| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.4 LAdmitted-Finance 184 KEELA STREET NEIKULAM NEDUNGUR LALGUDI 621105 | TIRUCHIRAPPALLI | TAMIL NADU | 621105 | ₹3.4 L | L1 | Admitted-Finance |
| 2 | L2₹3.8 LAdmitted-Finance | ₹3.8 L | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | ASV CONSTRUCTION L1 | AKRN CONSTRUCTION L2 |
|---|---|---|---|---|---|
| 1.00 | Earth work excavation and depositingon bank with all lead andlift in all classes of soil such as hard stiff claystiff black cotton hard red earth shales murrams, hard gravellyetc except sand and rock requiring blasting all incidental charges etc complete for Box cutting/ foundation asper SS 20B | 31.5 | cum | 260 ₹8,190 | 350 ₹11,025 |
| 2.00 | Cement concrete in C M 1:4:8 mix using40mm ISS HBG metal including cost and conveyanceof all materials to siteand labour charges, for mixing laying and raming, curing the concrete etc., | 3.15 | cum | 5,440 ₹17,136 | 6,000 ₹18,900 |
| 3.00 | CC 1:3:6 using 20 mm metal including cost and conveyance of all materials to site and including curing and other labour charges etc., | 23.51 | cum | 6,190 ₹1.5 L | 6,500 ₹1.5 L |
| 4.00 | Rcc 1:1.5:3 using 20 mm ISS metal including cost and conveyance of material to site and all labour charges are mixing and laying concrete (excluding steel, centering charges) etc., complete. | 3.15 | cum | 9,170 ₹28,885.50 | 9,500 ₹29,925 |
| 5.00 | Supply and fabrication of steel for RCC works including cost and conveyance of material to site and all labour charges etc., complete. | 0.35 | Mt | 91,880 ₹32,158 | 93,000 ₹32,550 |
| 6.00 | Centering and Shuttering charges for Rcc works inclusing cost and conveyance of materials to site and all labour charges etc., complete | 18.99 | Sqm | 1,095 ₹20,794.05 | 1,500 ₹28,485 |
| 7.00 | Centering and Shuttering charges for Rcc works inclusing cost and conveyance of materials to site and all labour charges etc., complete | 69.27 | Sqm | 545 ₹37,752.15 | 750 ₹51,952.50 |
| 8.00 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package} | 1 | GST Amount (in Rupees) | 52,280 ₹52,280 | 58,617 ₹58,617 |
Tender Value
Refer Docs
EMD Value
₹4,000
Closing Date
19 Feb 2026, 4:00 pmClosed
The Block Development officer
The Block Development officer PU Thottiyam
Construction of RCC Slab at Araslur -Karuppannasamy Koil Road in Arasalur Pt
2026_RDTN_655798_5
A5/1228/2026
Open Tender
Civil Works - Bridges
120 days
PU Thottiyam
Work Experience
5 documents required · 5 mandatory
₹0
₹4,000
Yes
23 Feb 2026
13 Feb 2026
20 Feb 2026
13 Feb 2026
19 Feb 2026
13 Feb 2026
Earth work excavation and depositingon bank with all lead andlift in all classes of soil such as hard stiff claystiff black cotton hard red earth shales murrams, hard gravellyetc except sand and rock requiring blasting all incidental charges etc complete for Box cutting/ foundation asper SS 20B
Cement concrete in C M 1:4:8 mix using40mm ISS HBG metal including cost and conveyanceof all materials to siteand labour charges, for mixing laying and raming, curing the concrete etc.,
CC 1:3:6 using 20 mm metal including cost and conveyance of all materials to site and including curing and other labour charges etc.,
Rcc 1:1.5:3 using 20 mm ISS metal including cost and conveyance of material to site and all labour charges are mixing and laying concrete (excluding steel, centering charges) etc., complete.
Supply and fabrication of steel for RCC works including cost and conveyance of material to site and all labour charges etc., complete.
Centering and Shuttering charges for Rcc works inclusing cost and conveyance of materials to site and all labour charges etc., complete
Centering and Shuttering charges for Rcc works inclusing cost and conveyance of materials to site and all labour charges etc., complete
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.22 MB
TechBid5.pdf
Tender Documents • 0.54 MB
PriceBid5.pdf
Additional Documents • 0.41 MB
BOQ_786515.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid