Tender Value
₹1.5 Cr
EMD Value
₹1.5 L
Closing Date
18 Aug 2026, 2:30 pmClosed
Commissioner Municipal Corporation of Rajahmundry
Municipal Corporation, Rajahmundry
Widening of East Railway station road (from 40' to 80 from Hotel Aditya Inn to Railway coal filling area in 16th Division of RMC. (Under Pushkaram Funds)
969941
183/MCR/Pushkarams/ 2026-27/EE-1
OPEN - NCB
Road Work
EAST GODAVARI, ANDHRA PRADESH
19 documents required · 18 mandatory · 1 optional
₹5,231
₹1.5 L
18 Aug 2026
31 Jul 2026
31 Jul 2026
Dismantling of existing structures like culverts, bridges, retaining walls and other structures comprising of brick masonry, including disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202 MORD / MORTH (Brick / Tile Work)
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202 MORD / MORTH (RCC)
Labour engaged for removing of old damaged existing poles and fencing and jungle clearance, site levelling with NMR man mazdoors including all T & P charges etc., as directed by the site engineer.
Earth work for Ordinary Soil excavation for structures as per drawing and technical specifications clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious materials and disposal upto a lead of 0.50Mtrs. Dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD/ 304 MORTH for Mechanical Means
Earth work excavation in all kinds of Soils for Structures as per drawing and technical specifications clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious materials and disposal upto a lead of 0.50Mtrs. Dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD/ 304 MORTH VP No. 484. For Manual Means
Granular sub-base/base/surface course with local materials (Table 400.13) Construction of granular sub-base by providing Quarry Rubbish / Surface Stone of Granite (CHATRU) spreading in uniform layers on prepared surface, and compacting with smooth wheel roller to achieve the desired density complete as per Clause 401.4 as per Technical Specification Clause 408 MORD.
Granular sub-base/base/surface course with local materials (Table 400.13) by mix in place method normal Construction of granular sub-base by providing using Naturally Occurring Gravel spreading in uniform layers on prepared surface and compacting with smooth wheel roller to achieve the desired density complete as per Clause 401.4 as per Technical Specification Clause 408 MORD.
Construction of granual surface course by providing well graded material like 2.36mm to 5mm size HBG Material,spreading in uniform layers with motor grader on prepared surface,mixing by mix in place method with rotavator at OMC,and compacting eith three wheel 80-100 KN static roller/vibrator roller 80-100 KN capacity to achieve the desired density,complete as per technical specification clause 402 MORD.
Providing, laying, spreading and compacting graded stone aggregate to Wet Mix Macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN / Vibratory Roller 80-100 kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406 MORD / MORTH.
Providing and applying primer coat with bitumen emulsion (medium setting) on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.60 kg/sqm using mechanical means as per Tech. specification No 502 MORTH.
Providing and applying tack coat with bitumen 80/100 grade (s-90) using bitumen pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom as per Tech. specification No 503 MORTH.
Providing and Laying Bitumenous Mecadam with 100-120 TPH / 40-60 TPH hot mix plant providing and average output of 75 t / hr. using crushed aggregates of specified grading premixed with bitumenous binder, trasnported to site, laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled as per clauses 501.6 and 501.7 to achieve the desired compaction as per Tech. specification clause 504 MORTH.
Providing and laying Bituminous Concrete with 40-60 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading -II, premixed with bituminous binder VG30 @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 509 complete in all respects
Supplying of hot applied thermoplastic road marking compound, 2.5mm thick including reflectorising glass beads @ 250gms with Reflectorising Glass Beads on Bituminous Surface at 250 gms per sqm area, thickness of 2.5mm is exclusive of surface applied glass bead as per IRC: 35, the material should be of BERGER Company/ BERGER Equivalent/ Equivalent brand and must comply with the following: a) White index for the product should be in the range of 60-70 when measured against standard reference. The applied panel 7/8 number must be submitted for checking up the white index in the department lab. In case the department approves the white index of any vendor, the department engineer may carryout random cheacking of the applied products at site against the approved panel. In case of any major deviation, beyond acceptance limit, department reserve the right to cancel or reject the total supplied consignment of the said material and will compell the vendor has to replace the full consignment by the desired material as per approved panel at his own cost and additional demurrages may be claimed due to loss of man days (as per the rules of the department). b) Luminance factor of the material should be in the range of 80-85% at 45 degree centigrade as per AASTHOM 249. c) Crack resistance: The applied panel cured for 7 days under ambient condition and then should be tested as per BS3262, Part-1, 1989 and should pass at the range of '0' degree centigrade to '-10' degree centigrade D) Adhesion : Strong E) Softening point: 102 degree centigrade F) Dried film finish : Smooth and uniform G) Night Vision: High as directed by the Engineer-in-Charge and confirming to IS: 164-1961 (1st revision reaffirmed in 1986) and clause conforming to IRC 35-1997
Supplying & Fixing of Twin Molded Shanks Raised Pavement Markers made of polycarbonate and ABS moulded body and reflective panels with micro prismatic lens capable of providing total internal reflection of the light entering the lens face and shall support a load of 16000 kg tested in accordance to ASTM D 4280 Type H and complying to Specifications of Category A of MORTH Circular No RW/NH/33023/10-97 – DO III Dt 11.06. 1997. The height, width and length shall not exceed 50 mm, 100 mm and 100 mm and with minimum reflective area of 13 Sqcm on each side and the slope to the base shall be 35 +/- 5 degree. The strength of detachment of the integrated cylindrical shanks, (of diameter not less than 19 +/- 2 mm and height not less than 30+/- 2 mm) from the body is to be a minimum value of 700 Kgs. Fixing will be by drilling holes on the road for the twin shanks to go inside, without nails and using epoxy resin based adhesive as per manufacturer’s recommendation and complete as directed by the engineer.
Carting away of excavated earth / debries to a lead of 2KM (the rate including conveyance charges, labour charges for loading, unloading charges) including ideal hire charges of truck etc. complete as directed by the Departmental Authorities of the work.
Providing Earth Filling for Marshi Soil foundation trenches as per drawing and technical specification clause 305.39 MORD & 304 MORTH including cost and conveyance of all materials and all labour charges etc., complete as per SS and as directed by the site engineer.
Dismantling of existing structures like culverts, bridges, retaining walls and other structures comprising of brick masonry, including disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202 MORD / MORTH (Brick / Tile Work)
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202 MORD / MORTH (RCC)
Labour engaged for removing of old damaged existing poles and fencing and jungle clearance, site levelling with NMR man mazdoors including all T & P charges etc., as directed by the site engineer.
Earth work for Ordinary Soil excavation for structures as per drawing and technical specifications clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious materials and disposal upto a lead of 0.50Mtrs. Dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD/ 304 MORTH for Mechanical Means
Earth work excavation in all kinds of Soils for Structures as per drawing and technical specifications clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious materials and disposal upto a lead of 0.50Mtrs. Dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD/ 304 MORTH VP No. 484. For Manual Means
Granular sub-base/base/surface course with local materials (Table 400.13) Construction of granular sub-base by providing Quarry Rubbish / Surface Stone of Granite (CHATRU) spreading in uniform layers on prepared surface, and compacting with smooth wheel roller to achieve the desired density complete as per Clause 401.4 as per Technical Specification Clause 408 MORD.
Granular sub-base/base/surface course with local materials (Table 400.13) by mix in place method normal Construction of granular sub-base by providing using Naturally Occurring Gravel spreading in uniform layers on prepared surface and compacting with smooth wheel roller to achieve the desired density complete as per Clause 401.4 as per Technical Specification Clause 408 MORD.
Construction of granual surface course by providing well graded material like 2.36mm to 5mm size HBG Material,spreading in uniform layers with motor grader on prepared surface,mixing by mix in place method with rotavator at OMC,and compacting eith three wheel 80-100 KN static roller/vibrator roller 80-100 KN capacity to achieve the desired density,complete as per technical specification clause 402 MORD.
Providing, laying, spreading and compacting graded stone aggregate to Wet Mix Macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN / Vibratory Roller 80-100 kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406 MORD / MORTH.
Providing and applying primer coat with bitumen emulsion (medium setting) on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.60 kg/sqm using mechanical means as per Tech. specification No 502 MORTH.
Providing and applying tack coat with bitumen 80/100 grade (s-90) using bitumen pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom as per Tech. specification No 503 MORTH.
Providing and Laying Bitumenous Mecadam with 100-120 TPH / 40-60 TPH hot mix plant providing and average output of 75 t / hr. using crushed aggregates of specified grading premixed with bitumenous binder, trasnported to site, laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled as per clauses 501.6 and 501.7 to achieve the desired compaction as per Tech. specification clause 504 MORTH.
Providing and laying Bituminous Concrete with 40-60 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading -II, premixed with bituminous binder VG30 @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 509 complete in all respects
Supplying of hot applied thermoplastic road marking compound, 2.5mm thick including reflectorising glass beads @ 250gms with Reflectorising Glass Beads on Bituminous Surface at 250 gms per sqm area, thickness of 2.5mm is exclusive of surface applied glass bead as per IRC: 35, the material should be of BERGER Company/ BERGER Equivalent/ Equivalent brand and must comply with the following: a) White index for the product should be in the range of 60-70 when measured against standard reference. The applied panel 7/8 number must be submitted for checking up the white index in the department lab. In case the department approves the white index of any vendor, the department engineer may carryout random cheacking of the applied products at site against the approved panel. In case of any major deviation, beyond acceptance limit, department reserve the right to cancel or reject the total supplied consignment of the said material and will compell the vendor has to replace the full consignment by the desired material as per approved panel at his own cost and additional demurrages may be claimed due to loss of man days (as per the rules of the department). b) Luminance factor of the material should be in the range of 80-85% at 45 degree centigrade as per AASTHOM 249. c) Crack resistance: The applied panel cured for 7 days under ambient condition and then should be tested as per BS3262, Part-1, 1989 and should pass at the range of '0' degree centigrade to '-10' degree centigrade D) Adhesion : Strong E) Softening point: 102 degree centigrade F) Dried film finish : Smooth and uniform G) Night Vision: High as directed by the Engineer-in-Charge and confirming to IS: 164-1961 (1st revision reaffirmed in 1986) and clause conforming to IRC 35-1997
Supplying & Fixing of Twin Molded Shanks Raised Pavement Markers made of polycarbonate and ABS moulded body and reflective panels with micro prismatic lens capable of providing total internal reflection of the light entering the lens face and shall support a load of 16000 kg tested in accordance to ASTM D 4280 Type H and complying to Specifications of Category A of MORTH Circular No RW/NH/33023/10-97 – DO III Dt 11.06. 1997. The height, width and length shall not exceed 50 mm, 100 mm and 100 mm and with minimum reflective area of 13 Sqcm on each side and the slope to the base shall be 35 +/- 5 degree. The strength of detachment of the integrated cylindrical shanks, (of diameter not less than 19 +/- 2 mm and height not less than 30+/- 2 mm) from the body is to be a minimum value of 700 Kgs. Fixing will be by drilling holes on the road for the twin shanks to go inside, without nails and using epoxy resin based adhesive as per manufacturer’s recommendation and complete as directed by the engineer.
Carting away of excavated earth / debries to a lead of 2KM (the rate including conveyance charges, labour charges for loading, unloading charges) including ideal hire charges of truck etc. complete as directed by the Departmental Authorities of the work.
Providing Earth Filling for Marshi Soil foundation trenches as per drawing and technical specification clause 305.39 MORD & 304 MORTH including cost and conveyance of all materials and all labour charges etc., complete as per SS and as directed by the site engineer.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
BOQ.xlsx
TENDER_DOCUMENT • 0.14 MB
DOC.DOC
TENDER_DOCUMENT • 0.56 MB
Nit BT.DOC
TENDER_DOCUMENT • 0.28 MB
183.pdf
document • 0.19 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .