Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹55.3 LAccepted-AOC B 203 2ND FLOOR SHAPATH HEXA NR GUJARAT HIGH COURT OPP KARGIL PETROL PUMP S G HIGHWAY | ₹55.3 L | 1 | Accepted-AOC L1 Bidder |
| 2 | 2₹1.8 Cr+₹1.2 Cr (221.5%)Rejected-AOC 56 57 HADAPSAR INDUSTRIAL ESTATE HADAPSAR PUNE MAHARASHTRA 411013 | PUNE | PUNE | MAHARASHTRA | 411013 | ₹1.8 Cr+₹1.2 Cr (221.5%) | 2 | Rejected-AOC L2 Bidder |
| 3 | Rejected-Technical | - | - | Rejected-Technical Not Ok |
Tender Value
₹52 L
EMD Value
₹1 L
Closing Date
8 Sept 2021, 3:00 pmClosed
Managing Director
Cochin International Airport Ltd. Kochi Airport (PO), Ernakulam District, Pin - 683 111, Kerala, India
Supply, Installation, Testing and Commissioning of Facial Recognition based Biometric Attendance Monitoring System (BAMS) and smart-card based Access Control System (ACS) at CIAL
2021_CIAL_429664_1
CIAL/COMMN/ACBM_01
Open Tender
Hardware
Turn-key
120 days
Cochin Airport, Nedumbassery
Please refer NIT 5. in Tender documents.
5 documents required · 5 mandatory
₹0
₹1 L
7 Apr 2022
13 Jul 2021
9 Sept 2021
13 Jul 2021
8 Sept 2021
13 Jul 2021
13 Jul 2021 - 31 Jul 2021
Amount
CENTRAL MANAGEMENT SOFTWARE: BAMS and ACS system
Supply
Installation, Testing & Commissioning
DATABASE LICENSE
Supply
Installation, Testing & Commissioning
FACIAL BIOMETRIC BAMS READERS (Within Airport)
Supply
Installation, Testing & Commissioning
FACIAL BIOMETRIC BAMS READERS (At Remote Locations)
Supply
Installation, Testing & Commissioning
CONTACTLESS SMART-CARD READERS
Supply
Installation, Testing & Commissioning
CONTACTLESS SMART CARDS
ELECTRO-MAGNETIC LOCK (SINGLE DOOR)
Supply
Installation, Testing & Commissioning
ELECTRO-MAGNETIC LOCK (DOUBLE DOOR)
Supply
Installation, Testing & Commissioning
DOOR CONTACTS (SINGLE LEAF)
Supply
Installation, Testing & Commissioning
DOOR CONTACTS (DUAL LEAF)
Supply
Installation, Testing & Commissioning
DOOR EXIT BUTTON SWITCH
Supply
Installation, Testing & Commissioning
EMERGENCY RELEASE SWITCH
Supply
Installation, Testing & Commissioning
ENROLMENT UNIT
Supply
Installation, Testing & Commissioning
INTEGRATION OF BAMS WITH CIAL'S SAP HR MODULE
ANNUAL MAINTENANCE CONTRACT (AMC) CHARGES : (POST 1 YR DEFECTS-LIABILITY PERIOD)
AMC Charges - Year 1
AMC Charges - Year 2
AMC Charges - Year 3
AMC Charges - Year 4
AMC Charges - Year 5
AMC Charges - Year 6
AMC Charges - Year 7
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .