Loading…
Loading…
Tender Value
₹5 Cr
EMD Value
₹5 L
Closing Date
7 Aug 2026, 6:00 pmClosed
Muncipal Commissioner Nadiad
BID DOCUMENTS FOR ANNUAL RATE CONTRACT FOR SUPPLYING AND INSTALLATION WORK OF SOLAR PANELS AT DIFFERENT PROPRITIES OF NADIAD MUNICIPAL CORPORATION – NADIAD_2ND CALL
326374
02 of 21 july 2026-27
Open
Electrical
Works
Kheda
3 documents required · 3 mandatory
₹7,080
MUNICIPAL COMMISSIONER NADIAD MUNICIPAL CORPORATION
₹5 L
21 Jul 2026
21 Jul 2026
21 Jul 2026
7 Aug 2026
21 Jul 2026
DESCRIPTION QTY UNIT RATE
Supply, Installation, Testing & Commissioning of following size of Grid Tied Solar Power Plant
Solar Panels (ALMM approved): Frame Material : Anodized Aluminum alloy Frame With Twin
Wall Profile, Front Cover : High Transmission Low-Iron Tempered Glass (AR Coated), High
efficency and positive power tolerance Pmax: 0/+5, Module Efficiency should be approx. 19.5%-
22%, Normal operating temperature 45'C, Junction Box with Waterproof IP67 & MC4
Compatible and Enclosed with Bypass diodes, 100% Electroluminescence test to ensure error
free Modules, Thep. temp. co-efficient of the PV module shall equal or better than -
0.45%/degree C. Solar PV modules of minimum fill factor 75% to be used. Unit Production:- More
than 4.5 Unit /kw /day (Actual)(1Year Avg) With 10 year Product warranty and 25 year Linear
Power Warranty includes all mechanical and electrical parameters of the Solar panel. Modules
must be complied to the DCR(Domestic content requirements). The Ration of AC to DC is 5:6 for
the Installation capacity which are given in AC KW.
Solar Inverter: MPPT Range: MPPT Range: 80-1000 V , Max efficiency: 97.5% - 98.9%, O/p
Frequency: 50/60Hz, Operating Altitude (m) ≤4000, O/p Power Factor: ~1, O/P THDi: <3%,
Operating Tempreture Range: -25~60°C, Integrated protection of Inverter are Anti-islanding
Protection, Input Reverse Polarity Protection, Insulation Resistor Detection, Ground fault
protection, Residual Current Monitoring Unit, Output Over Current Protection, Output Short
Circuit Protection, Output Over Voltage Protection, PV array string fault Protection. Protection
Degree: IP65, User Interface LCD & APP, Datalogger & Communication: GPRS / Wi-Fi.
Integrated, Input Reverse Polarity Protection Integrated, Insulation Resistor Detection Integrated,
Residual Current Monitoring Unit Integrated, Output Over Current Protection Integrated, Output
Short Circuit Protection Integrated, Output Over Voltage Protection Integrated, Protection
Degree: IP65, User Interface LCD & APP,Datalogger & Communication: GPRS / Wi-Fi, Module
Mounting Structure: The mounting (Rectangular pipe / square pipe / circular pipe) with requisite
1.00 cross bars, nuts and bolts, etc. shall be Hot deep galvanized with minimum 80micron coating. 1.00 PER KW
The Rectangular / square /circular hollow pipe section used for the structure should have a
minimum thickness of 2.0 mm. other than above, the material thickness should be minimum
mm. A certificate of a structural engineer certifying the strength and stability of the mounting
structure to withstand the weight and wind speed of 150 km/hour throughout the life span of
years of the system, shall be submitted by the vendors. Hot Dipped Galvanized steel coils.
suitable arrangement for base plate for foundation , solar panel mounting, the structure should
be suitable for carry the load of solar panel,wiring, sprinkler system etc. with necessary
foundation work/wall mount, j bolt, anchor fastner etc. the nut bolt used for installtion of
stucture should be (SS 304) quality.The ground clearance of the bottom most edge of solar panel
shall not be less than 300 mm to 1200 mm or as per site’s technical/feasibility requirement.
a. Column –The minimum section (thickness) should be 60MM*40MM
b. Rafter - The minimum section (thickness) should be 60MM*40MM
c. Purlin - The minimum section (thickness) should be 40MM * 40MM Balane of System with
necessary Swichgears (Suitabel size and protection of ACDB & DCDB), inter connecting wiring,
earthing system as per the CEIG drawing approval, lightining arrester system as per the CEIG
drawing approval, all liasoning work with various gov. dipartment like state nodal
agency,DISCOM & CEIG is included in agency scope
(Excluding All charges namely GEDA Application fees, Solar connectivity Charges, Meter
connectivity Charges, Meter testing Charges and system stability/strenthning charges.)
(A) Grid Tied Solar Power System: 1 - 6 kW (Single phase)
1.01 ---As Above---(B) Grid Tied Solar Power System: 7 - 10 kW (3 - phase) 1.00 PER KW
1.02 ---As Above---(C ) Grid Tied Solar Power System: 11 - 25 kW (3 - phase) 1.00 PER KW
1.03 ---As Above---(D) Grid Tied Solar Power System: 26 - 50 kW (3 - phase) 1.00 PER KW
1.04 ---As Above---(E) Grid Tied Solar Power System: 51 - 100 kW (3 - phase) 1.00 PER KW
NADIAD MUNICIPAL CORPORATION - NADIAD
BID DOCUMENTS FOR ANNUAL RATE CONTRACT FOR SUPPLYING AND INSTALLATION WORK OF SOLAR PANELS AT DIFFERENT PROPRITIES OF NADIAD
MUNICIPAL CORPORATION - NADIAD_2ND CALL
DESCRIPTION QTY UNIT RATE
1.05 ---As Above---(F) Grid Tied Solar Power System: 101 - 250 kW (3 - phase) 1.00 PER KW
1.06 ---As Above---(G) Grid Tied Solar Power System: 251 - 500 kW (3 - phase) 1.00 PER KW
S.I.T.C of Poly Crystline/Mono Crystline PV Module (ALMM approved) with 72 Cells - 150 Cells or
More , Frame Material : Anodized Aluminum alloy Frame With Twin Wall Profile, Front Cover :
High Transmission Low-Iron Tempered Glass (AR Coated), High efficency and positive power
tolerance Pmax: 0/+5, Module Efficiency should be approx. 18%-21%, Normal operating
temperature 45'C, Junction Box with Waterproof IP67 & MC4 Compatible and Enclosed with
2.00 1.00 PER WATT
Bypass diodes 100% Electroluminescence test to ensure error free Modules, Thw temp. co-
efficient of the PV module shall equal or better than -0.45%/degree C. Solar PV modules of
minimum fill factor 75% to be used. Unit Production:- 4 to 5 Unit /kw /day (Actual)(1Year Avg)
With 10 year Product warranty and 25 year Linear Power Warranty.
(A) Moudule o/p Range: 250 - 335 watt, Maximum Power Voltage Vmpp: 26 -38 V, Maximum
Power Current Impp: 8 - 8.9 A
---As Above---(B) Moudule o/p Range: 365 - 390 watt, Maximum Power Voltage Vmpp: 39 - 40 V,
2.01 1.00 PER WATT
Maximum Power Current Impp: 9 - 10 A
---As Above---(C) Moudule o/p Range: 435 - 455 watt, Maximum Power Voltage Vmpp: 40 - 42 V,
2.02 1.00 PER WATT
Maximum Power Current Impp: 10.5 - 11 A
---As Above---(D) Moudule o/p Range: 480 - 505 watt, Maximum Power Voltage Vmpp: 41 - 42 V,
2.03 1.00 PER WATT
Maximum Power Current Impp: 12 - 13 A
---As Above---(E) Moudule o/p Range: 520 - 545 watt, Maximum Power Voltage Vmpp: 41 - 42 V,
2.04 1.00 PER WATT
Maximum Power Current Impp: 12.5 - 13 A
S.I.T.C of Solar Inverter Gried Tied: MPPT Range: 80-1000 V, Max efficiency: 97.5% - 98.9%, O/p
Frequency: 50/60Hz, Operating Altitude (m) ≤4000, O/p Power Factor: ~1, O/P THDi: <3%,
Operating Tempreture Range: -25~60°C, Anti-islanding Protection: Integrated, Input Reverse
Polarity Protection Integrated, Insulation Resistor Detection Integrated, Residual Current
3.00 Monitoring Unit Integrated, Output Over Current Protection Integrated, Output Short Circuit 1.00 PER WATT
Protection Integrated, Output Over Voltage Protection Integrated, Protection Degree: IP65, User
Interface LCD & APP,Datalogger & Communication: GPRS / Wi-Fi (Optional)
(A) Solar Inverter: 1 kW to 3 kW: Max. input Current: 10A, Max DC i/p Power: 1300-3900W &
Nominal o/p Power: 1000-3000W Nomimal O/p Voltage: 220/230 V 1-Phase, Nominal O/p
Current: 5-13.5A.
---As Above---(B) Solar Inverter: 3 kW to 6 kW: Max. input Current: 11A, Max DC i/p Power: 3900-
3.01 7200W & Nominal o/p Power: 3000-6000W, Nomimal O/p Voltage: 220/230 V 1-Phase, Nominal 1.00 PER WATT
O/p Current: 13.6-27.3A.
---As Above---(C) Solar Inverter: 6 kW to 15 kW: Max. input Current: 22 A, Max DC i/p Power:
3.02 7800-19500 W & Nominal o/p Power: 6000-16500 W, Nomimal O/p Voltage: 400 V 3-Phase, 1.00 PER WATT
Nominal O/p Current: 10-24A,
---As Above---(D) Solar Inverter: 15 kW to 25 kW: Max. input Current: 27 A, Max DC i/p Power:
3.03 22100-32500W & Nominal o/p Power: 15000-25000W, Nomimal O/p Voltage: 400 V 3- 1.00 PER WATT
Phase,Nominal O/p Current: 25-37A.
---As Above---(E) Solar Inverter: 25 kW to 50 kW: Max. input Current: 30 A, Max DC i/p Power:
3.04 22100-51500 W & Nominal o/p Power: 25000-50000W, Nomimal O/p Voltage: 400 V 3- 1.00 PER WATT
Phase,Nominal O/p Current: 37-80A.
---As Above---(F) Solar Inverter: 50 kW to 100 kW: Max. input Current: 40 A, Max DC i/p Power:
3.05 66500-130500 W & Nominal o/p Power: 50000-100000 W, Nomimal O/p Voltage: 400 V 3- 1.00 PER WATT
Phase,Nominal O/p Current: 80-144 A.
---As Above---(G) Solar Inverter: 100 kW to 136 kW: Max. input Current: 40 A, Max DC i/p Power:
3.06 130.5 -176.5 KW & Nominal o/p Power: 100-136 KW, Nomimal O/p Voltage: 540 V 3-Phase, 1.00 PER WATT
Nominal O/p Current: 144-145 A,
---As Above---(H) Solar Inverter: 136 kW to 200 kW: Max. input Current: 40 A, Max DC i/p Power:
3.07 176.5-260KW & Nominal o/p Power: 136-200KW, Nomimal O/p Voltage: 540 V 3-Phase, Nominal 1.00 PER WATT
O/p Current: 144-145A,
NADIAD MUNICIPAL CORPORATION - NADIAD
BID DOCUMENTS FOR ANNUAL RATE CONTRACT FOR SUPPLYING AND INSTALLATION WORK OF SOLAR PANELS AT DIFFERENT PROPRITIES OF NADIAD
MUNICIPAL CORPORATION - NADIAD_2ND CALL
DESCRIPTION QTY UNIT RATE
Supplying and Erecting Seamless Box Pipe of suitable size for rooftop solar installations with
good stability agaist wind, Thickness 2 mm and 80 micron, Hot Dipped Galvanized steel coils.
suitable arrangement for base plate for foundation , solar panel mounting, the structure should
be suitable for carry the load of solar panel,wiring, sprinkler system etc. with necessary
4.00 1.00 PER KG
foundation work/wall mount, j bolt, anchor fastner etc. the nut bolt used for installtion of
stucture should be (SS 304) quality.
box. pipe ref. size (A) 40 x 40 x 2mm, (B) 50 × 50 × 2mm, (C.) 60 x 40 x 2mm,(D) 72 x 72 x 2.5mm
Supplying and Erecting 'C' Channel of suitable size for rooftop solar installations with good
stability agaist wind, Hot Dipped Galvanized steel coils. It have suitable arrangement for base
plate for foundation Screw Arrangement , solar panel mounting, the structure should be suitable
5.00 1.00 PER KG
for carry the load of solar panel,wiring, sprinkler system etc. with necessary foundation
work/wall mount, j bolt, anchor fastner etc. the nut bolt used for installtion of stucture should be
(SS 304) quality.
Supplying and Erecting Stainless Steel Nut Bolt (SS 304) for Installation of Solar PV Module,
6.00 Structures, and other related items with required size as engineer in charge demands for project 1.00 Ea.
Size, length upto 10 x 150 mm
DC Cable: Electron beam cross linked compound,UV, Ozone, Temperature & Hydrolysis resistant
Flame Retardant, Low Smoke Excellent Encapsulation
Very long / Service life >
Standards / Material Properties:
Fire performance : IEC 60332-1-2
Smoke emission : IEC 61034/ EN 50268-2
7.00 1.00 PER MTR
Halogen Free: EN 50267-2-1/-2, IEC 60754-2
Toxicity: EN 50305, ITC – Index <3
Ozone Resistant : EN50396
Weathering UV: HD 605/A1 or DIN
Approvals : EN 50618; H1Z2Z2-k
with suitable sized of PVC pipe(ISI Mark) and Clamps,Shadels,Lugs.
(A) 1 core 4 sqmm copper DC cable Colour Red
7.01 ---As Above---(B) 1 core 4 sqmm copper DC cable Colour Black 1.00 PER MTR
'S,I,T.C of Distribution board from AC Side, ACDB 1-Phase - 1 kW - 6 kW: AC MCB: 16-25A, 2POLE,
C-CURVE, 10KA, AC SPD: 40KA, 1P+N, TERMINAL/END PLATE/END CLAMP: 6SQMM (KUT6) FOR
OUTPUT, AC Interconnection with suitable size wire/cable, All switchgears and connection are
enclosed with IP66 Enclosure which have transperant cover in frontside to view and operate the
S,I,T.C of Distribution board from AC Side ,ACDB 3-Phase - 6 kW - 10 kW: AC MCB 20-32A, 4POLE,
10KA, AC SPD 40KA, 3P+N, TERMINAL/END
PLATE/END CLAMP: 6SQMM (KUT10) FOR OUTPUT,AC Interconnection with suitable size
wire/cable. All switchgears and connection are enclosed with IP66 Enclosure which have
transperant cover in frontside to view and operate the MCB position.
S.I.T.C of Distribution board from AC Side, ACDB 3-Phase - 11 kW - 20 kW: AC1 DUTY
CONTRACTOR-40A 4P,
100A MCCB 4P(Cat III), 3 PHASE SPD, VOLTAGE MONITORING RELAY,
ELR WITH CBCT, PHASE INDICATING LAMP, POWER CABLE &
OTHER ACCESSORIES, All switchgears and connection are enclosed with IP66 Enclosure and
operate the MCB position.
NADIAD MUNICIPAL CORPORATION - NADIAD
BID DOCUMENTS FOR ANNUAL RATE CONTRACT FOR SUPPLYING AND INSTALLATION WORK OF SOLAR PANELS AT DIFFERENT PROPRITIES OF NADIAD
MUNICIPAL CORPORATION - NADIAD_2ND CALL
DESCRIPTION QTY UNIT RATE
S.I.T.C of Distribution board from AC Side ,ACDB 3-Phase - 21 kW - 50 kW: AC1 DUTY
CONTRACTOR-80A 4P,
100A MCCB 4P(Cat III), 3 PHASE SPD, VOLTAGE MONITORING RELAY,
ELR WITH CBCT, PHASE INDICATING LAMP, POWER CABLE &
OTHER ACCESSORIES, All switchgears and connection are enclosed with IP66 Enclosure and
operate the position.
S.I.T.C of Distribution board from AC Side , ACDB 3-Phase - 51 kW - 100 kW: which includes AC1
DUTY CONTRACTOR-200A
4P, 200A MCCB 4P(Cat III) WITH SPREADER & SHUNT, 3 PHASE SPD,
8.04 VOLTAGE MONITORING RELAY, ELR WITH CBCT, PHASE 1.00 Ea.
INDICATING LAMP, POWER CABLE & OTHER ACCESSORIES. All switchgears and connection are
enclosed with IP66 Enclosure and operate the position.
S.I.T.C of Distribution board from AC Side , ACDB 3-Phase - 101 kW - 200 kW: AC1 DUTY
CONTRACTOR-300A
4P, 200A MCCB 4P (Cat III)WITH SPREADER & SHUNT, 3 PHASE SPD,
VOLTAGE MONITORING RELAY, ELR WITH CBCT, PHASE
INDICATING LAMP, POWER CABLE & OTHER ACCESSORIES. All switchgears and connection are
enclosed with IP66 Enclosure and operate the position.
S.I.T.C of Distributiob System DC Side, DCDB 1-Phase - 1 kW - 3.5 kW(1in:1out) : DC MCB 500V,
SPD 600V, TYPE 2, TERMINAL/END,PLATE/END CLAMP: 4SQMM
(KUT6) FOR OUTPUT, DC CABLE With suitable size of interconnection.
S.I.T.C of Distributiob System DC Side, DCDB - 3.6 kW - 6 kW (2in:2out) : DC MCB 500V, 16A, DC
TYPE 2, TERMINAL/END PLATE/END CLAMP
4SQMM (KUT6), GREEN (KUT6), DC CABLE With suitable size of interconnection.
S.I.T.C of Distributiob System DC Side, DCDB - 6 kW - 10 kW (3in:3out) : DC MCB 500V, 16A, DC
1000V, TYPE 2, TERMINAL/END PLATE/END CLAMP
4SQMM (KUT6), GREEN (KUT6), DC CABLE With suitable size of interconnection.
S.I.T.C of Distributiob System DC Side, DCDB - 10 kW - 20 kW (4in:4out) : Input Mcb - 1000 V,
1000 V DC SPD TYPE 2, TERMINAL/END,PLATE/END CLAMP:
4SQMM (KUT6) FOR OUTPUT, DC CABLE With suitable size of interconnection.
S.I.T.C of Distributiob System DC Side, DCDB - 20 kW - 25 kW (5in:5out) : Input Mcb - 1000 V,
1000 V DC SPD TYPE 2, TERMINAL/END,PLATE/END CLAMP:
4SQMM (KUT6) FOR OUTPUT, DC CABLE With suitable size of interconnection.
S.I.T.C of Distributiob System DC Side, DCDB - 35 kW - 40 kW (8in:8out) : Input Mcb - 1000 V,
1000 V DC SPD TYPE 2, TERMINAL/END,PLATE/END CLAMP:
4SQMM (KUT6) FOR OUTPUT, DC CABLE With suitable size of interconnection.
S.I.T.C of Distributiob System DC Side, DCDB - 50 kW - 65 kW (12in:12out) : Input Mcb - 1000 V,
1000 V DC SPD TYPE 2, TERMINAL/END,PLATE/END CLAMP:
4SQMM (KUT6) FOR OUTPUT, DC CABLE With suitable size of interconnection.
S.I.T.C of Distributiob System DC Side, DCDB - 60 kW - 80 kW (16in:16out) : Input Mcb - 1000 V,
1000 V DC SPD TYPE 2, TERMINAL/END,PLATE/END CLAMP:
4SQMM (KUT6) FOR OUTPUT, DC CABLE With suitable size of interconnection.
S.I.T.C of Distributiob System DC Side, DCDB - 80 kW - 300 kW (18in:18out) : Input Mcb - 1000 V,
1000 V DC SPD TYPE 2, TERMINAL/END,PLATE/END CLAMP:
4SQMM (KUT6) FOR OUTPUT, DC CABLE With suitable size of interconnection.
NADIAD MUNICIPAL CORPORATION - NADIAD
BID DOCUMENTS FOR ANNUAL RATE CONTRACT FOR SUPPLYING AND INSTALLATION WORK OF SOLAR PANELS AT DIFFERENT PROPRITIES OF NADIAD
MUNICIPAL CORPORATION - NADIAD_2ND CALL
DESCRIPTION QTY UNIT RATE
INSTALLATION ACCESSORIES
10.00 'Supplying & Errecting MC4 Connector Male - Female Set for Solar DC Cable which is installed in 1.00 Ea.
Solar PV-module/Inverter/DCDB etc.
WATER SPRINKLE SYSTEM
Providing & erecting Automatic solar panel cleaning system for solar power projects which
includes necessary plumbing work (UPVC pipes and accessories) from source of water to project
11.00 site (upto 30 meters),Suitable size of sub mercible/ open well motor, necessary wiring for motor 1.00 PER KW
and sprinkler system with safety, timer circuit for automatically on/off the sprinkler system,
necessary size oand number of nozzles/JET (minimum 1 Nozzle/Jet per module).
(A) 1KW-5KW Cleaning System
11.01 ---As Above---(B) 5KW-10KW Cleaning System 1.00 PER KW
11.02 ---As Above---(C ) 11KW-20KW Cleaning System 1.00 PER KW
11.03 ---As Above---(D) 21KW-50KW Cleaning System 1.00 PER KW
11.04 ---As Above---(E) 51KW-100KW Cleaning System 1.00 PER KW
11.05 ---As Above---(F) 101KW-200KW Cleaning System 1.00 PER KW
The all inclusive comprehencive annual maintance contract cost covers yearly maintanance of
solar Pv Modules, Inverter, wiring,earthing,switchgears, etc with material and labour cost
including preventive maintanance.The cost covers entire installation. AMC also includes monthly
site visit and inspection of project with submission of inspection and solar generation report. All
parts should be replaced/repaired if found faulty within specified time. Agency has to provide
necessory licening work for warranty,power,Bidirectional meter etc
(A) 1KW-10KW System
12.01 ---As Above---(B) 11KW-20KW System 1.00 PER KW
12.02 ---As Above---(C ) 21KW-50KW System 1.00 PER KW
12.03 ---As Above---(D) 51KW-100KW System 1.00 PER KW
12.04 ---As Above---(E) 101KW-200KW System 1.00 PER KW
NADIAD MUNICIPAL CORPORATION - NADIAD
BID DOCUMENTS FOR ANNUAL RATE CONTRACT FOR SUPPLYING AND INSTALLATION WORK OF SOLAR PANELS AT DIFFERENT PROPRITIES OF NADIAD
MUNICIPAL CORPORATION - NADIAD_2ND CALL
DESCRIPTION QTY UNIT RATE
I / We am / are willing to carry out above work at .................. % above / below. In words ..................... percentage above / below the tender
rate, which mentioned above.
Or any other Item subjected to the ARC work of place making required as per the instruction shall be executed as per the SOR with effect of
above / below for this tender.
1. The Contractor shall exhibit a board with detailed specification and details of work as directed by the Engineer-In-Charge for which no extra payment
2. The labour cess will be deducted as per prevailing rules i.e. 1% of the work done.
3. GST and Income tax TDS will be deducted at a source while making payments of bills
4. In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per Govt. G.R.: PRC-10/2017 Cement Consumption/16/C
Date:11/05/2017 as stated in S.O.R. therefore in R.C.C. items where there is a change as per actual mix design the cost of difference of cement
consumption have been deducted from the rate of original item at the rate of input rate mentioned in all the tender.
5. Bidder has to quote rates without GST, GST will be applicable extra on tender rate.
Stamp with signature of contractor
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
01.00_TENDER NOTICE.pdf
02.00_SCHEDULE B_ARC SOLAR.pdf
03.00_A_P-1_GENERAL TECHNICAL SPECIFICATION _ELECTRICAL -1-33.pdf
04.00_A_P-2_GENERAL TECHNICAL SPECIFICATION _ELECTRICAL -34-63.pdf
05.00_GENERAL TECHNICAL SPECIFICATION BOOKLET_CIVI WORK.pdf
06.00_DMO 2799 11-Mar-2024 662.pdf
07.00_GR DOC 1_compressed.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .