Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹15.3 LAccepted-AOC | ₹15.3 L | L1 | Accepted-AOC L1 |
| 2 | L2₹15.5 LRejected-Finance | ₹15.5 L | L2 | Rejected-Finance L2 |
| 3 | L3₹15.8 LRejected-Finance | ₹15.8 L | L3 | Rejected-Finance L3 |
Tender Value
₹15.5 L
EMD Value
₹31,006
Closing Date
14 Feb 2026, 5:00 pmClosed
EXECUTIVE ENGINEER, KAKDWIP IRRIGATION DIVISION
Irrigation Waterways Directorate Office of the Executive Engineer Kakdwip Irrigation Division Postal address Kakdwip, South 24 Parganas
M/R to damage embankment for a length of 181 m within Ch. 0.35 to Ch.0.39 Ch. 0.50 km to 0.65 km at right bank of river Hatania-Doania at Mouza Namkhana
2026_IWD_995971_16
WBIW/EE/KIDIVISION/e-NIT- 17 (e)/2025-26
Open Tender
CIVIL WORKS
30 days
MOUSUNI
Please refer Tender documents.
4 documents required · 4 mandatory
₹31,006
Yes
18 May 2026
31 Jan 2026
16 Feb 2026
31 Jan 2026
14 Feb 2026
31 Jan 2026
Supplying Jhaw / Eucalyptus bullah piles at work site, including dressing and making one end pointed. (iii) 15 cm av. Diameter
Labour for driving Jhaw / Eucalyptus bullah piles by monkey in all sorts of soil including hoisting and placing piles in position, protecting the pile head with iron ring and cutting and shaping heads before and after driving and including hire and labour for necessary driving appliances and all tackles. (iii) 15 cm av. diameter
Supplying, fitting and fixing with iron nails half split bullah wailing pieces and cross pieces etc. complete with cost of all materials and carriage to site. (a) Width of thinner end above 10 cm. and less than 15 cm. (i) Jhaw / Eucalyptus.
Supplying, dressing and stacking at site bamboo pins above 5 cm. diameter and upto 7.5 cm. diameter. (Dia. to be measured at mid length).
Driving bamboo pins in standing or flowing water including scaffolding and driving appliances. (a) Where boats are not necessary.
Supplying, fitting and fixing with iron nails half split bamboo wailing pieces (av. dia. of bamboo not less than 5.0 cm.)
Supplying to site empty cement polythene bags (capacity 50kg) in good condition including stacking, incedental charges etc. all complete (capacity 50 kg)
Labour charges for filling empty cement gunny bag / polythene bag (capacity 50 kg) with all kinds of earth (wet or dry), sand or agreegates(stone / brick) and sewing as done in case of cement bags ,( tying with a knot after filling willnot beaccepted ) , andstacking withina lead of 30 metre as per direction of Engr-in-charge (cost is excluding the cost of any types of filling materials). NB:- Volume of earth/ sand filled bags should not be less than 0.028 cum/ bag.
Dumping in position earth/sand filled gunny/polybags (capacity50kg) within a lead of 30 metre inclusive of all lifts.
Earthwork from borrow pits over existing embankment or for repairs to embankment, closing breaches etc. within an initial lead of 30 metre and lift of 1.50 metre including breaking clods and depositing the same in layers not exceeding 25 cm. and rough dressing etc. complete as per profile.
Extra rate over Item Nos.10 for all kinds of soil for every additional lead of 30 metres or part thereof beyond the initial lead of 30metres. (iii) From 30 Metre to 60 Metre
Extra rate over Item Nos 10.0 for all kinds of soil for every additional lift of 1.50 metre or part there of beyond the initial lift of 1.50 metre. One additional lift
Earthwork in excavation in all kinds of soil for making embankments, repairs to the embankment, closing breaches etc.as per profile including supply and transporting the earth by truck or tractor or any other mechanical meanson land , including loading, transporting, unloading and stacking with all lifts bothways and head load where necessary and depositing the same on embankments, clannels, filling depressions in requisite profile, levelling as per direction of theEngineer-in-charge within a lead of, B) Beyond 1.00 km and upto 2.00 km
Supplying at site and laying in position UV stabilized poly propylene woven geo textile of 430 gsm as filter,as per specification, including cost of preparing the bed , placing the geo textile as per profile with at least 15 cm lapping, wherever required and anchorage at top, sewing /welding the overlapped portion, storage and transportation by all means, complete as per direction of the Engineer-in-charge. Note: 1.Payment tobemadeonmeasurement of finishedsurface without lapping, but including anchoring length at top. 2.Payment will b emade subject to the result of 3rd Party Testing, to be done by the Engineer-in-charge departmentally. Paragraphs 2.7.7,2.7.9 and 2.7.10 under theChapter of “Specification for Works” in the USoR shall be reproduced and included in the tender document as “Specification & Special Terms & Conditions for Geotextile ” in case of use of this item in the estimate.3. This particular item is to be used in special cases, either in continuation of previous usage or after offering adequate justification from techno-economical angles
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.35 MB
Tendernotice_2.pdf
PDF • 1.01 MB
BOQ_2437454.xls
BOQ • 0.39 MB
Download all tender documents and submit your bid