| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.5 LAccepted-AOC | L1 | Accepted-AOC LOWEST | |
| 2 | L2₹2.8 L+₹23,923.58 (9.46%)Rejected-AOC | L2 | Rejected-AOC SECOND | |
| 3 | L3₹2.8 L+₹25,310.05 (10.0%)Rejected-AOC | L3 | Rejected-AOC THIRD |
| Sl No | Description | Qty | Unit | ABDUL LATHIEF L3 | Sudarsanan A L1 | BALU B L2 |
|---|---|---|---|---|---|---|
| 1.00DRAIN | ||||||
| 1.00 | OD173491/2025-2026:Ring bund type -1-Putting up ring bund as per approved shape 2.50 m bottom width 1.00 m Top width using gunny bags-Plythene bags filled with earth placed in 2 rows at 6.00 m apart and filled in between with puddle clay to form bund for an average height of 2.00 m including | 2.5 | metre | 2,199 ₹5,497.5 | 1,999.76 ₹4,999.4 Lowest | 2,195 ₹5,487.5 |
| 1.00 | OD173484/2025-2026::Bailing out water Using 5HP Pump- Bailing out water with 5HP engine and pump set
including conveyance to site and erection, cost of fuel, lubrication oil and other stores, pay of
staff etc
complete | 96 | hour | 474.87 ₹45,587.52 | 431.66 ₹41,439.36 Lowest | 470 ₹45,120 |
| 1.00 | 11.1.1.1:Excavation for Structures Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. I. Ordinary soil (i) Upto 3 m depth | 2.33 | cum | 941.83 ₹2,194.46 | 856.12 ₹1,994.76 Lowest | 940 ₹2,190.2 |
| 1.00 | 11.4.1.1:Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 I. P.C.C grade M 10 (i) Nominal mix 1:3:6 | 0.71 | cum | 9,001.46 ₹6,391.04 | 8,182.33 ₹5,809.45 Lowest | 9,000 ₹6,390 |
| 1.00 | 12.5.3:Plain/reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204 For height upto 5 m III. R.C.C grade M 20 | 3.04 | cum | 10,457.41 ₹31,821.9 | 9,505.79 ₹28,926.12 Lowest | 10,450 ₹31,799.35 |
| 1.01 | 12.7:Supplying, fitting and placing TMT bar reinforcement (Fe 415) in substructure complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202 | 0.28 | tonne | 1,00,926.12 ₹28,158.39 | 91,741.84 ₹25,595.97 Lowest | 1,00,000 ₹27,900 |
| 1.01 | OD198292/2025-2026:AMBALAPPUZHA TALUK-Construction of Subgrade and Earthen Shoulders<br> Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with a lift upto 1.5m, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.1 and 300.2 with lead upto 1000 m as per Technical Specification Clause 301.5(WITHOUT POWER ROLLER) | 23.28 | cum | 1,391.89 ₹32,404.59 | 1,265.23 ₹29,455.82 Lowest | 1,390 ₹32,360.59 |
| 1.01 | OD188506/2025-2026:(Derived from 4.11.2).Granular sub-base/base/surface course with local materials (Table 400.13) by mix in place method normal. Construction of granular sub-base by providing local material spreading in uniform layers on prepared surface, mixing by mix in place method with rotavator at once and compacting with rammer to achieve the desired density complete as per Clause 401.4 as per Technical Specification Clause 408. <br>(ii) Using Gravel mix soil. (WITHOUT ROLLER & MOTOR GRADER) | 8.79 | cum | 2,341.92 ₹20,597.19 | 2,128.81 ₹18,722.88 Lowest | 2,340 ₹20,580.3 |
| 1.01 | OD174156/2025-2026: Interlocking Concrete Block Pavement- Providing and Laying of M.30 grade Interlocking concrete Block
Pavements having thickness 80 mm over 50mm thick crushed stone of 6.70mm sizes, filling the joints with fine sand etc.complete.as per
drawings and Technical Specification Clause 1504. | 87.95 | sqm | 1,126.38 ₹99,065.12 | 1,023.88 ₹90,050.25 Lowest | 1,120 ₹98,504 |
Tender Value
₹2.8 L
EMD Value
₹6,954
Closing Date
3 Sept 2025, 6:55 pmClosed
Assistant Engineer
O/o Assistant Engineer,LSGD Section,Ambalappuzha north GP
Annual Plan_ANGP_2025_26_Construction of Approach Road and drain for velloor _ Kuruppaserry road in ward 3_Proj.No 196_2026_General Civil Work
2025_LSGD_791474_1
06/AE/ANGP/2025
Open Tender
Civil Works - Roads
Item Rate
Ambalappuzha north
Please refer Tender documents.
8 documents required · 8 mandatory
₹615
Yes
₹6,954
Yes
4 Oct 2025
26 Aug 2025
9 Sept 2025
26 Aug 2025
3 Sept 2025
26 Aug 2025
Amount
DRAIN
OD173491/2025-2026:Ring bund type -1-Putting up ring bund as per approved shape 2.50 m bottom width 1.00 m Top width using gunny bags-Plythene bags filled with earth placed in 2 rows at 6.00 m apart and filled in between with puddle clay to form bund for an average height of 2.00 m including
OD173484/2025-2026::Bailing out water Using 5HP Pump- Bailing out water with 5HP engine and pump set including conveyance to site and erection, cost of fuel, lubrication oil and other stores, pay of staff etc complete
11.1.1.1:Excavation for Structures Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. I. Ordinary soil (i) Upto 3 m depth
11.4.1.1:Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 I. P.C.C grade M 10 (i) Nominal mix 1:3:6
12.5.3:Plain/reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204 For height upto 5 m III. R.C.C grade M 20
12.7:Supplying, fitting and placing TMT bar reinforcement (Fe 415) in substructure complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202
OD198292/2025-2026:AMBALAPPUZHA TALUK-Construction of Subgrade and Earthen Shoulders<br> Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with a lift upto 1.5m, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.1 and 300.2 with lead upto 1000 m as per Technical Specification Clause 301.5(WITHOUT POWER ROLLER)
OD188506/2025-2026:(Derived from 4.11.2).Granular sub-base/base/surface course with local materials (Table 400.13) by mix in place method normal. Construction of granular sub-base by providing local material spreading in uniform layers on prepared surface, mixing by mix in place method with rotavator at once and compacting with rammer to achieve the desired density complete as per Clause 401.4 as per Technical Specification Clause 408. <br>(ii) Using Gravel mix soil. (WITHOUT ROLLER & MOTOR GRADER)
OD174156/2025-2026: Interlocking Concrete Block Pavement- Providing and Laying of M.30 grade Interlocking concrete Block Pavements having thickness 80 mm over 50mm thick crushed stone of 6.70mm sizes, filling the joints with fine sand etc.complete.as per drawings and Technical Specification Clause 1504.
75.8.1.1.A:Providing Plain cement concrete for wearing coat CC 1:2:4 (1 cement: 2 fine aggregate:4 course aggregate) laid to required slope as required including compaction, finishingand tamping etc .complete. Max. size of course aggregate not exceeding 25mm , mixedin concrete mixer etc complete as per specification (i) Nominal mix (1:2:4)
BALU B (BID ID -2323976)
ABDUL LATHIEF (BID ID -2324018)
Bidder Name
ABDUL LATHIEF
BALU B
Sudarsanan A
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .