Loading…
Loading…
Tender Value
₹7.6 L
EMD Value
₹8,000
Closing Date
8 Oct 2026, 6:00 pm
Executive Engineer, Und Irrigation Division, Jamnagar
SASOI-II WATER RESOURCES PROJECT Providing Operation & Maintenance Services for Disaster Management work during Monsoon & Non-Monsoon Days for year 2026-27 (Second Attempt).
348809
10 of 2026-27
Open
Civil Works
Works
Jamnagar
7 documents required · 7 mandatory
₹900
EXECUTIVE ENGINEER UND IRRIGATION DIVISION JAMNAGAR
₹8,000
24 Sept 2026
24 Sept 2026
24 Sept 2026
8 Oct 2026
24 Sept 2026
BILL OF QUANTITIES
(A) Percentage Rate Tender (Up to INR 10 Cr.)
Name of work : SASOI-II WATER RESOURCES PROJECT
Providing Operation & Maintenance Services for Disaster
Management work during Monsoon & Non-Monsoon Days for year
2026-27 (Second Attempt).
Item Description of Item (with brief Quantity Unit Rate In Amount
No. specification and reference to book of figures
specifications)
1 Supplying unskilled labour (Majdoor) 883.00 Man 557.17
(Male) for petrolling of dam and all misc. Day
dam site works etc. complete.
2 Supplying skilled labour (Male) for 459.00 Man 580.50
operation of Flood Cell, Petrolling of Dam Day
and all misc. irrigation works etc.
I am/we are willing to carry out the work at ____________________ % below/above percent
(Should be written in figures and words) of the estimated rates mentioned above. Amount of
My/Our tender works out as under :-
Estimated Amount Rs. 7,58,430=61 Estimated Amount Rs. 7,58,430=61
Put to Tender Rs. Put to Tender Rs.
Deduct _______% Below Rs. __________ Add _______% Above Rs. __________
Net Rs. Net Rs.
(Rupees in words) ________________________ (Rupees in words) ________________________
1. The Contractor shall exhibit a board with detailed specification and details of work as
directed by the Engineer-In-Charge for which no extra payment shall be made.
2. The labour cess will be deducted as per prevailing rules i.e.1% of the work done.
3. GST and Income tax TDS will be deducted at a source while making payments of bills
4. In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per
Govt.G.R.:PRC-10/2017CementConsumption/16/CDate:11/05/2017as stated in S.O.R.
therefore in R.C.C. items where there is a change as per actual mix design the cost of
difference of cement consumption have been deducted from the rate of original item at the
rate of input rate mentioned in all the tender. DELETED
5. The rates to be quoted by the contractor must be inclusive of all duties, taxes, and other
levies except GST payable by the contractor under the contract.
Deputy Executive Engineer
Signature of Contractor Irrigation Project Sub Division No.6/1
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
5.pdf
BOQ.pdf
Tender Notice No.10.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .