Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹67.7 CrAccepted-AOC | L1 | Accepted-AOC Lowest Bidder | |
| 2 | L2₹67.9 Cr+₹25.6 L (0.38%)Rejected-Finance | L2 | Rejected-Finance Rejected as the bid is
not L1 (Lowest One) | |
| 3 | L3₹69.3 Cr+₹1.6 Cr (2.39%)Rejected-Finance | L3 | Rejected-Finance Rejected as the bid is
not L1 (Lowest One) | |
| 4 | L4₹70.5 Cr+₹2.8 Cr (4.09%)Rejected-Finance 73 29 GOLF CLUB ROAD KOLKATA 700 033 | KOLKATA | KOLKATA | WEST BENGAL | 700033 | L4 | Rejected-Finance Rejected as the bid is
not L1 (Lowest One) | |
| 5 | L5₹71.3 Cr+₹3.6 Cr (5.39%)Rejected-Finance | L5 | Rejected-Finance Rejected as the bid is
not L1 (Lowest One) |
Tender Value
₹75.2 Cr
EMD Value
₹50 L
Closing Date
6 Jan 2020, 12:00 pmClosed
SE/C-II/ RB/KMDA
UNNAYAN BHAVAN,BLOCK A,(7th FLOOR) BIDHAN NAGAR,KOLKATA-700091
Strengthening work of Southern By-pass Road starting from Kamalgazi Flyover End to Baruipur / Padmapukur More (Both Eastern and Western Flanks)....(PART - A) and Repairing, Renovation work ..... kamalgazi flyover portion for ...(PART - B).
2019_KMDA_258598_1
13/SE/C-II/RB/KMDA of 2019-2020 dt. 09.12.2019
Open Tender
CIVIL WORKS
Percentage
365 days
Kolkata
Please refer Tender documents.
9 documents required · 9 mandatory
₹0
₹50 L
19 May 2020
9 Dec 2019
8 Jan 2020
9 Dec 2019
6 Jan 2020
9 Dec 2019
eProcurement System of Government of West Bengal Created By: Rajib Sadhu Created Date/Time: 20-Jan-2020 01:35 PM Tender Title: 13/SE/C-II/RB/KMDA of 2019-2020 dt. 09.12.2019 Tender ID: 2019_KMDA_258598_1
Tender Inviting Authority: Superintendering Engineer,C-II, R & B SECTOR ,KMDA.
Name of Work: Strengthening work of Southern By-pass Road starting from Kamalgazi Flyover End to Baruipur / Padmapukur More (Both Eastern and Western Flanks) in the District of South 24 Pargans under South Division, Road & Bridge Sector (PART - A) & Repairing, Renovation work of wearing course of kamalgazi flyover portion for improvement of riding quality (PART - B).
Contract No: 13/SE/C-II/R&B/KMDA of 2019 – 2020/SL-01
SCHEDULE OF WORK / ITEM(S)
Sl.No Bidder Name Estimated Rate Quoted Percentage Quoted Rate in Figures and Words
1.00 S. S. CIVIL CONSTRUCTION PVT. LTD. 752082763.72 -7.85 693044267.03 Sixty Nine Crore Thirty Lakh Fourty Four Thousand Two Hundred Sixty Seven
2.00 CIVTECT INDIA PVT LTD 752082763.72 -6.32 704551133.32 Seventy Crore Fourty Five Lakh Fifty One Thousand One Hundred Thirty Three
3.00 Naveen Merico Engg Co. Pvt Ltd 752082763.72 -5.15 713350501.65 Seventy One Crore Thirty Three Lakh Fifty Thousand Five Hundred One
4.00 Stone Concern Infrastructure Development Pvt Ltd 752082763.72 -9.66 679431569.00 Sixty Seven Crore Ninty Four Lakh Thirty One Thousand Five Hundred Sixty Nine
5.00 SANDIPAN PRAMANIK INFRA PVT. LTD. 752082763.72 -10.00 676874487.60 Sixty Seven Crore Sixty Eight Lakh Seventy Four Thousand Four Hundred Eighty Seven
Lowest Amount Quoted BY: SANDIPAN PRAMANIK INFRA PVT. LTD.(676874487.60)
BOQ Summary Details Tender Title: 13/SE/C-II/RB/KMDA of 2019-2020 dt. 09.12.2019 Tender ID: 2019_KMDA_258598_1
Sheet Name Sl.No Bidder Name Amount Bid Rank
BoQ1 1 SANDIPAN PRAMANIK INFRA PVT. LTD. 676874487.60 L1
2 Stone Concern Infrastructure Development Pvt Ltd 679431569.00 L2
3 S. S. CIVIL CONSTRUCTION PVT. LTD. 693044267.03 L3
4 CIVTECT INDIA PVT LTD 704551133.32 L4
5 Naveen Merico Engg Co. Pvt Ltd 713350501.65 L5
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .