Tender Value
₹5.8 L
EMD Value
₹6,000
Closing Date
30 Apr 2026, 6:00 pmClosed
Similar tender results from the same govt authority in the past 3 years.
Executive Engineer, Panchayat (R&B) Division, Tapi
Jilla Vahivati Tantra (DDO Fund) TASP 2025-26. CONST. MPC SHED IN JILLA PANCHAYAT SANCHALIT KRUSHAK KUMAR CHATRALAYA VYARA TA. VYARA DIST.TAPI.
298658
31 OF 2025-26
Open
Civil Works - Buildings
Tapi
6 documents required · 6 mandatory
₹900
Executive Engineer, Panchayat (R&B) Division, Tapi-Vyara
₹6,000
23 Apr 2026
23 Apr 2026
23 Apr 2026
30 Apr 2026
23 Apr 2026
Name of Work:- TASP 2025-26.CONST. MPC SHED IN JILLA PANCHAYAT SANCHALIT KRUSHAK
KUMAR CHATRALAYA VYARA TA. VYARA DIST. TAPI.
: : BILL OF QUANTITY.' : :
Percentage Rate Tender
It. Description of Item (with brief Specification Rate In
Quantity Unit Amount
No. and reference to book of specifications) Figures
1 Excavation for foundation upto 1.5 m depth 4.50 Cum. 261.82
including sorting out and stacking of useful
materials and disposing off the excavated stuff
upto 50 Meter lead.(C) Hard Murrum
2 Filling available excavated earth (excluding rock 2.25 Cum. 133.66
in trenches plinth, slides of foundations etc. in
layers not exceeding 20 cm in depth
consolidating each deposited layer by ramming
3 Filling in foundation and plinth with murrum or 27.00 Cum. 296.30
selected soil in layers of 20cm thickness including
watering ramming and consolidating etc.
4 Providing and laying cement concrete 1:2:4 (1- 9.70 Cum. 3713.67
Cement : 2- Coarse sand : 4- graded stone
aggregates 20 mm nominal size) and curing
complete excluding cost of formwork in (A)
Foundation and Plinth (more than 10 ton)
5 Providing and laying controlled cement concrete 2.02 Cum. 9066.13
M-200 and curing complete including the cost of
form work but excluding cost of reinforcement
for reinforced concrete work for Column upto
6 Providing and laying controlled cement concrete 3.39 Cum. 6375.70
M.200 and curing complete excluding the cost of
formwork and reinforcement for reinforced
concrete work in (D) Columns, Pillars posts and
struts, upto floor two level. (more than 10 ton
7 Brick work using common burnt clay building 3.60 Cum. 4121.55
brick having crushing strength not less than
kg/sq. cm. in foundation and plinth in cement
mortar 1:6 ( 1 Cement: 6 fine sand) (B)
8 Providng TMT bars renforcement of FE 500/500D 1278.45 kg 77.29
for R.C.C. work including bending binding and
placing in position complete for all floor.
9 20 mm thick sand faced cement plaster with on 12.60 Sqmt 135.53
wall upto all height above ground level consisting
12 mm thick backing coat of c.m. 1:3 (1 cement :
3 sand ) and 8 mm thick finishing coat of cm 1:1
(1 cement : 1 sand) etc. complete.all height etc.
10 Steel work, welded in built up sections framed 19.00 Qui 9908.67
work including cutting, hoisting, fixing in position
and applying a priming coat of red lead paint. (D)
In trussses and trussed purlins, upto 25 M. span
and 15 M. ovarall height.
11 Providing corrugated G.I. sheet of class-3 roofing 126.88 Sqmt 734.19
fixed with glavanished iron J or L Hooks, Bolts
and nuts 8mm diameter with bitumen and G.I.
limpet washer or G.I. limpet washer. filled with
white lead complete excluding the cost of purlins,
Rafters and Trusses.(1) 0.80 mm thick sheet.
12 Providing and laying polished Kota stone slab 91.71 Sqmt 1015.82
flooring over 20mm (Average) thick base of
cement mortar 1:6 (1-cement : 6-coarse sand) or
L.M. 1.1.5 (1-Lime putty :1.5 - coarse sand) laid
over and jointed with grey cement slurry mixed
with pigment to match the shade of slab including
rubbing and polishing etc. complete. (A) 25mm
13 Wall painting (two coats) with plastic emulsion 12.60 Sqmt 86.93
paint of approved brand and manufacture with on
undecorated wall surface to give an even shade
including throughly brushing the surface free from
mortar droppings and other foreign matter and
sand papered smooth along ceilings and sloping
I / Weam / are willing to carryout the work at…………………. % above/ below percent (Should Be written in
figures and words) of the estimated rate mentioned above Amount of my / our tender works out as under.
*Estimated amount put to tender *Estimated amount put to tender
Deduct ……. % below Rs…………………… Add ………........% Above
*( please strike out whichever is not applicable)
1 The Contractor shall exhibition board with detailed specification and details of works directed
by the Engineer – In – Charge for which no extra payment shall bemade.
2 The labourcess will be deducted as per prevailing rules i.e. 1% of the work done.
3 GST and Income tax TDS will be deducted at a source while making payments of bills.
4 In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per
Govt G.R.: PRC-10/2017 Cement Consumption/16/C Date: 11/05/2017 as stated in S.O.R.
therefore in R.C.C. items where the reisa change as per actual mix design the cost of
difference of cement consumption have been deducted from the rate of original item at the
rate of input rate mentioned in all the tender.
Executive Engineer
Signature of the contractor Panchayat (R & B) Division
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
SBD MPC Shed Kumar chatralaya Vyara.pdf
BOQ MPC Shed Kumar chatralaya Vyara.pdf
building booklet.pdf
GRs - SBD with Index.pdf
Download all tender documents and submit your bid