Superintending Engineer, Project Implementation Unit, Health & Family Welfare Department.
Supply, Installation, Testing and Commissioning of Modular Operation Theatre at Stem cell Building & Kidney Building at NCH Campus Surat.
251338
2025-26/103/08
Open
Civil Works - Buildings
Surat
1 document required · 1 mandatory
₹6,000
Yes
PIU-General Fund A/c 11-114
₹3.5 L
Yes
9 Dec 2025
9 Dec 2025
9 Dec 2025
27 Jan 2026
9 Dec 2025
Memorandum showing items of works to be carried out
Approved Rate & Sor 2024-2025
Item estimated but
Item Of Work Unit In figures Rs. estimated
No. may be more or In Words
Supply, Installation, Testing and Commissioning of 50 mm thick Pre Fabricated Modular Operation Theater Panels
(Walls and Ceiling) made out Polyurethane foam injected at 40 Kg/m3 sandwiched between 0.8 mm thick GP and SP
sheet on front side and 0.5 mm GP and SP/PPGI sheet on back-side. The inner surface walls be fixed to the bricks wall
with essential support. There will be minimum possible cavity/gap in between solid and steel walls and will be variable
to suit the architects lay out for the flush mounting of the equipments. The wall and ceiling panels must comply with
necessary provision of to JIS Z 2801/ISO 22196, BS EN 1363-1:2020, EN 1363-2:1999, EN 1364-1:2015, DIN 52210-
2:1984-08, DIN 4102-1, Class A2. Any Third-party compliance certificate mandatory. Panel should be covered with Rupees Six Thousand Five
1 1346.73 Smt 6550.00 Hundred Fifty Only
protective sheath of 300 d.f.t Anti-bacterial Paint having undergone Washability/Water resistance Test JIS K
5663.7.12, permeability test less than 200 unit of permeability, Anti-bacterial effect against staphyloccoccus aureus,
Escherichia coli (via HALO test) and safety and causative agents such as formaldehyde, toluene, xylene,
paradichlorobenzene etc. Third party (NABL approved Lab) certification for EGP and thickness test certificate to be
submitted at time of supply. The item includes refixing of Curtain removed during ceiling work after completion of the
ceiling. this works in the contractor’s scope, and no extra payment shall be made for this.
Memorandum showing items of works to be carried out
Approved Rate & Sor 2024-2025
Item estimated but
Item Of Work Unit In figures Rs. estimated
No. may be more or In Words
Supply, Installation, Testing and Commissioning of Ceiling Filtration System - The ceiling filtration system in the
surgical theatre should ensure a unidirectional distribution of sterile air, covering all areas affected by the airflow. It
should consist of a laminar flow system incorporated within a frame made from thick extruded aluminum profiles,
complete with a sealed gasket to prevent leaks. The system should incorporate "H 14" class HEPA filters positioned in
the ceiling plenum. These filters should achieve an MPPS average efficiency greater than 99.95% and a 3-micron DOP
efficiency greater than 99.99%. The filters should also be designed to handle a final pressure drop of no more than
Pa, operate at a maximum temperature of 60 degrees Celsius, and function effectively within a relative humidity range
of 40-50%. The filtration ceiling system should be capable of maintaining a constant airflow velocity of 0.25 m/s at the
diffuser. This should be accomplished through the use of a diffuser or flow equalizer that ensures uniform and constant
Rupees Three Lakh Ninety
2 3.00 air distribution over the entire surface area. The structure holding the filtration system, including the filter frames and Nos. 390000.00 Thousand Only
top plenum, should be made from either aluminum or stainless steel. The system should be CE/UL certified and
designed to achieve an ISO 14644/1 classification of ISO 5, with a bacteriological class of B (5 CFU/m3) and particle
decontamination kinetics CP of 5 minutes. After installation, the system's performance should be validated by a third-
party government-approved environmental lab to ensure compliance with specified standards. A positive pressure
should be maintained inside the operating theatre to prevent contamination from external air sources. The supplier
should provide test certificates for the HEPA filters and the laminar airflow systems from the original manufacturers.
Furthermore, the size of the laminar airflow system should be a minimum of 8 feet by 8 feet. Finally, the entire system
should meet CE/BIS certification standards, ensuring it adheres to both European and Indian safety and performance
regulations and including validation.
Memorandum showing items of works to be carried out
Approved Rate & Sor 2024-2025
Item estimated but
Item Of Work Unit In figures Rs. estimated
No. may be more or In Words
The flooring within the surgical theatre should consist of a minimum of 2mm thick antistatic seamless PVC, ensuring
durability and safety. This floor should be smooth, non-slip, and made from an impervious material with sufficient
conductivity to dissipate static electricity effectively, yet not so conductive as to risk electric shock to personnel. The
PVC used should be of very high quality, particularly designed for electrostatic charge dissipation, and should not be
less than 2 mm in thickness. The installation process should utilize continuous rolls, and joints should be seamlessly
welded using special PVC thermal welding units with welding bars of the same color to ensure uniformity and prevent
contamination. The sheets should be highly durable, capable of resisting shocks, indentations, and scratches. The
conductive material should be uniformly impregnated within the PVC as grains to enhance its antistatic properties.
Additionally, the flooring should be inert to body fluids, chemicals, and disinfectants, and remain unaffected by
temperature variations typical within an operating theatre. It should efficiently discharge electric charges up to 2 kV,
and the electrical resistance (point to ground) should be maintained within 2.5x10^4 to 5x10^6 ohms, ensuring no
buildup of electrical charge beyond 100 volts. Floor installation should be performed by skilled workers from
accredited agencies authorized by the PVC sheet supplier. The installation should include a conductive copper grid Rupees Four Thousand
beneath the PVC sheet, supported by liquid epoxy compounds to create a uniform and level surface. Copper strips Two Hundred Fifty Only
should be made visible by grinding and not project more than 0.5mm above the floor level to prevent damage to the
PVC sheet, with one earthing lead brought out from every 150 sq.ft area and attached to the main earthing strip/ground.
The flooring should also be mechanically shockproof, scratchproof, flame retardant, and antimicrobial. Corners of the
flooring should be uniformly curved, and a concealed cove-former (aluminium) should overlap the wall panel to a
height of approximately 25mm and be sealed perfectly and uniformly. Before laying the PVC, suitable self-leveling
compounds should be used to prevent any undulations within the operating theatre. The final surface should be non-
corrosive to biological fluids and detergents, with a color that is uniform, pleasant, and matching with the ambience as
approved by the respective consignee. The item includes dismantling of existing vinyl flooring and, as per site
conditions, repairing or replacing any damaged vitrified or Kota tile flooring with ready-mix mortar. The floor shall be
made level, smooth, and durable. All such work is in the contractor’s scope, and no extra payment shall be made for
Memorandum showing items of works to be carried out
Approved Rate & Sor 2024-2025
Item estimated but
Item Of Work Unit In figures Rs. estimated
No. may be more or In Words
The door to the surgical theatre should be a hermetically sealed, single sliding door measuring 2.1 meters in height and
1.5 meters to 2.10 M (as per site required) in width. The door should be equipped with a controller capable of being
operated by elbow switches, foot switches, and a touchless sensor, providing multiple, accessible control options. The
track for the door should be made from stainless steel or aluminum, with the running surface for the top rollers angled
appropriately to minimize resistance and facilitate smoother movement. The door leaf should be suspended using high-
quality hard plastic rollers with double bearings at the top. These rollers should run under the stainless steel or
aluminum track to ensure smooth and noiseless operation. The opening and closing mechanisms of the door should be
controlled by a microprocessor for precise electromechanical movement. The material of the door should be either SMS
or HPL, with a color that matches the interior design. The door should be designed to be strong yet lightweight for ease
of use. In case the automatic mechanism fails, the door should still be able to open and close effortlessly manually. The
handle of the door should be made from stainless steel with a matte finish and equipped with a high-quality cylindrical
or ESPg lock for security. The door leaf should incorporate a high-quality synthetic rubber gasket with long durability
to ensure hermetic sealing and maintain a 99.99% air tightness at a minimum pressure of 75Pa. The floor on either side Rupees Two Lakh Ninety
of the door should be perfectly level, with a maximum permissible difference of +1mm, to avoid any tripping hazards Five Thousand Only
or unsealed gaps. The overall thickness of the finished door should range from 30-60mm, with the inner part of the
door filled with CFC-free polyurethane foam, approximately 48mm thick, sealed airtight to block any microbial ingress.
The door and its controls should comply with IEE regulations, utilizing DC brushless or PMDC motors that are
effectively isolated from mains power to ensure safety and reliability. Additionally, the door should include a vision
window measuring 300mm x 300mm, featuring double-glazed panels that are hermetically sealed to maintain the
integrity of the seal. The movement of the door should be as quiet as possible, and the time to start moving after
receiving a signal should be adjustable between 0.5 to 20 seconds.The door controller should be CE marked, BIS
certified, or IEC 60601 certified to meet international and national safety standards. A test certificate for the
hermetically sealed door frame should be included in the pre-dispatch documents to verify compliance with the
specified standards and functionality.During auto sliding door installation, if any addition or alteration in existing
granite sill, jamb, or flooring is required as per site conditions, it shall be in the contractor’s scope. No extra payment
shall be made for such work.
Double Dome OT Light with Ceiling mounted Double Dome LED OT lights having following features and enclosed
technical specifications, having Mobile App Connectivity, Battery Backup -Light intensity Ec - 160 000 & 160 000 lux,
- Light intensity adjustment - 10 – 100% (using Digital Capacitive Touch (Fully Remote Controlled) - Color
temperature Tc (with adjustment) -3800 – 4800 K -Light field diameter d10 at Ec - 100 - 150 mm -Working range - 1 m
Rupees Three Lakh Ninety
4.1 3.00 -Color rendering index 93Ra - Focusing Preset: Adjustable - LED Average life - 50000-60000 hrs - Diameter of Light - Nos. 390000.00 Thousand Only
not less than 650 mm per dome - Power Consumption - not more than 120W OT Light should be BIS marked;
manufacturer should have CDSCO License for this product under Class A, Compliant to IEC standards such as
IEC60601- 1:2005+A2:2020, IEC 60601-2-41:201 (Relevant Test Certificates to be submitted with Bid) Clause-wise
Technical Compliance to be
Memorandum showing items of works to be carried out
Approved Rate & Sor 2024-2025
Item estimated but
Item Of Work Unit In figures Rs. estimated
No. may be more or In Words
Supply, Installation, Testing and Commissioning of Membrane-Type Operation Switch and Communication Controller -
The Operation Switch and Comms Controller should encompass all necessary controls to ensure the proper operation
and monitoring of equipment and services in the operating room (OR). Positioned for optimal visibility in the surgeon's
line of sight and the OT staff, the wall-mounted membrane-buttons should be easily accessible to the nurse for
operation and assistance. In addition to hosting a digital clock and elapsed time indicator, the panel should feature a
medical gas alarm, clearly indicating high and low gas pressures for each gas service, including vacuum, supported by
an audible alarm. The Operation Switch and Comms Controller should also provide an alarm mute option for fault
annunciation, with pressure sensors strategically located near isolation valves. Controls for general lighting, including Rupees One Lakh Ninety
5 10.00 Nos. 195000.00 Five Thousand Only
ON/OFF and dimming, organized in groups for uniform illumination, should be present. Furthermore, the panel should
facilitate control over operating lights (major and satellite) and camera functions (on/off and intensity). A hands-free
telephone set with memory should be conveniently situated, and temperature and humidity controls for the room, linked
to the AHU (+/5%) using NO/NC or Chilled Water/Hot Water Actuator Control Valve (whichever is applicable),
should be adjustable from the Operation Switch and Comms Controller. Real-time indicators, such as a digital room
pressure indicator and HEPA filter bank differential pressure indicator, are essential for monitoring and maintaining a
safe and controlled environment in the operating room. Telephone with Alpha-numeric keyboard is required with
Speed-dialing option
In each operating theater, an operating list board should be installed. It should be made of ceramic with magnetic
properties and should be flush with the wall to maintain cleanliness and ease of use. LED type flat panel X-ray viewing
panels should be provided, complying with relevant electrical safety codes, and mounted flush with the wall to prevent Rupees Twenty Eight
6 10.00 dust accumulation and microbial growth. The body should be made of extruded aluminum, powder-coated with a Nos. 28500.00 Thousand Five Hundred
bacteria-resistant and disinfectant-resistant finish. The diffuser on the front panel should provide a uniformly lit screen, Only
and dimming controls should be easily accessible. Additionally, a proper spring-loaded film clip with rollers should be
included to securely hold and easily remove films without causing scratches.
Supply, Installation, Testing and Commissioning of Double-Bay Scrub Sink - The scrub station should be compact,
designed for use in the OT complex, and facilitate pre-procedural scrubbing. It should be made from heavy gauge type
304 stainless steel with a minimum thickness of 1.5mm and feature seamless welded construction polished to a satin
finish. The scrub sink should have a front access panel for easy maintenance of water control valves, waste
connections, stoppers, and strainers. Hands-free operation should be enabled through infrared sensors with
Rupees One Lakh Twenty
7 1.00 programmable adjustments. Thermostatic mixing valve control should maintain constant water temperature and be Nos. 126000.00 Six Thousand Only
located behind the access panel. Timing should be adjustable to meet individual usage requirements, and units should
have reduced anti-splash fronts. An additional knee/foot-operated switch should also be provided for enhanced
functionality. During scrub installation, if any plumbing, drainage, or any kind of civil work is required from the terrace
to the ground floor level, it shall be in the contractor’s scope. No extra payment shall be made for such works.
Memorandum showing items of works to be carried out
Approved Rate & Sor 2024-2025
Item estimated but
Item Of Work Unit In figures Rs. estimated
No. may be more or In Words
Supply, Installation, Testing and Commissioning of Storage Units - Storage units should be constructed with same
material, as wall and ceiling panels. The shelves, made of glass and, should be removable for cleaning. The unit should Rupees Eighty Five
8 20.00 Nos. 85000.00 Thousand Only
be divided into two or more parts, each with individual glass doors equipped with a high-quality locking system. The
overall size of the storage unit should be approximately 200 cm (H) x 120 cm (W) x 35 cm (D).
AIR HENDALING UNIT Make:KrVelocity: Not More Then 10 mt/second. , Canvass Connection-Heavy duty, non
partical shreding,Fire Retardentuger,Nikotra only , Type: PLUG,Drirect Driven,Dynamically Balanced Selection of fan-
Should run comfortably at 50 HZ at rated capecity. Motor Make:Siemence,B.B,Crompton,ABB , Type:TEFC, IP:55,
Foot Mounted, VFD compitable and I2 generation Safety: Motor should have interlocked with AHU Motor Rupees Twelve Lakh
8.1 3.00 door/excess/Fire DamperType-TWO TIRE, Floor Mounted , Inner const.:0.6mm plain G.I , Outer const.:0.8 mm G.I. Nos. 1225000.00 Twenty Five Thousand
Pre coated / Powder coated Thickness of Insulation: 25mm,PUF injected having density 40 to 42 kg/m3. ,Colour:As Only
approved by CLIENT CONDENSING UNIT : Condensing unit for AHU with all assesories and instalation (Copper
pipie provide 40 mtr Only Extra will charged extra) consider 1200 sqfeet insulation and ducting M
Supply, Installation, Testing and Commissioning of Peripheral Lighting - To enhance the operational environment of
each operating theatre, peripheral lighting and clean room luminaries should be installed, with a minimum of eight
units per theatre. These lights should offer an intensity of at least 500 Lux and be housed in highly specular anodized
aluminum with an optical antiglare system to minimize visual fatigue and glare. Each peripheral light should measure 2'
x 1'. The covers for these luminaries should be constructed from highly resistant, disinfectant-proof laminated safety
glass or acrylic, featuring a stylish, fine-grained surface that complements the clean and sterile environment of the
operating theatre. The body of the luminaries should be made from sheet steel, perfectly powder-coated to resist
contamination and facilitate easy cleaning, and should be ready for connection either as individual units or within a Rupees Twelve Thousand
series circuit. This setup should include digital electronic control gear utilizing multilamp technology to optimize
energy efficiency and light output. The installation of these luminaries should ensure that the recess frames are gas
tight. Each fitting should be flush with the ceiling and designed to be removable from either the top or bottom for ease
of maintenance. It is crucial that the light fittings are uniformly and aesthetically distributed across the ceiling to
provide consistent illumination throughout the OT, without interfering with visibility during procedures such as green
mode endoscopy. Furthermore, the peripheral lighting system should conform to IP65 or IP54 international protection
ratings, ensuring that the fixtures are dust tight and protected against water ingress, suitable for the demanding
conditions of an operating theatre.
Memorandum showing items of works to be carried out
Approved Rate & Sor 2024-2025
Item estimated but
Item Of Work Unit In figures Rs. estimated
No. may be more or In Words
Supply, Installation, Testing and Commissioning of Electrical Wiring inside OT - Power distribution within each
Operating Theatre (OT) should be handled via distribution boards located locally to each theatre using Fire Resistance
Low Smoke Wiring, layed in PVC conduits of reputed brand. The sub mains power to these panels should be provided
by the general electrical contractor, and all distribution services within the departments should run from these panels.
The power distribution unit should hold certifications such as EN, CE, FDA, IEC, and BIS to ensure compliance with
international safety and performance standards. Each wall of the MOT should have a minimum of two hybrid switch
sockets (6/16A) on each wall, in compliance with IEC standards. Light fittings within the clinical areas should be
recessed LED types equipped with control gear and sealed in accordance with the IP54 standard. This standard ensures
that the fittings are protected against limited dust ingress and water spray from all directions, suitable for clinical
environments. All equipment should be fully and permanently labeled to clearly identify and describe the function,
operation, and voltage of the apparatus concerned. Upon completion of the electrical installation, tests should be carried
Rupees Two Lakh Ninety
10 10.00 out in accordance with the relevant sections of local wiring regulations, with results duly recorded. Each OT should job 299000.00 Nine Thousand Only
have a distribution board (DBs) installed, with suitable wiring. A separate enclosure should house all high-voltage
equipment to ensure safety and isolation. The remote cabinet should contain operating lamp transformers, mains failure
relays, UPS, electrical distribution equipment, and circuit protection equipment for all circuits within the operating
theatre. All internal wiring within the DBs should terminate in connectors equipped with screws and clamp springs.
Connections should be of the clip-on type mounted on a rail approved by CE/IEC/BIS standards and labeled with
indelible proprietary labels. All internal circuits should be protected by individual fuses or miniature circuit breakers to
ensure safety and manage potential electrical faults effectively. During wiring work, it must be ensured that the ceiling
HVAC duct is free from any leakage or water sweating. In case any problem is found, necessary action shall be taken to
prevent water leakage from the HVAC duct. The item includes all required repair or replacement of any part of the
HVAC duct and AHU as necessary to ensure proper functioning and prevent water leakage.
Hatch boxes should be provided in each operating theater to facilitate the safe and efficient removal of waste materials
to the dirty linen area or adjacent corridor. Each hatch box should be equipped with two doors, operated electrically or
motorized, designed such that only one door can be opened at a time to prevent cross-contamination. UV lighting
Rupees One Lakh Fifteen
11 2.00 should be installed to ensure sterilization and should remain on when both doors are closed, automatically turning off Nos. 115000.00 Thousand Only
when either door is opened. Indicators should be provided on both sides of the operating theater to monitor the door
open/close status. The material of the hatch box should also be SS304 grade stainless steel, with a minimum size of
Medical Gas Pipe Line Of Required dia for OT oxygen , Vaccum , Air.. Etc reuired Point from existing line as directed
Rupees Three Lakh Forty
12 10.00 by engineer incharge from Outer Nearest Passage to OT Pendant Rate Including , Alarm , Valve (for all line) , Point job 345000.00 Five Thousand Only
,Flowmeter and Probe.
Memorandum showing items of works to be carried out
Approved Rate & Sor 2024-2025
Item estimated but
Item Of Work Unit In figures Rs. estimated
No. may be more or In Words
General Surgeon Operating Table – Floor-mounted, height-adjustable (hydraulic/electric) OT table, overall size approx.
1900–2000 mm (L) × 500–600 mm (W); height adjustment 750–1000 mm; stainless steel/aluminum frame with
radiolucent sections; adjustable backrest, leg rest, Trendelenburg/reverse Trendelenburg, lateral tilt, and headrest; fire- Rupees Two Lakh Fifty
13 2.00 Nos. 250000.00 Thousand Only
retardant, antimicrobial seamless mattress; smooth castor movement with central brake; provision for standard
accessories (arm boards, headrest, IV pole, supports); load capacity 150–200 kg; easy to clean, durable, and compliant
with IEC/ISO medical standards.
Dismentaling tiled of stone floors laid or Dedo in mortar including stacking of serviceable materilas and disposal of Rupees Fifty and Paisa
14 125.99 Sqm 50.11 Eleven Only
unserviceable materials with all lead and lift up to 10th floor level
Dismantling of existing gypsum sheet false ceiling or 0.60 m x 0.60 m modular sheet false ceiling, including careful
Rupees Forty and Paisa
15 993.86 removal, cleaning of debris, and ensuring no disturbance or damage to existing electrical wiring, ceiling-mounted Sqm 40.40 Forty Only
equipment and ceiling-mounted sliding curtains. (Item including all lead af lift up to 10th floor)
Single-arm surgery/anesthesia pendant designed for Operating Theatres should feature a compact, modular
configuration to meet the precise requirements of hospitals, enabling customization to suit specific operational needs of
both Operating Theatres and Intensive Care Units. It should be equipped with robust ceiling support capable of
mounting a selection of arms. The extension arm, pivotal for functionality, should allow horizontal movement with a
radius of 800-900mm and provide a level rotation ranging from 0 to 330/340 degrees, with both the extension arm and
terminal box designed to rotate together and independently for maximum versatility. The pendant should support a net
loading capacity of min. 100 kg, accommodating a variety of medical instruments and devices securely. For medical
and electrical services, it should offer configurations that include at least two oxygen outlets, two vacuum outlets, one
medical air, one medical air at 7 bar, and an optional nitrous oxide outlet (In-scope of MGPS vendor) Additionally,
there should be six main sockets, each capable of supporting 5 to 15 amps, conforming to universal standards to Rupees Two Lakh Eighty
facilitate the operation of various medical and electronic devices. In terms of materials and construction, the pendant Four Thousand Only
should be crafted from high-strength aluminum alloy with a sealed design to enhance durability and maintain sterile
conditions. The arm itself should be made from high-density aluminum alloy extrusion, ensuring both strength and
reliability. Installation of the pendant should be ceiling-mounted to provide a reliable and firm setup, optimizing space
usage in the Operating Theatre or ICU while seamlessly integrating with existing medical systems for managing
medical gas, electrical services, data communication, and equipment. Additionally, the pendant should include practical
features such as a stainless steel IV pole and a ward vacuum unit clamp to further enhance its utility in a medical
setting. With a net weight of approximately 105 kg, accessible by the equipment carrier, the pendant should be robust
yet manageable, ensuring it meets the rigorous demands of modern medical environments.
Memorandum showing items of works to be carried out
Approved Rate & Sor 2024-2025
Item estimated but
Item Of Work Unit In figures Rs. estimated
No. may be more or In Words
Removing and refixing of OT Light, OT Pendant, and Auto Sliding Door during Modular OT construction, including
safe dismantling, storage, and refixing in working condition. Contractor shall carry out necessary modifications such as Rupees Ten Thousand
16 35.00 Nos. 10500.00 Five Hundred Only
flange height or door frame adjustments at own cost. No extra payment shall be made for such works. (Item including
all lead af lift up to 10th floor)
Total Amount :-
Total Amount :-
Rupees :-Rupees Three Crore Forty Eight Lakh Seven Thousand Nine Hundred Twenty Seven Only
(A) Total tendered amount
(B) Rebate on above tendered amount(if any) (% In figure) ________ (% in Words) ___________________________
(C ) Net tendered amount(A - B)
(D) Net Tendered Amount (In words): Rupees
Deputy Executive Engineeer Executive Engineeer
Project Implementation Unit Zone 7 Project Implementation Unit zone
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Condition for cement.pdf
GR RnB Revise.pdf
GR-TMT-Lap Length.pdf
INSTRUCTIONS TO PERSON TENDERING.jpg
JPG
Performance Bond and SD-Paripatra-2023.pdf
PIU SPECIAL CONDITIONS.pdf
Inclusion of Insurance clause as per new SBD.pdf
6372 Make List HO 15.10.2025.pdf
PQ OT.pdf
Specification.pdf
Schedule B.pdf
SBD.pdf
Tender Document.pdf
Revised PQ.pdf
Revised Specification.pdf
Revised Tender Document.pdf
Special Condition.pdf
Corrigendum for PRE-BID MEETING CLARIFICATIONS.pdf
Corrigendum for Certification.pdf
Corrigendum for submission of Certification.pdf
Download all tender documents and submit your bid