Tender ID
Tender Value
₹74.6 L
EMD Value
₹1.5 L
Closing Date
27 Mar 2026, 5:00 pmClosed
Executive Engineer, water works (Distribution) Department, Vadodara municipal corporation
INSTALLATION/REPLACEMENT OF AIR VALVE ON MAIN WATER PIPELINES COMING FROM WATER SOURCES TO CITY.
283667
1263/2025-26
Open
Miscellaneous Works
Works
Vadodara
3 documents required · 3 mandatory
₹6,000
Municipal Commissioner, Vadodara Municipal Corporation
₹1.5 L
6 Mar 2026
6 Mar 2026
6 Mar 2026
27 Mar 2026
6 Mar 2026
BILL OF QUANTITIES
BILL OF QUANTITIES
1. The bill of Quantities shall be read in conjunction with the Instructions to Bidder,
Conditions of Contract, Technical Specifications and Drawings.
2. The quantities given in the Bill of Quantities are estimated and provisional, and are
given to provide a common basis for bidding. The basis of payment will be the actual
quantities of work ordered and carried out, as measured by the Contractor and verified
by the Engineer and valued at the rates and prices tendered in the priced Bill of
Quantities, where applicable, and otherwise at such rates and prices as the Engineer may
fix within the terms of the Contract.
3. The rates and prices tendered in the priced Bill of Quantities shall, except in so far as
it is otherwise provided under the Contract, include all constructional plant, layout,
supervision, materials, erection, maintenance, insurance, profit, taxes and duties,
together with all general risks, liabilities and obligations set out or implied in the
4. The rates and prices shall be quoted entirely in Indian Currency.
5. A rate or prices shall be entered against each item in the Bill Quantities, whether
quantities are stated or not. The cost of Items against which Contractor has failed to enter
a rate or price shall be deemed to be covered by other rates and prices entered in the
Bill of Quantities (in case of Item rate contract).
6. The whole cost of complying with the provisions of the Contract shall be included in the
items provided in the priced Bill of Quantities, and where no Items are provided the
cost shall be deemed to be distributed among the rates and prices entered for the
related items of Work.
7. General direction and descriptions of work and materials are not necessarily
repeated or summarized in the Bill of Quantities. References to the relevant sections of
the contract documentation shall be made before entering rates or prices against each
item in the Bill of Quantities.
8. The method of completed work of payment shall be in accordance with the specification
for Road and Bridge works. For building works specifications for building are to be
9. Errors will be corrected by the Employer for any arithmetic errors pursuant to Clause
of the Instructions to Bidder.
10. Rock is defined as all materials which, in the opinion of the Engineer, required blasting,
or the use of metal wedges and sledgehammers, or the use of compressed air drilling for
its removal, and which cannot be extracted by ripping with a tractor of at least 150 kw
with a single rear mounted heavy duty ripper
1 The Contractor shall exhibit a board with detailed specification and details of
work as directed by the Engineer-In-Charge for which no extra payment shall be
2 The labour cess will be deducted from the bill amount excluding GST as per
prevailing rules i.e. 1% of the work done.
3 Income tax TDS will be deducted from the bill amount excluding GST at a source
while making payments of bills.
(Government rules will be applicable)
4 Total value of SD i.e. 5% shall be calculated on Contract Price + GST.
Name of Work : Installation/replacement of Air Valve on main water pipelines coming from water
sources to city.
ITEM DESCRIPTION QTY. Rate Rs. UNIT Amount
Excavation for pipe line trenches for water
supply, sewerage line, manhole etc. all with
shorting and struting if requried as per requried
1 gradient adn line includin all safety provisions
using site rails and staking excavated stuff
including upto requried lead cleaning the site etc
complete fro all lift and starta as specified.
GWSSB SOR22-23, Sec.B, P.No.32, I.No. 1.A.
Refilling the pipeline trenches incl. remming,
2 watering, consolidating desposal of surplus stuff 390.00 25.47 Cum.
as directed within VMC limit
GWSSB SOR-22-23, Section B, Item no. 14 Pg
Providing and casting in situ C.C. in grade M-15
(approx. corresp. to prop. 1:2:4) (proportions as
per mix design or as per Table 9 of IS456 2000 in
masses by weigh batching) using granite,
quartzite trap metal of size 6 mm to 20 mm for
3 RCC work, including scaffolding centering, form 3.00 5479.35 Cum.
work, needle vibrated consolidation, curing comp.
up to 6 meter depth or height (excluding cost of
reinforcement and neat finishing) with centering
and shuttering/deshuttering etc. comp. for
structure for other than water retaining.
GWSSB SOR-22-23 Section 1C, Item no. 6 Pg No.44
Providing and casting in situ C.C. in grade M-25
(approx. corresp. to prop. 1:2:4) (proportions as
per mix design or as per Table 9 of IS456 2000 in
masses by weigh batching) using granite,
quartzite trap metal of size 6 mm to 20 mm for
4 RCC work, including scaffolding centering, form 30.00 9352.64 Cum.
work, needle vibrated consolidation, curing comp.
up to 6 meter depth or height (excluding cost of
reinforcement and near finishing) with centering
and shuttering/deshuttering etc. comp. for
structure for other than water retaining.
GWSSB SOR-22-23 Section 1C, Item no. 6 Pg No.44
Steel /Reinforcement bars: Supplying cutting,
bending, binding and placing in position steel as
per plan and design and as per ISS 2502 including
cost of steel and binding wire for
reservoirs/structures only including lift up to
meter height or depth below G.L. for all diameters
Do-deformed (TMT) bars confirming to relevant
IS Fe -500 grade for all diameters. Do-deformed
(TMT) bars confirming to relevant IS Fe -500
grade for all diameters.
GWSSB SOR22-23,Sec.C, P.No.45, I.No.9
Providing and supplying ISI mark CI Temper
proof Air valves with SS 304 float gun metal
nozzal of approved make and quality of following
class and diameter including all taxes, insurance,
6 transportation, freight charges, octroi, inspection 70.00 Nos.
charges, loading, unloading, conveyance to site of
work, stacking etc. complete.
Temper proof Air Valve With isolation Sluice
Valve (PN-1.6) - 150 mm dia.
GWSSB SOR 22-23 /section 1&2A- Item no.16.2.C,
Lowering, laying and jointing in position following
CI/DI CI/DI reflux valves, sluice valves, air valves
including cost of all labour, jointing material
7 including nut bolts and giving satisfactory 70.00 677.39 Nos.
hydraulic testing etc.Temper proof Air Valve
With isolation Sluice Valve (PN-1.6) - 150 mm
GWSSB SOR 22-23/section 1&2B- Item no.15.A, C,
Excavation in bituminous road as per required
gradient and line including safety provisions
8 using site rails and stacking excavated stuff 11.20 290.64 Cum.
including up to all required lead cleaning the site
etc. complete for all lifts as specified.
GWSSB SOR-22-23, Section 1&2B, Item no. 2 Pg
Box cutting the Road surface to proper slope and
camber for making a base for road work incl.
9 removing the excavated stuff and depositing on 28.00 106.48 Cum.
the road side slope us directed upto 50 Mt.lead.
R & B SOR24-25, Page No - 177, It code
GSB :Providing and laying of good quality material
of GSB in proper line,level and camber
10 (compacted with roller 8-10MT capacity on GSB 189.00 1052.21 Cum.
as per specification and instruction by engineer
As per VMC Approved Rate
Providing & laying compacted machine crushed
black stone aggregate wet mix macadam in two
layers in the material with water to OMC in
mecanically mix (pug mill) carriage of mix
11 material by tipper to site laying,spreading and 157.50 1760.00 Cum.
compacting in sub base of compacting power
vibrater roller to achive the desired density
(mechanically laid) etc.complete.as per technical
specification MORTH clause-406
As per VMC Approved Rate
Providing and laying of compacted Patch Work
carpet using coarse aggreagete/fine
aggregate/filler as per required gradiation,
applying tack coat at the rate of 3 Kg/10 Sm. And
using asphalt (VG-30) 4% by wt. of mix and
mixing by drum mix process spreading by paver
finisher and flushing Quarry dust on B.T. surface
at the rate of 0.75 CM/100 SM including
consolidtion etc. complete by using Sevaliya
Timba Quarry Material.
As per VMC Approved Rate
Demolition including stacking of serviceble
13 materials and disposal of unserviceble materials 5.00 1080.97 Cum.
with all lead & lift [i] R.C.C. work
R & B SOR - 24-25, Chap- 20, I. No.20.3(i)) Pg no -
Demolition including stacking of serviceble
14 materials and disposal of unserviceble materials 5.00 562.42 Cum.
with all lead & lift [i] Brick work.
R & B SOR - 24-25, Chap- 20, I. No.20.11) Pg no -
MS Specials plain ended/flange ended
Manufacture, supply and delivery of 80 mm to
300 mm dia Mild steel plain ended/flange ended
specials complete like tee, bend, skew tee etc. as
15 per IS. The delivery of specials is to be made to
VMC store or sites including all taxes, loading,
carting, unloading, stacking, insurance, octroi,
inspection charges etc. complete as per
instruction of engineer in charge.
M.S Specials plain & socket ends Upto 300 mm
M.S. Specials flanged ends Upto 300 mm dia.
GWSSB SOR-22-23, Section A, Item Code: 7.7.1a&b
Gas Cutting of MS Pipe/Plates: Gas cutting(Either
16 square cut or V cut) pipes, plates etc. including all 350.00 41.69 Rmt.
costs for the followng thickness up to 5 mm.
GWSSB SOR-22-23, Section E, Item Code : 8 Pg
Welding in all positions with required number
runs, for M.S.Pipes internally and/or externally
including gauging wherever necessary, fixing
17 appurtenances and other accessories in 350.00 788.55 Rmt.
connection with pipe laying work as per
specification. 1 Welding for Pipe thickness 4 mm
GWSSB SOR-22-23, Section E, Item Code : 7 Pg
Hiring of Crane with Driver (8 working Hours in
GWSSB SOR-22-23, Section 2. E - Miscellaneous,
Item No. 5 Pg No.105
19 Labour charges - Mazdoor (Male) 20.00 508.48 Each
R&B 2024-25 ,Page No.53,Item code L022
Dewatering by pumping set of requried capacity
incl temparary platform carting pumping at site 1248.2 HP/H
and fixing the same in posotion incl all accessories 3 r.
and fuel and labour etc complete.
GWSSB SOR-22-23, Section 2. E - Miscellaneous,
Item Code: 1 Pg No.104
Manufacture, Supply and Delivery of Submerged ARC
Welded M.S Pipe having beveled ends from plate or
Coil confirming to IS-3589-2001 or its latest
revision/ammendment with inside 406 micron food
grade epoxy painting and ouside 3 LPE coating for
21 following thickness outside diameter at site with all 140.00 1751.00 Rmt.
type of specials, tees, bends & flanges, lowering, laying
and jointing the pipes with welding in prepared trench
including hydro testing etc. completed with all taxes,
insurance, freight charges, octroi, inspection charges,
transportation, etc. complete.
GWSSB SOR-22-23, Section
Lobour Charges for hiring DG sets with
maintenance & Fuel Charges for operating pump
& other equipments. (the rates are inclusive of
providing change over switch & standard length
cable & operating crew)
22.1 Capacity: 30KVA Rent of DG set Rs./Day 17.00 1036.00 Day
22.2 Fuel-Oil-Lubricant Charges Rs./Hr. 135.00 374.14 Hour
As per VMC Approved Rate
Work amount including 0.69% TPI charges Without GST (Tender amount) (A)
I/We am/are willing to carry out the work at… ..................... % above/below percent (Should be written
in figures and words) of the estimated rate mentioned above. Amount of my /our tender works out as
Estimated amount put to tender Estimated amount put to tender
Deduct………% below Add………% Above
In words In words
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
1.0 TECHNICAL BID.pdf
2.0 General Specification-Air Valve.pdf
3.0 Price Bid-Air Valve.pdf
Typical Air Valve Details.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .