of Bid Proposal Sheets.
12.0 Bid Price:
12.1 The Bidder shall indicate percentage above/below of total bid price indicated in the
commissioning, and other services it proposes to furnish under the contract. Prices quoted
should be in % Above/ Below on Estimated Cost. However, detail bifurcation of Taxes
applicable should be mentioned separately with Price bid
12.2 The Bidder shall specifically note that the Tenders are invited on percentage rate
12.3 If the Supplier/Contractor has opted for the Composition scheme of GST, the same must be
clearly specified with valid Declaration & Certificate from Department. In the event of
withdrawal/cessation of the Supplier from Composition scheme during the tenure of the
contract, the rate (i.e. price) mentioned in the price bid shall be final and any additional GST will
have to be borne by the tenderer himself. In no case additional amount towards GST or
otherwise will be paid / reimbursed to supplier/contractor. Further Statutory Variation clause will
not be applicable in case of Supplier / Contractor has opted for Composition Scheme under
Seal & Signature of Bidder
Also, please mention separate applicable HSN / SAC Code and rate of GST and Cess as
applicable for each item of Goods/Service. If not specifically mentioned then COMPANY will
have the option to take the prices as exclusive of taxes and duties at maximum higher slab
rates for the evaluation of the tenders.
The offered prices to be indicated in online mode of tender in the format given (i.e. Schedule-B).
The price bid submitted in physical mode shall not be considered.
Every bidder shall inform their GSTIN No. of the registered place(s) wherefrom the bidder intends
to supply the goods / services, meaning thereby the bidder has to supply the goods / services
from the relevant declared / registered place of supply only.
13.0 Price Basis:
13.1 The Price shall be quoted on firm basis.
13.2 The Price quoted by the bidder shall remain fixed during the bidder's performance of the
contract and shall not be subject to variation on any account save for change in quantity.
A bid submitted with an adjustable price quotation shall be treated as non-responsive and
14.0 Taxes and Duties:
14.1 As regards the income Tax, will be levied as per prevailing rate on payment to contractors. Any
other tax except specifically mentioned in tender will not be born by GETCO. The bidder shall be
liable and responsible for payment of such taxes as attracted under the provisions of the law.
14.2 Notwithstanding the tax liabilities as per the sub-clause14.1 above the owner shall have the
right to make deduction at source from the amounts payable to the contractor in respect of
Income Tax (on the cost of items of supply included in the works contract) as may be
mandatory in terms of the law. The owner shall not bear any liability in this regard but shall
issue necessary certificate in respect of such deduction made.
14.3 In case any tax or duty is newly introduced by the Government applicable for this contract
with effect from the next day of the date submission of the bid and if the contractor is
required to pay additional tax or duty, then the owner shall reimburse the contractor the
additional tax or duty so paid by the contractor against submission by the contractor of
documentary evidence to the satisfaction of the owner. This provision will not be applicable
to transaction between the contractor and his sub-contractors. Besides the said statutory
variation, no other statutory variation shall be payable by the owner.
14.4 The owner’s liability for all taxes and duties under the contract shall be limited to those
indicated by the Bidder in the Bid Proposal Sheets, subject to the statutory variations and
variations as per Clause No.
14.3. If the cost to the Contractor during the performance of the ‘Contract’ shall be increased or
reduced by reasons of the making, passing or promulgation of any law after the date of
submission of bid or by any order, regulation or bye-law having the force of law the amount
of such increase or reduction shall be added to or deducted f rom the “Contract Price” as
the case may be for direct transactions b e t we en contactor & owner, and not for bought
out items. It is the Bidders responsibility to furnish details of taxes, duties, levies etc.
applicable as on the date of submission of the bid.
14.5 No claim for any increase towards the statutory variation regarding enhancement of existing
tax or duty or introduction of a new tax or duty applicable shall be entertained by the Owner
during the extended period of contract, if any, provided the extension of the contract is
required by causes attributable to the contractor.
14.6 The provision of statutory variation regarding enhancement of existing tax or duty or
introduction of a new tax or duty will be applicable only to the direct transaction between the
Seal & Signature of Bidder
contractor and the owner.
14.7 Before quoting, the bidder may ascertain from the concerned tax authorities of Government of
Gujarat the applicability of Work Contract Tax. Entry Tax, GST, etc. in respect of this work
and include the same in the quoted price. No separate claim in this regard will be
entertained by the Owner, as it is the responsibility of the Bidder to pay all these taxes.
14.8 In addition, the conditions detailed under Special Conditions of Contract shall apply.
15.0 Time Schedule:
15.1 The basic consideration and the essence of the contract shall be strict adherence to the
time schedule for performing the specified works.
15.2 The Owner’s requirements of completion schedule for the Works are mentioned in the
accompanying Special Conditions of Contract.
15.3 The completion schedule as stated in the special conditions of contract shall be one of the
major factors in consideration of the bids.
15.4 Validity of tender: 180 Days from the date of opening of Technical Bid
16.0 Insurance:
The Bidder’s insurance liabilities pertaining to the scope of Works are detailed out in
Clauses titled Insurance, in General Terms and Conditions of Contract and in Erection
Conditions of this Part-I. Bidder’s attention is specifically invited to these clauses. Bid price
shall include all the costs in fulfilling all the insurance liabilities under the Contract.
17.0 Erection Tools and Tackles:
The Bidder under a separate schedule, in his proposal shall include a list of all-special
equipment tools & tackles e t c . which h e proposes t o bring t o site f or the purpose o f
erection, h a n d l i n g , t e s t i n g a n d commissioning including performance and guarantee
tests of the equipment. If any such equipment is listed anywhere else in the proposal and
not specially mentioned in the above schedule, it shall be deemed to have been included in
the Bidder’s proposed scope of supply.
18.0 Bid Security/EMD:
18.1 The bidder shall furnish, as a part of its bid EMD, bid security for an amount of one percent
of estimated cost to be paid as under:
a) All the Bidders will be required to pay Tender Fees with applicable GST and EMD as
mentioned in the Tender document either in Cash (up to Rs. 10,000/- only) at the office
address specified in the tender document or by RTGS/ NET/online
18.2 The bid security is required to protect the owner against the risk of Bidder’s conduct, which
would warrant the guarantee forfeiture, pursuant to relevant paras elsewhere The bid
guarantee shall be made payable to the Owner without any condition whatsoever.
18.3 The Owner will reject any bid not secured in accordance with Para 20.1 above, as non-
responsive, No exemptions are made in the furnishing of the security.
18.4 Unsuccessful B idder ’s bid security/EMD w i l l be returned/refunded o n finalization of tender
or three months from the date of submission of tender whichever is later.
18.5 The successful b i d d e r s , B id Security wi l l be discharged u p o n , furnishing t h e contract
p e r f o r m a n c e guarantee
18.6 The bid guarantee may be forfeited.
a) If a Bidder withdraws its bid during the period of bid validity specified by the bidder
Seal & Signature of Bidder
b) If a bidder refuses to accept the contract or fails to commence the works (including
supplies within thirty days of letter of award of contract)
19.0 Format of Bid:
19.1 The Bidder shall prepare one copy of the technical bid with all the documents. No
Hard/Physical copy of Price/Commercial bid required in physical submission. Technical as
well as Price bid must be considering from N-Code/Online only
19.2 The original and all copies of the bid shall be typed or written in indelible ink and shall be
signed by the Bidder o r a person o r persons d u l y a ut hor i ze d b y the Bidder t o sign
t he Contract. The lett er of authorization shall be indicated by written power-of-attorney
accompanying the bid. All pages of the bid, except for un-amended printed literature, shall be
initiated by the person or persons signing the bid.
19.3 The Bidders must submit the qualifying data in the technical bid in this Instructions to
Bidders in separate envelopes sealed and enclosed in the envelope submitting
proposals, super scribed as under:
Erection of (1) 01 no. of 400/220KV, 500MVA, ICT -5 bay Work (2) 400kV Bus Extension
(A,B & C) work (3) Erection of 220kV Palanpur Line-2 bay with 220kV Bus Extension Work
at 400KV Kansari ss under Palanpur Circle.
19.4 The bid shall contain no interlineations, er asur es or overwriting except as necessary to
correct errors made by the Bidder, in which case such corrections shall be initiated by the
person or persons signing the bid.
No Hard/Physical copy of Technical/Price/Commercial bid required in physical submission.
Technical Bid as well as Price bid must be consider from N-Code/Online only
20.0 Signature of Bids:
21.1 The bid must contain the name, residence and place of business of the person or persons
making the bid and must be signed and sealed by the Bidder with his usual signature. The
names of all persons signing should also be typed or printed below the signature.
20.2 Bid by a partnership must be furnished with full names of all partners and be signed with the
partnership name; followed by the signature(s) and designation(s) or the authorized partner(s)
or other authorized representative(s).
20.3 Bids by Corporation/Company must be signed with the legal name of the
Corporation/Company by the President/Managing Director or by the Secretary or other person
or persons authorized to bid on behalf of such Corporation/Company in the matter.
20.4 A bid by a person who affixes to his signature the word ‘President’, ‘Managing Director’,
‘Secretary’, ‘Agent’ or other designation without disclosing his Principal will be rejected.
20.5 If it is found that two or more persons who are connected with one another either
financially or as a principal and agent have bid under different names without disclosing their
connection then such bids will be l i a b l e for rejection. Satisfactory evidence of authority of
the person signing on behalf of the Bidder shall be furnished with the bid.
20.6 The Bidder’s name stated on the proposal shall be the exact legal name of the firm.
20.7 Bids not conforming to the above requirements of signing may be disqualified and EMD
22.0 Deadline for submission of bids:
Seal & Signature of Bidder
22.1 The Bidders have been send by registered post only. Bids submitted b y telex/telegram w i l l
not be accepted. No request from any Bidder to the Owner to collect the proposals from
airlines, cargo agent etc. shall be entertained by the Owner.
22.2 Bids must be received by the Owner at the address specified under Para 23.3, not later
than the time & date mentioned in the Invitation to Bid.
22.3 The Owner may, at its discretion, ext end this deadline for the submission of bids by
amending the Bidding Document in which case all rights and obligations on the Owner and
Bidders previously subject to the deadline will thereafter be subject to the deadline as
23.1 Any bid received by the Owner after the time and date fixed or extended for submission of
bids prescribed by the Owner, will be rejected and not considered for evaluation.
23.0 Modification and withdrawal of bids:
23.1 The Bidder may modify or withdraw its bid after the bid’s submission provided that written
notice of the modification or withdrawal is received by the Owner prior to the deadline
prescribed for submission of bids.
23.2 The Bidder’s modification o r withdrawal notice shall be prepared, sealed, marked and
dispatched in accordance w i t h t h e pr ovisions o f clause 2 3 . 0 . The envelope should
clearly indicate whether the modification is for the Technical bid or the Price bid. No bid
modifications notice by Telex/Grams/Fax shall be entertained by the Owner.
23.3 No bid shall be modified in any manner, whatsoever subsequent to the deadline for
submission of bids.
23.4 No bid may be withdrawn in the interval between the deadline for submission of bids and
the expiration of the period of bid validity specified by the Bidder on the Bid Form.
Withdrawal/modification of a bid during this interval may result in the Bidder’s forfeiture of its
E. BID OPENING AND EVALUATION
27.0 Opening of bids by owner:
27.1 The Owner will open the technical bids (Cover –I, II, ) in the presence of Bidder’s
representatives who choose to attend on the date and time mentioned for opening of bids
in the Invitation to Bid or in case any extension has been given thereto, on the extended
bid opening date and time notified to all the Bidders who have purchased the bidding
document. The Bidder’s representatives who are present shall sign a register evidencing
their attendance.
27.2 The Bidder’s names, Technical modifications, Bid withdrawal and such other details as the
Owner, at his discretion may consider appropriate, will be announced in the Technical Bid
27.3 The price bids of all the “Techno-Commercial” Responsive Bidders shall be opened in the
presence of representatives (up to two per firm) of such bidders who choose to be present.
The date & time of opening the Price Bid shall be intimated to all such qualified bidders by
Fax/Telex, at least one week in advance besides inviting final price bid if found appropriate
after evaluation of Technical bids.
27.4 The Bidder’s name, lump sum Bid Price, all discounts if any, modifications in the Price Bid
Seal & Signature of Bidder
and any such other details as the Owner, at his discretion, may consider appropriate, will
be announced/ furnished in the Price Bid Opening.
27.5 No electronic recording/transmitting devices will be permitted during Bid opening.
28.0 Purpose of evaluation of bids:
28.1 The Bids received/accepted/opened will be evaluated by the Owner to ascertain the
technical responsiveness of the bid for the complete scope of the proposal, as covered
under these specifications and documents. All technically responsive bids shall then be
examined to determine the LOWEST EVALUATED COMMERCIALLY AND TECHNICALLY
RESPONSIVE BIDS.
29.0 Policy for bids under consideration:
29.1 Bids shall be deemed to be under consideration immediately after opening of Technical
Bid and until such time official intimation of award/rejection is made by the Owner to the
Bidders. While the Bids are under consideration, Bidders and/or their representatives and
other interested parties are advised to refrain from contacting by any means, the owner
and/or his employee’s representatives on the matters related to Bids under consideration.
30.0 Clarification of bids:
To assist in the examination evaluation and comparison of Bids the owner may on his own
ask the Bidder for a clarification of its bid. The request for clarification and the response
shall be in writing and no change in the price or substance of the bid shall be sought, offered
31.0 Preliminary Examination:
31.1 The Owner will examine the bids to determine whether they are complete, whether any
computational errors have been made, whether required sureties have been furnished,
whether the documents have been properly signed, and whether the bids are generally in
31.2 Arithmetical errors will be rectified on the following basis:
If there is a discrepancy between the unit price and the total price that is obtained by
multiplying the unit price and quantity, t h e unit price shall prevail and the total price
shall be corrected. If there is a discrepancy between the total bid amount and the sum of
total costs, the latter shall prevail and the total bid amount will be corrected accordingly. If
there is a discrepancy bet wee n words and figures, the amount advantageous to the Owner
will prevail. If the Bidder does not accept the correction of the errors as above, his Bid will
be rejected and the amount of Bid Security will be forfeited. The Bidder should ensure that
of any inconsistency in the prices furnished in the specified prices schedules to be identified
in Bid Form for this purpose, the Owner shall be entitled to consider the highest price for
the purpose of evaluation and for the purpose of award of Contract use the lowest of the
prices in these schedules.
31.3 Prior to the detailed evaluation, the Owner will determine the substantial responsiveness
of each bid to the Bidding Docum ent. For purpose of these Clauses, a substantially
r e s p o n s i v e b i d is one, which conforms t o all the terms and conditions o f the Bidding
Docum ent w i t h o u t material de vi at i o ns. A material deviation is one which affects in
any way the prices, quality, quantity or delivery period of the equipment, completion of
works or which limits in any way the responsibilities or liabilities of the Bidder of any right of
the Owner as required in these specifications and documents. The Owner’s determination of
a bid’s responsiveness shall be based on the contents of the bid itself without recourse to
extrinsic evidence.
Seal & Signature of Bidder
31.4 A bid determined as not substantially responsive will be rejected by the Owner and may not
subsequently be made responsive by the Bidder by correction of non-conformity.
31.5 The Owner may waive any minor informality or non-conformity or irregularity in a bid which
does not constitute a material deviation, provided such waiver does not prejudice or affect
the relative ranking of any Bidder.
32.0 Evaluation of Price Bids: No Copy of Technical Bid/PRICE-BID requires in
Physical copy of bid. It is compulsory to submit through on-line (n-code) only.
Same will observed in bid during opening, whole tender may be not
32.1 Definitions and Meanings:
For the purpose of the evaluation and comparison of bids, the following meanings and
definition will apply: -
a) ‘Bid Price’ shall mean the price quoted by each Bidder in his proposal for the complete
scope of works.
d) ‘ Evaluated Bid Price’ shall be summation of ‘Bid Price’, ‘Differential Price’ and ‘Cost
Compensation for Deviations.’
F. AWARD OF CONTRACT
33.0 Award Criteria
33.1 The owner will award the contract to the successful B idder , whose bid has been
determined t o be substantially responsive and has been determined as the lowest
evaluated bid, providing further that the Bidder is determined to be qualified to perform the
contract satisfactorily. The Owner shall be the sole judge in this regard.
33.2 Further, the Owner reserves the right to award separate contracts to two or more parties
in line with the terms and conditions specified in the accompanying Technical Specifications.
34.0 Owner’s right to accept any bid and to reject any or all bids:
34.1 The Owner reserves the right to accept or reject any bid, and to annual the bidding
process and reject all bids at time prior to award of contract, any without thereby incurring
any liability to the affected Bidder or Bidders or any obligation to inform the affected Bidder
or Bidders of the grounds for the Owner’s action.
35.0 Notification of award:
35.1 Prior to the expiration of the period of bid validity and extended validity period, if any, the
Owner will notify the successful Bidder in writing by registered letter or cable or telex or
FAX, to be confirmed in writing by registered letter, that its bid has been accepted.
35.2 The notification of award will constitute the formation of the Contract.
35.3 Upon the successful Bidder’s furnishing of performance guarantee pursuant to relevant
clause 38 .0, the Owner will promptly notify each unsuccessful Bidder and will discharge its
bid security, pursuant to Clause 20.0.
36.0 Signing of contract:
36.1 At the same time as the Owner notifies the successful Bidder that his bid has been
accepted, the Owner will send the Bidder the detailed of Award, incorporating all agreements
Seal & Signature of Bidder
between the parties.
36.2 Within 15 days of receipt of the detailed of Award, the successful bidder shall sign the
same with date and return it to the Owner.
36.3 The Bidder will prepare the Contract Agreement as per the Performa prescribed and the
same will be signed before commencement of work.
37.0 Welfare cess
1) As per the Welfare cess Act, the welfare cess @ 1% is applicable on supply and erection items
for supply, erection, testing & commissioning of substation, transmission lines, EPC/Turnkey
projects and civil works. Before release of payment of every RA bill, the contractor has to submit
documentary evidence of payment of welfare cess of that RA bill at the time of the final bill for
final bill. Also, the bidder should submit the certified copy of welfare registration before 1st RA bill.
The payment should be released after submission of said registration.
2) Contractor shall get registered under welfare cess Act before commencement of work. Office of
the factory inspector is authorized at present as a registering authority.
3) GETCO shall pay the welfare cess by way of reimbursing to contractors on production of
documentary evidence of payment.
4) The contacts for which supply or part supply of material are in the scope of GETCO, then
contractors shall deposit welfare cess on estimated cost of supplied items to GETCO contractor
on progressive basis of utilization. As this part of welfare cess is on GETCO account, the same
shall be reimbursed to the contractor on receipt of request letter along with documentary
evidence of payment. For calculation of welfare cess on supply part, valuation as per MR shall
be taken and informed to the contractor for payment. This will be over and above the A/T value.
Seal & Signature of Bidder
GENERAL TERMS & CONDITIONS OF CONTRACT
A. INTRODUCTION
1.0 DEFINITION OF TERMS
1.1 The ‘Contract’ means the agreement entered into between the Owner and the
Contractor as per the Contract Agreement signed by the parties, including all
attachments and appendices thereto and all documents incorporated by reference therein.
1.2 ‘Owner’ shall mean the Superintending Enginee, GETCO, Palanpur or any of its
subsidiaries and shall include its legal representatives, successors and assigns.
1.3 ‘Contractor’ shall mean the Bidder whose bid is accepted by the Owner for the award of the
Works and shall include such successful Bidder’s legal representatives, successors and
permitted assigns.
1.4 ‘Engineer’ shall mean the officer appointed in writing by the Owner to act as Engineer from
time to time for the purpose of the Contract.
1.5 The terms ‘Equipment’, ‘Stores’ and ‘Materials’ shall mean and include equipment, stores
and materials to be provided by the Contractor under the Contract.
1.6 ‘Works’ shall mean and include the furnishing of equipment, Labor and services, as per the
Specifications and complete erection, testing and putting into satisfactory operation
including all transportation, handling, unloading and storage at the Site as defined in the
1.7 ‘Specifications’ shall mean the Specifications and Bidding Document forming a part of the
Contract and such other schedules and drawings as may be mutually agreed upon.
1.8 Site’ shall mean and include the land and other places on, into or through which the works
and the related facilities are to be erected or installed and any adjacent land, paths, street or
reservoir which may be allocated or used by the Owner or Contractor in the performance of
1.9 The term ‘Contract Price’ shall mean the lump-sum price quoted by the Contractor in
his bid with additions and/or deletions as may be agreed and incorporated in the Letter of
Award and the contract agreement for the entire scope of the works.
1.10 The term ‘Erection Portion’ of the Contract price shall mean the value of field activities of
the works including erection, testing and putting into satisfactory operation including successful
completion of performance and guarantee tests to be performed at Site by the Contractor
including cost of insurances.
1.11 Site Engineer ‘Inspector’ shall mean the owner’s Engineers or any person nominated
by the time to inspect the equipment; stores or Works under the Contract and/or the duly
authorized representative of the Owner.
1.12 ‘Notice of Award of Contract’/’Letter of Award’/’Telex of Award’ shall mean the official
notice issued by the Owner notifying the Contractor that his bid has been accepted.
Seal and signature of Contractor
1.13 ‘Order’ shall mean the official letter issued by the Owner informing the acceptance of the bid.
1.14 ‘Date of Contract’ shall mean the date on which letter of commencement of work issued by
the respective sub division deputy engineer.
1.15 ‘Month’ shall mean the calendar month. ‘Day’ or ‘Days’ unless herein otherwise expressly
defined shall mean calendar day or days of 24 hours each.
A ‘Week’ shall mean continuous period of seven (7) days.
1.16 Writing’ shall include any manuscript, type written or printed statement, under or over
signature and/or seal as the case may be.
1.17 When the words ‘Approved’, ‘Subject to Approval’, ‘Satisfactory’, ‘Equal to’, ‘Proper’,
‘Requested’, ‘As Directed’, ‘Where Directed’, ‘When Directed’, ‘Determined by’, ‘Accepted’,
‘Permitted’, or words and phrases of like importance are used the approval, judgment,
direction etc. is understood to be a function of the Owner/Engineer.
1.18 Test on completion shall mean such tests as prescribed in the Contract to be performed by
the Contractor before the work is taken over by the Owner.
1.19 ‘Performance and Guarantee Tests’, shall mean all operational checks and tests required to
determine and demonstrate capacity, efficiency, and operating characteristics as specified in
the Contract Documents.
1.20 The term ‘Final Acceptance’/‘Taking Over’ shall mean the Owner’s written acceptance of
the Works performed under the Contract, after successful commissioning/completion of
Performance and Guarantee Tests, as specified in the accompanying Technical Specifications
or otherwise agreed in the Contract.
1.21 ‘Latent Defects’ shall mean such defects caused by faulty designs, material or work-man-
ship which cannot be detected during inspection, testing etc, based on the technology
available for carrying out such tests.
1.22 ‘Codes’ shall mean the following including the latest amendments and/or replacements, if any:
a) Indian Electricity Act, 1905 and Rules and Regulations made there under.
b) Electricity Act 2003 and Rules & Regulations made there under.
c) Indian Factory Act, 1948 and Rules and Regulations made there under.
d) Indian Explosives Act, 1884 and Rules and Regulations made there under.
e) Indian Petroleum Act, 1934 and Rules and Regulations made there under.
f) A.S.M.E. Test Codes.
g) A.I.E.E. Test Codes.
h) American Society of Materials Testing Codes.
i) Standards of the Indian Standards Institution.
j) Other Internationally approved standards and/or rules and regulations touching the
subject matter of the Contract.
1.23 Words imparting the singular only shall also include the plural and vice –versa where the
context so requires.
1.24 Words imparting ‘Person’ shall include firms, companies, corporations and associations
or bodies of individuals, whether incorporated or not.
Seal and signature of Contractor
2.0 APPLICATION
These General Conditions shall apply to the extent that they are not super ceded by
provisions in other parts of the Contract.
3.0 CONTRACT DOCUMENTS
3.1 The term Contract Documents shall mean and include the following which shall be
deemed to form an integral part of the Contract:
a) Invitation to Bid including letter forwarding the Bidding Documents, Instructions to
Bidders, General Terms and Conditions of Contract, the Special Conditions of
Contract. and all other documents included under Part-I, Part-II and Part-III .
b) Specifications of the erection of the equipments and other technical services to be
provided under the Contract as brought out in the accompanying Technical
Specifications.
c) Contractor’s Bid Proposal and the documents attached there to including the letters of
clarifications thereto between the Contractor and the Owner prior to the Award of
Contract except to the extent of repugnancy.
d) Letter of Award and any agreed variations of the conditions of the documents and special
terms and conditions of Contract, if any.
3.2 In the event of any conflict between the above mentioned documents the matter shall be
referred to the Engineer whose decision shall be considered as final and binding upon the
4.0 USE OF CONTRACT DOCUMENTS AND INFORMATION
4.1 The Contractor shall not, without the Owner’s prior written consent, disclose the
Contract, or any provision thereof, or any specification, plan, drawing, pattern, sample or
information furnished by or on behalf of the Owner in connection therewith, to any
person other than a person employed by the Contractor in the performance of the
Contract. Disclosure to any such employed person shall be made in confidence and shall
extend only so far as may be necessary for the purpose of such performance.
4.2 The Contractor shall not, without the Owner’s prior written consent, make use of any
document or information enumerated in various Contract documents except for the
purpose of performing the Contract.
4.3 The Contractor shall not communicate or us in advertising, publicity, sales releases or
in any other medium, photographs or other reproduction of the Works under this Contract,
or descriptions of the site, dimensions, quantity, quality or other information, concerning the
works unless prior written permission has been obtained from the Owner.
4.4 Any document, other than the Contract itself, enumerated in various Contract documents
shall remain the property of the Owner and shall be returned (in all copies) to the
Owner on completion of the Contractor’s performance under the Contract if so required by
Seal and signature of Contractor
5.0 CONSTRUCTION OF THE CONTRACT
5.1 Notwithstanding anything stated elsewhere in the bid documents, the Contract to be entered
into will be treated as a single Contract. Award shall be placed on the successful Bidder as
For providing s e r v i c e s l i k e inland t r a ns por t a t io n, i n s u r a n c e f o r delivery at site,
unloading, s t o r a g e , handling at site, installation, testing and commissioning including
performance testing in respect of all the equipment material equipment/materials given by the
owner after observing standard store procedures for transport f r o m o wn e r ’ s s t o r e s
i n s u r a n c e , u n l o a d i n g s t o r a g e h a n d l i n g a t site i n s t a l l a t i o n t e s t i n g &
5.2 In case erection Contract, or where the Owner hands over his equipment to the Contractor
for executing, then the Contractor shall at the time of taking delivery of the
equipment/dispatch documents be required to execute an Indemnity Bond in favor of the
Owner in the form acceptable to the S u p e r i n t e n d i n g engineer , Palanpur for keeping the
equipment in safe custody and to utilize the same exclusively for the purpose of the said
Contract. Samples of Performa for the Indemnity Bond will be furnished during award of
5.3 The Contract shall in all respects be construed and governed according to Indian Laws.
5.4 It is clearly understood that the total consideration for the Contract(s) has been broken up into
various components only for the convenience of payment under the Contract(s) and for the
measurement of deviations or modifications under the Contract(s).
6.0 JURISDICTION OF CONTRACT
6.1 The laws applicable to the Contract shall be the laws in force in India. The Courts of
Palanpur shall have exclusive jurisdiction in all matters arising under this Contract.
7.0 EXECUTION OF CONTRACT:
7.1 The Owner, after the issue of the Letter of Award to the Contractor, will send one copy
of the final agreement to the Contractor for his scrutiny and approval.
7.2 The Agreement, unless otherwise agreed to, shall be signed within 30 days of the acceptance
of the Letter of Award, at the office the Owner at Palanpur on a date and time to be mutually
agreed. The Contractor shall provide for signing of the Contract, Performance Guarantee,
appropriate power of attorney and other requisite materials. In case the Contract is to be
signed beyond the stipulated time, the Bid Guarantee submitted with the Proposal will have to
be extended accordingly.
7.3 The Agreement will be signed in copies to be specified and the Contractor shall be
provided with one signed original and the rest will be retained by the Owner.
7.4 Subsequent to signing of the Contract, the Contractor at his own cost shall provide the
Owner with copies of agreement within fifteen (15) days after the signing of the Contractor.
8.0 ENFORCEMENT OF TERMS
8.1 The failure of either party to enforce at any time any of the provisions of this Contract or any
rights in respect thereto or to exercise any option therein provided, shall in no way be
Seal and signature of Contractor
construed to be a waiver of such provisions, rights or options or in any way to affect the
validity of the Contract. The exercise by either party of any of its rights herein shall not
preclude or prejudice either party from exercising the same or any other right it may have
under the Contract.
9.0 COMPLETION OF CONTRACT
9.1 Unless otherwise terminated under the provisions of any other relevant clause, this Contract
shall be deemed to have been completed on the expiry of the guarantee period as provided
for under the clause entitled ‘Guarantee’ in this section of the Volume-I.
B. GUARANTEES & LIABILITIES
10.0 TIME – THE ESSENCE OF CONTRACT
10.1 The time and the date of completion of the Contract as stipulated in the Contract by the
Owner without or with modifications, if any, and so incorporated in the Letter of Award, shall
be deemed to be the essence of the Contract. The Contractor shall so organize his resources
and perform his work as to complete it not later than the date agreed to.
10.2 The Contractor shall submit a detailed bar chart within the time frame agreed consisting of
adequate number of activities covering various key phases of the work such as
design, procurement, manufacturing, shipment and field erection activities within seven (7)
days of the date of LOI.
10.3 The above bar chart shall be compatible with the Owner’s computer environment and
furnished to the Owner on such media as may be desired by the Owner.
11.0 EFFECTIVENESS OF CONTRACT
The Contract shall be considered as having come into force from the date of the
commencement given by the respective construction sub division unless otherwise provided
12.0 PENALTY FOR DELAY
The tenderer should note that the completion time allowed for carrying out the work should be
strictly observed. Any delay that may take place in work excavation beyond Contractual cutoff
date stated as per stipulated delivery period shall be subject to the penalty at the rate of ½ % per
week or part there of on delayed portion of the work subject to ceiling of 10% of total contract
value Plus GST as applicable will be impose.
The penalty will be deducted from bills payable either against this contract or from any Bank
Guarantee or any other amount payable under any other contract with the GETCO.
13.1 In the event of any emergency where in the judgment of the Engineer, delay would cause
serious loss or damages, repairs or adjustment may be made by the Engineer or a third
party chosen by the Engineer without advance notice to the Contractor and the cost of such
work shall be paid by the Contractor. In the event such action is taken by the Engineer, the
Contractor will be notified promptly and he shall assist wherever possible in making necessary
corrections. This shall not relieve the Contractor of his liabilities under the terms and
conditions of the Contract.
13.2 If it becomes necessary for the Contractor to rectify or renew any defective portions of
the works the provision of this clause shall apply to portion of the works so rectified or
Seal and signature of Contractor
corrected until the expiry of six (6) months from the date of such rectification or correction.
If any defects are not rectified within a reasonable time, the Engineer may proceed to do
the work at the Contractor’s risk and cost but without prejudice to any other rights which the
Owner may have against the Contractor in respect of such defects.
13.3 The rectification or correction of the work will be carried out free of cost by the Contractor.
If any rectification or correction is carried out on his behalf at the site, the Contractor shall
bear the cost of such rectification or correction.
13.4 The acceptance of the works by the Engineer shall in no way relieve the Contractor of
his obligations under this clause.
14.0 TAXES, PERMITS & LICENSES
The Contractor shall be liable and pay all non-Indian taxes, duties, levies lawfully assessed
against the Owner or the Contractor in pursuance of the Contract. In addition, the Contractor
shall be responsible for payment of all Indian duties, levies and taxes lawfully assessed
against the Contractor for his personal income & property only.
15.0 DEFENSE OF SUITS
If any action in court is brought against the Owner or Engineer or an officer or agent of the
Owner, for the failure, omission or neglect on the part of the Contractor to perform any acts,
matters, covenants or things under the Contract, or for damage or injury caused by the
alleged omission or negligence on the part of the Contractor, his agents, representatives or
his Sub-Contractors, or in connection with any claim based on lawful demands of Sub-
Contractors, workmen, suppliers or employees, the Contractor shall in all such cases
indemnify and keep the Owner, and the Engineer and/or his representative, harmless from
all losses, damages, expenses or decrees arising of such action.
16.0 LIMITATION OF LIABILITIES
The final payment by the Owner in pursuance of the Contract shall mean the release of the
Contractor from all his liabilities under the Contract. Such final payment shall be made only at
the end of the Guarantee/Warranty period or after finalization of material account and final bill
and till such time as the Contractual liabilities and responsibilities o f the Contractor, shall
prevail. All other payments made under the Contract shall be treated as on-account
17.0 ENGINEER’S DECISION
17.1 In respect of all matters which are left to the decision of the Engineer including the granting
or with- holding of the certificates, the Engineer shall, if required to do so by the Contractor,
give in writing a decision thereon.
17.2 If, in the opinion of the Contractor, a decision made by the Engineer is not in accordance
with the meaning and intent of the Contract, the Contractor may file with the Engineer,
within fifteen (15) days after receipt of the decision, a written objection to the decision.
Failure to file an objection within the allotted time will be considered as an acceptance of the
Engineer’s decision and the decision shall become final and binding.
17.3 The Engineer’s decision and the filing of the written objection thereto shall be a condition
precedent to the right to request arbitration. It is the intent of the Agreement that there
shall be no delay in the execution of the works and the decision of the Engineer as rendered
shall be promptly observed.
Seal and signature of Contractor
18.0 POWER TO VARY OR OMIT WORK
18.1 No alterations, amendments, omissions, suspensions or variations of the Works (hereinafter
referred to as ‘variation’) under the Contract as detailed in the Contract Documents, shall be
made by the Contractor except as directed in writing by the Engineer, but the Engineer shall
have full powers subject to the provisions hereinafter contained, from time to time during the
execution of the Contract, by notice in writing t o instruct t h e Contractor t o make such
v a r i a t io n w i t h o u t pr e j u d i c e t o the Contract. The Contractor shall carry out such
variation and be bound by the same conditions as far as applicable as though the said
variations occurred in the Contract Documents. If any suggested variations would, in the
opinion of the Contractor, if carried out, prevent him from fulfilling any of his obligations or
guarantees under the Contract, he shall notify the Engineer thereof in writing and the Engineer
shall decide forthwith whether o r no t, t h e s a m e s h a l l b e carried o u t a n d if t he
E n g i n e e r c o n f i r m s h i s i n s t r u c t i o n s , t h e Contractor’s obligations and guarantees shall
be modified to such an extent as may be mutually agreed. Any agreed difference in cost
occasioned by any such variation shall be added to or deducted from the Contract Price as
the case may be.
18.2 In the event of Engineer requiring any variation, a reasonable and proper notice shall be
given to the Contractor to enable him to work his arrangement accordingly, and in cases
where goods or materials are already prepared or any design, drawings or pattern made or
work done as per the contract requires to be altered, a reasonable and agreed sum in respect
thereof shall be paid to the Contractor.
18.3 In any case in which the Contractor has received instructions from the Engineer as to the
requirement of carrying out the alterations or additional or substituted work which either then
or later on, will in the opinion of the Contractor, involve a claim for additional payment, the
Contractor shall immediately and in no case later than thirty (30) days, after receipt of the
instructions aforesaid and before carrying out the instructions, advise the Engineer to that
effect. But the Engineer shall not become liable for payment of any charges in respect of
any such variations, unless the instructions for the performance of the same shall be
confirmed in writing by the Engineer.
18.4 If any variation in the Works results in reduction of Contract Price, the parties shall agree,
in writing, so to the extent of any change in the price, before the Contractor proceeds with the
18.5 In all the above cases, in the event of a disagreement as to the reasonableness o f the
said sum, the decision of the Engineer shall prevail.
18.6 Notwithstanding anything stated above in this clause, the Engineer shall have the full power
to instruct the Contractor, in writing, during the execution of the Contract to vary the
quantities of the items or groups of items in accordance with the provisions of clause entitled
‘Change of Quantity’ in section GCC of this Volume-I. The Contractor shall carry out such
variations and be bound by the same conditions as though the said variations occurred in the
Contract Documents. However, the Contract Price shall be adjusted at the rates and the
prices provided for the original quantities in the Contract.
19.0 CHANGE OF QUANTITY
19.1 During the execution of the Contract, the Owner reserves the right to increase or decrease
or cancel the quantities of items under the Contract but without any change in unit price or
other terms & conditions. Such variations unless otherwise specified in the accompanying
Special Conditions of Contract and/or Technical Specifications, shall not be subjected to any
Seal and signature of Contractor
limitation for the individual items but the total variations in all such items under the Contract
shall be limited to a percentage of the Contract price as specified in the Special Conditions
19.2 The Contract price shall accordingly be adjusted based on the unit rates available in the
Contract for the change in quantities as above. The base unit rates, as identified in the
Contract shall however remain constant during the currency of the Contract, except as
provided for in Clause 33.0 below. In case the unit rates are not available for the change in
quantity, the same shall be subjected to mutual agreement.
20.0 CO-OPERATION WITH OTHER CONTRACTORS AND CONSULTING ENGINEERS
The Contractor shall agree to cooperate with the Owner’s other Contractors and Consulting
Engineers and freely exchange with them such technical information as is necessary to obtain
the most efficient and economical design and to avoid unnecessary duplication of efforts.
The Engineer shall be provided with three copies of all correspondence a d d r e s s e d by the
Contractor t o other Contractors an d Consulting Engineers of the Owner in respect of such
exchange of technical information, wherever needed.
21.0 NO WAIVER OF RIGHTS
Neither the inspection by the Owner or the Engineer or any of their officials, employees, or
agents nor any order by the Owner or the Engineer for payment of money or any payment
for or acceptance of, the whole or any part of the Works by the Owner or the Engineer,
nor any extension of time, nor any possession taken by the Engineer shall operate as a
waiver of any provision of the Contract, or of any power herein reserved to the Owner or
any right to damages herein provided nor shall any waiver of any breach in the Contract be
held to be a waiver of any other or subsequent breach.
22.0 CERTIFICATE NOT T O AFFECT RIGHT OF OWNER AND LIABILITY OF THE
No interim payment certificate of the Engineer, nor any sum paid on account by the
Owner, nor any extension of time for execution of the Works granted by the Engineer shall
affect or prejudice the rights of the Owner against the Contractor or relieve the Contractor of
his obligation for the due performance of the Contract, or be interpreted as approval of the
Works done or of the equipment furnished and no certificate shall create liability for the
Owner to pay for alterations, amendments, variations or additional works not ordered, in
writing , by the Engineer or discharge the liability of the Contractor for the payment of
damages whether due, ascertained, or certified or not or any sum against the payment of
which he is bound to indemnify the Owner, nor shall any such certificate nor the
acceptance by him of any sum paid on account or otherwise affect or prejudice the rights of
the Owner against the Contractor.
23.0 PROGRESS REPORTS
During the various stages of the work in pursuance of the Contract, the Contractor shall at
his own cost submit periodic progress reports as may be reasonably required by the
Engineer with such materials as, charts, net-works, photographs, test certificates, etc. Such
progress reports shall be in the form and size as may be required by the Engineer.
24.0 TAKING OVER
Upon successful completion of all the tests to be performed at Site on equipment furnished
and erected by the Contractor, the Engineer shall issue to the Contractor a Taking over
Seal and signature of Contractor
Certificate as a proof of the final acceptance of the equipment. Such certificate shall not
unreasonably be withheld nor will the Engineer delay the issuance thereof on account of
minor omissions or defects which do not affect the commercial operation and/or cause any
serious risk to the equipment. Such certificate shall not relieve the Contractor of any of his
obligations which otherwise survive, by the terms and conditions of the Contract after issue
of such certificate.
25.1 The payment to the Contractor for the performance of the works under the Contract will be
made by the Owner as per the guidelines and conditions specified herein. All payments made
during the Contract shall be on account payments only. The final payment will be made on
completion of all Works and on fulfillment by the Contractor of all his liabilities under the
Contract and production of work completion certificate of the Sub-Station in-charge, after
following the procedures of GETCO.
Payment of Invoice will be done as mentioned below.
1. 80% of FOR destination price (on Adhoc basis)
2. 20% of FOR destination price & GST be kept under retention account and be released towards
final settlement of such invoice after verifying benefits of higher ITC passed on to the GETCO, based
on Certificates from Practicing CA firm in regard to passing of ITC and reduction in Tax instance.
It is to state that under GST Regime, the Suppliers will be entitled to Input Tax Credit (lTC) in
respect of Tax paid on input goods & service used by him as against the earlier Tax regime where
CENVAT Credit was available on account of Excise Duty and Input Tax Credit was available on
account of VAT. Hence under Statutory Variation clause, Excise Duty clause and extension in
Contractual delivery clause of Purchase Order & Works Order, the Supplier or Contractor are
supposed to pass on benefit on account of higher Input Tax Credit now available, due to introduction
of GST, for ongoing and pending supply &I works orders.
Considering, the Anti Profiteering provision of GST and Excise Duty and Statutory Variation clause
of Purchase Order and Works Order issued by GETCO, invoive will be processed & paid on
Adhoc/ provisional basis as mentioned above keeping balance 20% of FOR destination price +
GST under retention account.
25.2 Currency of Payment
All payments under the Contract shall be in Indian Rupees
Payment terms will be as prescribed in the special conditions of contract and on fulfillment of
conditions specified thereof.
26.0 Payment Schedule
26.1 Application for Payment
26.2 The Contractor shall submit application for the payment in the prescribed Performa of
the Owner. Performa for application for payment will be as prescribed.
Seal and signature of Contractor
26.3 Each such application shall state the amount claimed and shall set forth in detail, in the
order of the Payment Schedule, particulars of the Works including the Works executed at
Site and of the equipment shipped/brought on to the site pursuant to the Contract up to the
date mentioned in the application and for the period covered since the last preceding
certificate, if any.
26.4 Every interim payment certificate shall certify the Contract value of the Works executed up to
the date mentioned in the application for the payment certificate, provided that no sum shall
be included in any interim payment certificate in respect of the works that, according to the
decision of the Engineer, does not comply with the Contract.
26.5 Mode of Payment
26.6 Payment due on dispatch of equipment shall be made by the Owner through Owner’s Bank
or directly to the Contractor as per the payment schedule.
26.7 The payment of test charges, if any, payment, taxes and duties (whenever
admissible) inland transportation (including port handling), insurance and the erection
portion of the Works shall be made direct to the Contractor by the Owner.
26.8 All payments under the Contract shall be made as stipulated in the Special Conditions of
Contract after signing the Contract Agreement. The payments linked with the dispatch of
materials shall only be made after production of all dispatch documents as specified in the
relevant Contract conditions which will include the Material Inspection Clearance Certificate
issued by the Owner.
Progressive payments linked with erection shall only be made after the issue of
certificates by the Engineer, one for the quantum of work completed and the other for the
successful completion of quality check points involved in the quantum of work billed.
27.0 DEDUCTIONS FROM CONTRACT PRICE
All costs, damages or expenses that the Owner may have paid, for which under the
Contract the Contractor is liable, or any other retention award will be claimed by the
Owner. The Owner to the Contractor shall bill all such claims regularly as and when they
fall due. Such bills shall be supported by appropriate and certified vouchers or explanations,
to enable the Contractor to properly identify such claims. Such claims shall be paid by
the Contractor within thirty (30) days of the receipt of the corresponding bills and if not
paid by the Contractor within the said period, the Owner may then deduct the amount, from
any monies due or becoming due by him to the Contractor under the Contract or may be
recovered by sections of Law or otherwise.
D. RISK DISTRIBUTION
28.1 The Contractor at his cost shall arrange, secure and maintain all insurance as may be
pertinent to the Works and obligatory in terms of law to protect his interest and interests of
the Owner against all perils detailed herein. The form and the limit of such insurance as
defined herein together with the under-writer in each case shall be acceptable to the
Owner. However, i r r e s p e c t i v e of such acceptance, the responsibility to maintain
adequate insurance coverage at all time during the period of Contract shall be of Contractor
alone. The Contractor’s failure in this regard shall not relieve him of any of his contractual
responsibilities and obligations. The insurance covers to be taken by the Contractor shall be
Seal and signature of Contractor
in the joint name of the Owner and the Contractor. The Contractor shall, however, be
authorized to deal directly with Insurance Company or Companies and shall be responsible
in regard to maintenance of all insurance covers. Further the insurance should be in freely
convertible currency.
28.2 Any loss or damage to the equipment during handling, transportation, storage, erection,
putting into satisfactory operation and all activities to be performed till the successful
completion of commissioning of the equipment shall be to the account of the Contractor.
The Contractor shall be responsible for preference of all claims and make good the
damages or loss by way of repairs and/or replacement of the equipment, damaged or lost.
The transfer of title shall not in any way relieve the Contractor of the above responsibilities
during the period of Contract. The Contractor shall provide the Owner with copy of all
insurance policies and documents taken out by him in pursuance of the Contract.
Such copies of documents shall be submitted to the Owner immediately after such
insurance coverage. The Contractor shall also inform the Owner in writing at least
sixty (60) days in advance regarding the expiry/cancellation and/or change in any of
such documents and ensure revalidation, renewal etc., as may be necessary well in time.
28.3 The perils required to be covered under the insurance shall include, but not be limited to
fire and allied risks, miscellaneous accidents (erection risks) workman compensation risks,
loss or damage in transit, theft, pilferage, riot and strikes and malicious damages, civil
commotion, weather conditions, accidents of
all kinds, etc. The scope of such insurance shall be adequate to cover the
replacement/reinstatement cost of the equipment for all risks up to and including delivery of
goods and other costs till the equipment is delivered at Site. The insurance policies to be
taken should be on replacement value basis and/or incorporating escalation clause.
Notwithstanding the extent of insurance cover and the amount of claim available from the
underwriters, the Contractor shall be liable to make good the full replacement/rectification
value of all equipment/materials and to ensure their availability as per project requirements.
28.4 All costs on account of insurance liabilities covered under the Contract will be on
Contractor’s account and will be included in Contract Price, However, the Owner may from
time to time, during the pendency of the Contract, ask the Contractor in writing to limit the
insurance coverage, risks and in such a case, the parties to the Contract will agree for a
mutual settlement, for reduction in Contract price to the extent of reduced premium amount.
The Contractor, while arranging the insurance shall ensure to obtain all discounts on
premium, which may be available for higher volume or for reason of financing arrangement of
28.5 The clause entitled ‘Insurance’ under the section ECC of this Volume-I, covers the additional
insurance requirements for the portion of the works to be performed at the Site.
28.6 Special Conditions of Contract details out the various insurance liabilities.
29.0 LIABILITY FOR ACCIDENTS AND DAMAGES
Under the Contract, the Contractor shall be responsible for loss or damage to the plant until
the successful completion of commissioning as defined elsewhere in the Bid document.
30.0 DELAYS BY OWNER OR HIS AUTHORISED AGENTS
30.1 In case the Contractor’s performance is delayed due to any act of omission on the part of the
Owner or his authorized agents, then the Contractor shall be given due extension of time
for the completion of the Works, to the extent such omission on the part of the Owner
Seal and signature of Contractor
has caused delay in the Contractor’s performance of the Contract.
Regarding reasonableness or otherwise of the extension of time, the decision of the
Engineer shall be final.
30.2 In addition, the Contractor shall be entitled to claim demonstrable and reasonable
compensation if such delays have resulted in any increase in cost. The Owner shall examine
the justification for such a request for claim and if satisfied, the extent of compensation shall
be mutually agreed depending upon the circumstances at the time of such an occurrence.
31.0 FORCE MAJOR
31.1 Force major is herein defined as any cause which is beyond the control of the Contractor or
the Owner as the case may be, which they could not foresee or with a reasonable amount
of diligence could not have foreseen and which substantially affects the performance of the
Contract, such as:
a. Natural phenomena, including but not limited to floods, droughts, earthquakes and
b. Acts of any Government, domestic or foreign, including but not limited to war,
declared or undeclared, priorities, guarantees, and embargoes.
Provided either party shall within fifteen (15) days from the occurrence of such a cause notify
the other in writing of such causes.
31.2 The Contractor or the Owner shall not be liable for delays in performing his obligations
resulting from any force major cause as referred to and/or defined above The date of
completion will, subject to hereinafter provided, be extended by a reasonable time even
though such cause may occur after Contractor’s performance of obligation has been delayed
due to other causes.
32.0 SUSPENSION OF WORK
32.1 The Owner reserves the right to suspend and reinstate execution of the whole or any part
of the Works without invalidating the provisions of the Contract. Orders for suspension or
reinstatement of the Works will be issued by the Engineer to the Contractor in writing. The
time for completion of the works will be extended for a period equal to duration of the
32.2 Any necessary and demonstrable cost incurred by the Contractor as a result of such
suspension of the works will be paid by the Owner, provided such costs are substantiated to
the satisfaction of the Engineer. The Owner shall not be responsible for any liabilities if
suspension or delay is due to some default on the part of the Contractor or his Sub-
33.0 CONTRACTOR`S DEFAULT
33.1 If the Contractor shall neglect to execute the works with due diligence and expedition or shall
refuse or neglect to comply with any reasonable order given to him, in writing by the
Engineer in connection with the works or shall contravene the provisions of the Contract, the
Owner may give notice in writing to the Contractor to make good the failure, neglect or
contravention complained of. Should the Contractor fail to comply with the notice within thirty
(30) days from the date of serving the notice, then and in such case the Owner shall be at
liberty to employ other workmen and forthwith execute such part of the works as the
Seal and signature of Contractor
Contractor may have neglected to do or if the Owner shall think fit, without prejudice to any
other right he may have under the Contract to take the work wholly or in part out of the
Contractor’s hands and re-contract with any other person or persons to complete the works
or any part thereof and in that event the Owner shall have free use of all Contractor’s
equipment that may have been at the time on the Site in connection with the works without
being responsible to the Contractor for fair wear and tear thereof and to the exclusion of any
right of the Contractor over the same, and the Owner shall be entitled to retain and apply any
balance which may otherwise be due on the Contract by him to the Contractor, or such
part thereof as may be necessary, to the payment of the cost of executing the said part of the
Works or of completing the Works as the case may be. If the cost of completing of works or
executing part thereof as aforesaid shall exceed the balance due to the Contractor shall pay
such excess. Such payment of excess amount shall be independent of the liquidated
damages for delay which the Contractor shall have to pay if the completion of works is
33.2 In addition, such action by the Owner as aforesaid shall not relieve the Contractor of his
liability to pay liquidated damages for delay in completion of Works as defined in Clause
of this Section.
33.3 Such action by the Owner as aforesaid the termination of the Contract under this clause
shall not entitle the Contractor to reduce the value of the Contract Performance Guarantee
nor the time thereof. The Contract Performance Guarantee shall be valid for the full value
and for the full period of the Contract including guarantee period.
34.0 TERMINATION OF CONTRACT ON OWNER`S INITIATIVE
34.1 The Owner reserves the right to terminate the Contract either in part or in full due to
reasons other than those mentioned under clause entitled ‘Contractor’s Default’. The
Owner shall in such an event give fifteen (15) days notice in writing to the Contractor of his
decision to do so.
34.2 The Contractor upon receipt of such notice shall discontinue the work on the date and
to the extent specified in the notice, make all reasonable efforts to obtain cancellation of all
orders and Contracts to the extent they are related to the work terminated and terms
satisfactory to the Owner, stop all further sub- contracting or purchasing activity related to
the work terminated, and assist Owner in maintenance, protection, and disposition of the
works acquired under the Contract by the Owner.
In the event of such a termination the Contractor shall be paid compensation, equitable and
reasonable, dictated by the circumstances prevalent at the time of termination.
34.3 If the Contractor is an individual or a proprietary concern and the individual or the proprietor
dies and if the Contractor is a partnership concern and one of the partners dies then unless
the Owner is satisfied that the legal representatives of the individual Contractor or of the
proprietor of the propriety concern and in the case of partnership, the surviving partners, are
capable of carrying out and completing the Contract the Owner shall be entitled to cancel
the Contract as to its incomplete part without being in any way liable to payment of any
compensation to the estate of deceased Contractor and/or to the surviving partners of
the Contractor’s firm on account of the cancellation of the Contract. The decision of the
Owner that the legal representatives of the deceased Contractor or surviving partners of the
Contractor’s firm cannot carry out and complete the Contract shall be final and binding on
the parties. In the event of such cancellation the Owner shall not hold the estate of the
deceased Contractor and/or the surviving partners of the estate of the deceased Contractor
and/or the surviving partners of the Contractor’s firm liable to damages for not completing
Seal and signature of Contractor
35.0 FRUSTRATION OF CONTRACT
35.1 In the event of frustration of the Contract because of supervening impossibility in terms of
Section 56 of the Indian Contract Act, parties shall be absolved of their responsibility to
perform the balance portion of the Contract, subject to provisions contained in sub-clause
35.2 In the event of non-availability or suspension of funds for any reasons, whatsoever (except
for reason of willful or flagrant breach by the Owner) and/or Contractor then the works under
the Contract shall be suspended.
Furthermore, if the Owner is unable to make satisfactory alternative arrangements for financing
to the Contractor in accordance with the terms of the Contract within three months of the
event, the parties hereto shall be relieved from carrying out further obligations under the
Contract treating it as frustration of the Contract.
35.3 In the event referred to in sub-clauses 45.1 & 45.2 above the parties shall mutually discuss
to arrive at reasonable settlement on all issues including amounts due to either party for the
work already done on quantum merit basis, which shall be determined by mutual agreement
between the parties.
36.0 GRAFTS AND COMMISSIONS ETC.
Any graft, commission, gift or advantage given, promised or offered by or on behalf of the
Contractor or his partner(s), agent(s), officer(s), director(s), employee(s) or servant(s) or any
one on his or their behalf in relation to the obtaining or to the execution of this or any
other Contract with the Owner, shall in addition to any criminal liability which it may incur,
subject the Contractor to the cancellation of this and all other Contracts and also to
payment of any loss or damage to the Owner resulting from any cancellation. The
Owner shall then be entitled to deduct the amount so payable from any monies
otherwise due to Contractor under the Contract.
RESOLUTION OF DISPUTES
37.0 SETTLEMENT OF DISPUTES
37.1 Any dispute(s) or difference(s) arising out of or in connection with the Contract shall, to
the extent possible, be settled amicably between the parties.
37.2 If any dispute or difference of any kind, whatsoever, shall arise between the Owner and the
Contractor, arising out of the Contract for the performance of the Works whether during the
progress of the Works or after its completion or whether before or after the termination,
abandonment or breach of the Contract, it shall, in the first place, be referred to and settled
by the Engineer, who, within a period of thirty (30) days after being requested by either party
to do so, shall give written notice of his decision to the Owner and the Contractor.
37.3 Save as hereinafter provided, such decision in respect of every matters so referred shall
be final and binding upon the parties until the completion of the Works and shall forthwith
be given effect to by the Contractor who shall proceed with the Works with all due diligence,
whether he or the Owner requires arbitration as hereinafter provided or not.
37.4 If after the Engineer has given written notice of his decision to the parties, no claim to
arbitration has been communicated to him by either party within thirty (30) days from the
Seal and signature of Contractor
receipt of such notice, the said decision shall become final and binding on the parties.
37.5 In the event of the Engineer failing to notify his decision as aforesaid within thirty (30) days
after being requested as aforesaid, or in the event of either the Owner or the Contractor
being dissatisfied with any such decision, or within thirty (30) days after the expiry of the first
mentioned period of thirty days, as the case may be, either party may require that the
matters in dispute be referred to arbitration as hereinafter provided.
38.0 ARBITRATION
38.1 All disputes or differences in respect of which the decision, if any, of the Engineer has not
become final or binding as aforesaid shall be settled by arbitration in the manner hereinafter
38.1.1 The arbitration shall be conducted by three arbitrators, one each to be nominated by the
Contractor and the Owner and the third to be appointed as an umpire by both the arbitrators
in accordance with the Indian Arbitration Act. If either of the parties fails to appoint its
arbitrator within sixty (60) days after receipt of a notice from the other party invoking the
Arbitration clause, the arbitrator appointed by the party invoking the arbitration clause
shall become the sole arbitrator to conduct the arbitration.
38.1.2 The arbitration shall be conducted in accordance with the provisions of the Indian Arbitration
Act, 1940 or any statutory modification thereof. The venue of arbitration shall be Palanpur.
38.2 The decision of the majority of the arbitrators shall be final and binding upon the parties.
The arbitrators may, from time to time with the consent of all the parties enlarge the time for
making the award. In the event of any of the aforesaid arbitrators dying, neglecting,
resigning or being unable to act for any reason, it will be lawful for the party concerned to
nominate another arbitrator in place of the outgoing arbitrator.
38.3 The arbitrator shall have full powers to review and/or revise any decision, opinion, direction,
certification or valuation of the Engineer in accordance with the Contract, and neither party
shall be limited in the proceedings before such arbitrators to the evidence or arguments put
before the Engineer for the purpose of obtaining the said decision.
38.4 No decision given by the Engineer in accordance with the foregoing provisions shall
disqualify him as being called as a witness or giving evidence before the arbitrators on any
matter whatsoever relevant to the dispute or difference referred to the arbitrators as
38.5 During settlement of disputes and arbitration proceedings, both parties shall be obliged to
carry out their respective obligations under the Contract.
39.0 RECONCILIATION OF ACCOUNTS
The Contractor shall prepare and submit every one month, a statement covering payments
claimed and the payments received vis-à-vis the works executed, for reconciliation of
accounts with the Owner. The Contractor s h a l l also prepare and submit a detailed
account of Owner Issue materials re cei ve d and utilized by him for reconciliation purpose
in a format to be discussed & finalized with the Owner before the award of Contract.
Seal and signature of Contractor
ERECTION CONDITIONS OF CONTRACT
1.1 The following shall supplement the conditions already contained in other parts of these
specifications & document and shall govern the portion of the work of this Contract to be
performed at Site.
1.2 The Contractor upon signing of the Contract shall, nominate a responsible officer as his
representative at Site suitably designated for the purpose of overall responsibility and
coordination of the works to be performed at Site. Such person shall function from the Site
office of the Contractor during the pendency of Contract.
2.0 REGULATION OF LOCAL AUTHORITIES AND STATUTES
2.1 The Contractor shall comply with all the rules and regulations of local authorities during the
performance of his field activities. He shall also comply with the Minimum Wages Act,
1948 and the Payment of Wages Act (both of the Government of India) and the rules made
there under in respect of any employee or workman employed or engaged by him or his Sub-
Contractor. He shall abide by labor laws and others as specified in the special conditions of
2.2 All registration and statutory inspection fees, if any, in respect of his work pursuant to this
Contract shall be to the account of the Contractor. Should any such inspection or registration
need to be re-arranged due to the fault of the Contractor o r his Sub Contractor, t h e
additional f e e s to such inspection a n d /or registration also shall be borne by the
3.0 OWNER’S LIEN ON EQUIPMENT
The Owner shall have lien on all equipment brought to the Site for the purpose of erection,
testing and commissioning of the equipment to be supplied & erected under the Contract.
The Owner shall continue to hold the lien on all such equipment throughout the period of
Contract. No material brought to the Site shall be removed from the Site by the Contractor
and/or his Sub-Contractors without the prior written approval of the Engineer.
4.0 ACCESS TO SITE AND WORKS ON SITE
4.1 Suitable a cc ess to and possession o f the Site shall be afforded t o the Contractor b y the
Owner in reasonable time.
4.2 The works so far as it is carried out on the Owner’s premises, shall be carried out at
such time as the Owner may approve and the Owner shall give the Contractor reasonable
facilities for carrying out the works.
4.3 In the execution of the works, no person other than the Contractor or his duly appointed
representative, Sub- Contractor and workmen, shall be allowed to do work on the Site,
except by the special permission, in writing of the Engineer or his representative.
Seal and signature of Contractor
5.0 CONTRACTOR’S SITE ESTABLISHMENT
The Contractor shall at all times keep posted an authorized representative for the purpose of
the Contract. Any w r i t t e n o r d e r o r i n s t r u c t i o n of t h e E n g i n e e r o r h i s d u l y
authorized representative shall b e communicated to the said authorized resident
representative of the Contractor and the representative shall be available at a stated address
for this purpose.
6.0 CO-OPERATION WITH OTHER CONTRACTORS
6.1 The Contractor shall co-operate with all other Contractors or tradesmen of the Owner,
who may be performing other works on behalf of the Owner and the workmen who may be
employed by the Owner and doing work in the vicinity of the Works under the Contract. The
Contractor shall also so arrange to perform his work as to minimize, to the maximum extent
possible, interference with the work of other Contractors and their workmen. Any injury or
damage that may be sustained by the employees of the other Contractors and the Owner,
due to the Contractor’s work shall promptly be made good at the Contractor’s own expense.
7.0 DISCIPLINE OF WORKMEN
The Contractor shall adhere to the disciplinary procedure set by the Engineer in respect of
his employees and workmen at Site. The Engineer shall be at liberty to object to the
presence of any representative or employee of the Contractor at the Site, if in the opinion of
the Engineer such employee has misconduct himself or is incompetent or negligent or
otherwise undesirable and then the Contractor shall remove such a person objected to and
provide in his place a competent replacement.
8.0 CONTRACTOR’S FIELD OPERATION
8.1 The Contractor s h a l l keep the Engineer i n f o r m e d i n advance r eg a r din g h i s field
activity plans and schedules for carrying-out each part of the works. Any review of such
plan or schedule or method of work by the Engineer shall not relieve the Contractor of any
of his responsibilities towards the field activities. Such reviews shall also not be considered
as an assumption of any risk or liability by the Engineer or the Owner or any of his
representatives and no claim of the Contractor will be entertained because of the failure or
inefficiency of any such plan or schedule or method of work reviewed. The Contractor shall be
solely responsible for the safety, adequacy and efficiency of plant and equipment and his
erection methods.
8.2 The Contractor shall have the complete responsibility for the conditions of the Work-site
including the safety of all persons employed by him or his Sub–Contractor and all the
properties under his custody during the performance of the work. This requirement shall
apply continuously till the completion of the Contract and shall not be limited to normal
9.0 PROGRESS REPORT
9.1 The Contractor shall furnish three (3) copies each to the Engineer of progress
including if any, photographs of the work done at Site.
9.2 The monthly progress report detailing-out the progress achieved on all erection activities
shall highlight comparison to the schedules. The report shall also indicate the reasons for
the variance between the scheduled and actual progress and the action proposed for
Seal and signature of Contractor
corrective measures, wherever necessary.
10.0 MAN-POWER REPORT
10.1 The Contractor shall submit to the Engineer, on the first day of every month, a man hours
schedule for the month, detailing the man hours scheduled for the month, skill-wise and area-
11.0 PROTECTION OF WORK
The Contractor shall have total responsibility for protecting his works till it is finally taken
over by the Engineer. No claim will be entertained by the Owner or by the Engineer for any
damage or loss to the Contractor’s works and the Contractor shall be responsible for
complete restoration of the damaged works to original conditions to comply with the
specification and drawings.
12.0 EMPLOYMENT OF LABOR
12.1 The Contractor will be expected to employ on the work only his regular skilled
employees with experience of his particular work. No person below the age of eighteen
years shall be employed.
12.2 All traveling expenses including provisions of necessary transport to and from Site, lodging,
allowances and other payments to the Contractor’s employees shall be the sole responsibility
of the Contractor.
12.3 In case the Owner becomes liable to pay any wages or dues to Labor or any Government
agency under any of the provisions of the Minimum Wages Act, Workmen
Compensation Act, Contract Labor Regulation Abolition Act or any other law due to act of
omission of the Contractor, the Owner may make such payment and shall recover the same
from the Contractor’s bills.
13.0 FACILITIES TO BE PROVIDED BY THE OWNER
Land for Contractor’s Store, Workshop
a) The Engineer shall at his discretion and for the duration of execution of the Contract make
available at site, land for construction of Contractor’s field office, workshop, stores, etc.
required for execution of the Contract. Any such temporary construction shall be done by the
Contractor at his cost.
b) On completion of work the Contractor shall hand over the land duly cleaned to the Engineer.
Until and unless the Contractor has handed over the vacant possession of land allotted to him for the
above purpose, the payment of his final bill shall not be made.
13.2 Electricity: Power Supply
Where power supply is available with the Owner for construction purpose the same will be
provided at the job site at one point of the distribution system as may be decided by Engineer
free of charge for consumption in works. Electricity furnished will be 440 volts, 3 phase,
cycles and 230 volts, 1 phase,50 cycles. Each Contractor shall provide and install all
necessary transformers, switchgears, wiring fixtures, bulbs and other temporary equipment
for further distribution and utilization of energy for power and lighting and shall remove the
same on completion of the work. Should, however, electricity be used in the Contractor’s
Labor/staff colony, the power so consumed shall be charged at the prevailing tariff rate of
the GUVNL as prevalent for that area at the time of award of work; the supply may be
Seal and signature of Contractor
withdrawn if the power is used for purposes other than for the work of the project and the
Contractor shall not be entitled to any claim whatsoever on account of any such action taken
by the Engineer.
14.0 FACILITIES TO BE PROVIDED BY THE CONTRACTOR
14.1 Tools, tackles and scaffoldings
The Contractor shall provide all the construction equipment; tools, tackles and scaffoldings
required for pre-assembly, erection, testing and commissioning of the equipment covered
under the Contract. He shall submit a list of all such materials to the Engineer before the
commencement of work at Site. These tools and tackles shall not be removed from the Site
without the written permission of the Engineer.
The Contractor s h a l l provide necessary f irst -aid f a c i l i t ie s f or all his employees,
r e p r e s e n t a t i v e s a n d workmen working at the Site. Enough number of Contractor’s
personnel shall be trained in administering first-aid.
14.3 Cleanliness
The Contractor shall be responsible for keeping the entire area allotted to him clean and free
from rubbish, debris etc. during the period of Contract. The Contractor shall employ
enough number of personnel to keep the work area clean. Materials and stores shall be so
arranged to permit easy cleaning of the area. In areas where equipment might drip oil and
cause damage to the floor surface, a suitable protective cover of a flame resistant, oil proof
sheet shall be provided to protect the floor from such damage.
15.0 LINES AND GRADES
All the works shall be performed to the lines, grades and elevations indicated on the
drawings. The Contractor shall be responsible to locate and lay-out the works. Basic
horizontal and vertical control points will be established and marked by the Engineer at site
at suitable points. These points shall be used as datum for the works under the Contract.
The Contractor shall inform the Engineer well in advance of the times and places at which
he wishes to do work in the area allotted to him so that suitable datum points may be
established and checked by the Engineer to enable the Contractor to proceed with his
works. Any work done without being properly located may be removed and/or
dismantled by the Engineer at Contractor’s expense.
16.0 FIRE PROTECTION
16.1 The work procedures that are to be used during the erection shall be those, which minimize
fire hazards to the extent practicable. Combustible m a t e r i a l s , combustibl e w a s t e and
rubbish shall be collected and removed from the Site at least once each day. Fuels, oils
and volatile or inflammable materials shall be stored away from the construction and
equipment and materials storage areas.
16.2 All the Contractor’s supervisory personnel and select number of workers shall be trained for
fire fighting. Enough of such trained personnel must be available at the Site during the entire
period of the Contract.
Seal and signature of Contractor
The Contractor shall have total responsibility for all equipment and materials in his
custody/stores, loose, semi-assembled and/or erected by him at Site. The Contractor shall
make suitable security arrangements ensure the protection of all materials, equipment and
works from theft, fire, pilferage and any other damages and loss.
18.0 PRE-COMMISSIONING TRIALS AND INITIAL OPERATIONS
The pre-commissioning trials and initial operations of the equipment erected by the
Contractor shall be carried out in presence of contractor and is deemed considered as part of
the work completion. If it is anticipated that the above test may prolong for a long time, the
Contractor’s workmen required for the above test shall always be present at Site during such
tests and trials.
19.0 MATERIALS HANDLING AND STORAGE
19.1 All the equipment furnished under the Contract and arriving at Site shall be promptly
received, unloaded, transported and stored in the storage spaces by the Contractor.
19.2 Contractor shall be responsible for examining all the shipment and notify the Engineer
immediately of any damages, storage, discrepancy etc, for the purpose of Engineer’s
information only. The Contractor shall submit to the Engineer every week a report detailing
all the receipts during the week. However, the Contractor shall be solely responsible for any
shortages or damages in transit, handling and / or in storage and erection of the equipment
at Site. Any demurrage, wharf age and other such charges claimed by the transporters,
railways etc, shall be to the account of the Contractor.
19.3 The Contractor shall maintain an accurate and exhaustive record detailing out the list of
all equipment materials received by him for the purpose of erection and keep such record
open for the inspection of the Engineer in-charge.
19.4 All equipment shall be handled very carefully to prevent any damage or loss. The
equipment stored shall be properly protected to prevent damage either to the equipment or to
the floor where they are stored. The equipment from the store shall be moved to the actual
location at the appropriate time so as to avoid damage of such equipment at Site.
19.5 All electrical panels, control gears, motors and such other devices shall be properly
dried by heating before they are installed and energized. Motor bearings, slip ring,
commutators and other exposed parts shall be protected against moisture ingress and
corrosion during storage and periodically inspected.
19.6 All the electrical equipment such as motors, generators, etc. shall be tested for insulation
resistance at least once in three months from the date of receipt till the date of
commissioning and a record of such measured insulation values maintained by the
Contractor. Such records shall be opened for inspection by the Engineer.
19.7 The consumable and other supplies likely to deteriorate due to storage must be thoroughly
protected and stored in a suitable manner to prevent damage or deterioration in quality by
19.8 All the materials stored in the open or dusty location must be covered with suitable
weatherproof and flame proof covering material wherever applicable.
19.9 If the materials belonging to the Contractor are stored in areas other than those
earmarked for him, the Engineer will have the right to get it moved to the area earmarked
for the Contractor at the Contractor’s cost.
Seal and signature of Contractor
19.10 The Contractor shall be responsible for making suitable indoor storage facilities to store all
equipment, which require indoor storage. Normally, all the electrical equipment such as
motors, control gears, generators, exciters and consumables like electrodes, lubricants etc.
shall be stored in the closed storage space. The Engineer, in addition, may direct the
Contractor to move certain other materials, which in his opinion will require indoor storage,
to indoor storage areas, which the Contractor shall strictly comply with.
20.0 CONSTRUCTION MANAGEMENT
20.1 The field activities of the Contractors working at Site will be coordinated by the
Engineer and the Engineer’s decision shall be final in resolving any disputes or conflicts
between the Contractor and other Contractors and the tradesmen of the Owner regarding
scheduling and coordination of work. Such decision by the Engineer shall not be a
cause for extra compensation or extension of time for the Contractor.
20.2 The Engineer shall hold weekly meetings of the Contractor at Site, at a time and place to be
designated by the Engineer. The Contractor shall attend such meetings and take notes of
discussions during the meeting and the decision of the Engineer and shall strictly adhere to
those decisions in performing his works. In addition to the above weekly meeting, the
Engineer may call for other meetings either with individual Contractors or with selected
number of Contractors and in such a case the Contractors if called, will also attend such
20.3 Time is the essence of the Contract and the Contractor shall be responsible for performance
of his works in accordance with the specified construction schedule. If at any time, the
Contractor is falling behind the schedule, he shall take necessary action to make good for
such delays by increasing his work force or by working overtime or otherwise accelerate the
progress of the work to comply with the schedule and shall communicate such actions in
writing to the Engineer, satisfying that his action will compensate for the delay. The
Contractor shall not be allowed any extra compensation for such action.
20.4 The Engineer shall, however, not be responsible for provision of additional Labor and/or
materials or supply or any other services to the Contractor except for the coordination
work between various Contractors if any at site.
21.0 FIELD OFFICE RECORDS
The Contractor shall maintain up to date copies of all drawings, specifications and
other Contract Documents and any other supplementary data complete with all the
latest revisions thereto. The Contractor shall also maintain in addition the continuous
record of all changes to the above Contract Documents, drawings, specifications, and
supplementary data, etc. effected at the field and on completion of his total assignment under
the Contract shall incorporate all such changes on the drawings and other Engineering data
to indicate as installed conditions of the equipment furnished and erected under the
Contract. Such drawings and Engineering data shall be submitted to the Engineer in
required number of copies.
22.0 CONTRACTOR’S MATERIALS BROUGHT TO SITE
22.1 The Contractor shall bring to Site all equipment, components, parts, materials, including
construction equipment, tools and tackles for the purpose of the works under intimation to
the Engineer. All such goods shall, from the time of their being brought vest in the Owner,
but may be used for the purpose of the works only and shall not on any account be
removed or taken away by the Contractor without the written permission of the Engineer.
Seal and signature of Contractor
The Contractor shall nevertheless be solely liable and responsible for any loss or destruction
thereof and damage thereto.
22.2 The Owner shall have a lien on such goods for any sum or sums which may at any time be
due or owing to him by the Contractor, under, in respect of or by reasons of the Contract.
After giving a fifteen (15) days notice in writing of his intention to do so, the Owner shall be
at liberty to sell and dispose off any such goods, in such manner as he shall think fit and to
apply the proceeds in or towards the satisfaction of such sum or sums due as aforesaid.
22.3 After the completion of the Works, the Contractor shall remove from the Site under the
direction of the Engineer the materials such as construction equipment, erection tools and
tackles, scaffolding etc. with the written permission of the Engineer.
23.0 PROTECTION OF PROPERTY AND CONTRACTOR’S LIABILITY
23.1 The Contractor shall be responsible for any damage resulting from his operations. He
shall also be responsible for protection of all persons including members of public and
employees of the Owner and the employees of other Contractors and Sub-Contractors and
all public and private property.
24.1 In addition to the conditions covered under the Clause entitled ‘Insurance’ in General
Terms and Conditions of Contract of this Volume-I, the following provisions will also apply to
the portion of works to be done beyond the Contractor’s own or his Sub-Contractor’s
manufacturing Works.
24.2 Workmen’s Compensation Insurance
This insurance shall protect the Contractor against all claims applicable under the
Workmen’s Compensation Act, 1948 (Government of India). This policy shall also cover
the Contractor against claims for injury, disability, disease or death of his or his Sub-
Contractor’s employee, which for any reason are not covered under the Workmen’s
Compensation Act, 1948. The liabilities shall not be less than:
Workmen’s : As per statutory Provisions
Employee’s : As per statutory
Liability Provisions
24.3 Comprehensive General Liability Insurance
The insurance shall protect the Contractor against all claims arising from injuries, disabilities,
disease or death of members of public or damage to property of others, due to any act of
omission on the part of the Contractor, his agents, his employees, his representatives and
Sub-Contractors or from riots, strikes and civil commotion.
2.4.4 The hazards to be covered will pertain to all the works and areas where the
Contractor, his Sub- Contractors, his agents and his employees have to perform work
pursuant to the Contract.
24.5 The above are only illustrative list of insurance covers normally required and it will be the
responsibility of the Contractors to maintain all necessary insurance coverage to the extent
Seal and signature of Contractor
both in time and amount to take care of all his liabilities either direct or indirect, in pursuance
of the Contract.
25.0 UNFAVORABLE WORKING CONDITIONS
The Contractor shall confine all his field operations to those works, which can be
performed without subjecting the equipment and materials to adverse effects during
inclement weather conditions, like monsoon, storms etc. and during other unfavorable
construction conditions. No field activities shall be performed by the Contractor under
conditions, which might adversely affect the quality and efficiency thereof, unless special
precautions or measures are taken by the Contractor in a proper and satisfactory manner in
the performance of such Works and with the concurrence of the Engineer. Such unfavorable
construction conditions will in no way relieve the Contractor of his responsibility to perform
the Works as per the schedule.
26.0 PROTECTION OF MONUMENTS AND REFERENCE POINTS
The Contractor shall ensure that any finds such as relic, antiquity, coins, fossils, etc. which
he may come across during the course of performance of his Works either during excavation
or elsewhere, are properly protected and handed over to the Engineer. Similarly the
Contractor shall ensure that the bench marks, reference points, etc, which are marked either
with the help of Engineer or by the Engineer shall not be disturbed in any way during the
performance of his Works. If any work is to be performed which disturbs such reference
the same shall be done only after these are transferred to other suitable locations under the
direction of the Engineer. The Contractor shall provide all necessary materials and
assistance for such relocation of reference points etc.
27.0 WORK & SAFETY REGULATIONS
27.1 The Contractor shall ensure proper safety of all the workmen, materials, plant and
equipment belonging to him or to or to others, working at the Site. The Contractor shall also
be responsible for provision of all safety notices and safety equipment required both by the
relevant legislations and the Engineer, as he may deem necessary.
27.4 All equipment used in construction and erection by Contractor shall meet
Indian/International Standards and where such standards do not exist, the Contractor
shall ensure these to be absolutely safe. All equipment shall be strictly operated and
maintained by the Contractor in accordance with manufacturer’s Operation Manual and safety
instructions and as per Guidelines/rules of in this regard.
27.5 Periodical examinations and all tests for all lifting/hoisting equipment & tackles shall be
carried-out in accordance with the relevant provisions of Factories Act 1948, Indian Electricity
Act 1910 and associated Laws/Rules in force from time to time. A register of such
examinations and tests shall be properly maintained by the Contractor and will be promptly
produced as and when desired by the Engineer or by the person authorized by him.
27.6 The Contractor shall provide suitable safety equipment of prescribed standard to all
employees and workmen according to the need.
27.8 The Contractor shall provide safe working conditions to all workmen and employees at the
Site including safe means of access, railings, stairs, ladders, scaffoldings etc. The
scaffoldings shall be erected under the
control and supervision of an experienced and competent person. For erection, good and
standard quality of material only shall be used by the Contractor.
Seal and signature of Contractor
27.9 The Contractor shall not interfere or disturb electric fuses, wiring and other
electrical equipment belonging to the Owner or other Contractors under any
circumstances, whatsoever, unless expressly permitted in writing by to handle such fuses,
wiring or electrical equipment
27.10 Before the Contractor connects any electrical appliances to any plug or socket belonging
Contractor or Owner, he shall:
a. Satisfy the Engineer that the appliance is in good working condition;
b. Inform the Engineer of the maximum current rating, voltage and phases of the
c. Obtain permission of the Engineer detailing the sockets to which the
appliances may be connected.
27.11 The Engineer will not grant permission to connect until he is satisfied that;
a. The appliance is in good condition and is fitted with suitable plug;
b. The appliance is fitted with a suitable cable having two earth conductors, one of
which shall be an earthed metal sheath surrounding the cores.
27.12 No electric cable in use by the Contractor/Owner will be disturbed without prior permission.
No weight of any description will be imposed on any cable and no ladder or similar
equipment will rest against or attached to it.
27.13 No repair work shall be carried out on any live equipment. The equipment must be
declared safe by the Engineer and a permit to work shall be issued by the Engineer before
any repair work is carried out by the Contractor. While working on electric lines/equipment,
whether live or dead, suitable type and sufficient quantity of tools will have to he provided by
the Contractor to electricians/workmen/officers.
27.14 In case any accident occurs during the construction/ erection or other associated activities
undertaken by the Contractor thereby causing any minor or major or fatal injury to his
employees due to any reason, whatsoever, it shall be the responsibility of the Contractor to
promptly inform the same to the Engineer in prescribed form and also to all the authorities
envisaged under the applicable laws.
27.15 The Engineer shall have the right at his sole discretion to stop the work, if in his opinion
the work is being carried out in such a way that it may cause accidents and endanger the
safety of the persons and/or property, and/or equipment. In such cases, the Contractor shall
be informed in writing about the nature of hazards and possible injury/accident and he
shall comply to remove shortcomings promptly. The Contractor after stopping the specific
work can, if felt necessary, appeal against the order of stoppage of work to the Engineer
within 3 days of such stoppage of work and decision of the Engineer in this respect shall be
conclusive and binding on the Contractor.
27.16 The Contractor shall not be entitled for any damages/compensation for stoppage of work
due to safety reasons as provided in Para 31.18 above and the period of such stoppage of
work will not be taken as an extension of time for completion of work and will not be the
ground for waiver of levy of liquidated damages.
Seal and signature of Contractor
27.17 It is mandatory for the Contractor to observe during the execution of the works, requirements
of Safety Rules which would generally include but not limited to following
a) Each employee shall be provided with initial indoctrination regarding safety by the
Contractor, so as to enable him to conduct his work in a safe manner.
b) No employee shall be given a new assignment of work unfamiliar to him without proper
introduction as to the hazards incident thereto, both to himself and his fellow employees.
c) Employees must not leave naked fires unattended. Smoking shall not be permitted
around fire prone areas and adequate firefighting equipment shall be provided at crucial
d) There shall be a suitable arrangement at every work site for rendering prompt and
sufficient first aid to the injured.
j) Requirements of ventilation in underwater working to licensed and experienced divers,
use of gum boots for working in slushy or in inundated conditions are essential
requirements to be fulfilled.
27.18 The Contractor shall follow and comply with all Safety Rules, relevant provisions of
applicable laws pertaining to the safety of workmen, employees, plant and equipment as
may be prescribed from time to time without any demur, protest or contest or reservations. In
case of any discrepancy between statutory requirement and Safety Rules referred above,
the latter shall be binding on the Contractor unless the statutory provisions are more
a. Fatal injury or accident Rs. 1, 00,000/- : These are applicable
Causing death per person for death
b. Major injuries or accident causing Rs. 20,000/- : injury to any person,
25% or more permanent disablement per person whosoever. to Workmen or employees
Permanent disablement shall have same meaning as indicated in Workmen’s Compensation
Act. The compensation mentioned above shall be in addition to the compensation
payable to the workmen/employees under the relevant provisions of the Workmen’s
Compensation Act and rules framed there under or any other applicable laws as applicable
from time to time. In case the Owner is made to pay such compensation then the
Contractor is liable to reimburse the Owner such amount in addition to the compensation
indicated above.
28.0 CODE REQUIREMENTS
The erection requirements and procedures to be followed during the installation of the
equipment shall be in accordance with the relevant Codes and accepted good engineering
practice, the Engineer’s drawings and other applicable Indian recognized codes and laws and
regulation of the Government of India.
Seal and signature of Contractor
SPECIAL CONDITIONS OF CONTRACT
1.0 General Particulars:
This part of the Bid Document relates to certain specific/special terms and conditions particular
to the Contract. The provisions herein are to be read and understood in conjunction with the
relevant provisions elsewhere in the Instructions to Bidders (ITB), the General Conditions of
Contract (GCC) and Erection Conditions of Contract (ECC). The intent of provisions herein
are specific to this contract and are, in general, supplementary to related provisions under
ITB, GCC and ECC. However, in certain provisions which are contrary to those in ITB, GCC
and ECC, the provisions in these Special Conditions of Contract will prevail.
2.0 Tender Fee:
All the Bidders will be required to pay Tender Fees with applicable GST and EMD as mentioned in
the Tender document either in Cash (up to Rs. 10,000/- only) at the office address specified in the
tender document or by RTGS/ NET/online
3.0 Earnest Money Deposit (EMD):
3.1 All the Bidders will be required to pay Tender Fees with applicable GST and EMD as
mentioned in the Tender document either in Cash (up to Rs. 10,000/- only) at the office
address specified in the tender document or by RTGS/ NET/online
4.0 Declaration by Bidder:
The Bidder shall sign the Declaration enclosed to this SCC and not furnishing the same will
make the Bid invalid.
5.0 Technical Qualifying Criteria:
1. Registration: Bidder shall be strictly a GETCO registered contractor of E1 and above class
1. Bidder shall have executed minimum 01no. of 220/66KV or higher voltage class
substation with state or central Transmission Utility or major industries
equivalent nos. of 220KV or higher voltage class Transformer/Feeder bays at same or
different locations. Substations include minimum two nos. of feeder bays, one no. of
transformer bay with at least 1 Nos 220kV bus Extension Work
2. The bidder shall have valid Electrical Contract License and approved
vendor of GETCO/ STU/ CTU, registered under GST-Tax Act, service tax act and should
have CPF/ PF registration certificate Attested Xerox copy of work orders executed from
GETCO and satisfactory completion certificate from respective department should be
6.0 Financial Qualifying Criteria:
As per Qualification requirement clause No.- 2 which are mentioned in ITB.
7.0 Price Inclusions (including Taxes & Duties):
7.2 The prices quoted shall be all inclusive of freight, Octroi, transportation, loading, –unloading
Seal and signature of contractor
& stacking at site of equipment materials received from S o j a R & M S t o r e / construction
store K a n s a r i o r a n y s t o r e after observing all store formalities of GETCO .
7.3 No extra payment toward any type of templates and erection tools /materials will be made.
7.5 Goods and Service Tax (GST):
The F.O.R. Destination prices are excluding GST and Cess as applicable which will be paid extra
on a given taxable goods and/or services within the original contractual delivery period. The
amount and % of GST and Cess as applicable should clearly be indicated separately. (GST/Cess
means all applicable Tax/Cess under GST Laws. GST Laws means IGST Act, GST
(Compensation to the State for Loss of Revenue) Act, CGST Act, UTGST Act and SGSCT Act,
2017 and all related ancillary legislations).
You shall have to submit a C.A Certificate& duly authorized Signatory of successful bidder,
certifying that you have not claimed Refund of any applicable GST and Cess, charged to
COMPANY or shall not claim any such Refund, on a future date, from the concerned Authorities
and if, any Refund/Credit, in respect of such GST and Cess, is claimed by you, it will be
immediately passed on to the COMPANY, without COMPANY making any specific Claim, for the
same, either from the Department or from you.
The offers having price INCLUSIVE OF GST and Cess is likely to be rejected if the rate of GST
and Cess is not mentioned clearly unless the bidder has opted for Composition Scheme under
GST Act, which should be clearly indicated in the price bid. COMPANY may at its discretion
consider such offer with presumption of highest applicable rate of VAT/GST/Cess prevailing
when the price quoted is inclusive of GST and Cess.
If the Supplier/Contractor has opted for the Composition scheme of GST, the same must be
clearly specified with valid Declaration & Certificate from Department. In the event of
withdrawal/cessation of the Supplier from Composition scheme during the tenure of the contract,
the rate mentioned in the price bid shall be final and any additional GST will have to be borne by
the tenderer. In no case additional amount towards tax or otherwise will be paid / reimbursed to
supplier/contractor. Further Statutory Variation clause will not be applicable in case of Supplier /
Contractor has opted for Composition Scheme under GST.
Supplier/Contractor should charge GST in Invoice at the rate as agreed to / mentioned in
acceptance of tender only and any deviation in the same shall not be accepted. Further, any
additional liability of GST (later on due to wrong mentioning of GST rate, mis-interpretation of
HSN/SAC Code, etc.) over and above as charged in the invoice shall be borne by the
Supplier/Contractor. However, any refund received by the supplier / contractor on account of GST
charged from the company; such refund shall have to be passed on to the company, along with
interest if any. Such refund along with interest needs to be passed on suo-moto by the supplier /
Further, the Company has a right to recover the amount of GST along with penal interest at the
rate of 15% per annum if GST charged is not paid / short paid to the government or fail to upload
the details or uploads inaccurate particulars on GSTIN portal by the Supplier / Contractor within
the stipulated time limit.
In case, Govt. revises the rate of GST rate / Code during the tenure of the contract, the provision
of GUVNL’s statutory variation clause shall apply.
Also, please mention separate applicable HSN / SAC Code and rate of GST and Cess as
applicable for each item of Goods/Service. If not specifically mentioned, then COMPANY will
have the option to take the prices as exclusive of taxes and duties at maximum higher slab rates
for the evaluation of the tenders.
Every bidder shall inform their GSTIN No. of the registered place(s) where from the bidder
intends to supply the goods / services, meaning thereby the bidder has to supply the goods /
services from the relevant declared / registered place of supply only.
Seal and signature of contractor
INPUT TAX CREDIT BENEFIT
In the event of any statutory increase in the rate of Input Tax Credit and / or due to inclusion of
any other additional item of their inputs / input services under the ambit of the Input Tax Credit
provisions under the GST Act, subsequent to the date of submission of the offer, the same should
be passed on to COMPANY and you should inform such changes to COMPANY from time to
GST Compliances:
The GST at the applicable rates will be levied on the total of Schedule-B. GST on the work
executed will be subject to CGST Act, SGST Act, IGST Act, UTGST Act its rules, regulations
and notifications, circulars issued and in force time to time by Government and M/s. GETCO.
Contractors are required to clarify the product and services related HSN codes and SAC
codes respectively.
7.6 Statutory Variations:
Any statutory increase or decrease in the taxes and duties including GST and Cess as applicable
or in the event of introduction of new tax/cess or cessation of existing tax/cess subsequent to
suppliers offer if it takes place within the original contractual delivery date will be to COMPANY’s
account subject to the claim being supported by documentary evidence. However, if any
decrease takes place after the contractual delivery date, the advantage will have to be passed on
Statutory Variation clause will not be applicable in case of Supplier / Contractor has opted for
Composition Scheme under GST.
1) As per the Welfare cess Act, the welfare cess @ 1% is applicable on supply and erection
items for supply, erection, testing & commissioning of substation, transmission lines,
EPC/Turnkey projects and civil works.
2) Contractor shall get registered under welfare cess Act before commencement of work. Office
of the factory inspector is authorized at present as a registering authority.
3) GETCO shall pay the welfare cess by way of reimbursing to contractors on production of
documentary evidence of payment.
4) The contacts for which supply or part supply of material are in the scope of GETCO, then
contractors shall deposit welfare cess on estimated cost of supplied items to GETCO
contractor on progressive basis of utilization. As this part of welfare cess is on GETCO
account, the same shall be reimbursed to the contractor on receipt of request letter along with
documentary evidence of payment. For calculation of welfare cess on supply part, valuation
as per MR shall be taken and informed to the contractor for payment. This will be over and
above the A/T value.
The modality of payment/ reimbursement of welfare cess will be as under.
• On receipt of A/T, the contractor / bidder will get them registered under Welfare Cess Act and
submit the documentary evidence to the concern office.
• Before release of payment of first R.A.Bill, the contractor has to submit the documentary
evidence of registration. Only thereafter, the bill will be processed for payment.
• Before release of payment of subsequent R.A.Bills, the contractor has to submit the
documentary evidence of payment of welfare cess of previous R.A.Bill.
Seal and signature of contractor
• Before release of payment of final bill, the contractor has to submit documentary evidence of
payment of welfare cess of previous R.A.Bill as well as of this final bill.
• If the R.A.Bill happens to be first and final bill, then before release of payment, contractor has
to submit documentary evidence of registration under Welfare Cess Act and evidence of
payment of welfare cess.
• The welfare cess shall be reimbursed to the contractor on submission of copy of
documentary evidence of payment by observing due formalities.
7.18 Income Tax
Income tax at source at the prevailing rate will be deducted from bills in accordance with
the provision of Income-Tax Laws and to that effect a certificate will be issued to the
7.19 TDS under GST:
Tax deduction at source(TDS) under GST at the prevailing rate will be deducted from
bills in accordance with the provision of section 51 of the CGST Act, 2017, and to that
effect a certificate will be issued to the contractor.
8.0 SECURITY DEPOSIT
8.1 The successful bidder has pay security deposit within 10 working days of receipt of
8.2 The successful bidder will be required to pay an amount equivalent to 5 % of the
value of the order as a Security Deposit for satisfactory execution of the contract. Such
Security Deposit will be payable either in DD payable at PALANPUR / Bank guarantees
from Scheduled / Nationalized Banks will be acceptable or by NEFT/RTGS/Online as per
tender notice bank details.
8.3 No interest will be allowed on amount of Security deposit.
8.4 The Security Deposit- total shall be kept deposited up to completion of work
finalization of final bill. The same shall be return on receipt of N.O.C. by the concerned EE
8.5 This security deposit is for the performance of contract and the same is liable to be
forfeited by the in event of non- fulfillment of the term and conditions of this contract by the
8.6 Corporate Guarantees are not admissible.
8.7 The ‘Signing of Contract ‘and ‘Contract Agreements’ will be done as per
Prevalent Terms a n d Conditions.
8.8 Contractor shall paid SD within stipulate time if SD is not paid by contractor than EMD
9.0 GUARANTEE PERIOD:
Total work executed shall be covered under guarantee period against any defect in poor
workmanship etc. for a period of one year from the date of commissioning of substation.
9.0A BAR CHARTS
Seal and signature of contractor
The Bidder shall furnish along with the bid, the bar charts and project schedules indicating
starting and completion dates of each activity. This is mandatory condition the tenders without
which shall be liable to be rejected.
10.0 PENALTY FOR DELAY:
10.1 The tenderer should note that the completion time allowed for carrying out the work
should be strictly observed. Any delay that may take place in supply and erection beyond
Contractual cutoff date stated as per stipulated delivery period shall be subject to the penalty
at the rate of ½ % per week or part thereo f on delayed portion of the work subject to ceiling
of 10% of total contract value plus GST as applicable will be imposed.
10.2 The penalty will be deducted from bills payable either against this contract or from any
Bank Guarantee or any other amount payable under any other contract with the.
11.0 COMPLETION PERIOD
11.1 Overall Completion period for this Contract will be 3(Three) Months from the date of
commencement of work.
11.2 No mobilization period, idling or stoppage period will be allowed during this period of the
11.3 The completion date will be deemed to be the date on which all works on the Contract are
demonstrated to be complete to the satisfaction of the /Engineer and is complete in all
respects as per the terms and conditions of this Contract.
12.0 Presentation of Bills
12.1 Monthly RA bills for 90% value of the supplied tower material and work executed
including cost of material consumed is to be prepared in triplicate and submitted to Site
Engineers in-charge of the work, for necessary payment. These bills shall be serially
numbered with suffix SE-I.
12.2 Balance 10% payment shall be released only after finalization of material account and
passing of final bill. The contractor has to submit the final bill along with the material
consumption statement and other required data of the work carried out within 3 months from
the date of completion of work. These bills shall be serially numbered with suffix SE-I.
12.3 All the bills in accordance with the above clauses must be submitted with the following
a) Item wise work done during billing
period. b) Item wise cumulative work done.
c) Account for material consumed and balance stock.
12.4 For non-submission or part submission of above information, an additional 5% amount of the
respective RA bill shall be withheld and shall only be released at the time of final bill.
13.0 Terms of Payment
The payment for work done shall be made as under only after execution of the contract
documents/furnishing of Security Deposit and on execution of substation erection work in
scope of work order.
13.1 For erection works.
Seal and signature of contractor
(i) 90% payment of amount claimed covering various activity such as structure, equipment
erection, earthing installation, control wiring, battery charging etc. works against R.A. bills
duly certified by EIC within 60 days from the date of R.A. bill. OVER AND ABOVE THIS
PAYMENT TERMS MENTIONED ABOVE WILL BE APPLICABLE WHILE RELEASING
(ii) Balance 10% of erection value shall be paid against completion of work only after
Settlement of material account statement of items used, erected and successful
Commissioning of transmission line the same amount will be release in final bill only
and Payment will be made only after passing of final bill.
14.0 TAKING DELIVERY AND INSURANCE:
14.1 The contractor has to take delivery from Palanpur construction store of S/S equipment and
materials and keep in safe custody and transport to the respective sites and will be fully
responsible for any damage to or loss of all materials at any stage during transportation or
erection or taking over of the S/S by GETCO.
14.2 The Contractor has to open site store and ensure for safe custody of all the stored
materials at his own cost.
14.3 The Contractor shall have total responsibility for the entire materials stored, loose, semi
assembled and/or erected by him at site in his custody. The Contractor shall make suitable
security arrangements at his own cost to ensure the protection of all materials, equipment
and works from theft, fire pilferage and any other damages and loss. It shall be the
responsibility of the contractor to arrange for security till the works are finally taken over by the
14.4 STORAGE-CUM-ERECTION INSURANCE:-
The contractor shall take suitable storage-cum-erection insurance cover at his cost to the
extent of 100% cost of cost of sub-station / line materials, which are required to complete
the sub-station / line. Bidder shall have to take the comprehensive Marine Cum Erection
(MCE) insurance policy against any loss, damage, theft, pilferage, fire etc. for the complete
period of storage, erection and commissioning up to the time of taking over of the sub-
station / line by GETCO. However, if the work is not completed within stipulated time limit
as mentioned into work order, the MCE shall be extended by the contractor up to the work
completion and taking over of line or SS by GETCO. Moreover, the change for extension of
insurance shall be borne by contractor if the delay is attributed to the contractor. The
charge for extension of insurance shall be reimbursed by GETCO to the contractor on
production of proof for extension of MCE if the delay is attributed on the part of GETCO.
The contractor shall deal directly and pursue the claim with the insurance company and
shall be responsible in regard to maintenance of all insurance coverage as well as for
settlement of claim. The proof of insurance policy taken by the contractor shall be
furnished / submitted to engineer-in-charge of GETCO.
No material shall be issued to bidder/erection agency in absence of such insurance policy.
The risk shall be covered for lifting of materials from store to final handing over to GETCO.
Further, in absence of the above insurance policy, R.A. bill payment will be withheld.
14.5 In the event of any damage, theft, loss, pilferage, fire etc., Contractor will be responsible to
lodge, pursue and settle all the claims with the Insurance Company for all items,
materials and the shall be kept informed about it. Contractor shall replace the lost /
damaged materials / items promptly irrespective of the settlement of the claims by
underwriter and ensure that the work progress is as per agreed schedule. The loss, if any,
such replacement will have to be borne by the Contractor and will not entertain any claim
/ representation in this regard. However it will be contractor's responsibility to insure the
Seal and signature of contractor
entire project till the S/S is taken over by the GETCO.
15.0 LABOR LAWS:
15.0.1 Labour below the age of 18 years shall not be employed for the work. No female worker
shall be employed in the night shift between 07.00 p.m. and 06.00 a.m. next day.
15.0.2 Contractor shall maintain a valid labor license under the contract Labor (Regulation and
abolition) Act for employing necessary manpower required by him. In the absence of such
license, the contract shall be liable to be terminated without assigning any reason thereof.
15.0.3 The Contractor shall at his own expenses comply with all labor laws and keep the
indemnified in respect thereof. Some of the major liabilities under various labor and industrial
laws which the Contractor shall comply as under:
i) Payment of contribution by way of Employer’s Contribution towards provident
Fund, Family Pension Scheme, Deposit Linked Insurance Scheme, Administrative
charges, etc. at the rates made applicable from time to time by the Government of
Gujarat / Government of India or other Statutory Authority.
ii) Payment of deposit in respect of each contract labor at the rate of Rs. 30/- or later
prevailing rate with the Office of Commissioner of Labor as per the Contract Labor
(Regulation and Abolition) Act.
iii) License fee as prescribed under the Contract Labor (Regulation and Abolition) Act
and Rules framed there under depending upon the number of workmen.
iv) Paid leave facility and wages as per the provision of the Factories Act at the rate of
one day for every 20 days of working.
v) Identity cards as prescribed under the Factories Act with photo affixed thereto, for
identification.
vi) Payment of retrenchment compensation, Notice Pay and other liabilities as per
Industrial Dispute Act. Any payment to the Contractor’s employee arising out of any
claim of disputes under the Industrial Disputes Act 1947 or any other Labor Laws.
vii) Payment of compensation in case of accidental injury.
viii) Provision of crèche if the female laborers employed are more than
ix) Maternity Leave as per the provisions of the Maternity Benefit Act.
The above are some of the major liabilities of the Contractor in addition to other liabilities
prescribed under the various Labor laws, in force from time to time, from Statutory
Authorities like State Government/ Government o India, which the Contractor shall have to
15.1 PROVIDENT FUND AND FAMILY PENSION SCHEME:
The Contractor shall submit along with his bills (month wise) a statement regarding deduction
against employees P r o v i d e n t Fund and Family Pension Scheme in respect of each
concerned employee. Provident Fund and Family pension Scheme at the rate of 18% (or at
the rate made applicable by the Government from time to time of the wages. The Contractor’s
contribution and his workers contribution towards Provident Fund and Family Pension
Scheme shall be deposited by the Contractor with Regional Provident Fund Commissioner,
15.2 DEPOSIT LINKED INSURANCE SCHEME
The contractor shall have to deposit ½ % of the wages in respect of employees who is a
member of the Provident Fund, as the contribution to the Deposit Linked Insurance
Scheme with Regional Provident Fund Commissioner, Ahmedabad.
Seal and signature of contractor
15.3 ADMINISTRATIVE CHARGES:
Administrative charges for maintaining Provident Fund Account shall be deposited by the
Contractor with Regional Provident Fund Commissioner, Ahmedabad at the rates applicable.
15.4 PAID LEAVE FACILITY:
Paid Leave Facility at the rate of one day for every twenty days worked by the Contract
Labor, shall be provided by the Contractor to his workers. He shall maintain Leave Records,
Leave Cards, for individual laborer, which shall be duly verified, approved and certified by the
authorized Officer of the GETCO.
15.5 WORKMAN’S COMPENSATION FUND AND EMPLOYER’S LIABILITY INSURANCE:
The contractor shall cover all his employees under workmen’s compensation fund and under
the liability insurance. The purchaser shall not be responsible for any payments of
compensation to the workers/supervisor of the contractor for fatal or non-fatal accidents
during the pendency of the contract.
15.6 The contractor shall employ adequate number of experienced skilled at site for daily
supervision and for maintenance of various registers and records required under the law
and contract. No payment for supervision shall be admissible
15.7 CONTRACTOR TO INDEMNIFY THE GETCO:
The Contractor shall Indemnify the GETCO and every member officer and employees of
the GETCO also, Engineer-in-Charge and his staff against all actions, proceedings,
claims, demands, costs and expenses whatsoever, arising out of or in connection with the
matters referred herein above elsewhere and against all actions, proceedings, claims,
demands, costs and expenses which may be made against the GETCO or Government for
or in respect of performance of his obligation under the contract documents. The GETCO
shall not be liable for intervention of authority Government for or in respect of performance of
his obligation under the contract documents. The GETCO shall not be liable for or in respect
of or in consequence of any accident or injury to any workman or other person in the
employment of the Contractor or his Sub-Contractor and the contractor shall indemnify and
keep indemnified the GETCO against all claims, demands, proceedings, cost, charges and
expenses whatsoever in respect thereof or in relation thereto.
15.8 WORKMEN’S COMPENSATION AND EMPLOYER’S LIABILITY INSURANCE
Insurance shall be affected for all the Contractor’s employee engages in the performance of
this contract. If any of the work is sublet, the Contractor shall required the Sub-Contractor
to provide workmen’s
employer’s liability insurance for the latter’s employees, such employees shall be covered
Contractor’s Insurance.
15.9 WAGES TO BE PAID & TIME OF PAYMENT ETC. BY THE CONTRACTOR
a) The Contractor shall pay minimum wages per day to his Labors/ Workers as per rates
fixed under the minimum wages act. The wages of every Contract Labor employed by
him under this contract shall also be paid by him before the expiry of 7th day of the last
day of the month in respect of the wages are payable (i.e. wages of a month have to
be paid by him in the first week of the next
month). Any default will result in cancellation of contract forthwith or else the contractor
shall be punishable to the extent of Rs. 100/- per each day or as per the prevailing
rules of Labor laws.
b) The Contractor shall give his Telephone Number and Address to the GETCO, so
Seal and signature of contractor
that, in case of Labor trouble etc. the Contractor can be contacted. The Contractor
shall arrange to have his office outside the factory work premises and the Contractor
shall arrange to have his office outside the factory work premises and the Contractor
shall keep himself present throughout the working hours.
15.10 REGISTRATION WITH PROVIDENT FUND OFFICE
I) The separate P.F. code issued from P.F. commissioner is required to be taken by
ii) If the contractor does not possess separate P.F. code number of RPFC, his tender
will not be considered for acceptance.
iii) The contractor should mention separate P.F. code number allotted by PPFC,
along with the tender.
15.11 Termination of Contract:
In case of contractor fails to deliver the stocks or any consignment thereof within
contractual period of delivery or in case the stores are found not in accordance with
prescribed specification and/or the approved sample, the shall exercise its discretionary
15.11.1 To recover, from the contractor as agreed, by way of penalty clause above, or
15.11.2 To purchase from elsewhere after giving due notice to the contractor on account and at
the risk of the contractor for such stores not so delivered or other similar description
without canceling the contract in respect of the consignment not yet due for delivery or
15.12 To cancel the contract.
In the event of the risk purchase of stores of similar description, the opinion of the
GETCO shall be final. In the event of action taken under clause (A) or (B) above, the
contractor shall be liable to pay for any loss which GETCO may sustain on that account,
but the contractor shall not be entitled to have any saving on such purchases made
against default.
The decision of the GETCO shall be final as regards to the acceptability of stores supplied
by the contractor and the GETCO shall not be required to give any reason in writing or
otherwise at any time for rejection of the stores.
15.12.1 MATCHING OF END COST:
In case the GETCO decides to award contract on matching end-cost basis, the bidder has
to reduce all the quoted rates proportionately. The reduction on overall basis will not
be accepted (i.e. all unit rates of erection schedule shall be reduced proportionately
by difference in percentage). The confirmation for matching end cost shall be given
within 7 (seven) days from the letter form.
16.0 VENDOR REGISTRATION: REGISTRATION AS A CONTRACTOR:
Registration with Palanpur or any other GETCO office is pre requisite for participating in
tender. It is required to furnish documents of registration along with offer in Technical bid
and the details at appropriate place in confirmation of details of bidder shall be given by
the contractor.
17. 0 ARBITRATION
17.1 All disputes or differences in respect of which the decision, if any, of the Engineer has not
become final or binding as aforesaid shall be settled by arbitration in the manner hereinafter provided.
Seal and signature of contractor
17.1.1 Amicable Settlement
Any dispute, difference, controversy or claim between the Parties arising out of or relating to this
contract with reference to the construction, interpretation, breach, termination or validity thereof
(hereinafter referred as "the Dispute") shall, upon the written request of either Party be referred to the
authorized representatives of the Disputing Parties for resolution. The authorized representatives shall
promptly meet and attempt to negotiate in good faith a resolution of the Dispute within thirty days of the
service of the request.
37.1.2 Arbitration
If the parties fail to amicably resolve the disputes or differences or contrary claims as indicated
herewith in sub clause (1) of Clause, arising under or in connection with the present works contracts,
whether pertaining to works contracts alone or works and procurement both, the same shall be referred to
arbitration under the Gujarat Public Works Contracts Disputes Arbitration Tribunal Act,
18.0 RECONCILIATION OF ACCOUNTS
The Contractor shall prepare and submit every one month, a statement covering payments claimed
and the payments received vis-à-vis the works executed, for reconciliation of accounts with the
Owner. The Contractor shall also prepare and submit a detailed account of Owner Issue
materials received and utilized by him for reconciliation purpose in a format to be discussed &
finalized with the Owner before the award of Contract.
19.0 Use of ‘Call Before u Dig’ (CBuD) mobile application
19.1 Bidder is note that it is mandatory to use ‘Call Before u Dig’ (CBuD) mobile application for all
excavators prior to any type of excavation / digging.
20.0 Responsibility for correctness of the information submitted in the bid lies with
If any information furnished in the bid is proved to be false at a later date, GETCO reserve
right to reject the bid and the bid will not only be rejected but the bidder will be
BLACKLISTED as per GUVNL Policy
Seal and signature of contractor
Part II – GENERAL INFORMATION
1.1. SCOPE OF WORK
This specification covers the storage and handling at site, erection, testing, commissioning
and handing over in ready to switch on condition to GETCO of complete equipment /
accessories. of Erection of (1) 01 no. of 400/220KV, 500MVA, ICT -5 bay Work (2) 400kV
Bus Extension (A,B & C) work (3) Erection of 220kV Palanpur Line-2 bay with 220kV Bus
Extension Work at 400KV Kansari ss under Palanpur Circle . etc, as per the Schedule-B
and as per approved layout drawing
2.0 INSTRUCTIONS TO THE BIDDER (TECHNICAL) :
2.1. CODES, STANDARDS & REGULATION
2.2. DOCUMENTS REQUIRED FOR APPROVAL:
2.3. FOR REFERENCE
2.4. AS- BUILT DRAWINGS
The successful bidder will give guarantee for the equipments for its workmanship as per
2.6. FUNCTIONAL AND COMPOSITE TESTING
Following test shall be conducted on equipment after completion of erection in the presence of
-in-charge from point of view of completeness in the presence of’s Authorized Representative.
1 Visual inspection of total system.
2 Verification and measurement of earthing resistance.
3 Checking of cable terminations and laying, dressing etc. in the equipment kiosk
and control panels.
4 Checking of safe accessibility of components.
2.7. BAR CHARTS
The Bidder shall furnish along with the bid, the bar charts and project schedules indicating starting
and completion dates of each activity.
Seal and signature of contractor
TECHNICAL PARTICULARS FOR
Erection of (1) 01 no. of 400/220KV, 500MVA, ICT -5 bay Work (2) 400kV Bus Extension (A,B &
C) work (3) Erection of 220kV Palanpur Line-2 bay with 220kV Bus Extension Work at 400KV
Kansari ss under Palanpur Circle. .
3.1.1 The scope for erection works covered under this section consist of :
i) Taking delivery of equipment and other material from the GETCO’s stores,
checking them, transporting to site's stores and keeping in safe custody by
ii) To take suitable storage-cum-erection insurance of equipment/materials
issued by the GETCO.
iii) Distribution of all materials to erection site.
iv) Structure/Equipment e r e c t i o n including fixing of attachments, accessories
and tack-welding of structures.,
v) Stringing of ACSR/AAAC T w i n M o o s e / Z e b r a conductor bus with fixing of
insulators, Hardware, dampers, spacers etc.
vi) Workmanship guarantee of all the activities carried out from (i) to (v).
3.1.2 The successful Contractor shall carry out all addition/alteration required to complete
the substation for commissioning.
3.1.3 The GETCO will supply equipment, structure materials, bolts-nuts, structure accessories
/ attachments, i n s u l a t o r s , i n s u l a t o r -hard w a r e s , conductor, accessories,
ground wire, ground wire accessories, GI Earthing strip, Control cable etc. required for
erection of equipment and other associated works.
3.1.4 All works shall be carried out in accordance with the revised and latest Provisions under
Indian Electricity Act and Rules made hereunder.
3.1.5 The contractor at his own cost shall arrange all the erection tools required during
execution of work. The Contractor solely is responsible for any damage and / or loss
of his erection tools.
3.1.6 The Contractor shall be fully responsible for completing all the above works till
the complete substation is taken over by the GETCO, and thereafter up till guarantee
3.1.7 The methods of erection are not dealt with in detail but are left to the Contractor who
shall exercise his own judgment with regards to actual handling of equipment &
materials and in deciding upon the best methods to be adopted for all the erection
3.1.8 The successful bidder shall carryout all the erection works in accordance with structural
drawings, and other erection drawings etc. provided by the GETCO.
3.2.0 LAYOUT OF SUB STATION
3..2.1 The proposed layout of the substation is available with concerned field office. The
bidders are presumed to have acquainted themselves with the site before submitting
3.2.2 The successful bidder has to collect from concerned field office the detailed layout
drawing along with the following drawings for the substation duly approved by the
Seal and signature of contractor
GETCO immediately on receipt of the Order. He shall also arrange visit of proposed site
jointly with GETCO’s representative for important marks coming across the scope of
works under the contract. Structural drawings of 66 KV Structures listed at Schedule –B
3.3.0 TECHNICAL INSTRUCTIONS TO THE BIDDER
3.3.1. The works shall be carried out strictly as per the erection manuals and shall fully
comply with the relevant Indian Standard. The IE rules and Acts in force from time to
time shall also be applicable during pendency of the contract.
3.4.0 ERECTION AND COMMISSIONING TOOLS & TACKLES.
3.4.1 The contractor shall provide all tools/tackles jigs and fixtures winches, alignment
tools, welding sets, breaker handling devices all consumable items and construction
equipment as required to install the equipment and to complete the work in all
respects and shall necessarily include (but not limited to ) bolts, nuts, rivets, welding
rods, shims, wedges, packing sheets, packing compounds, oil installation and
protection of individual equipment in storage and during erection.
3.4.2 This shall also cover proper alignment, tack welding tagging, laying marking of
and connection of cables, fabrication supply and installation of all support structures
for installation of various electrical equipment and cables
3.4.3 Provision of cable glands, ferrules, and cable lugs tags sealing kit (for HT cables)
shall also be arranged by the contractor.
3.4.4. Erection of various equipment shall be done strictly as per manufacturer's instructions
3.4.6 All additional iron framework erected to put the equipment in operational condition
shall be provided with two coats of primer and two topcoats of finish paint.
3.4.7 Special care shall be taken to make the enclosed equipment protected against
entry of rates, lizard, and creeping reptiles, which may create electrical short circuits.
3.5.0. COMPLETION OF ERECTION (GENERAL)
3.5.1. Equipment shall be considered to have been completely erected when the
following activities have been completed.
3.5.2 Moving of all equipment to the respective foundations
3.5.3. Fixing of anchor bolts or tack welding as required.
3.5.4 Leveling and alignment of equipment.
3.5.5 Assembling of all accessories such as relays, CTs, PTs, meters instruments
etc. as described in the job specifications.
3.5.6. Drying of equipment as required and testing of oil for dielectric strength.
3.5.7 Filtration and filling of oil as required.
3.5.8. Cable laying, termination with continuity checks.
3.5.9. Applying of finishing coat of pain wherever required.
3.5.10. Mounting of lighting fixtures & connections.
3.511. Testing of all system with operation of all protection system.
Seal and signature of contractor
3.60 ERECTION OF SWITCHYARD STRUCTURES.
3.6.1. Erection o f s w i t c h y a r d structure shall mean erection of gantry column,
beams, equipment support structure and lighting mast, VHF masts, watch
and ward observation posts if any.
3.6.2 The foundation work of switchyard structure is not in the scope of this tender.
The foundation with concreted anchor bolts shall be made available by well in
time to enable the contractor of this work to get a clear working front.
3.6.3. The switchyard structure shall be made available to the contractor in the knocked
down condition either at site or from any other store of in the radius of 100 KMs.
Small parts like cleat, plate fasteners step bolts and other accessories (if any) shall
also be supplied as above separately
3.6.4. Before commencement of the erection work, the contractor shall check
cast foundations and anchor bolts for their individual and mutual distances and also
for the correctness of concreted bolts in terms of number and verticality. In case of
any disagreement with the lay out drawing, the matter may be referred to
Engineer in charge for remedial measures who in turn will arrange such
remedial measures. However, the contractor shall also render necessary assistance
3.6.5. The erection of structure shall be done strictly as per the approved set of
structural drawings to be given by the . The erected column for bringing the
structure in alignment or bringing the structure in plumb shall be allowed.
3.6.6. The erection of column/beams shall be done in phased manner on already
erected column. The elevation faces of the beam should be first fastened to the
column one by one and thereafter plan bracings should provide one by one to
complete the beam geocentric Pre-stressing of beam member for alignment
should be avoided. In case of difficulty i n f a b r i c a t e d m a t e r i a l o r o t h e r w i s e
the Engineer in charge should be contacted for remedial measures who in turn
will take necessary action. However, the contractor shall also render necessary
assistance in this work to Engineer in charge for speedy completion of work. The
load point’s rings bracing shall also be provided as per drawings.
3.6.7. The Cross-connected beams should be perfectly at right angle and matching
with respective faces of the column. No column or beam shall be erected with
missing members.
3.6.8. The method of erection is not being dealt with in detail here. However, while
making the rigging arrangement, it should be ensured that no column beam or
part thereof is damaged due to misjudgment. All the members, plates, cleats, bolts,
buts and other accessories should be fitted to the column, beam support structure
as per the approved drawing.
3.6.9. After the erection of beam and column, the bolt nuts should be properly tightened
and center punched. The thread protruding bolt should be dented in the contact
surface of nut at 3 point 120 degrees apart to eliminate loosening of bolt due to
vibration. The stringing of bus bar conductor be done only after getting certificate
from Engineer. in charge that all bolts &nuts are provided as per approved drawings
3.6.10. The equipment support structure should also be erected like gantry column.
They should well be in plumb with all members fitted as per approved drawings
and bolt nuts properly tightened. The contractor shall also take care to see that the
alignment of foundation of equipment support structure is well done. The
equipment support structures shall be erected as per the approved drawings.
Seal and signature of contractor
3.6.12 CABLE TERMINATION BOX :
1. Cable termination box for gantry structure shall be completely weather proof confirming to ISW
55 and provided with lockable door and HRC fuse mounted on fuse carrier and fuse base
assembly. The terminal shall be stud type and suitable for two Nos. 4mm2 cable necessary
arrangements for glanding cable along with supply of gland are included in tender scope.
2. The bolts nuts and screw required for erection is to be supplied by the contractor at his own
3. Outside and inside the cable terminal boxes will be furnished in two coats light grey colours.
4. Finished painted appearance on equipment shall aesthetically pleasing appearance free from
dots and uneven surfaces.
5. Touch up paint at site shall have to be done if necessary.
3.8.0 ERECTION OF SECONDARY EQUIPMENTS.
3. 8.1. The secondary equipments like PI, CT, CVT, PT, LA (Surge arrestors) wave trap
etc. shall be procured by the contractor from the site store centre or other store
centers of the and transported to the site at the cost of contractor. The contractor
shall also do loading and unloading of the equipment.
3.8.2 After the arrival of equipment at site, packing shall be gently removed without
causing any damage to the equipment. The equipment shall be checked for its
correctness of dimension, make etc. as per the approved drawing. The
equipment then shall be cleaned by a piece of cloth and made ready for erection.
3.8.3. The equipment shall be mounte3d on the ready pedestal (of masonry) or steel
structure as the case may be and checked the same for its verticality.
Construction of masonry pedestal is not in the scope of this work.
3.8.5. In case of CT, PT and CVT, the junction box or terminal box of the equipment shall
be opened, cleaned and all their connections should be checked.
3.8.6 The arcing horns or corona control rings shall be provided as per the
approved drawing. Similarly all fittings etc. shall also be provided as per the
approved drawings
3.8.7. The electrical connection of the equipments through jumpers or through 4"
aluminum pipe shall be carried out along with the cable connection of respective
equipment to the marshalling kiosk or to the control relay panels. The
connection of high voltage terminal of equipment shall not be resorted to, unless
secondary connection or cabling work to control equipment is over. Testing of
equipment shall also be done to ensure the correct wiring sequence of the
equipment and continuity before energizing equipment by EHV
3.8.8. Polarity of the equipment to be connected on HV side should be checked
prior to erection. The oil level( if any) of the equipment should be checked for its
totality. If level is found to be inadequate, topping filling of oil should be resorted
. The willl supply the quantity of oil required.
3.8.9. Fuse, links, etc provided in the secondary box of the equipment shall be
checked for their position and continuity and any lacuna observed will be set right
before taking the equipment for commercial use.
3.9.0 ERECTION OF CIRCUIT BREAKER :
3.9.2. The circuit breaker shall be taken delivery from the site/other stores of and
transported to the work place well in time on loading/unloading. The crates
containing the insulators and important parts and accessories shall be opened
carefully keeping them in their proper position. Insulator parts and other
accessories shall be thoroughly cleaned for any deposits of dust or other particles.
3.12.3 The breaker shall be brought on the pedestal of masonry or steel frame as the
case may be) in upright position without any inclination. The main parts of the
Seal and signature of contractor
equipments shall be assembled as per approved drawing to be submitted by the
GETCO to arrange Service of commissioning engineer of circuit breaker
manufacturer. However, the contractor will not remain contended with the
instruction and guidelines given by the commissioning engineer and shall also use
his own judgment in better erection of commissioning practice of circuit breaker.
3.12.4 After the placement of circuit breaker in position the kiosk of the breaker shall
be thoroughly inspected and any lacuna found shall be reported to the Engineer in
charge of the work. The HT terminal connection shall be done only after the
terminals of the equipment kiosk are made to the marshalling kiosk and or to the
control/relay panels.
Polarity of the equipments shall also be ensured before physical erection.
3.12.5. The method of erection of breaker is not dealt with in details; however, it
is recommended that breaker poles shall be erected only by using telescopic
crane or other suitable mechanical arrangement. The rigging should be tool proof.
3.12.6. The operating mechanism in the breaker Kiosk and contacts as well as the
power supply circuits (AC/DC) shall be properly checked for its operation
worthiness. All piping for gas/air shall be laid as per the approved drawing.
The air receiver or compressor shall be positioned as per the relevant
drawing. Minor fittings and fabrication or grouting work required to place these
articles or accessories shall be done by the contractor without any extra cost to the
purchaser. In case of breakers with spring mechanism the trials of the mechanism
by actuating should be done to ensure its' line worthiness.
3.12.7 EHV side of the breaker should be aligned to a incoming and outgoing bus conductor.
While erecting the breaker, the operating mechanism without the porcelain
insulator should be laid perfectly to avoid any mal functioning of the breaker.
3.12.8. Earthing points of the breaker as well as attached Kiosk shall be connected to earth
grid by means of risers already available nearby the equipment. Any other erection
checks and pre-cautions indicated in the Manual furnished by the respective supplier
of the equipment shall be studied well by the contractor and the provisions there of
shall be implemented as far as possible.
3.14.0 ERECTION OF ISOLATORS.
3.14.1 Isolators of the switchyard shall be with or without earth blade type. centre breaks type
etc.The isolators shall be procured by the contractor from the site stores of the and
transported to the work site. All the spare parts shall be properly unpacked cleaned and made
ready for erection.
3.14.2 Before erection, the contractor shall obtained copies of approved drawing of
respective equipments. The isolators shall be erected on the ready galvanized
structures. However, foundation for them will be available readily the respective points in the
3.14.3 The contractor shall check the erected support structure for their alignment vertically
and tightness of fasteners before mounting the isolators parts on them. The contractor
shall also verify the mounting arrangement for the operating mechanism on this structure
and suitable for the same. In case of any shortcoming the matter may be reported to engineer
in charge. Any modification of trivial nature for the structure of fixtures shall be carried out
3.14.4 The parts of the isolators, fixed and moving contacts earthing rode etc. shall be handled very
carefully to avoid breakage or distortions. The erection shall be carried out using mechanized
erection tools. The polarity of the isolator polls shall be properly identified and also the
direction of the opening should be pre-determined. It should be ensured that in the entire
switchyard the isolator open and close uniformly (direction point)
3.14.5 The operating mechanism for the line contacts shall be thoroughly checked for their
accessories as per approved drawing and it should be ensured that all the
Seal and signature of contractor
connection fuses links dehumidifiers lighting sockets electric motors are in their proper
position. Any deviation from the approved drawing should be got sat right with the help of
engineer in charge. Position. Any deviation from the approved drawing should be got set
right with the help of Engineer-in- Charge.
3.14.6 While erecting the isolator, it should be ensured that it should be properly aligned with
respect to bus conductors or line conductor bus provided in the switchyard: The erected
Isolator shall be within the plumb. The operating mechanism rods, pole and rotating
insulators shall be checked for their proper function. The testing of the wiring to the kiosk
should also be done to ensure its operation worthiness. The final commissioning of the
isolator should be done only after connection to control panel is affected. However
prior to that it should be ensured that the physical movement of the fixed and moving
contacts and reach of them is within the prescribed limit.
3.15.0 ERECTION OF CONTROL AND RELAY PANELS.
3.15.1 The contractor shall procure the control and relay panel from site store or any other
stores of the GETCO and transport the same to the erection site. The cases containing the
panel shall be unpacked carefully and shall be nicely cleaned. In case any of external
damage is observed, same shall be brought to the notice of Engineer In charge. The
panel shall be unpacked in upside up position. After an external visual inspection, the
panel door shall be opened and checked for the circuit connection, terminal connector,
dehumidifier, power connection etc.
3.15.2 A front side of the panel shall be checked for any damage to the meter indicator, hooter,
and semaphore indicators
3.15.3 Any lacuna in the equipments, circuits, fittings, dimensions etc. observed shall be brought
to the notice of Engineer in charge who will try to impose remedial measures
3.15.4 The relay panel should also be checked for type, of schemes adopted for protection, internal
connection, fascia indicator etc. Any difference observed should be brought to the notice of
Engineer in charge who will take necessary action.
3.15.5 The panel shall be erected along cut outs provided in the slab concrete, in the order,
it is decided, by Engineer in charge or which is approved by authorized drawing.
3.15.6 The size and number of cores of cables be brought from the equipment to control panel,
control panel to relay panel and back to equipment shall be pre-determined by study.
3.15.8 After the erection of control panel and relay, panel, all the equipments, accessories
indicators etc. along with the internal wiring and other accessories provided with the kiosk of
3.16.0 LAYING OF CONTROL CABLES AND TERMINATIONS THEREOF
3.16.1 Laying and termination of control Cable work shall generally Includes following:
a) Control and power cable from individual equipments kiosk to the field kiosk.
b) Laying and termination of Control and L.T power cable from field -kiosk to control
room equipment (i.e. LT switchgear, DC battery and control panel/relay panel.)
c) Laying and termination of Cable from the transformer kiosk to transformer panel and up
to AC/DC supply source.
Seal and signature of contractor
d) Laying & termination of Control cables from control panel to relay panel and vice a versa.
e) Laying & Termination of cable from DC/AC source, battery room L/T switch gear room
to control/relay panel.
g) Laying & termination of cable from 11KV/400 V Distribution transformer to LT switch gear
h) Laying & termination of cables from Station transformer to distribution transformer in
the switchyard as well as in the residential. Quarter area.
I) Laying & termination of LT power cable from station transformer to fire protection system
kiosk (If required).
3.16.2 GETCO will provide the cable schedule for the various control schemes, protection
schemes and metering scheme as well as communication, scheme etc.
3.16.3 ‘The contractor shall procure’ the required size of control and power cable from the
purchaser’s site store to any other stores from where the same allotted and transport it to its
3.16.4 The control cables shall be terminated using correct type of lugs and further prodded
with ferules giving the identification number of various cores of the cable. Correct type of
tools for termination shall be used to secure a rigid connection of the cable tray along with
the cable trenches. Normally mild steel, racks and cable trays are provided in the cable
trench. However, the purchaser may it its’ own discretion prefer to utilize fiber reinforced
poly propylene (FRP) cable racks and trays. In such an event, the racks and trays will be
supplied by the Purchaser to the contractor in a knocked down condition. The contractor
shall assemble the rack and provide trays on them as per the approved drawing given by
the purchaser. If FRP trays and racks are to be utilized, the contractor will have to take
extra care while laying the cable through different layer and racks to avoid any
displacement or distortion of the FRP racks. However, if the laying of pre-fabricated FRP
racks and trays fall in the scope or FRP rack/tray supplier, the contractor shills co-ordinate
and synchronize his cable laying activities with respective supplier of FRP rack/trays.
3.16.5 Utmost care shall be taken by the contractor to prevent damage to outer insulation
and the armors of the cables. No joint to the cable shall be permitted. Unless situation so
warrants and Engineer in charge permits the same.
3.16.6 After .laying, all the power and control cable shall be properly identified giving the both
a number and details of end connections.
3.18.1 The Contractor shall ensure that at the end of each sub-activity the
Surplus materials are immediately removed from the work-site and the surplus
excavated earth is spreader around to avoid loss or injury to the
public/equipments.
3.18.2 The Contractor has to return all surplus materials after reconciliation of
material account in good and useable condition. The contractor shall settle the
final bill including signature on all relevant papers required for passing of final
bill, excess/saving statement and time limit extension proposal. If any within
three months from the date of charging/commissioning or taking over by the
GETCO of the Sub Station.
3.18.3. Most of all equipments should be erected in presence of the concerned
engineer from OEM/GETCO Engineer.
Seal and signature of contractor
3.18.4. After complete erection and operation, contractor's supervisor should attend
the site whenever called from GETCO for further testing commissioning of
equipments/panels etc.
3.16 MAINTENANCE FREE TREATED EARTHPIT
Seal & Signature of Bidder - 69 -
The bidder shall have to do the entire work of earth pits required for equipment earthing and
for the pits at the corners of earth mat.
The product and the equipment covered by this specification shall, unless otherwise
specifiedbe in line with the requirement of any of the latest applicable standards and will
apply in order of priority as listed below:-
a) Indian Standards
c) ANSI (American National Standards)
d) BS (British Standards)
All the Earth Pit shall be with special Ground electrodes supplied by Reputed Manufacturer.
These special electrodes are provided with Ground enhancement material.
A. EARTHING PRODUCT COMPONENT SPECS
- The Earthing System should be based on use of Copper Bonded Earth Rods / Pipe
/PIP electrode (for corrosion resistance) and Ground Enhancement Material (to reduce Soil
- It should be capable of providing any ohmic value as specified by the client, by
interconnection of ground rods to form a Grid.
- The system shall be totally maintenance free and require no periodic or scheduled
maintenance for a period of at least 30 years.
- There shall be no requirement to add water or any other chemical any time after initial
- There should be no requirement to have a inspection/maintenance chamber. The system
shall provide constant low ohmic value for entire life cycle without any consideration for
moisture or temperature conditions.
- The system shall be in use world wide for a period of at least 20 years.
- The manufacturer shall be a company of international repute engaged in the field of
Facility Electrical Protection work.
(1) COPPER BONDED EARTH RODS
- The Earth Rods shall have a nominal (actual) dia of 20mm (Min.) and length of 3 M.
- The Rods shall have a steel core with molecular bonding of 250 micron of copper as per
international standards.
- A nickel layer is applied to steel core (and subsequently copper) by an electrolytic process
forming a metallurgical bond between the three.
- The copper used shall be type DHP alloy No. 122 CDA and rated at 99.95% copper. The
thickness of copper layer shall be uniform 250 micron.
- The Rods should be manufactured by a company of high repute to ensure quality of
Copper Bonding.
- The Rods should have been subjected to long term study to verify the claims of corrosion
resistivity made by the manufacturers
(2) PIPE or PIP (Pipe-In-Pipe) ELECTRODE
- It shall be capable to carry out the fault current as per GETCO standard considerations.
- It should have been subjected to long term study to verify the claims of corrosion resistivity
made by the manufacturers.
C. GROUND ENHANCE MENT MATERIAL / BACK FILL / GROUNDING
Seal and signature of contractor
- Ground Enhancement Material/ Backfill / Grounding compound shall be permanent and
maintenance free. (No re- charging with salts or any other chemicals) and shall maintain its
earth resistance with time.
- Ground Enhancement Material/ Backfill / Grounding compound shall confirm IEEE 80-
2000 Clause No.14.5 (d)
- It must set up firmly and not dissolve or decompose or otherwise pollute the soil or the local
Seal & Signature of Bidder - 70 -- It shall be suitable for use in dry form or slurry form.
- The Ground Enhancement Material/ Backfill / Grounding compound shall not depend on
the continuous presence of water to maintain its conductivity.
- Ground Enhancement Material/ Backfill / Grounding compound in its set form shall have a
resistivity of not more than 0.12 ohm-m.
- The material should have been subjected to long term study to verify the claims made by
manufacturers about its soil resistivity reducing qualities.
- The material shall have been tested in a reputed laboratory for not containing any
hazardous chemicals as per EPA Chapter-7.
- The material shall be carbon based conductive concrete and shall not contain bentonite in
- The bottom 300 mm of the bore hole shall be filled with good quality preferably black
cotton soil. The balance length of the bore shall be filled entirely with the backfill
compound in pure form without mixing with soil. The compound shall bond tightly with the
electrode and become a solid mass.
- Each Earth Rod/pipe must be provided with a suitable clamp to facilitate Inter-connection
of rods and connection to Equipment Earth Bar using appropriate copper/GI strip or
The product shall be guaranteed for trouble free operation for a period of 30 years from date
of commission or arrival at site which ever is later. Any defect discovered during this period
shall be rectified free of charge. The pits shall be drawn with the help of a boring machine,
an auger or any other means as required by site conditions and nature of ground strata.
Drawing No. GETCO/E/STD/P-021 (1 of 2 & 2 of 2), DTD.30.07.14 shall be used for
Important Note:
Terms “CI Pipe Electrode” and “Treated Electrode” shall be replaced by “Maintenance
free Treated Earth pit” wherever written in Earthing Philosophy as well as applicable
equipment earthing drawings.
3.17.1 The Contractor shall ensure that at the end of each sub-activity the Surplus materials are
immediately removed from the work-site and the surplus excavated earth is spreaded around
to avoid loss or injury to the public/equipments.
3.17.2 The Contractor has to return all surplus materials after reconciliation of material account in
good and useable condition. The contractor shall settle the final bill including signature on all
relevant papers required for passing of final bill, excess/saving statement and time limit
extension proposal. If any within three months from the date of charging/commissioning or
taking over by the GETCO of the Sub Station.
3.17.3. Most of all equipments should be erected in presence of the concerned engineer from
OEM/GEB engineer. Seal & Signature of Bidder - 71 -
3.17.4 After complete erection and operation, contractor's supervisor should attend the site
whenever called from GETCO for further testing commissioning of equipments/panels etc.
3. 18.0 WASTGES:
Seal and signature of contractor
3. 18.1 The contractor shall make every effort to minimize the breakages, losses and
wastages of line material etc. supplied “ Free of cost “ by the GETCO for
line Erection work.
3.18.2 The maximum ceiling for wastages permitted is as under:
The maximum ceiling for wastages permitted is as under:
Sr no Item % Wastages permitted (Max.)
1 conductor & earth wire 1/2 % (for jumpering & sag)
2 conductor & earth wire 1/2% ( for credit s scarp of cut piece
length (from 10 mtrs up to 30 mtrs)
3 conductor & earth wire 2 % ( for credit in pieces good
conductor from > 30 mtrs up to 100 mtrs)
4 Insulators 1/4 %
Seal and signature of contractor
Following material will be supplied b y GETCO “free of cost” for “Erection of (1) 01 no. of
400/220KV, 500MVA, ICT -5 bay Work (2) 400kV Bus Extension (A,B & C) work (3) Erection of
220kV Palanpur Line-2 bay with 220kV Bus Extension Work at 400KV Kansari ss under
Palanpur Circle.”
1) G I Structures, accessories, attachments bolts-nuts, Angle, channel etc.
2) Conductor, conductor accessories, earth wire, earth wire accessories.
3) Insulators, insulator hardware’s.
4) 400/220 KV equipment with accessories and control and relay panels
5) Various sizes of armored control cables for control wiring of equipment.
6) Earthing materials like GI Strips. Galvanized wire etc.
7) 11KV Power Cable.
8) 11KV Indoor Cable Termination Kits if available with GETCO.
9) MS Girder, Channel, Angle sections for fabrication of various supports as included in
respective items.
10) If available than 11KV single phasing switches, 11KV GO switches, 11KV LA, 11KV DO
Following m a t e r i a l s / equipment will be procured / arranged by the c o n t r a c t o r activities
f o r Erection of (1) 01 no. of 400/220KV, 500MVA, ICT -5 bay Work (2) 400kV Bus Extension
(A,B & C) work (3) Erection of 220kV Palanpur Line-2 bay with 220kV Bus Extension Work at
400KV Kansari ss under Palanpur Circle.”
1) Tools tackles required for Sub-Station erection activities and stringing.
2) Earthing m a t e r i a l s f i l t e r ma ch i n e , h y d r a u l i c c r a n e a n d h yd ra u l i c j o i n t i n g
m a c h i n e /welding machines. GI pipe, coal, salt etc.
3) Wherever necessary cement, sand, metal, water for concreting works.
4) All required material for Colony & Yard Lighting, Control-Room Industrial Electrification and
Staff-Quarter Residential Electrification work except GI angle required for fabrication for fixing
Seal and signature of contractor
Sus-Station Equipment/Material will be issued from following Store Centers.
Sr. Name of Sub Station. Store Centers for issue of S/s
No. materials. /equipment.
1 Erection of (1) 01 no. of 400/220KV, Palanpur/R&M store
500MVA, ICT -5 bay Work (2) 400kV Bus Kansari and any store of
the GETCO or as per
Extension (A,B & C) work (3) Erection of instruction of Engineer-
220kV Palanpur Line-2 bay with 220kV in- charge.
Bus Extension Work at 400KV Kansari ss
under Palanpur Circle.”
Note: 1) Generally all required materials will be issued form above store centers. In case of
non-availability of some items, contractor shall have to collect from other nearby store
centers without extra cost to the GETCO.
2) Bidder shall be note that material/equipment shall be issued from Palanpur/R&M store
Soja and Bidder shall arrange loading, unloading, transportation from Palanpur/R&M
store Soja to work site.
Seal and signature of contractor
GUJARAT ENERGY TRANSMISSION CORPORATION LIMITED
TRANSMISSION CIRCLE OFFICE, PALANPUR.
To create environment where Business confidence is built though best business practices and is
fostered in an atmosphere of trust and respect between providers of goods and services and their
users for the ultimate benefit of society the nation.
GETCO COMMITEMNT PARTY’S COMMITEMENT
To maintain the highest ethical Not to bring pressure
standards in business and recommendations outside GETCO to
professional influence its decision.
Ensure maximum transparency to the Not to use intimidation, threat,
satisfaction of stakeholders. inducement or pressure of any kind on
GETCO or any of its employees under
any circumstances.
To ensure to fulfill the terms of To be prompt and reasonable in
agreement / contract and to consider fulfilling the contract, agreement, legal
objectively the viewpoint of parties. obligations.
To ensure regular and timely release To provide goods and / or services
of 9payment on due dates for work timely as per agreed quality and
done. specifications at minimum cost of
To ensure that no improper demand is To abide by the general discipline to
made by employees or by anyone on be maintained in our dealings.
To give maximum possible assistance To be true and honest in furnishing
to all the Vendors / Suppliers / Service information including payment to
provider and other to enable them to agents / sub-agent.
complete the contract in time.
To provide all information to suppliers / Not to divulge any information,
contractors relating to contract / Job business details available during the
which facilitate him to complete the course of business relationship to
contract / job successfully in time others without the written consent of
To ensure minimum hurdles to Not to enter into carter / syndicate /
Vendors / suppliers / contractors in understanding whether formal / non
complete of agreement / contract / formal so as to influence the price.
Seal & Signature Seal & Signature
(GETCO Authorized Signatory) (Party’s Authorized Person)
Seal and signature of contractor
Safety Penalty Clause:
1. In case if any safety related fatal Elect. / Mech. accident occurred to any employee
of agency or outsider d u e t o neg lig ence o r non-compliance of GETCO s a f e t y
n o r m s t h e n i n addit ion t o t he compensation and liability as per statutory
requirement, contractor / agency shall be penalized as under:
Sr. No Amount of Contract in Rs. Penalty amount
1 Up to -1 Lac Rs.5000/-
2 Above 1 Lac to -7 10 Lacs Rs.25000/-
2.1 The c o n t r a c t o r s h a l l i n f o r m c o n c e r n e d E x . Engineer C o n s t /TR in writing
within 24 hours of fatal/Non-fatal accident occurred to human being.
2.2 The GETCO investigating officer findings in to accident shall be final and binding to
the contractor /Agency.
3. Safety Requirement:
3.1 Kick off Meeting exclusively for safety shall be done in each contract in presence of
contractor’s site in charge and supervisor. Safety document shall be handed over and
vital safety norms and key points of safety related to project shall be explained and
recorded for commitment by erection contractor. Such records are mandatory for
clearing first erection bill.
3.2 During site visit by GETCO official of Executive Engineer and above rank, the
following checks during execution of work shall be covered.
3.21 Safety equipments available and utilize.
(b) Safety belt.
(c) Safety shoes.
(d) Live line Voltage detector
3.2 2 Safety procedures adopted.
a) Permit to work
(b)Earthing at the place of Work. (c)Adequate supervision.
3.23 T & P physical Check. (Healthiness and Quality)
(b) Wire rope and sling.
(c) Earthing rod
3.3 If above-mentioned saf ety requirements found violated in any of the above three
conditions shall attract penalty of Rs. 1000/-per occasion. (Max.Rs.3000/--for violation of
three conditions)
3.4 During subsequent visit, if violation is found, then double penalty shall be deducted
from the bill of the Contractor/Agency.
Seal and signature of contractor
SAFETY CUM INDEMNITY BOND
(On Non-Judicial Stamp paper of value not less than Rs. 300.00)
KNOW ALL MEN BY THESE PRESENTS that we, by this SAFETY CUM
INDEMNITY BOND Executed on this _ Day of 2024. I/We Having
Registered Office (herein after called “THE CONTRACTOR”
which expression shall mean and includes my /our heirs, executors, administrators and legal
representatives, successors and permitted assigns) do hereby binds myself/ourselves and also
our company/firms after having the power to bind by this promise and undertaking in favour of
the Gujarat Energy Transmission Corporation Limited (GETCO), Palanpur a State Transmission
Utility under The Electricity Act, 2003 having its registered office at Sardar Patel Vidyut
Bhavan, Race course, Palanpur.( hereinafter called as GETCO, which expression shall
mean and include its legal representative, administrators assigns) has agreed under the terms
and conditions of the contract no…………………………………………………………………….
dated…………………….made between
for the contract of the Work of Augmentation of 315 MVA to 500 MVA, 400/220kv ICT 1 AND
ICT 2 including Erection of bay equipment, CR panel, control wiring etc. at 400kv
Charanaka s/s approved under GEC Pahse-II under Deodar TR Division of Palanpur circle. .
v alue of Rs. ………………………interalia on production of Safety Cum Indemnity Bond.
We do hereby undertake and agree to Indemnify and keep Indemnified GETCO from time to
time to the extent of Rs………………………………
only against any losses or damages, costs, charges and expenses caused to or suffered by
reason of the CONTRACTOR while Project, R&M, O&M work including work carried out by
outsourcing agency, failing to take proper care or not complying the guidelines given
hereunder as per Annexure-A and instructions which may be given from time to time during
the continuance of the contract and we further undertake to unconditionally pay the amount
claimed by the GETCO on demand and without demur to the extent aforesaid.
Whereas the CONTRACTOR has/have been awarded to execute the job/works under order
, dated …………………………. for Work of Augmentation of 315 MVA to 500 MVA, 400/220kv
ICT 1 AND ICT 2 including Erection of bay equipment, CR panel, control wiring etc. at
400kv Charanaka s/s approved under GEC Pahse-II under Deodar TR Division of Palanpur
circle. issued by the GETCO after having observing necessary formalities, the details of
which is described in the order
dated …………………………..and whereas the said job/works will be /likely to be done in
places covered under Employees’ State Insurance Act,1948 (ESI) and /or the Workmen
Compensation Act,1923 and /or other laws relating to the Labour Management and Welfare Act.
(Respective Amendments) And whereas according to the condition of the Contract the
CONTRACTOR is under obligation to execute this Safety cum Indemnity Bond before the
commencement of actual execution of work
Now the indenture witnesses that I/We the CONTRACTOR do hereby undertake to follow the
guidelines as per Annexure-A prepared by the GETCO.
Further we the CONTRACTOR agree that the GETCO shall be sole judge of and as to whether
there has been any breach of the guidelines as per Annexure-A of this bond and as to the
extent of the loss, damages, costs, charges and expenses caused to or suffered by the GETCO.
Seal and signature of contractor
We the CONTRACTOR further agree that our liability under this bond shall not be discharged
because of the change in the constitution of the GETCO or for the extension of the time
limit or for any other reason.
We the CONTRACTOR further agrees to the given terms and conditions:
a. That t h e C O N T R A C T O R u n d e r t a k e s / undertake t o i n d e m n i f y a n d k e e p
harmless the GETCO from a l l claims, actions, proceedings and risk, damage danger to
any person whether belonging or not belonging to the. CONTRACTOR.
b. That the CONTRACTOR shall keep harmless the GETCO from all claims, compensation,
damages any proceedings in respect of any of its employee / workmen under the Workmen
Compensation Act or any other laws for the time being in force.
c. That, if during the course of execution of work as stated in the contract order
mentioned hereinabove issued by the OBLIGEE, it is found that the CONTRACTOR has not
complied with guidelines as per Annexure-A or terms and conditions / formalities within the
meaning of Employees’ State Insurance Act,1948 (ESI) or Workmen Compensation Act
or any other laws relating to the Labour Welfare for the time being in force, and also has not
observed the safety norms in accordance with the law prevailing at the place of work/job to
the satisfaction of the GETCO, the GETCO shall have the right to stop the execution of
work/job and the period of such stoppage shall not be taken into account for the calculation
of the total period of completion of work for which the CONTRACTOR is responsible to
complete the work/job and it will be deemed that discontinuance was due to default of the
d. That, if any time, due to exigency, GETCO as the Principle Employer, becomes liable to pay
any such compensation mentioned hereinabove, whether on failure of the
CONTRACTOR or for any other reason, the GETCO shall have the right to recover the said
amount from any amount receivable by GETCO or any bank guarantee deposited or anything
payable whether in connection with this contract or other contract by the CONTRACTOR to
e. That the CONTRACTOR is/are aware and accept that for the persistent or
repeated violation of any guidelines as per Annexure-A and terms and conditions mentioned
in this Safety cum Indemnity Bond, GETCO shall have right to terminate the contract of work
issued to the CONTRACTOR.
f. In case if any safety related fatal Electrical / Mechanical accident occurred to any employee
of agency or outsider due to negligence or non-compliance of GETCO safety norms then in
addition to the compensation and liability as per statutory requirement, contractor / agency is
hereby agreed to pay the penalty amount as given below:
Sr. Amount of Contract in
1 Up to -71 Lac Rs.5000/-
Above1 Lac to -7 10 Lacs
4 > 100 Lacs 1.0 % of contract value
g. I/We the CONTRACTOR hereby confirm that in case of any dispute/difference for
settlement of claims under this Safety Cum Indemnity bond the courts in Gujarat State
wherever job/work is performed or as per GETCO norms shall have the jurisdiction to decide
the rights & liabilities of the parties while adjudicating the matter of claims under this Safety
Cum Indemnity Bond.
h. This Safety cum Indemnity Bond shall continue and hold good until it is released by the
GETCO in Writing on the Contractor’s application after the
Contractor has discharged all his obligations under the order mentioned hereinabove and
Seal and signature of contractor
submitted a “NO DEMAND CERTIFICATE” from the GETCO under the said order. The
Safety cum Indemnity Bond shall be valid for a CONTRACT PERIOD and renewable thereof
(Claim Period).
i. This Safety cum Indemnity Bond and the guidelines as per Annexure-A herein
contained are in addition to And not by way of limitation or substitution for any other
guarantee, indemnities Hereto before given to the GETCO by the CONTRACTOR and this
indemnity does not Revoke or limit such indemnities or guarantees. IN WITNESS WHEREOF
the Parties hereto have executed this indenture the day the year First hereinabove written.
(Signature with seal of The CONTRACTOR)
In the presence of:
Seal and signature of contractor
OUR ENDEVOUR Safety a habit
To create environment where Business Confidence is built through Best Business Practices and is fostered
in an atmosphere of trust and respect between providers of goods and services and their users for the
ultimate benefit of society the nation, safety guidelines are agreed upon by the agency as under.
Safety is our prime concern and zero accident is our goal. In order to prevent the accident, while execution
of works in indoor and outdoor systems of GETCO, the following guideline and preventive measures are
Indoor safety precaution Outdoor safety precaution
The method of work required T&P and manpower The method of work required T&P and manpower
should be discussed between GETCO should be discussed between GETCO supervisor,
supervisor, contractor’s supervisor and gang leaders.
contractor’s supervisor and gang leaders.
Prior to execution of work a joint survey must be Prior to execution of work a joint survey must be
conducted by GETCO supervisor and contractor’s conducted by GETCO supervisor, contractor’s
supervisor for risk assessment supervisor and DISCOM line man in order to
•Clearly identify the work location, to distinguish identify the following:
between the equipment that is dead and other a. HT/LT line or tap line crossing under each span of
equipment / part that may be live. line of the work.
•Disconnect equipment from supply. b. Isolation point of each line crossing.
•Protect against other live parts. c. Each line crossing & isolation point under each
•Take special precautions when close to bare span must be discussed and noted in maintenance
conductors / Bus bar. register with sketch.
Following safety guidelines are mandatory for all Contractor’s supervisor and GETCO Supervisor
contractors operating in GETCO premises for must ensure all isolations physically with adequate
Electrical, non-electrical & civil works. earthing technically prior to give clearance to gang
1. The contractors must provide advance planning leader for taking up job.
of work to concerned incharge of substation in While execution of stringing work, the identified line
writing. crossing must be isolated / deenergized and written
2. Before starting any work whether switch yard, clearance should be obtained from concerned
“permit to allow to work” must be taken from controlDISCOM supervisor.
room incharge. The isolation of Tap line must be physically seen
1. Utilizing Electrical / nonelectrical equipments,
and verified by Contractor and GETCO supervisor.
safety rules must be implemented. At D.O. fuse junction contractors person should be
2. If the work is to be carried out on Sunday orposted to ensure that no person restore D.O. supply
Public holiday, the necessary permission must be while work is under execution
taken in advance, requesting in writing. Contractor’s supervisor must ensure that concern
3. Unwanted person including children of labours officer take LCP for EHV line and power line crossing.
will not be allowed at working site/ in the switchyard
and in the prohibited area.
4. Any electrical work or electrical connections to
equipment for any other work must be carried out by
Sign & Seal of Contractor Page
electrician/wiremen with adequate size of wire
through MCB as per I.E. Rule.
-Live penal area / bus bar must be isolated and
sealed / bifurcated with red colour tape for visible
warning. Display Board must hang on LCP panel.
-Transformer must be switched off whenever and
wherever contractor and line workers are not
satisfied with isolation, earthing or any equipment
performance of GETCO, it will be pointed out and
work shall begin only after resolution. Contractor
shall not take up job in absence of GETCO
authorized person. All wire temporary connection &
material whenever erection activity has any
connection and disconnection work of bus bar,
All workers / labour of contractor & All workers / labour of contractor &
supervisors must use personal protective supervisors must use personal protective
equipment (PPE) during the work like equipment (PPE) during the work like
gloves, safety belt, Safety shoes, Helmet, gloves, safety belt, Safety shoes, Helmet,
earthing rods, etc, duly approved by earthing rods, Live line detector etc, duly
GETCO. approved by GETCO.
The local earthing must be done at the The local earthing must be done at the place
place of work before execution of any work. of work before execution of any work.
11 kV breaker in panel must be switched Circuit breaker opening is not an isolation
off and racked out only after ensuring no and isolator on either side must be opened.
voltage in breaker and without door No work during rains and cloudy weather
opening. condition.
Transmission line activities.
1) Used of Voltage detector to ensure
2) Earthing at three point, local, left &
right side of bus bar / string bus.
3) Match line colour code with colour of
Local earthing of electrical equipments like
filter M/c, welding machine, testing kits etc.
Crane shall only be used for material
handling and erection. Working platform
shall only be used for work in switchyard.
Sign & Seal of Contractor Page
TENDER NO. CDD/ET/30/2026
Sub. : Erection of (1) 01 no. of 400/220KV, 500MVA, ICT -5 bay Work (2) 400kV Bus
Extension (A,B & C) work (3) Erection of 220kV Palanpur Line-2 bay with 220kV Bus
Extension Work at 400KV Kansari ss under Palanpur Circle.”.
In connection with above subject, I / we confirm the following:
a) I/ we, the undersigned, have read and understand the Tender Specification For Work of
Erection of (1) 01 no. of 400/220KV, 500MVA, ICT -5 bay Work (2) 400kV Bus Extension (A,B &
C) work (3) Erection of 220kV Palanpur Line-2 bay with 220kV Bus Extension Work at 400KV
Kansari ss under Palanpur Circle.” . .Complete with the entire tender Terms and Conditions.
b) The price in the bid is firm prices in line with Tender Specifications and shall stand valid till
completion of the Contract, if awarded.
c) I/We declare that our bid is strictly in line with Tender Specifications and there is no deviation.
Further, I / we also agree that additional conditions / deviations, if any found in bid, the offer
shall be out rightly rejected without assigning any reason thereof.
Signature of Authorized representative
of Company / Agency
Sign & Seal of Contractor Page
CONFIRMATION OF DETAILS OF BIDDER
Bidders are required to furnish following information specifying YES / NO
1) Whether the Bid is on percentage basis as called for. Yes / No
2) Whether rebate furnished is in percentage basis as called for. Yes / No
3) Whether the Bid is submitted by RPAD. Yes / No
4) Whether a l l pages of Bid Specifications are sealed and signed by the Bidder.
5) a) Whether the Bidder is registered with for Getco
b) In case of “Yes”, please furnish following details:
i) Registration Letter No. &date.
ii) Class of Registration
c) Whether Bidder is having PF Code No. Yes / No
6) a) Whether EMD/Tender fees paid. ( BG/NEFT/RTGS/Online ) Yes/no
7) Whether following documents as specified are submitted.
a) Human Resources detail. Yes / No
b) Availability of tools, equipment’s etc. Yes / No
c) Details of orders executed / on hand Yes / No
d) Financial capability. Yes / No
e) Experience as specified. Yes / No
f) Company's Articles Of Association Yes / No
g) Details Of Partners / Directors Yes / No
h) B.R./P.A. Authorizing Person Yes / No
i) Power of Attorney of Consortium Members Yes / No.
J) Pan card Yes/No
K) GST Registration Yes/No
L) Electrical Contractor registration Yes/No
M) Solvency certificate Yes /No
8) Price: [FIRM ONLY] Yes/No
9) Security terms agreed Yes/no
10) Penalty terms agreed Yes/No
11) Terms agreed: Yes/no
12) Validity of the offer for 180 days from the date of
opening of the technical bid: agreed Yes/No
13 payment terms agreed:
Company / Agency
NAME: STATUS: Name of
tendering Company
Sign & Seal of Contractor Page
1) DETAILS OF WORK ORDERS EXECUTED BY THE BIDDER OF VARIOUS SIMILAR
Sr. Order Description of Order Order Name of Order
No. No./Date work Qty.(Bay/ss) Amount placing authority
Completion date as Date of commencement of ual completion of work
2) SATISFACTORY WORK COMPLETION CERTIFICATE
Sr. Description Certificate No Date Order Certificate issuing
No. Amount authority
3) WORKS TENDERED / IN HAND
Details of other Works, tendered for & in hand, as on the date of the Submission of this tender [Tenderers
shall submit the information in the Format detailed here under]
Name Of Work and Anticipate
Location Order Value date of Remarks
No Quantity(Bay/SS)
Signature of Authorized Representative
Company / Agency
NAME: STATUS: Name of
tendering Company
Sign & Seal of Contractor Page
FINANCIAL CAPABILITY
Sr. Details Amount Rs. In lacks Remarks
1. Solvency A scheduled Banker’s
Certificate of present
solvency be attached.
2. Price of the biggest job
3 Average Turnover of Last
Signature of Authorized Representative
Company / Agency
NAME: STATUS: Name of
tendering Company
Sign & Seal of Contractor Page
ERECTION CAPACITY
Based on available men power, tools-tackles, machinery and financial resources, our erection
capacity is as under:
Sr. Name of activity Unit Capacity per No. of Persons per
No. Annum per gang gang.
Seal and signature of contractor
TENDERER’S DETAILS OF PERSONNEL
The List of Technical Personnel intended to be placed at the Work by the Contractor.
[Tenderers shall submit in the Format detailed here under]
Firm Type (Proprietary/
Partnership/Corporate )
Contact Person Name and
5 Qualification
6 Professional Experience
9 Contract Details
Note: All the correspondence, queries etc., will be asked on above E-Mail only. Bidder is
responsible to check and operation of e-mail ID.
Contractor’s Representative legible signature: ______________________
Seal of the company
Seal and signature of contractor
This is to declare that none of the Proprietors/ Partners/ Directors are having any relatives employed or
working with Gujarat Energy Transmission Corporation Ltd at any of its offices or its parent Department
Signature of Authorized Representative
Company / Agency
NAME: STATUS: Name of
tendering Company
Seal and signature of contractor
(UNDERTAKING IN REGARD TO STOP DEAL/BANNED FOR BUSINESS DEALING /BLACK LIST
SUB: Undertaking in regard to stop deal/Banned for Business dealing /Black list thereof)
Ref: Tender no:
All bidders will have to furnish the following undertaking duly filled in, Signed and stamped for each
quoted item of the tender along with the technical bid.
Authorized signatory of M/s _______________________________________________ here by certified
That M/S_____________________________________________________ and their proprietor/any
partner /any director of the firm is not stop deal and/or banned for business dealing and/or black listed
by GUVNL and/or their any subsidiary company viz. GSECL/GETCO/DGVCL/MGVCL/UGVCL/PGVCL.
Seal of Firm Signature of Tenderer
Seal and signature of contractor
QUALIFICATION REQUIREMENT.
Contractor must fill up below details & should place at the top of the Technical Bid.
Sr No: List of Documents
1 Registration(No, Class)
3 Partnership deed/Proprietor/AOA/MOA
(Notarized copy)
4 Power of Attorney (Notarized copy)
5 Bl. Sheet / P&L A/C, last three years.
6 Latest Solvency certificate.
8 GST registration No
9 Experience certificate As per QR
10 Electrical contractor Certificate valid up
11 Man and tools and tackle detail
Signature of Tenderer Company’s Round Seal
Seal and signature of contractor
GUJARAT ENERGY TRANSMISSION CORPORATION LTD.
CIRCLE OFFICE, PALANPUR
“Erection of (1) 01 no. of 400/220KV, 500MVA, ICT -5 bay Work (2) 400kV Bus Extension (A,B & C)
work (3) Erection of 220kV Palanpur Line-2 bay with 220kV Bus Extension Work at 400KV Kansari
ss under Palanpur Circle.”PRICE BID
TENDER NO. CDD/ET/30/2026
(TO BE SUBMITTED ONLINE – N-Code Only)
GETCO , PALANPUR CIRCLE
Name of Work - Estimate for Erection of 01 no. of 400/220KV, 500MVA, ICT -5 bay
and Bus Extension (A,B & C) work and 220kV Palanpur Line-2 bay with 220kV Bus
Extension at 400KV Kansari ss.
Schedule-B (Part-A-400KV side)
Seal and signature of contractor
Particulars of Item Unit Rate Amount Rs.
Erection of equipments of any type / make with required all
spares & accessories as per supplier’s manual and FQP,
including individual & interpole wiring of for all mentioned
voltage class switchyard (as per respective technical Set of
specifications & relavant special conditions) suitable for all Pole
type of bus configurations. Scope includes the dragging /
loading / unloading of same from site store to erection site.
(A) Erection of breaker- 400KV with Crane
Erection of CT/PT/CVT on Erected structure including complete
dragging/loading/unloading of same with crane only from site
2 store to erection site and fixing of required clamps, connectors 5535 3.00
& accessories as per instruction of Engineer-in-charge. (A)
kV CT (with crane only)
Erection of surge arrester with counter on Erected structure
including complete dragging/loading/unloading of same with
3 crane only from site store to erection site and fixing of required 1661 3.00
clamps, connectors as per instruction of Engineer-in-charge. (A)
400 kV LA (with crane only)
Erection of Solid core porcelain/ composite polymer Bus post
insulator on its erected structure complete, fixing of accessories
and shifting of same including loading /unloading from its site
store to erection site. (A) 400KV
Erection of Horizontal Centre break/ Double break/ Pantograph
isolator (All make) electrically gang operated with one/ two
earth blade per phase on its erected structure in horizontal/
tendem position consisting of base channels with solid core
porcelain insulator including connection of operating pipe with Set of
6 operating mechanism and all accessories including pantograph Phase(P 12452 2.00
bus compansation accessories with final adjustment for er Unit)
mechanical and electrical opening & closing . The rates are
inclusive of dragging / loading /unloading of the same from site
store to erection site as per instructions of Engineer-in-charge.
(A) 400 kV Isolator (with/ without crane prermitted)
Seal and signature of contractor
As per item No. 6 but without earth blade & for
7 Tandom/Pentograph isolator. (A) 400 kV Isolator (with/ 11069 2.00
without crane prermitted)
Erection of 400kV Pantograph isolator (Single Phase unit only)
(All make) electrically gang operated without earth blade on its
erected structure with solid core porcelain insulator including
connection of operating pipe with operating mechanism and all
8 accessories including pantograph bus compansation accessories 4150 3.00
with final adjustment for mechanical and electrical opening &
closing . The rates are inclusive of dragging / loading /unloading
of the same from site store to erection site as per instructions
of Engineer-in-charge.
Erection of S/S & Equipment structure including punching of
9 nut bolts. Rates are inclusive of shifting of same up to erection MT 4150.00 70.00
site from its s/s Store.(A) For 400KV
Erection of “4” / 2.5" IPS tubular bus including fixing of
10 clamps, connectors jumpers corona rings etc. complete as per Rmt. 84 350.00
instructions of engineer in charge.
Supply,Installation,Testing and commissioning of maintenance
free treated earth electrodes suitable for NORMAL SOIL as
per drawing No.. GETCO/E/STD/P-021 (1 OF 2) R3 dated 29-05-
2020 and technical specifications GETCO/E/TS-Maintenance
free earth pits/R1 dated 04-06-15 for 132,220 & 400 kV
substations with ground enhancement material/ back fill /
grounding compound as per IEEE 80-2000 Clause 14.5 (d) and as
per part-7 of IEC-62561 Using Copper bonded earth electrode
(with 250 micron copper coating) having 38 mm dia (min) and
3000 mm length which shall be capable of handling STC of
KA-1 sec. work also includes Providing BB masonary inspection
chamber(manhole) incl. light type CI cover.
Installation of earthing strips / MS round bar as shown below
including digging of 600 mm depth and 450 mm wide trench in
any kind of soil except Rocky (HR/SR) soil / fixing on structure as
per attached drawing including fixing arrangement with two
bolt arrangement, jointing with nut-bolts and lap welding and
applying zinc rich paint on added joints including supply of GI
nuts & bolts as per specification. (A) 75 x 10 mm GI strip / MS
round bar (25 to 40 mm)
Seal and signature of contractor
13 (B) As above but 50 x 6 mm GI strip Mtr. 43 60.00
Providing Bore type earthing with drilling of minimum 200mm
dia bore upto following mentioned depth in Rocky (HR/SR) Soil
as per earthing philosophy of GETCO.
1) Work includes inserting 20/25mm dia MS Rod (for 66kV S/S)
/ 40 mm dia MS Rod (for EHV S/S) in bore depth and to be
connected to the earthing grid at junction point by proper
welding at both end.
2) This includes cutting, fabrication & welding of flat.
14 3) Refilling and compression of surrounding areas with No 1743 20.00
No.rmal/yellow soil, ground enhancement material etc.
wherever applicable as per approved Soil strata and earthing
design calculation.
4) Required G.I. Earthing strip/ MS rods will be supplied by
GETCO Free of Cost.
5) Earthing material like Normal/yellow soil, ground
enhancement material (0.5CMT/Meter depth), water, etc. shall
be supplied by contractor. (e) 6 Mtr Depth
Stringing of Bus complete in all respect with fixing of all
fittings, insulators sag compensating plate/spring and all
accessories as per the instruction of Engineer –In-Charge. a)
Quadruple ACSR Moose/ AL-59 conductor
Stringing of Bus complete in all respect with fixing of all
fittings, insulators sag compensating plate/spring and all
accessories as per the instruction of Engineer –In-Charge. b)
Twin Moose/ AL-59 /Zebra conductor
Stringing of overhead earth wire in switch yard on S/S
structure including fixing of all fittings and accessories, jointing,
jumpering, tensioning, clamping etc. complete as per
instruction of Engineer –in –charge (400KV & 220KV Side )
Preparing and fixing of required length of jumpers in the
switchyard on respective Bus & equipments, tensioning & R.Mtr./P
dressing of jumpers complete as per instructions of Engineer – hase
in –charge (B) Twin ACSR Moose / AL-59 / Zebra conductor
19 (C) Single Moose/AL-59/Zebra/Panther conductor 16 50.00
Seal and signature of contractor
Fabrication for erection of any Equipment/Structure/panel or
anywhere in s/s & F.B, at other end as per lnst. Of E.l.C
Erection of control panel relay panel or C/R panel or RTC panel
including grouting of panel, jointing with adjoining panels
including required fabrication for entry of control cables and
complete vermin proofing. Job includes supply of required
bolts, nuts etc. and shifting of panel from S/S site store to work
Laying of 1.1 KV PVC armored copper / aluminum cable inside
hume pipe / cable trench including binding /clamping of cable
with GI wire as per requirement including supply and fixing of
22 identification tags on both ends and at distance every 100 mtrs Per Mtr. 6 5500.00
for following size (A) 2C x 2.5 mm 2 , 2 C x3.5 mm 2 ,4C x
mm 2 ,7 C x 2.5 mm2 , 4C x 4 mm2 Copper control cable or any
equivalent size of all LT cable
As above but 12C x 2.5 mm , 12C x 4 mm 2 , 12 C x 6mm 2
C x 2.5 mm2 , 27C x 2.5 mm 2 , Copper control cable , 3.5 C or
C x 10 mm 2 , 70 mm2 aluminum armored or unarmored LT
Laying of 1.1 KV PVC armored copper / aluminum cable in
ground by digging trench of suitable width and 450 mm depth
in any type of soil including supply and fixing of identification
24 tag on both end and at distance every 100 mtrs for following Per Mtr. 21 1000.00
size (A) 2C x 2.5 mm 2 , 2 C x3.5 mm 2 ,4C x 2.5 mm 2 ,7 C x
mm2 , 4C x 4 mm2 Copper control cable or any equivalent size
of all LT cable
As above but 12C x 2.5 mm , 12C x 4 mm 2 , 12 C x 6mm 2 ,19 C
x 2.5 mm2 , 27C x 2.5 mm 2 , Copper control cable , 3.5 C or 4 C
x 10 mm 2 , 70 mm2 aluminum armored or unarmored LT
Preparing of complete schedule of wiring for line/ transformer
bay for 66KV bays in triplicate. necessary drawing will be
provided by the GETCO. Schedule should be approved by EE. or
DE in charge. (A) For 400KV
Termination of Control Cable at Panel / M.K./ Equipments
including supply of required size of brass cable glands, lugs,
ferrules, PVC Binding pe, Buttons etc. for Up to 7 Core Control
28 As above but for Above 7 Core Control Cable. End 349 270.00
Seal and signature of contractor
Providing and fixing 'B' class G.I. pipes of following size for
cable protection including fixing with the structures.( Non SOR)
including required 'L' & 'T' band,coupling for CT,PT,
Transformer, M.K.Box cabling on structure including required
fabrication.(weight of pipe-25kg/meter)
(A) 40mm dia (weight of pipe-3.2kg/meter)
30 (B) 50mm dia (weight of pipe-5.1kg/meter) Mtr. 284 250.00
Providing and fixing of all weather proof, cold rolled sheet steel
junction box for CVT & PT, CT terminations with required.of
31 disconnecting type, 'Elmex' make CATDM 4 or equivalent type No 21549 1.00
connectors and required no of fuses, links etc.as per instruction
of Engineer-in-charge, As per approved schedule of cable
Providing of M15 Grade Concrete for various equipment
structure, Guy11kv DP, M.K. Box, Neutral channels, cable
support channel, groutingPole/ Flood light structure with
cement, sand & metal in proportion of 1:2:4 respectively. The
rates are inclusive of supply of sand, metal, water and with
smooth cement mortar (1:6) finish.
Providing and fixing of various type of sign Board, sticker, Big
Sign Board, earthing pit Board & Single line diagram etc. as per
instruction of IEC. Sticker of red, white, black Letters are to be
utilised for various sign board.
Earthing Pit Board Size:- 6" x 6" -30 Nos.
Switch yard sign Board 12" X 6" with 2 mm Thickness black &
white English language.-25 Nos.
Name plate board of transformer size :- 2' x 1'- 04 Nos.
P & F radium sticker for outdoor and indoor equipment
34 identification like LA, Isolator, Circuit Breaker, Transformer, CT, Sq Inch 2 3000.00
PT, MK Box, C&R panels, 11KV panel board etc.
Transportation of girder/rail/S/S
structure/tower/conductor/insulator/cables/Hardware/GI
strips/ Earthwire/ staywire/ furniture/transformer oil, etc from
GETCO's nearest store centre/S/S to another destination
35 including loading loading and unloading.(A)up to 70 KMs (Upto Job / Lot 16848 20.00
(To be executed / considered for a particular Job / Lot while
weight is not increasing 6 MT per Trip like transportation of
Nos. of 66kV CT)
Seal and signature of contractor
36 (A) Beyond 70KMs 22 2000.00
Providing and fixing of Single Piece Cast Alluminium with full
frame with Acrylic Cover integrated luminaries Energy Efficient
flood light luminaries on swaged pole / GI structure by
providing required fabrications, of Philips/CGL/Bajaj/GE/Osram
37 make, suitable for 1 x 250 Watt HPSV/T with allied accessories No 7487 28.00
such as Capacitor igniter, ballast, control gear box etc, 4 core
2.5 sqmm double insulated flexible stranded wire should be
used from control gear fittings to approved SMC type junction
box as per inst. of E.I.C.
Supplying & laying of following size Control/L.T power cable in
readymade cable trench or by excavating in any type of soil
cable trench size 1 ft. wide 2.5 ft. depth and refilling the same
as per the direction of EIC. Item Includes the cable laying upto
termination box with clamps & proper clamping of cable on
gantries by GI pipe & glands as per direction. Item includes
providing & supply of bircks, sand as per requirement. The L.T
power cable to be provided by contractor as under :As per ISI
1554 (Part-I). 3.5 Core x 50 mm2 Alluminium cable -Armoured,
from distribution X'mer to Main Distribution Board near dist.
X'mer and from MDB to indoor LT panel board (LTPB) - both
Supplying & laying of following size Control/L.T power cable of
FINOLEX or equivalent ISI make in readymade cable trench or
by excavating in any type of soil cable trench size 300mm wide
and 600mm depth and refilling the same as per the direction of
EIC. Item Includes the cable laying up to termination box with
clamps & proper clamping of cable on gantries by GI pipe &
glands as per direction. Item includes providing & fixing of
bricks, sand as per requirement to protect cables . The L.T
power cable to be provided by contractor as under :As per ISI
1554 (Part-I). 4 Core x 25 mm2 Aluminum cable -Armored, from
LT panel board (LTPB) to Yard Light AC MK (AC Panel-2)., AC
Panel 1 in C.R. and yard AC Box
- - do - - 4C x 4mm2 Copper cable - Armoured, from yard-light
AC panel-2 to all yard-light fixture junction boxes on LM &
40 street light light pole & Station transformer to Colony & LT Mtr. 19.43 2000.00
panel to watchman cabin.(Only laying. Cable will be supplied by
GETCO) (400KV/220KV side)
Seal and signature of contractor
Providing & fixing of all weather proof, cold rolled sheet steel
AC Panel - 2 for Yard-Light AC supply having
(1) 63A 4P MCB : 01 NO
(2) MCX-12A contactor : 01 NO
(3) Digital Timer : 01 NO
(4) 20A TPN MCB : 06 NOS
41 (5) Indication lamp " 03 NOS No 24732 1.00
(6) Push Butten : 02 NOS
(7) Terminal Connector as per site requierment
and other detail as per drawing enclosed including grouting &
Necessary fabrication of GI Angle or fixing on GI Structure and
earthing with main grid as per instruction of EIC.as per drawing
enclosed Part D-53
Providing & fixing of all weather proof, cold rolled steel sheet
floor mounted fixed type single door grey color Main AC Dist
box having size 900x600x250 MM with door closing
arrangement and necessary rubber gasket.
Contractor has to supply following materials with box along
with necessary mounting and wiring.
42 (1) L&T/Anchor/Havells Make 100A,4P MCCB - 1 No. No. 20650 1.00
(2) L&T/Anchor/Havells Make 63A,4P MCB - 2 Nos.
(3) 100 A Copper Bus-Bar Link - length 6 inch size & 25 x 3 MM -
(4) Tinned Earth Bus 25 x 3 MM Length - 32 Inch - 1No.
(5) 25 & 16 sqmm Cu. flexible cable - 4 & 8 Meter respectively.
(6) Required Nos. of Cu. Lugs , etc. as per instruction of EIC.
Sub Total (Part-A-400KV side) Rs.
Name of Work - Estimate for Erection of 01 no. of 220KV side Bay and Bus
Extension ( bus A,B & C) work at 400kv Kansari ss.
Schedule-B (Part-B-220KV side)
Particulars of Item Unit Rate Amount Rs.
Seal and signature of contractor
Erection of equipments of any type / make with required all
spares & accessories as per supplier's manual and FQP,
including individual &interpole wiring of for all mentioned voltage
class switcttyard (as per respective technical specifications & Set of
relavant special conditions) suitable for all type of bus
configuration. Scope includes the dragging/ loading/ unloading of
same from site store to erection site
(B) Erection of breaker- 220KV with Crane
Erection of CT /PT/CVT (All type make ) on its erected structure
including complete dragging/ loading/ unloading of same with
2 crane only from site store to erection site and fixing of required 3459 6.00
clamps, connectors as per instructions of Engineer –in –charge.
Dismantling of CT /PT/CVT (All type make ) on its erected
structure including complete dragging/ loading/ unloading of
same with crane only from site store to erection site and fixing
3 of required clamps, connectors as per instructions of Engineer – 1729.5 3.00
in –charge. (B) 220KV CT , NOTE:Dismentalling rates of Phase
equipments are to be taken as 50% of the erection rates of
that equipment (Item No.2, D-2)
Erection surge arrester with counter on its erected structure
including complete dragging/loading/unloading of the same
with crane only from site store to erection site and fixing of Per
required clamps, connectors, corona rings, surge counter and Phase
other accessories etc. as per instructions of Engineer –in –
charge. (B) 220KV
Erection of polyclone/Solid core/ Bus post insulator on its
erected structure complete, fixing of accessories and shifting of
same including loading /unloading from its site store to erection
Seal and signature of contractor
Erection of Horizontal Centre break/ Double break/
Pantograph isolator (All make) electrically gang operated with
one/ two earth blade per phase on its erected structure in
horizontal/ tendem position consisting of base channels with
solid core porcelain insulator including connection of operating
pipe with operating mechanism and all accessories including
pantograph bus compansation accessories with final
adjustment for mechanical and electrical opening & closing .
The rates are inclusive of dragging / loading /unloading of the
same from site store to erection site as per instructions of
Engineer-in-charge. (b) 220/132 kV (with/ without crane
As per item No. 12 but without earth blade & for Set of
7 Tandom/Pentograph isolator. (b) 220/132 kV Isolator (with/ 3 5535 3.00
without crane prermitted) Phase
Erection of S/S & Equipment structure including punching of
8 nut bolts. Rates are inclusive of shifting of same up to erection MT 35.00
site from its s/s Store.
Erection of “4” / 2.5" IPS tubular bus including fixing of
9 clamps, connectors jumpers corona rings etc. complete as per Rmt. 84 100.00
instructions of engineer in charge
Supply, installation, Testing and commissioning of
maintenance free treated earth electrodes suitable for normal
soil as per Drawing no. GETCO/E/STD/P-021(1 of 2) R2 dated
04-06-15 and technical specificationGETCO/E/TS- Maintanance
free earth pits/R1 Dtd. 04.06.15 for 132, 220 & 400KV S/S with
ground enhancement material/ back fill/ grounding compound
as per IEEE 80-2000 clause 14.5(d) and as per part-7 of IEC-
62561. Using copper bonded earth electrode (with 250micron
copper coating) having 38mm dia (min) and 3000mm length
which shall be capable of handling STC of 40KA-1 sec. Work also
include providing BB masonary inspection chamber(manhole)
incl. light type CI cover.
Installation of earthing strips / MS round bar as shown below
including digging of 600 mm depth and 450 mm wide trench in
any kind of soil except Rocky (HR/SR) soil / fixing on structure as
per attached drawing including fixing arrangement with two
bolt arrangement, jointing with nut-bolts and lap welding and
applying zinc rich paint on added joints including supply of GI
nuts & bolts as per specification. (A)75 x 10 mm GI strip / MS
round bar(25/32/36/40mm)
Seal and signature of contractor
12 (B) As above but 50 x 6 mm GI strip Mtr. 43 300.00
Installation & fixing of ground rod 40mm dia. Bar in 100mm
dia. Bore in any type of soil except hard rock, 3000mm deep
from bottom of trench including of steel bar welding with grid
13 bar/strip and back filling of bore with black cotton soil/ No 871 25.00
bentonite powder. Required steel rod shall be supplied by
GETCO free of cost. Wherever applicable as per soil strata
approved from Engineering.
Stringing of Bus complete in all respect with fixing of all
fittings, insulators sag compensating plate/spring and all R.Mtr./
accessories as per the instruction of Engineer –In-Charge. (a) Phase
Quadruple ACSR Moose/ AL-59 conductor
Stringing of Bus complete in all respect with fixing of all
fittings, insulators sag compensating plate/spring and all R.Mtr./
accessories as per the instruction of Engineer –In-Charge. (b) Phase
Twin Moose/ AL-59 /Zebra conductor
Stringing of Bus complete in all respect with fixing of all
fittings, insulators sag compensating plate/spring and all R.Mtr./
accessories as per the instruction of Engineer –In-Charge. (C) Phase
Single Moose/ AL-59 /Zebra conductor
Preparing and fixing of required length of jumpers in the
switchyard on respective Bus & equipments, tensioning & R.Mtr./
dressing of jumpers complete as per instructions of Engineer – Phase
in –charge (A) For Twin MOOSE /ZEBRA
18 (c) For Single MOOSE /ZEBRA 16 50.00
Fabrication for erection of any Equipment/Structure/panel or
19 anywhere in s/s & F.B, at other end as per lnst. Of E.l.C Part D- L.S 4992 2.00
Erection of control panel relay panel or C/R panel or RTC panel
including grouting of panel, jointing with adjoining panels
including required fabrication for entry of control cables and
complete vermin proofing. Job includes supply of required
bolts, nuts etc. and shifting of panel from S/S site store to work
site. (b) 220kv
Laying of 1.1 KV PVC armored copper / aluminum cable inside
hume pipe / cable trench including binding /clamping of cable
with GI wire as per requirement including supply and fixing of
identification tags on both ends and at distance every 100 mtrs 6 4500.00
for following size. (A) 2C x 2.5 mm 2 , 2 C x3.5 mm 2 ,4C x
mm 2 ,7 C x 2.5 mm2 , 4C x 4 mm2 Copper control cable or any
equivalent size of all LT cable
Seal and signature of contractor
As above but 12C x 2.5 mm , 12C x 4 mm 2 , 12 C x 6mm 2
C x 2.5 mm2 , 27C x 2.5 mm 2 , Copper control cable , 3.5 C or 4 Per
C x 10 mm 2 , 70 mm2 aluminum armored or unarmored LT Mtr.
Laying of 1.1 KV PVC armored copper / aluminum cable in
ground by digging trench of suitable width and 450 mm depth
in any type of soil including supply and fixing of identification
23 tag on both end and at distance every 100 mtrs for following 21 1000.00
size.(A) 2C x 2.5 mm 2 , 2 C x3.5 mm 2 ,4C x 2.5 mm 2 ,7 C x
mm2 , 4C x 4 mm2 Copper control cable or any equivalent size
of all LT cable.
As above but 12C x 2.5 mm , 12C x 4 mm 2 , 12 C x 6mm 2
C x 2.5 mm2 , 27C x 2.5 mm 2 , Copper control cable , 3.5 C or 4 Per
C x 10 mm 2 , 70 mm2 aluminum armored or unarmored LT Mtr.
Preparing of complete schedule of wiring for line/ transformer
bay for 66KV bays in triplicate. necessary drawing will be Per
provided by the GETCO. Schedule should be approved by EE. or Bay
DE in charge. (B) For 220KV
Termination of Control Cable at Panel / M.K./ Equipments
including supply of required size of brass cable glands, lugs,
ferrules, PVC Binding pe, Buttons etc. for Up to 7 Core Control
27 As above but for Above 7 Core Control Cable., End 349 180.00
Providing and fixing 'B' class G.I. pipes of following size for
cable protection including fixing with the structures.( Non SOR)
including required 'L' & 'T' band,coupling for CT,PT,
Transformer, M.K.Box cabling on structure including required
fabrication.(weight of pipe-25kg/meter) (A) 40mm dia (weight
of pipe-3.2kg/meter)
29 (B) 50mm dia (weight of pipe-5.1kg/meter) Mtr. 284 250.00
Providing and fixing of all weather proof, cold rolled sheet
steel junction box for CVT & PT, CT terminations with
required.of disconnecting type, 'Elmex' make CATDM 4 or
equivalent type connectors and required no of fuses, links
etc.as per instruction of Engineer-in-charge,as per drawing
Seal and signature of contractor
Providing of M15 Grade Concrete for various equipment
11kv DP, M.K. Box, Neutral channels, cable support channel,
Pole/ Flood light structure with cement, sand & metal in
proportion of 1:2:4 respectively. The rates are inclusive of
supply of sand, metal, water and with smooth cement mortar
Transportation of girder/rail/S/S
structure/tower/conductor/insulator/cables/Hardware/GI
strips/ Earthwire/ staywire/ furniture/transformer oil, etc from Per trip
GETCO's nearest store centre/S/S to another destination of 6MT
including loading loading and unloading. (A)Upto 70KMs Part L
34 (III) Beyond 70KMs 22 900.00
Providing and fixing of Single Piece Cast Alluminium with full
frame with Acrylic Cover integrated luminaries Energy Efficient
flood light luminaries on swaged pole / GI structure by
providing required fabrications, of Philips/CGL/Bajaj/GE/Osram
make, suitable for 1 x 250 Watt HPSV/T with allied accessories
such as Capacitor igniter, ballast, control gear box etc, 4 core
2.5 sq mm double insulated flexible stranded wire should be
used from control gear titting to junction box.
Supplying & laying of following size Control/L.T power cable in
readymade cable trench or by excavating in any type of soil
cable trench size 1 ft. wide 2.5 ft. depth and refilling the same
as per the direction of EIC. Item Includes the cable laying upto
termination box with clamps & proper clamping of cable on
gantries by GI pipe & glands as per direction. Item includes
providing & supply of bircks, sand as per requirement. The L.T
power cable to be provided by contractor as under :As per ISI
1554 (Part-I). 3.5 Core x 50 mm2 Alluminium cable -Armoured,
from distribution X'mer to Main Distribution Board near dist.
X'mer and from MDB to indoor LT panel board (LTPB) - both
Seal and signature of contractor
Supplying & laying of following size Control/L.T power cable of
FINOLEX or equivalent ISI make in readymade cable trench or
by excavating in any type of soil cable trench size 300mm wide
and 600mm depth and refilling the same as per the direction of
EIC. Item Includes the cable laying up to termination box with
clamps & proper clamping of cable on gantries by GI pipe &
glands as per direction. Item includes providing & fixing of
bricks, sand as per requirement to protect cables . The L.T
power cable to be provided by contractor as under :As per ISI
1554 (Part-I). 4 Core x 25 mm2 Aluminum cable -Armored, from
LT panel board (LTPB) to Yard Light AC MK (AC Panel-2)., AC
Panel 1 in C.R. and yard AC Box.
Providing & fixing of all weather proof, cold rolled sheet steel
AC Panel - 2 for Yard-Light AC supply having(1) 63A 4P MCB :
01 NO(2) MCX-12A contactor : 01 NO(3) Digital Timer : 01 NO(4)
20A TPN MCB : 06 NOS(5) Indication lamp " 03 NOS(6) Push
38 Butten : 02 NOS(7) Terminal Connector as per site No 24732 1.00
requiermentand other detail as per drawing enclosed including
grouting & Necessary fabrication of GI Angle or fixing on GI
Structure and earthing with main grid as per instruction of
EIC.as per drawing enclosed.
Providing & fixing of all weather proof, cold rolled steel sheet
floor mounted fixed type single door grey color Main AC Dist
box having size 900x600x250 MM with door closing
arrangement and necessary rubber gasket.
Contractor has to supply following materials with box along
with necessary mounting and wiring.
39 (1) L&T/Anchor/Havells Make 100A,4P MCCB - 1 No. No. 20650 1.00
(2) L&T/Anchor/Havells Make 63A,4P MCB - 2 Nos.
(3) 100 A Copper Bus-Bar Link - length 6 inch size & 25 x 3 MM -
(4) Tinned Earth Bus 25 x 3 MM Length - 32 Inch - 1No.
(5) 25 & 16 sqmm Cu. flexible cable - 4 & 8 Meter respectively.
(6) Required Nos. of Cu. Lugs , etc. as per instruction of EIC.
Sub Total (Part-B-220KV side) Rs.
Seal and signature of contractor
Net Total ,Schedule-B (Part- A & Part-B )
Inwords: Sixty Four Lakh fourty one thousand six hundred seventy seven rupees and twenty
three paise only
I/We/am/are willing to carry out work at _______ % Above / Below of (estimated amount at (A))
(In words ________________________________ % Above / Below) the Estimated rates at (A)
mentioned above. Amount of Tender work out as under. Total amount of My Tender (C)
mentioned above. Amount of Tender work out as under. Total amount of My Tender (C)
Rs._______________________ ( Amount in words Rupees
Signature of Contractor.
1. GST at applicable rate will be reimburse in actual to the contractor only after submission of sufficient proof of
such payment made to the Govt.
Seal and signature of contractor
2. The contractor shall pay 1% welfare cess to the respective Govt. Department if applicable & the same will be
reimbursed on production of proof of payment. Also, bidder has to take registration of said site and submit the
same to this office.
3. Tax deduction at source(TDS) under GST at the prevailing rate will be deducted from bills in accordance with
the provision of section 51 of the CGST Act, 2017, and to that effect a certificate will be issued to the contractor.
All erection work is to be carried out strictly as per the manual of OEM (Original equipment
manufacturer), FQP and instruction of E.I.C.
All equipment erection charges are inclusive of shifting dragging handling of the respective equipment up
to S/S erection site from its S/S site store.
Contractor has to ensure safe shifting dragging erection of all equipment’s to comply with labor laws I.E.
All erection charges are inclusive of fixing of clamp connectors, all necessary accessories to the
respective equipment’s.
All erection work includes erection insurance to be arranged by the contractor at his cost. This insurance
charges will be reimbursed on production of Insurance policy & Money receipt.
All the required tools and tackles like compression jointing machine for conductor, earth wire, cutting
machine, welding set, drill machine, etc are to be arranged by the contractor at his cost.
Earthing pit activities should be done in such a way in presence of GETCO supervisor that final earthing
9 pit resistance should be record as per standard. All expenditure like sufficient watering to maintain earth
resistance up to the mark should be born by contractor.
10 All the brought out items get to be approved from DE/EE invariably.
Contractor has to make arrangement for site engineer and skill labors for maintaining all activities and
11 records as per FQP. also assisting to staff/Engineer in charge to take IR values, Earth pits values, name
plate detail, oil samples etc all activities relative to commissioning of project.
Contractor has to make arrangement for skill labors for assisting to commissioning engineer, PLCC
staff/engineer, SMS/testing staff/Engineer as an when require as per instruction of Engineer in charge.
Cable laying, Circuit distribution and Fixture fixing shall be carried out as per GETCO Standard Drg. No.
GETCO/E/06S-STD/S-013 (R0) Sheet 1 to 3 of 3 and as per Instruction of Engineer In charge.
15 Successful bidder has to appoint site engineer to maintain site register and FQP as per ISO
All work should be done according to ISO & FQP and all require documents including filled FQP, testing
results, etc should be submitted while handing over the line
17 Contractor has to submit the progress bar chart before starting the work.
Seal and signature of contractor
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Tender Documents KANSARI ICT.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .