Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.5 CrAdmitted-Finance H NO 604A BLOCK A SUSHANT LOK 1 GURUGRAM HARYANA | GURUGRAM | GURUGRAM | HARYANA | ₹1.5 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.6 CrAdmitted-Finance | ₹1.6 Cr | L2 | Admitted-Finance |
| 3 | L3₹1.6 CrAdmitted-Finance | ₹1.6 Cr | L3 | Admitted-Finance |
| 4 | Rejected-Technical | - | - | Rejected-Technical TECHNICALLY DISQUALIFIED |
| Sl No | Description | Qty | Unit | BABU ENGINEERING AND FABRICATORS L3 | POWER CONTROL L2 | DB SECURE SOLUTION PRIVATE LIMITED L1 |
|---|---|---|---|---|---|---|
| 1.00Annual Maintenance Contract for Operation and Maintenance of Fire Fighting System and Generator at Oil Wharf Berths – I, II, III & Cruise Terminal for a period of two years. | ||||||
| 1.01 | Operation and maintenance of Fire Fighting facilities of Oil Wharf Berths I, II, III & Cruise Terminal which comprises Fire Pumps, Engines, pipe line of various sizes, monitors, Jockey Pumps, Valves, chipping and painting, regular monitoring and replacement of spares whenever necessary round the clock operations (24 hours) for a period of 2 years.
Required Man Power
1. Skilled =9 nos.
2. Semi-Skilled = 09 nos.
3. Un-Skilled = 06 nos.
Total = 24 Nos.
(Necessary spares shall be supplied by VPA) | 24 | MONTHS | 6,61,438.5 ₹1.6 Cr | 6,50,655 ₹1.6 Cr | 6,15,138 ₹1.5 Cr |
| 1.02NOTE: 1) The salaries to the staff shall include ESI and PF. Proof to be produced. 2) The salaries to the staff shall be paid to their Bank accounts only. Proof to be produced. 3)The staff shall be deployed in three shifts as instructed by the Engineer In charge. 4) The Firm shall not quote less than or equivalent to the CLC (C) wage rates order dated 25.09.2025 for the work schedule. | ||||||
Tender Value
₹1.6 Cr
EMD Value
₹2.6 L
Closing Date
18 May 2026, 2:00 pmClosed
CME
Chief Mechanical Engineer, Mechanical Electrical Engineering Department, 2nd Floor, Administrative Office Building, Visakhapatnam Port Authority, Visakhapatnam 530 035.
Annual Maintenance Contract for Operation and Maintenance of Fire Fighting System and Generator at Oil Wharf Berths I, II, III Cruise Terminal for a period of two years.
2026_VPT_275963_1
63/ 2026-27 /IMEE/MII/OSTT/OIL WHARF AMC Dt. 28.04.2026
Open Tender
Miscellaneous Works
VISAKHAPATNAM PORT AUTHORITY
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,770
Yes
₹2.6 L
Yes
12 Jun 2026
28 Apr 2026
19 May 2026
28 Apr 2026
18 May 2026
28 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1Annual Maintenance Contract for Operation and Maintenance of Fire Fighting System and Generator at Oil Wharf Berths – I, II, III & Cruise Terminal for a period of two years. | ||||||
| 1.01 | Operation and maintenance of Fire Fighting facilities of Oil Wharf Berths I, II, III & Cruise Terminal which comprises Fire Pumps, Engines, pipe line of various sizes, monitors, Jockey Pumps, Valves, chipping and painting, regular monitoring and replacement of spares whenever necessary round the clock operations (24 hours) for a period of 2 years.
Required Man Power
1. Skilled =9 nos.
2. Semi-Skilled = 09 nos.
3. Un-Skilled = 06 nos.
Total = 24 Nos.
(Necessary spares shall be supplied by VPA) | - | MONTHS | 1.25 | - | itemH1Code1 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.65 MB
BOQ_322290.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid